PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type

(Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT SITE CONSTRUCTION Earthwork on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere. PAVING AND SURFACING 01 Precast concrete pavers size 400 x400x40 mm gray color shotblasted and dark gray or light beige color smooth finish, including 20mm cement mortar bed, 100 mm thick concrete slab with a 193WWF, polyethylene moisture barrier, compacted sub grade as per detail 2 on drawing VL-GL-01 and specifications section 2515 Precast concrete pavers size 400 x400x40 mm with 200x100x80mm thk. brick bands including sand leveling course layer and cement mortar for tiles fixation, 100 mm thick concrete slab with a 193WWF, polyethylene moisture barrier, compacted sub grade as per detail 3 on drawing VL-GL-01 and specifications section 2515 200x100x80mm thk. interlocking concrete pavers and concrete edger including compacted sand leveling course, 20mm cement mortar bed, cast in place concrete foundation and compacted aggregate base course, subgrade as per detail 4 on drawing VL-GL-01 and specifications section 2515 400X400X10mm thk.non slip ceramic tiles including 20mm cement mortar bed, 100 mm thick concrete slab with a 193WWF, polyethylene moisture barrier, compacted sub grade as per detail 5 on drawing VL-GL-01 and specifications section 2515 SUNDRIES RAISED PLANTER raised planter including plain concrete and 150mm tkick R.C planter wall with granite cladding finish ,granite copping, gravel surface, weep hole, moisture barrier, compacted sub grade as per detail no. 6 on drawing VL-GL-01 and specifications section 3100, 3200, 3300, and 2515 Steps 5 30mm thick flamed granite tread, 20mm thick polished granite riser including expansion joint, 20mm cement mortar bedding as per detail no. 10 on drawing VL-GL-01 and specifications To Collection 16 M 5 M 27 M Note

02

54

03

17

04

13

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT PVC SHADE STRUCTURE PVC structure shade comprising tent fabric, beams, column (as per manufacture recommendation), earthworks, foundations, water proofing, fixing, finishing and all related works as per detail no. 7 on drawing VL-GL-01 and specification section 13015, 2870 (area measured on plan) 01 PVC shade structure TENSILE STRUCTURE Tensile structure comprising of posts, canopy (as per manufacture recommendation), earthworks, foundations, water proofing, fixing, finishing and all related works as per detail no. 8 on drawing VL-GL-01 and specification section 05500, 2870 (area measured on plan) 02 Tensile structure canopy CONCRETE FENCE Boundary concrete fence comprising excavation, backfilling, plain and reinforced concrete foundation, insulation, grade beams, columns, precast concrete w/plaster and paint (Both side), grooves, two aluminum doors tubular sections with glass, parking door, expansion joints, decorating, finishing as per elevations A,B,C on drawing VL02-X-L02 and as per specifications section 03300, 08120 03 Boundary concrete fence 2600mm height to suit required locations 69 M 16 M 18 M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT WATER FOUNTAIN Water Fountain comprising, reinforced concrete structure, 30mm thick cladding (sand stone , finish : natural/rought) fixed on 20mm thick latex modified mortar bed, 200x200x30mm thick sand stone coping all exposed edges to be pencil rounded finished sand blasted color to match surrounding, water basin with 20x20x4mm thick vitreous tile non slip glass mosaic, color mix laid on 15mm thick latex modified mortar bed,20mm thick cut to size black slate with natural finished to achieve wave/surge effect laid on 15mm thick latex modified mortar bed, 50mm thick x varies width hollow section marine grade stainless steel capping with water supply for cascade. Fin. polished to water feature, water proofing membrane, supply and drainage pipework, fountain pump, electrical power and lighting, required to complete the work installation and all associated works as per detail 9 on drawing VL-GL-01 and specification section 13150 01 To suit Fountain (approximate area 16 m2) 1 No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT LANDSCAPING Palms including pit, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer, concrete screed and waterproofing membrane and all required as per details P1 & P2 and planting schedule on drawing VL-GL-01 and specifications section 2900 PALMS 01 P/Re TREES 02 T/Aa Shrubs and ground cover including planting, , soil planting mix, filter, 63mm thick expanded polystyrene water storage and drainage element, 80 mm thick screed slope to drain, 3mm water proofing membrane and drainage layer all as per detail P3 and planting schedule on drawing VL-GL-01 as per specification section 2900 SHRUBS 03 04 S/Hs S/Ld GROUND COVER 05 06 07 08 G/Cgp G/Cm (p) G/Cm (y) G/Gr (y) LAWN 09 L/Cd 14 M 60 19 22 3 No. No. No. No. 9 4 No. No. 1 No. 1 No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Supply, install and test pipework, UPVC schedule 40, for waste and drainage the work shall include but not limited to earthwork, fittings, supports, trenchwork and all materials and equipment required to complete and finish the work as shown on drawings and according to specifiactions section 2730 01 02 03 50 mm dia 100 mm dia 150 mm dia Accessories 04 Gully trap, ef. (GT) Inspection chambers , including reinforced concrete, with aluminium cover and frame, including earthworks, and all materials and equipment required to complete the work as per drawings, and according to specifications section 2730 05 Ref. (CTIC) 600 x 600 mm STORM DRAIN INSTALLATION Supply, install and test pipework, UPVC schedule 40, for storm drainage the work shall include but not limited to earthwork, fittings, supports, trenchwork and all materials and equipment required to complete and finish the work as per drawings and according to specifiactions, section 2720 06 07 08 75 mm dia 100 mm dia 150 mm dia Accessories 09 10 Ground cleanout 75mm dia., ref. (GCO) Ground cleanout 100mm dia., ref. (GCO) To Collection 1 1 No. No. SR 16 22 24 M M M 3 No 1 No. 10 10 29 M M M

