ITEM DESCRIPTION
A. WATER SYSTEM
G. ELECTRICAL SYSTEM
J. SERVICES
(PCA.CD-002.M675LEA2.DOC)
DCPL-K8A08
VOLUME : IIA
SECTION-IV
The scope of the Contractor under this specification shall comprise design,
engineering, material selection, manufacturing, testing at works, supply to site,
construction, installation, testing, commissioning, performance testing at site, and other
related items of work for the Balance of Plant and equipment inclusive of all
mechanical, electrical, instrumentation & control systems, civil, structural and
architectural works, coordination with BHEL supplied Main Plant equipment for putting
into commercial operation a highly reliable, safe, efficient and environmentally
compliant power station comprising 2X500 MW UnitS on Engineering, Procurement &
Construction basis (EPC – BOP), including but not limited to the following. The systems
and equipment shall conform to the technical requirements specified in various
Volumes and Sections of this Specification.
Items not specifically mentioned here, but needed to complete the system and
equipment and to meet the intent of the specification or required for operation of the
equipment shall be deemed to be included in the scope of work of the Bidder unless
otherwise specifically brought out under exclusions.
SL. ITEMS
NO.
A. WATER SYSTEM
1. Intake Pump House with Channels,Trash Racks and Screens.
3. Raw water Reservoir and Raw Water Pump House with gates and
screens.
4. Raw Water Supply Pumps located in the Pump House adjacent to the
above Reservoir
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 1
DCPL-K8A08
SL. ITEMS
NO.
All chemicals required for operation of the entire plant will be stored in
the ground floor of a two-storied Chemical House. However, the
equipment and accessories for preparation of solution of alum as well
as lime and injection of the same into raw water shall be located at the
first floor of the Chemical House. The Chlorination System shall be
located at a part of the ground floor of the Chemical House and
complete with Chlorine Ton Containers, Chlorinators, Booster Pumps,
Strainers, Pipe Works and Diffuser Systems up to points of injection
complete with all other necessary accessories and auxiliaries.
SL. ITEMS
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 2
DCPL-K8A08
NO.
All regeneration wastes and other drainages from Ion Exchange Units
need to be led to Neutralization Pit.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 3
DCPL-K8A08
SL. ITEMS
NO.
• DM Regeneration Waste.
The treated water from Inclined Surface Settlers shall flow through
channels and shall be stored in a Clear Water Reservoir. From the
reservoir water shall be distributed for further miscellaneous use.
SL. ITEMS
NO.
All chemicals required for operation of the entire system will be stored at
the ground floor of a two-storied Chemical House. However, the
equipment and accessories for preparation of solution of Alum and
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 5
DCPL-K8A08
injection of the same into raw water shall be located at the first floor of
the Chemical House
8. Plant drains transformer sumps / all equipment drain sumps and drain
pumps for the entire plant, with piping up to the Effluent Treatment Plant
for treatment and recycling.
10. Service water, drinking water (for both plant and township) and other
auxiliary water systems, including piping, pumps, storage tanks, etc.
11. All pumps, piping, gates, screens, trash racks etc. for the complete
system with handling arrangement.
SL. ITEMS
NO.
12. All piping, valves, strainers etc required for the water systems.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 6
DCPL-K8A08
1. Coal wagons unloading system (with track hoppers with paddle feeders
for bottom discharge wagons).
8. Coal wagon weigh bridges for weighing loaded and empty rail-wagons.
11. Coal handling and storage area storm water drainage system, including
the arrangement for collection, clarification, recycling and reuse of the
drain water through Effluent Treatment Plant.
12. Dedicated Air Compressors, Air Dryers and Air receivers for wagon door
opening.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 7
DCPL-K8A08
Ash Handling Plant Complete with bottom ash, coarse ash and fly ash
conveying systems to intermediate storage or to silo directly and wet
transportation system upto the ash dump area, including:
2. Coarse ash collection system with hoppers, feeder ejectors, surge tank,
coarse ash jet pumps, piping for transporting the ash up to the ash
slurry sump.
3. Bottom ash slurry sump for collecting the bottom ash and coarse ash.
4. Bottom Ash slurry Disposal Pumps and ash slurry piping up to the ash
dyke.
5. Miscellaneous pump sets like H.P. Seal Water Pumps, L.P. Seal Water
Pumps, H.P. Ash Water Pumps, L.P. Ash Water Pumps, Refractory
cooling water pumps, Slurry Drain Sump Pumps, B.A. Overflow transfer
pumps, tube settler sludge pumps as per specification.
