Sei sulla pagina 1di 10

1.

1.1 GENERAL

INTRODUCTION

SHANTIGRAM is initiated by Adani Township and Real Estate Company a high end luxurious township providing all the modern amenities and services also inclusive of every need of personnel life. It has school, college, commercial complex, residential buildings as well as bunglows, golf club, adani corporate house, football-cricket stadium, all other indoor as well outdoor sport facilities.It is largest township in ahmedabad spreading over nearly 667 acres of land. THE MEADOWS is a LOWER BASEMENT+UPPER BASEMENT+G+16 residential apartments consisting of 5 blocks ie)G,H,I,J,K and in which each block has 3 towers expect I Block, I Block has 2 tower. Total land area of Meadows Phase 2 is nearly 27 acres of land. It is located at Khodiyar Village, Near Vaishnodevi Circle, S G Highway, Ahmedabad.

1.2 VISION
To establish Shantigram as the most preffered destination for First Home buyers in ahmedabad.

1.3 COMPANY PROFILE


Adani itself is a name which needs not to be explained a lot. Adani Group has its roots in various sectors like Adani Gas Limited, Adani Enterprises, Adani Power, Adani Retail, Adani Wilmar, Adani Mining, Gujarat Adani Port, iCall India, Adani Ports & SEZ Limited, Adani Agri Logistics, Adani Agri Fresh, Adani Properties, Adani Welspun, Gas, Infrastructure, Wilmar. ATRECO-Adani Township and Real estate Company is one of sub division of Adani group creating world class township offering modern high life style living.

Chapter I Introduction

ATRECO has experienced and qualified personnel, in house state of the art design systems that provide it with inherent business strengths. The project management and planning facilities at the sites, with their suitable level of computerization and application software, have helped this group to monitor and control its activities. The control and project costing system are developed for each of the major project sites and monitored by the top management for effective implementation. To people and the business community in Gujarat, the very name ADANI is synonymous with high quality construction and success.

1.4 SALIENT FEATURES


LB+UB+G+16 storied luxurious 2, 2.5, 3 BHK Flats RCC Framed Structure design as per earthquake zone Swimming Pool Club House Football Ground Jogging Track 3 Lifts in each tower 114 crores project cost 80 % of area left for greenary Temple Gymnasium, Community Hall, Neighbourhood Shops Solid Waste Management Construction by MIVAN Shuttering system 872 total number of flat units

Chapter I Introduction

TABLE 1.1 TOTAL BUILT UP AREA

Sr. No. 1 2 3 Stilt

Floor Basement (2 Floors) Super structure (16 Floors) Total

Unit Sqmt Sqmt Sqmt Sqmt

Built-up Area 39818 6086 114134 160038

TABLE 1.2 TOTAL CONSUMPTION OF MATERIAL

Sr. No. 1 2 3 4 5 6 7 8

Item Concrete Shuttering Reinforcement 100mm Thick Block work 200mm Thick Block work 300mm Thick Block work Internal Plaster External Plaster
3

Unit Cum Sqmt MT Sqmt Cum Cum Sqmt Sqmt

Quantum 81840 434005 9215 47720 15770 669 459081 112636

Chapter I Introduction

1.5 LOCATION

FIG 1.1 SITE PLAN OF SHANTIGRAM

FIG 1.2 LOCATION OF MEADOWS

Chapter I Introduction

1.6 ORGANISATION CHART

Chief Executive Officer

Senior Vice President

Associate Vice President

Project Manager

Senior Manager

Deputy General Manager

Assistant Manager

Senior Engineer

Engineer

FIG 1.3 ORGANISATION CHART

Chapter I Introduction

1.7 PROGRESS MILESTONE FOR G,H,I


TABLE 1.3 PROGRESS MILESTONE FOR G,H,I

Serial Number
1 2 3 4 5 6 7

Activity
Foundation Basement Completion Upto Upto and and including including 4
th