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT STORM DRAIN INSTALLATION Inspection chambers , including reinforced concrete, with aluminium cover and frame, including earthworks, and all materials and equipment required to complete the work as per drawings and specifications section 2720 01 Ref. (IC) 600 x 600 mm Supply, installation and test pipework, UPVC schedule 80class V for water and CPVC schedule 80 class V for hot water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work as per drawings and according to specifications section 2668 02 03 40 mm dia. 50 mm dia. Accessories 04 Water meter assembly 40mm dia., ref. (WMA) Irrigation water installation Supply, installation and test pipework, UPVC schedule 80class V for Irrigation water the work shall include but not limited to installation, fittings, valves, supports and all materials and equipment required to complete and finish the work as per draiwngs and according to specifications section 2810 05 06 15 mm dia. 20 mm dia. 2 25 M M 1 No 36 10 M M 1 No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT PLUMBING INSTALLATIONS Irrigation water installation Accessories 01 02 Water meter assembly 20mm dia., ref. (WMA) Hose bib 15mm dia., ref. (HP) POTABLE WATER SUPPLY Reinforced concrete under ground water tank with proprietary cast iron manhole covers and frames the work shall include but not limited to earthworks, concrete works, internal lining and water proofing, access ladders, pipework and valves, vent pipes, and all materials and equipments required to complete and finish the work according to drawings and specifications section 2668 03 Potable water tank capacity 10 m
3

1 2

No No

Item

POTABLE WATER SUPPLY SYSTEM Supply, installation and test Packaged type constant pressure booster potable water pumps, set of one duty and one stand by pump, the work shall include but not limited to piping and valves complete with all controllers, accessories for automatic operateion and all materials and equipments required to complete and finish the work according to drawings and specifications section 2668 04 Potable water pumps, power 1.32 KW 1 Set

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT ELECTRICAL UTILITIES MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit , including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16126 01 4C-120mm-CU/XLPE/PVC/ 110 mmd UPVC conduit in ground Supply, install ,test and commissioning panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors where required as shown on drawings and as described in specifications section 16129 & 16442 02 Bus bar interface panel (IP54) OUTDOOR HAND HOLE Supply, install, testing and commissioning reinforced concrete Hand Holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power & telecommunication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and as described in specifications section 16050 03 Hand Hole Ref.( HH) 1 No 1 No 20 M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT ELECTRICAL WORKS OUTDOOR POWER AND LIGHTING Supply , install, test and commissioning power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 01 02 Wall mounted junction box for CCTV camera Disconnect switch, non-fused with pilot light, weatherproof , 20A, 1P, 230V for fountain pump & lift pump OUTDOOR LIGHTING INSTALLATION Supply, install and testing of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16500 & 16050 03 Lighting fixture outlets 25 No 5 2 No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT ELECTRICAL WORKS OUTDOOR LIGHTING INSTALLATION Supply ,install, assembly, test and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16500 & 16050

01 02

Ref. WL2 Ref. WL3 DATA AND VOICE SYSTEM INSTALLATION Supply and install a data and voice system ( apart including fiber optic cable all UTP CAT 6A cable, switches , conduits, connection/ extension and interfacing all as shown on drawings, specifications section 16720 & 16770 and single line diagram drawing all as complete consisting of, but not limited to: To suit system network equipped with:

17 8

No No

03

Wall mounted telecommunication outlet, weatherproof for intercom, ref. (TO) I

No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT ELECTRICAL WORKS OUTDOOR COMMUNICATION SYSTEMS OUTDOOR INTEGRATED SECURITY SYSTEM Supply, install, testing and commissioning of integrated security system ( included all feeders/conduits where required) for extension, connection & interfacing) complete to suit the locations shown on drawings, coordination, integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16783 To suit a integrated security system consisting of, but not limited to: 01 IP digital color fixed outdoor camera, wall mounted with advanced smart motion detection Reader interface module (ref. RIM) Door access system push button (ref. PB) Elec. door shutter Door contact with electric lock Garage contact Long range card reader Integrated security system network including conduits, wiring, pull boxes, outlets, connections, and all required accessories to form a complete and fully operative system 4 No