6. Drain sumps, B.A. Overflow sumps, sludge sumps, tube settler for B.A.
Overflow recovery as per specification.
7. Fly ash silos with ash outlets and collection arrangements, intermediate
surge hoppers, dust extraction/ suppression systems, unloaders etc.,
and ash withdrawal system from both intermediate surge hoppers and
fly ash silos.
8. Dry fly ash handling system by pressure and vacuum mode, comprising
ash colleting hoppers outlet gates, ash piping up to the buffer vessels
and to the intermediate/ final ash silos, Mechanical Exhausters (Vacuum
Pumps), Transport Air Compressors, ESP Fluidizing Blowers, Ash Silos
Aeration Blowers, rotary feeders and ash conditioner/ telescopic chutes
for unloading fly ash from silos into trucks, vent filters with pulse jet
cleaning facilities, drain sump and sump pumps.
9. High Concentration Slurry Disposal (HCSD) system for fly ash including
intermediate silo for collection of ash, rotary feeders, dosing screw
feeders with ash conditioning, agitated retention tanks, HCSD Pumps,
HCSD piping up to the ash dump area along with inspection/ service
road and concrete bridge for Ash Disposal and Ash Water Recovery
Piping over Hasdeo River near Ash Dump Area.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 8
DCPL-K8A08
2. Fuel Oil piping with steam tracing and insulation for HFO piping.
3. Dyke for Fuel oil unloading and storage area, collection of run-off and
spillage etc. from fuel oil dyke area and transferring the same to the
Effluent Treatment Plant for separating the oil and reusing the water.
5. LDO unloading pumps and piping for unloading from road tankers
10. Service Air System in Fuel Oil Area including Hose etc.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 9
DCPL-K8A08
Complete fire detection and fire protection system for the entire power
station, including Main Plant BTG Package, all buildings, transformers,
HT/ LT Switchgears coal handling & fuel oil handling systems, coal
stock pile, open yard storage, portable fire extinguishers etc. as detailed
below.
1. Motor driven and diesel engine driven fire water pumps for hydrant
system
2. Motor driven and diesel engine driven fire water pumps for spray system
3. Jockey pumps, hydro pneumatic tank and air compressors for fire water
pressurizing system (common for hydrant system and spray system).
5. Automatic high velocity water spray system for oil filled transformer,
turbine oil tanks etc. as per specification.
7. Inert gas flooding system for control room, control equipment room,
programmer’s room, data storage room, UPS and Inverter room etc. as
per specification.
8. Foam type fire fighting system for fuel oil storage tanks.
9. Automatic fire detection and alarm system for the power station, as per
specification.
10. Fire hydrant system accessories like fire hose stations, hose pipes,
nozzles and couplings, at various locations, as per specification.
11. Portable and mobile fire extinguishers – dry chemical, CO2, Pressurized
Water, Foam type – as per specification.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 10
DCPL-K8A08
1. Auxiliary system piping. (e.g. compressed air, fuel oil, aux. Steam,
drinking water, service water, effluent etc.)
4. Hoists, trolleys & monorails for other plants and equipment such as
Portion of Power House Building outside the range of EOT crane, Coal
Handling Plant, Ash Handling Plant, Fuel Oil Pump House, Water Pre-
treatment Plant and Post treatment, raw water pump house, CW &
ACW Pump House etc.
8. Laboratory for testing coal, fuel oil, ash, ambient air quality, stack
emission, & other effluents, water analysis etc. (including Precision
Laboratory for WTP) as specified
10. Diesel generator set(s) as required for the safe coasting down of the
unit.
SL. ITEMS
NO.
14. Any other supply items not specifically mentioned but deemed
necessary for safe, reliable & satisfactory operation of the plant.
G. ELECTRICAL SYSTEM
SCOPE: -
I. Electrical equipment & accessories required for Raw water , CHP, AHP,
DM Plant, Fire water pump house, Ash Water Recovery System Intake
Pump House etc.
a) AC & DC motors
SL. ITEMS
NO.
k) Illumination system.
l) 415V DG Set.
1. GeneratorTransformer Bays - 2
3. Line Bays 5 5
5. Bus-coupler bay 1 1
7 Unequipped bays 3 7
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 13
DCPL-K8A08
m) Illumination system .
