Julian Clarke General Manager Technical Buildcast Sdn Bhd 29 November 2012
PULAU PINANG
PULAU JEREJAK
13
+0
00
0. 1+ 0 00 . 2+ 00 0.
. 3+ 0 00
0.
NAVIGATIONAL SPAN
4+ 00
5+ 0 00 .
PULAU AMAN
6+ 0 00 .
7+00 0.
BATU KAWAN
12 +0
8+000 .
9+000 .
10+ 000 .
23
11 + 00 0.
00 .
+0 00 .
. 22+ 000
21+ 000
20+00
19+00
14 + 00 0.
18+00
17+00
15+00 0.
16+00 0.
0.
0.
0.
0.
PROJECT OWNER
GOVERNMENT OF MALAYSIA
AUTHORITIES
MINISTRY OF WORKS
CONCESIONAIRE
JAMBATAN KEDUA SDN. BHD.
PACKAGE 2
UEM BUILDERS BERHAD
SBG CASTING
BUILDCAST SDN BHD BCSB
RB Perunding
Strength Design 55MPa Target: 67.5MPa Early strength 15MPa for mould striking and 25MPa for lifting Current average 28-day strength: 90+MPa
Workability 550 650 mm Flow Table
Typical Segments
Locator Segment
Deviator Segments
FINISHING BAYS
One reinforcement cutting shop (RCS) that processes all delivered stock length bars to cut bars for all three casting yards. Two segment storage yards (doublestacking) serviced by two 120 gantry cranes on rails and three straddle-carrier transporters. Note segments are also stored single-stacked on the general hardstanding areas. Total storage capacity is approximately 1000 segments.
Finishing bay area to the west end of Storage Yard B, of capacity eight spans, for finishing works and final inspection processing prior to delivery to UEMB jetty storage ready for shipment to the erection sites.
STORAGE YARD A
CANTEEN
STORAGE YARD B
RCS
CCY 7 Moulds
PENANG SECOND BRIDGE QUALITY OF SBG SOLVING ISSUES DURING CONSTRUCTION SEGMENT TYPES
TYPICAL SEGMENT
DEVIATOR SEGMENT
LOCATOR SEGMENT
Finalise and close Birth Certificates (QAQC Departments of BCSB, RBP, UEMB and JKSB)
Send spans to erection jetty storage
3
4 5 6 SOR 798 822 Crack at top slab (0.3mm width) OCY1 Suspected segregation on the soffit of bottom slab S1 cast on 24/5/12 S14 cast on 28/8/12
7
N 192 8 9 10 11 12 13 14 All 1 2 3 4 5 6 7 OCY 2 S 192 8 9 10 11 12 13 14 All OCY 1 OCY 2 SOR
S1 cast on 26/4/12
on 4/9/12
S14 cast
Monthly Cast
Casting of the segments commenced in July 2010, initially with the typical span segments and subsequently the pier segments. The rate of segment casting remained low until the end of 2011 when production increased to over 400 segments per month.
P2B APPROACH SPANS SEGMENT PRECASTING RATE OF SOR/NCR INCIDENCE AGAINST CUMULATIVE SEGMENT CASTING
SOR
NCR
60.00%
50.00% 40.00% 30.00% 20.00% 10.00% 0.00%
It is of note that, although production increased, the rate of SOR and NCR incidence (against cumulative number of segments cast) generally decreased.
It is stressed that incidence of serious defects is relatively low.
All remedial works are inspected by the Site Supervision teams at various stages, and are only closed out on final closure of the specific RFI. No Birth Certificate may be issued without the segment, including any defect remedial works, being in compliance with the Specification.
In cases where defects are deemed to be totally unacceptable, the segment affected has been rejected outright.
Proactive :
Improvements to: concrete consistency quality and supply casting and finishing practices
Reactive:
Development of appropriate remedial works procedures and practices Specific testing using cores, UPV and MP4 >> increased confidence that the remedial works are sound both structurally and for durability
BCSB, RBP design office and Site Supervision, JKSB and ICE have worked together to address the various issues
Quality issues experienced at the bridge site include: Spalling of concrete during PT stressing Design / construction development to minimise a particular quality issue Example of Continuous Improvement
Incorrect PT cast-in items QC System Issue Systems improved to eliminate production quality issues
2.
A modified system of shop drawing package preparation and schedule was developed which includes a rigorous double-check and random triple-check of the packages by successively senior QC staff plus a review by the RBP Site Supervision team.
3.
A modified QC site check system to ensure that the shop drawing details were being correctly installed as per the design requirements.