02 03 04 05 06 07 08

1 1 1 1 1 1 1

No No No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE DEVELOPMENT Collection Sheet - 1 Sheet - 2 Sheet - 3 Sheet - 4 Sheet - 5 Sheet - 6 Sheet - 7 Sheet - 8 Sheet - 9 Sheet - 10 Sheet - 11

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 2 - SITE WORK SITE GRADING All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation Excavation in natural land consisting of solid rock formation, cracked rocks, bolders and natural contoured soil, temporary earthwork supports, dewatering ( if any ) as per specifications sections 02200 01 Excavation for foundations commencing from existing grade level Backfilling 02 Approved selected imported fill material including compaction in making up levels around and over foundations, beds and the like as per spec. sections 02200 Approved fill material selected from excavated material including compaction as per specification section 02200 Drainage layer 04 100 mm thick compacted coarse gravel to underside of slabs on grade as per specification section 02200 Soil treatment application for termite control 05 To subgrades of slabs and along periphery of building Note

Note

123

70

03

price only

185

297

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK CONCRETE TYPES Include in Unit Rates for concrete of the following types and locations: 20 Mpa a) Blinding concrete b) Catch basins and side walks 40 Mpa a) Footings b) Columns and R.C. walls c) Floor and roof slabs, beams, girders, stairs d) Concrete topping or structural screed e) Slab on grade f) water tanks Plain insitu concrete, 20 Mpa, cement type V as per specifications section 03300 01 Blinding beds, 100 mm thick Insitu reinforced concrete, 40 Mpa cement type V including formwork and steel reinforcements conforming to ASTMA615and A185 as per specifications sections 03100, 03200 & 03300 02 03 04 05 06 Footing Grade and tie beams Strap beams Columns pedestals Slab on grade 125 mm thick with A193WWF mesh reinforcement including thickening Steps on grade including related concrete elements

Note

11

21 13 9 2
23

M M M M
M

07

To Collection

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 as per specifications sections 03100, 03200 & 03300 01 02 03 04 05 06 Columns Beams Suspended flat slabs, 240mm thick Suspended flat slabs, 200mm thick Suspended flat slabs, 180mm thick Stairs Sundries 07 08 R.C coping to suit parapet as per detail 7 on drawing VL-GA-04 Allow for precast concrete splash block including grout and all associated works as shown and detailed on drawings NOTES: Include in unit rates works associated to construction and control joints including joints surrounding equipment pads along with necessary caulk To Collection Collection Sheet - 14 Sheet - 15 63 2 M No. 14 11 87 19 2 7 M M M M M M

Note

SR

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 4 - MASONRY UNIT MASONRY Supply and fix concrete masonry blocks in courses with cement lime mortar including concrete lintels over openings , horizontal and vertical reinforcement, fixings, fillers, sealants and grout to complete the work according to specifications section 04200 and drawings 01 02 03 04 05 06 07 100 mm thick wall 200 mm thick wall Ditto, but one hour fire rated 300 mm thick insulated wall 400 mm thick insulated wall 200 mm thick pre-insulated wall 200 mm thick wall for parapet

499 166 116 183 12 37 77

M M M M M M M

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 5 - METALS HANDRAILS Supply and install twisted wrought iron hand rail with beech wood cap including fixing, wood handrail, finishing as per detail no.7 on drawing VL-GA-01 and as per specification section 05500 01 Handrail to suit stairs Supply and install stainless steel handrail diameter 60 and 30 mm, including fixing finishing as shown on drawing VL02-A02 and as per detail no. 13 on drawing VL-GA-04 and as per specification section 05500 02 Handrail to suit faade

26

15

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISON 6 - WOOD AND PLASTIC External wooden tiles including fixing, finishgs and all associated work as shown on drawing and according to specifications section 6400 01 External wooden tiles to suit faade SUNDRIES Supply and install counter top lavatory, comprising counter top holed for lavatory (lavatory measured elsewhere) with backsplash, vanity unit , stainless steel bars, facia, sides, and metal framing including finishings, sealants and trims as per detail 2,3 on drawing VL-GA-01 and specifications section 6100 02 Vanity top to suit required locations

M2

11

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Wall insulation 01 Vapour retarder as per specifications section 07100 Water proofing and moisture protection as per specification section 07100 02 Membrane waterproofing to suit "wet room" areas including upturn to abutting walls or upstands concrete screed and all required material and equipments to complete the work as per details shown on drawing, according to specifications and code of practice Damp proofing 03 Two coats of bituminous coatings on to surfaces of concrete in contact with soil as per specifications section 07150 Vapour barrier 04 Vapour barrier to underside of slabs, beds, and the like, specifications section 07100 ROOFING SYSTEM Roofing system comprising gravel layer separation sheet, rigid insulation, waterproofing membrane and concrete screed to form slope to drain, including precast tiles where occur for maintenance walks, forming of cant strips, and waterproofing membrane base flashing, metal flashing, sealants and fixings, steel fabrications, all as per detail 1 on drawing VL-GA-04 and specifications section 07500 05 To suit roof area 164 M