SL. ITEMS
NO.
All works except BHEL scope of work related to BTG package only will
be under BOE of BTG package. BHEL scope & Terminal points are
as follows :-
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 14
DCPL-K8A08
3. HT & LT Motors
6. IPB including Generator phase & neutral side CTs & VTs
SL. ITEMS
NO.
15. NGR and NGT for Generator grounding, NGRs for UT,
ST grounding
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 15
DCPL-K8A08
22. HVR for ESP, MCC/ACP for ESP including all LT power,
control & special cables as required for connection
between equipment under BHEL’s scope for STG island.
1. GeneratorTransformer &
Station Transformer HV Bushing of GT & ST
SL. ITEMS
NO.
Sl No. Description Terminal Point
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 16
DCPL-K8A08
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 17
DCPL-K8A08
7. All final control elements like Control valves, dampers / gates etc. with
actuators.
9. All field cables, field to local control panel cables, field to control room
cables, local control panel to control room cables, control room cables,
cables for drive interface from control room to Switchgear, PMCC, MCC
and interfacing cables with necessary connectivity hardware to B BTG
Plant max DNA DDCMIS. In short, all cables required for
instrumentation and control systems for BOP Package.
10. All cables from field to BTG power house control room, cables for drive
interface from control room to Switchgear, MCC for Instrumentation and
control system for BTG Plant which are not covered under BTG
Package.
11. Cable trays and cabling accessories for the above mentioned cables
shall also be under the BOP Package.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 18
DCPL-K8A08
16. Local UPS with ACDB for each PLC & for any other equipment, if
required.
17. Any special tools, calibration kits etc. required for Instruments and
equipments supplied by BOP vendor.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 19
DCPL-K8A08
15. Supply of cement, rebar and structural steel for entire civil & structural
works.
J. SERVICES
4. Co-ordination with Owner, BTG and other contractors at site and Project
Management.
SL. ITEMS
NO.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 20
DCPL-K8A08
12. Spare parts as required for the Balance of Plant during defects liability
period.
13. Tools and tackle including all special tools and tackle, calibration and
testing instruments etc. as required, for the Balance of Plant.
NOTE :
The above list of work is not exhaustive. Any additional works, whether
or not specifically described in this bid document, incidental to complete
the BOP systems in all respects shall be deemed to be in the scope of
work of the EPC Contractor.
SL. ITEMS
NO.
iii) Construction water and drinking water supply at one point near
plant boundary.
iv) 11KV power supply at one point near plant boundary for
construction purposes.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 21
DCPL-K8A08
3. Bottom Ash Hopper below furnace. The seal plate and shield plate will
be supplied by the BTG Package Contractor.
4. Fly ash and coarse ash hoppers outlet flanges. The hoppers will be
provided by the BTG Contractor
- Fuel oil return piping from Steam Generator, at the HFO/ LDO
storage tanks return oil flanges. BOP Contractor shall provide
the counterflanges with nuts, bolts, and gaskets.
SL. ITEMS
NO.
- Auxiliary steam piping for heating of HFO system; upto fuel oil
handling area.
6. Service air and instrument air piping for both SG and TG at one terminal
point each near C-row about 9M above local grade level. The pressure
at teminal points shall be about 6 Kg/sq.cm (g).
7. ELECTRICAL EXCLUSION
ii) Isolated phase busduct of generator inclusive of CTs, LAVT, SC, NGTR,
LR
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 22
DCPL-K8A08
viii) Electrical Control Panel for remote control of 6.6 kV and 11kV circuit
breakers, transformer (ST/UAT) tap changer.
ix) ESP – LT Dry type Auxiliary indoor transformer alongwith its non-
segregated phase bus duct, PCC, MCC.
SL. ITEMS
NO.
Laying and termination of all Power Cables down stream of soot blower
MCC. However, the main Cable Tray running from soot blower MCC
before branching for respective soot blower shall be in BOP bidder’s
scope. Only branch trays shall be fabricated and installed by BTG
Package Contractor.
Laying and termination of control cables and C&I cables wherever both
end equipments are in BTG package. However, supply & installation of
cable trays shall be in the scope of Balance of Plant package.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 23
DCPL-K8A08
3) Primary side (6.6 kV) bushing of Dry Type transformers for ESP.
(PCA.CD-002.M675LEA2.DOC) V.IIA/S-IV : 24