Sei sulla pagina 1di 1

Bd-N- WOOD FINISH

Sr. No. & Item Code 1 Bd-N 1.1 DESCRIPTION OF ITEMS Providing and applying boiled linseed oil in _________, preparing the surface, scaffolding etc. complete as directed. Spec. No.: Bd.N.1.1. Page No. 399 a) One Coat b) Two Coats Providing and applying Wax polishing to the ___________________, including knotting preparing the surface, scaffolding etc. complete as directed. Spec. No.: Bd.N.1.2 Page No. 399 a) New wood work b) Old wood work Providing and applying French polishing for required finish on ______________ including knotting, preparing the surfaces, scaffolding etc. complete as directed. Spec. No.: Bd.N.1.3 Page No. 399 a) Previously polished wood b) New wood work Providing and applying Varnish in one coat on previously varnished wood work including knotting preparing the surface, scrapping, scaffolding, etc. complete. Spec. No.: Bd.N.1.4 Page No. 400 Providing and applyng Varnish in two coats new wood work including knotting, preparing the surface, scaffolding etc. Complete. Spec.No.: Bd.N.1.4 Page No. 400 Providing and applying malamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping, applying french polishing, scaffolding if required etc. complete. Spec. No.: As directed by Engineer-in-charge. Note : For Item No. 6 prior approval of Superintending Engineer will be necessary. Unit Rate for 2012-2013 (in Rs.) Completed Labour

Sq.Mt. Sq.Mt.

11.00 18.00

6.00 11.00

2 Bd-N 1.2

Sq.Mt. Sq.Mt.

22.00 18.00

18.00 12.00

3 Bd-N 1.3

Sq.Mt. Sq.Mt. Sq.Mt.

51.00 98.00 16.00

32.00 70.00 8.00

4 Bd-N 1.4

5 Bd-N 1.4

Sq.Mt.

25.00

12.00

6 Bd-N

Sq.Mt.

615.00

290.00

53

Potrebbero piacerti anche