50

175

185

176

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS DOOR SETS Supply and install all doors to suit masonry openings and approved samples including fixings, decorations, frames, architrave, hardwares and saddles and all required materials and equipments to complete and finish the work as detailed on drawing VL-GA-02 and according to specifications sections 08210 and 08100 44mm thick solid hard wood door including frames and decoration as per drawings and specifications 01 Type A1, double leaves door, size 1300x2150mm 44mm thick paneled wood door. including frames and decoration as per drawings and specifications 02 03 04 Type C1, single leaf door, size 900x2150mm Type C2, single leaf door, size 800x2150mm Type C3, single leaf door, size 700x2150mm 44mm thick paneled wood folded door. including frames and decoration as per drawings and specifications 05 Type D1, four leaves door, size 1400x2150mm 44mm thick wrought iron door with laxan sheet backing including frames, finishes as shown on drawing and specification 06 Type E1, single leaf door, size 900x2150mm 44mm thick painted hollow metal insulated door including frames and decortion as per drawings and specification 07 Type F1, single leaf door, size 900x2150mm

Note

No.

8 7 1

No. No. No.

No.

No.

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS DOOR SETS GLAZED DOORS 24 mm thick double glazed sliding door tinted outside clear inside on powder coated aluminum frames including saddels and hardware as shown on drawing VL-GA-02 and specifications section 08800 01 Ref GD03, double leaves door, door size 1600x2200mm 24 mm thick double glazed sliding door tinted ouside clear inside on powered coated aluminum frames with fixed upper panel including saddels and hardware as shown on drawing VL-GA-02 and specifications section 08800 02 Ref GD08, double leaves door, door size 1920x3260mm

No

No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS WINDOWS Supply and install all windows to suit masonry opening including all hardware, fixtures, packing's, sealants, weather stripping and the like as described on drawing VL-GA-03 and according to specifications section 08520 24mm thick double tempered glazed sliding window, tinted outside clear inside on powder coated aluminum frame 01 Ref. W02, overall size 1500x1000mm 24mm thick double tempered glazed sliding window tinted outside clear inside on powder coated aluminum frame with fixed upper, lower & side panels 02 03 Ref. W06, overall size 4350x2860mm Ref. W24, overall size 4470x3160mm 6mm thick sand plastid tempered glazed awning window on powder coated aluminum frame with fixed lower panel 04 Ref. W08, overall size 600x1250mm 24mm thick double tempered glazed fixed window, tinted outside clear inside on powder coated aluminum frame 05 06 Ref. W13, overall size 1100x2860mm Ref. W20, overall size 1200x3260mm 24mm thick double tempered glazed sliding window tinted outside clear inside on powder coated aluminum frame with fixed upper panels 07 08 09 Ref. W21, overall size 2000 x 2860mm Ref. W22, overall size 2900 x 2260mm Ref. W23, overall size 1600 x 2860mm

No

1 1

No No

No

2 1

No No

2 1 1

No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS WINDOWS Supply and install all windows to suit masonry opening including all hardware, fixtures, packing's, sealants, weather stripping and the like as described on drawing VL-GA-03 and according to specifications section 08520 24mm thick double tempered glazed sliding window, tinted outside clear inside on powder coated aluminum frame 01 Ref. W17, overall size 1025x1200mm 24mm thick double tempered glazed sliding window tinted outside clear inside on powder coated aluminum frame with fixed upper & middle panels 02 Ref. W18, overall size 5320x2860mm

No

1
To Collection

No
SR

Collection Sheet - 20 Sheet - 21 Sheet - 22 Sheet - 23

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of bounding materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per ID drawing and specifications sections 9310, 9420, 9600, 9660, 9671, 9680 and 9685 01 02 03 04 05 06 Ceramic floor tiles size 300x300 mm , ref. CR Porcelain floor tiles size 600x600mm , ref. PT1 Porcelain floor tiles size 300x300mm , ref. PT2 Vinyl sheet for sportage use, ref. VS 600x600x20mm polished crema marfil marble, ref. M1 Floor pattern comprising of 600x600x20mm polished crema marfil marble, ref. M1 with polished dark emprador marble stripes, ref. M2

26 38 23 25 160
88

M M M M M
M

Ceramic tiles for wet area are anti-slip type Finishings : bases including sand-cement backing mortar and grout 07 08 09 10 100 mm high Polished marble base, ref. B01 100 mm high porcelain base, ref. B02 100 mm high Ceramic tiles base , ref. B03 100 mm high vinyl cove base , ref. B04 259 21 33 19