Contractual Block G,H,I


5 months 7 months 10 months

Floor Slab 8th 13 months Floor Slab Upto and including 12th 16 months Floor Slab Upto and including 16th 19 months floor slab Completion scope of work 21 months

1.8 PROGRESS MILESTONE FOR J,K

TABLE 1.4 PROGRESS MILESTONE FOR J,K Serial Number

Activity
Foundation Basement Completion Upto Upto and and including including Floor Slab

Contractual Block J,K


9 months 11 months 4th 14 months 8th 17 months

1 2 3 4 5 6

Floor Slab Upto and including 12th 20 months Floor Slab Upto and including 16th 23 months Floor Slab

Chapter I Introduction

1.9 VARIOUS AGENCIES INVOLVED


Name Of Client:- Adani Township & Real Estate Company Name Of Contractor:- M.S.Khurana Engineering Limited Name Of Architect Consultant:- Mandviwala Qutub & Associates, Mumbai Name Of Structural Consultant:- Gokani Consultant

1.10 VARIOUS PERSONNEL INVOLVED


List of personnel involved from client is given in table 1.5

TABLE 1.5: LIST OF PERSONNEL(CLIENT) Sr. No. 1 2 3 4 5 7 9 Name Of The Person Mr. Tarvindar Singh Mr. Ranjan Wajir Mr. Surya Prakash Mr. Girish Chikalpatti Mr. Ajay Pande Mr. Rajiv Jain Mr. Sangram Singh / Mr. Dhaval Bagaria Designation CEO Senior Vice President Associate Vice President Project Manager Senior Manager DGM Sr.Engineer / Engineer

List of personnel in contractors is given in table 1.6

TABLE 1.6: LIST OF PERSONNEL(CONTRACTOR) Sr. No. 1 3 Name Of The Person Mr. Mittal Mr. Varma Designation DGM-MSKEL Block Engineer

Chapter I Introduction

1.11 LIST OF DRAWINGS AVILABLE AT SITE


List of drawings available at site is as follows Architectural Drawings:- Plan, Elevation, Section Structural Drawings:- Plan, Elevation, Section Basement Slab Detail Foundation Detail Footing Detail Stair Case Detail Column Detail Beam Detail Slab Detail Typical Beam Detail Retaining wall detail Elevation Of Building Electrical layout

1.12 INFRASTRUCTURE FASCILITIES AVAILABLE AT SITE SITE OFFICE


Temporary site cabin has been kept in nursey opposite Meadows phase 1 where site drawings, various essential documents related to site are placed along with office accomodation for engineers.

LABOUR COLONY

Labour colony has been raised by contractor for accomodation of labours working in meadows phase 2. Labour colony are equiped with 24/7 electricity supply and proper sanitation to support hygeine.

Chapter I Introduction

CANTEEN

In Shantigram, there are three canteens available at site.1 for labour and 2 canteen are for client. However there is no restriction for anyone to move in any canteen.

TRANSPORT
Adani group offers well transport fascility for their employers. Bus fascility covering main spot in ahmedabad along with bolero jeep for staff member is available. Bikes are also alloted for engineer to move from one place to another in site.

ELECTRICITY

750 Kva main line is provided from torrent power along with distribution feeder where as required for uninturrupted power supply.

LIGHTENING ARRANGEMENT

Bulb, Tubelights, Generator arrangement is always available at site in case to fascilitate workers working at night.

WATER
Land at Shantigram is blessed with ground water which can be used for drinking as well as construction activity. Submersible pump has been placed at borewell providing continuous water supply.

Chapter I Introduction

MEDICAL FASCILITY/SAFETY ARRANGEMENTS


First aid is readily always available at site in order to aid the worker in case of any accidents. Workers are provided with safety boots, gloves, belts etc to ensure proper precautionary measures. Workers are also fascilited with workman compensation in case of any loss of life or temporary deficiency to help their families.

10