Note

M M M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds according to specifications section 9200, 9310, 9900 and 6400 01 02 03 04 05 Cement plaster Paint on cement plaster, ref. W01 Decorative paint on cement plaster, ref. W02 Ceramic wall tiles ,ref. W03 Porcelain wall tiles, ref. W04 Finishing: stair treads, risers and landings including bedding and pointing as per detail 6 shown on drawing VL-GA-01 and according to specifications section 9600 06 Polished marble 30mm thick for treads and 20mm thick for riser, ref. M3 to suit stair Polished marble to suit stair landings and floors, ref. M3 Finishings : ceilings 09 10 Cement plaster to suit ceiling Paint on cement plaster including , ref. C01

883 628 255 66 132

M M M M M

64

08

20

111 111

M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Finishings: Suspended ceilings including suspension system as shown on ID drawing and according to specifications section 9250, 9510 & 9547 (Area measured on plan) 01 02 03 Painted gypsum board, ref. C02 Painted gypsum board with cove light , ref. C03 Painted decorative gypsum board with cove light and cement plaster including paint to suit dining and living room ceilings space no. (G-06), (G-12) Moisture resistant painted gypsum board , ref. C04 Cement plaster including paint, ref. C01 and painted gypsum board with cove light, ref. C03 Moisture resistant painted gypsum board, ref. C04 and metal tiles 600x600mm, ref. C05

100 42 58

M M M

04 05

27 44

M M

06

20

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES EXTERNAL FINISHES Stone cladding mechanical fixation including fixings , finishings and all associated work as per detail on drawings and specification section 9600 01 02 Natural slatted brown stone cladding Black marble cladding Finishing : walls including metal angle beads and lathing at junctions of differing backgrounds according to specifications section 9200, 9600 and 9900 03 04 Cement plaster to suit external surface External Paint beige color on Cement plaster to suit external surface Ditto, but light brown color External paint on cement plaster to suit internal side of parapet Finishing: stair treads, risers and landings including bedding and pointing as per detail 6 shown on drawing VL-GA-01 and according to specifications section 9600 07 Polished marble 30mm thick for treads and 20mm thick for riser, to suit external stair Polished marble to suit external entrances, ref. M3

179 26

M2 M2

517 227

M2 M2

05 06

210 77

M2 M2

6 3

M M2

08

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

27 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES Collection Sheet - 24 Sheet - 25 Sheet - 26 Sheet - 27

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

28 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 10 -SPECIALTIES TOILET AND BATH ACCESSORIES Supply and installation of following toilet and bath accessories as per schedule including fixings and trims as shown on drawings and specification section 10800 to suit locations as required

01

Ref. FM1, Clear glass counter wide mirror on 20 mm thick plywood backing, 900mm high Ref. FM2, Clear glass mirror size 400x600mm with stainless steel frame Ref. RH, single robe hook Ref. SDH, wall mounted soap dish and holder Ref. TPH, Toilet paper holder Ref. TR, towel ring

11

02

No.

03 04 05 06

10 8 5 2

No. No. No. No.

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

29 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS SANITARY FIXTURES Supply and install sanitary fixtures, water mixers and accessories, as selection schedule, the work shall include but not limited to necessary fittings, trims, valves, traps, spouts and all materials and equipment required to complete and finish the work according to specifiactions section 15440 and drawings 01 02 03 04 05 06 07 Floor mounted water closet with flush tank, ref. (WC) Conuter top lavatory, ref. (LAV1) Surface-mounted wash basin over vanity unit, ref. (LAV2) Lavatory without pedistal, ref. (LAV3) Bath tub 70x160cm, ref. (BT) Counter top one bowel sink, ref. (03) One bowel sink with side drain, ref. (04) WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 40 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions section 15050, 15100, 15125, 15140 & 1540 and drawings 08 09 10 11 12 32 mm dia 40 mm dia 50 mm dia 75 mm dia 100 mm dia 28 52 111 56 55 M M M M M 5 2 5 1 2 1 1 No No No No No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

30 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Accessories 01 02 03 04 05 06 07 08 Floor drain, 50 mm dia., ref. (FD) Area drain 75mm dia., (AD) Roof drain , 75 mm dia., ref. (RD) Scupper roof drain 75mm dia., ref. (SRD) Cleanout, 100 mm dia., ref. (CO) Floor cleanout 75mm dia., ref. (FCO) Floor cleanout 100mm dia., ref. (FCO) Splash to roof deck 75mm dia., Packaged duplex type discharge pressure system potable water booster lift pumps, one duty & one stand-by, the work shall include but not limited to piping, valves, fittings, support, controllers, accessories for automatic operation and all materials and equipment required to complete and finish the work according to specifications, section 15453 and drawings 09 Potable water booster lift pump, power 0.88 kw each Supply, install, test and commissioning fiber glass elevated water tank for potable water, the work shall include but not limited to related piping fitting, valves and all materials and equipment required to complete and finish the work according to specifications section 15411 and drawings 10 Elevated water tank cap 1000 liters 2 No. 1 Set 10 2 1 2 1 2 2 2 No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

31 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS COLD WATER INSTALLATION Supply, installation and test pipework, plypropylene for cold water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications section 15411 and drawings 01 02 03 04 05 15 mm dia. 20 mm dia. 25 mm dia. 40 mm dia. 50 mm dia., HOT WATER INSTALLATION Supply, installation and test pipework, plypropylene for hot water the work shall include but not limited to installation, fittings, insulation for pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications section 15411 and drawings 06 07 15 mm dia. 20 mm dia. 36 7 M M 28 42 27 30 28 M M M M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

32 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15 - MECHANICAL HOT AND COLD WATER INSTALLATION Accessories 01 02 03 Isolating valve, 25 mm dia, ref. (IV) Hand spray with flexible hose and wall hook, ref. (HS) Wall mounted shower head, ref. (SH) Supply, install, testing and commissioning electrical water heaters the work shall include but not limited to short length pipework, valves, supports, controls, fixings, accessories and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification section 15860 04 05 06 Ref. EWH- 1, capacity 20 liters, 3 KW Ref. EWH- 2, capacity 10 liters, 1.5 KW Ref. EWH- 3, capacity 40 liters, 3 KW FIRE PROTECTION SYSTEM Supply and install portable fire extinguisher, multipurpose including fixing and all materials and equipments required to complete and finish the work according to drawings, specification section 15320 07 Ref. PFE 2 1 2 No No No 5 5 1 No. No. No.

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

33 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL Collection Sheet - 30 Sheet - 31 Sheet - 32 Sheet - 33

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

34 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and test black steel pipework including fittings thermal insulation, valves, gagues, strainers, flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 05 06 15 mm dia. 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. Flush mounted cabinet including 40mm dia., BTU meter and 40mm dia., two isolating valves and 40mm dia., check valve as detailed on drawings

35 45 10 35 20 1

M M M M M No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

35 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 01 02 03 04 05 06 07 08 09 10 11 Ref. FCU-01, 6.3 KW cooling capacity, 2 kw heating capacity Ref. FCU-02, 4.7 KW cooling capacity, 2 kw heating capacity Ref. FCU-03, 8 KW cooling capacity, 3 kw heating capacity Ref. FCU-04, 6.4 KW cooling capacity, Ref. FCU-05, 4 KW cooling capacity, 1.5 kw heating capacity Ref. FCU-06, 7.1 KW cooling capacity, 2 kw heating capacity Ref. FCU-07, 2.7 KW cooling capacity, 2 kw heating capacity Ref. FCU-08, 3.5 KW cooling capacity, 1.5 kw heating capacity Ref. FCU-09, 2.9 KW cooling capacity, 1.5 kw heating capacity Ref. FCU-10, 1.9 KW cooling capacity, 1.5 kw heating capacity Ref. FCU-11, 5.5 KW cooling capacity, 2 kw heating capacity

1 1 1 1 1 1 1 1 1 1 1

No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

36 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Ventilating fans as details on drawings and specifications, section 15860 01 02 03 04 05 06 07 08 09 10 Ref. EF- 01, 35 LPS capacity Ref. EF- 02, 35 LPS capacity Ref. EF- 03, 30 LPS capacity Ref. EF- 04, 30 LPS capacity Ref. EF- 05, 30 LPS capacity Ref. EF- 06, 30 LPS capacity Ref. EF- 07, 30 LPS capacity Ref. EF- 08, 30 LPS capacity Ref. EF- 09, 30 LPS capacity Ref. FAF- 01, 310 LPS capacity Supply, install, test and commission, Supply air square ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 11 Ref. SD6A, B, C, D & E Supply, install and test Supply air slot linear diffusers as detaild on drawings and spec. section 15891 12 13 14 Ref. SLD3 Ref. SLD5 Ref. SLD7

1 1 1 1 1 1 1 1 1 1

No. No. No. No. No. No. No. No. No. No.

No.

9 7 3

No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

37 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install and test Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 01 02 Ref. SD1 Ref. SD2 Supply, install, test and commission, Supply return air slot linear diffuser as detailed on drawings and spec. section 15891 03 04 05 Ref. RLD3 Ref. RLD5 Ref. RLD7 Supply, install, test and commission, Return square louver face ceiling diffusers as detailed on drawing and specification, sections 15860 & 15891 06 Ref. RD6A, B, C, D & E Supply and install exhaust register as detailed on drawing and specification, section 15891 07 Ref. ER1 Supply and install Galvanized steel sheet rectangular ductwork, including supports and volume damper , and bill mouth opening as per drawings and specification, section 15891 08 Various gauges

2 2

No. No.

9 7 3

No. No. No.

No.

13

No.

550

Kg

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

38 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission door grille as detailed on drawing and specification 01 Ref. DG 1 Supply and install Duct insulation 02 Thermal semi-rigid insulation to rectangular ductwork Supply, install and test return air round ceiling diffusers as detailed on drawing and specification, section 15860 03 04 Ref. RD1 Ref. RD2

No.

145

2 2
To Collection

No. No.
SR

Collection Sheet - 35 Sheet - 36 Sheet - 37 Sheet - 38 Sheet - 39

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

39 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL PRIMARY POWER SUPPLY Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications section 1621 To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1) 01 02 03 Electronic KWH meters M-bus master controller complete with software M-bus IP router MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V PVC multicore copper cable in conduit , including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16126 04 2C-10mm-CU/PVC/PVC+10mmG/32mmd PVC conduit in masonry 3 M 1 1 1 Note

No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

40 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit , including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16126 01 4C-10mm-CU/XLPE/PVC+10mmG/32mmd PVC conduit in 22 M

masonry
02 4C-16mm-CU/XLPE/PVC+16mmG/38mmd PVC conduit in masonry Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16442 03 04 05 06 07 Ref. DP-VL03 Ref. LPG Ref. LPF Ref. LPR Ref. UPG 1 1 1 1 1 No No No No No 13 M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

41 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of an emergency Uninterruptible Power Supply (UPS) unit including supports, battery rack, accessories and all associated works to suit the location shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16610 01 Ref. UPS (6 KVA , with 15 min.) POWER INSTALLATION The contractor is to insure that all power outlets mounted in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by central ground fault circuit interrupter (GFCI) Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 02 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for booster pump control panel, EWH-01,02,03 & washing M/C Disconnect switch, non-fused with pilot light, weatherproof, 32A, 1P, 230V for drying tumbler Disconnect switch, non-fused with pilot light, 45A, 1P, 230V, weatherproof for Elec. Rang Disconnect switch, non-fused with pilot light, 32A, 3P, 400V for UPS Disconnect switch, fused with pilot light, 20A, 1P, 230V for FCU-01,02,03,04,05,06,07,08,09 ,10 ,11 To Collection 7 No Note 1 No.

03

No

04

No

05

No

06

11

No

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

42 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces (according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 01 02 03 04 Wall mounted junction box Single socket outlet, 15A, 230V, grounding type Single socket outlet, weatherproof , 15A, 230V, grounding type Single socket outlet, weatherproof , 15A, 230V, with ground fault circuit interrupter ,ref. GF Single phase, single socket outlet, 16A, 230V,grounding type for emergency portable lighting fixture , mounted at 2200mm AFFL ,ref. (EPL ) Duplex socket outlet,15A,230V, grounding type Duplex socket outlet,15A,230V , with ground fault circuit interrupter ,ref. GF Duplex socket outlet,15A,230V, grounding type (2400 mm height mounted) ref.WAP Single phase power socket outlet 20A\230V, grounding type Floor mounted duplex socket outlet, 15A,230V, grounding type Door electric bell 13 39 6 6 No No. No. No.

05

16

No.

06 07

26 3

No. No.

08

No.

09 10 11

3 1 1

No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

43 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 & 16500 01 02 03 04 Single pole one-way switch (13A) Single pole ,two gang, switch (13A) Push button switch for door electric bell Motor switch with built-in overload protection (tumbler switch) 8 1 1 9 No. No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

44 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 and 16500 01 02 03 Ref.Chandelier (480W) Lighting fixture outlets Lighting fixture outlets type FT (cove light ) 4 149 34 No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

45 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories. (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 & 16500 01 02 03 04 05 06 07 08 09 10 11 Ref. F1 Ref. F2 Ref. F3 Ref. F4 Ref. F5 Ref. F6 Ref. F7 Ref. FT Ref. WL1 Ref. I1 Ref. EPL 32 10 4 24 7 2 6 212 9 38 17 No No No No No No No M. No No No

To Collection

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

46 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panels, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16720, 16770 & 16715 To suit system network equipped with: 01 Wall mounted telecommunication outlet ( one data ) , 300mm A.F.F.L.) ref. (T0 ) Wall mounted telecommunication outlet ( one tel ) , 300mm A.F.F.L. Ref. (T01) Wall mounted telecommunication outlet ( one tel ) ,1500mm A.F.F.L. Ref. (T01)w Wall mounted telecommunication outlet, 2 ports (one data, one tel) Ref.( T02 ) Wall mounted telecommunication outlet ( one TV ) Ref. ( T03) Wall mounted telecommunication outlet, ports (one TV, one MRM) Ref.( T04) Wall mounted telecommunication outlet, ports ( one data, one TV, one MRM ) Ref. T05 Wireless access points (ref. WAP) Wall mounted telecommunication outlet for intercom system ref. (TO) I 1 No

02

No

03

No

04

No

05 06

1 5

No No

07

No

08 09

3 7

No No

To Collection

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

47 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panel, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16720, 16770 & 16715 01 Floor Distributor includes :19", 30U telecom rack, Home automation gateway ( by others ) ,Fast Ethernet switch 2x48 port, Fast Ethernet switch 2x 24 port ,UTP P.P. CAT6 a 5x 24 port . with fans ,UPS ,home controller and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FD ) Data and voice system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No

02

Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

48 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM


Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, earthling for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16721

To suit fire alarm system network equipped with: 01 Analogue addressable fire alarm control panel- (ref. FACP '2 Loops) and power supply unit Ceiling mounted optical smoke detector, Ceiling mounted heat detector Fire alarm bell Fire alarm manual call station Fire alarm system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No

02 03 04 05 06

20 2 4 4 1

No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

49 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL AUDIO / VIDEO IP INTERCOM SYSTEM Supply , installation testing and commissioning of audio / video IP intercom system comprising of outdoor station unit with built-in color camera, indoor station units with built -in monitors, electrical door lock , AC power supply, cables and conduits and associated works as required to suit the locations shown on drawings and coordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16760 To suit audio /video phone IP intercom system network equipped with: 01 Waterproof outdoor station (6 line) unit including but not limited to color camera, mic, speaker, push buttons, power supply, etc. Indoor station unit including but not limited color LCD, head set, push buttons, door release push button, etc. Electric door lock Network controller with power supply Distributor Exit push button Audio / video IP intercom system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No

02

No

03 04 05 06 07

1 1 1 1 1

No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

50 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL SMART HOME SYSTEM Supply, installation , testing and commissioning of smart home system comprising of motion sensor, interactive LCD touch screen intelligent switches including all necessary cables, conduits, fittings, connections and associated works as required to suit the locations shown on drawings, coordination, integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16783 To suit system network equipped with: 01 02 03 04 05 06 07 7" interactive wireless portable LCD touch screen (LCD) 7.5 " interactive LCD touch screen (LCD1) Intelligent switch Type (LCD2) Presence sensor (Indoor type) Motion sensor (Indoor type) Motion sensor (Outdoor type) Smart home system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 2 22 10 10 2 1 No No No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

51 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL ACCESS CONTROL SYSTEM (VILLA DOOR LOCK ) Supply, installation , testing and commissioning of access control system (villa door lock ) comprising of Intelligent system controller ,double reader interface module , access system touch screen ,door access system push button , electro magnetic lock ,Magnetic door contact , including all necessary cables, conduits, fittings, connections and associated works as required to suit the locations shown on drawings, coordination, integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16783 To suit system network equipped with: 01 02 03 04 05 06 07 08 09 Intelligent system controller (ref. ISC) Double reader interface module (ref. DRIM) Door access system touch screen ref. (CR) Door access system push button (ref. PB) Electro magnetic lock Magnetic door contact(ref. DC) Security alarm bell ref. (SEC) Security alarm bell outdoor ref. (SEC) Access control system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 1 No No

2
2

No.
No

2
2 1 2 1

No.
No No No Item

To Collection DIVISION 16 - ELECTRICAL Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP 52 / 55 REVISED PAGE

SR

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

IP TV SYSTEM Supply, install, test and commissioning of television system connected to TCP/IP (LAN) comprising of RJ45 TV outlets (measured elsewhere) set top box , power supply , and associated work as shown on drawings and .Coordination, integration with other systems disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16787

To suit IPTV system network equipped with:


01 02 Set top box IP TV system network including coaxial cable and all required accessories to form a complete and fully operative system 10 1 No Item

To Collection DIVISION 16 - ELECTRICAL Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP 53 / 55 REVISED PAGE

SR

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

Collection Sheet - 40 Sheet - 41 Sheet - 42 Sheet - 43 Sheet - 44 Sheet - 45 Sheet - 46 Sheet - 47 Sheet - 48 Sheet - 49 Sheet - 50 Sheet - 51 Sheet - 52 Sheet - 53

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

54 / 55 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 1)

Bldg. no. VL03 Bill no. 1

ITEM

DESCRIPTION

AMOUNT S.R.

BILL SUMMARY Sheet - 12 Sheet - 13 Sheet - 15 Sheet - 16 Sheet - 17 Sheet - 18 Sheet - 19 Sheet - 23 Sheet - 28 Sheet - 29 Sheet - 34 Sheet - 39 Sheet - 54 SITE DEVELOPMENT SITEWORK CONCRETE MASONRY METALS WOOD AND PLASTIC THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES PLUMBING HVAC ELECTRICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To Tender Summary

SR

0.0

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

55 / 55 REVISED PAGE

Date: MAY 2012