Gbaran Infill Project Package 2 (Installation of Pipelines and Inter site cables) 26
B3.1

Commercial

B3.2

Project Milestones As per Appendix 3.4

B3.2.1

528
2

Mobilization_Appendix 3.4 A

50
8

B3.2.1.1

1.1 Mobilisation For Project Management,Engineering,Procurement,Offices,key Personnel and Resources


2

B3.2.1.2

1.2 Mobilisation of temporary construction camp,offices&storage yards completed

B3.2.1.3

1.3 Mobilisation of site Personnel, equipments, material and other resources to site

B3.2.1.4

1.4 Mobilization for precommissioning & commissioning

B3.2.2

Project Management_Appendix 3.4 B

B3.2.3

Residual Enginnering_Appendix 3.4 C

B3.2.4

Procurement_Appendix 3.4 D

B3.2.5

Installation of pipeline and intersite composite cable_Appendix 3.4 E

B3.2.5.1

5.1 Construction/installation and hook up of Pipelines

B3.2.5.2

5.2 Installation and termination of composite HV/Fiber Optic (FO) cables

B3.2.6

Pre commissioning and Commissioning_Appendix 3.4 F

12
7
5
14

B3.2.6.1

6.1 Pre Commissioning

B3.2.6.2

6.2 Commissioning Completed for all the WORK

Flawless Project Delivery and Asset Management_Appendix 3.4 G

B3.2.7.1

7.1 Flawless Project Delivery (FPD) Plan Implemented in line with COMPANY specifications

B3.2.7.2

7.2 Asset Management Deliverables

Demobilization

Mobilization of Key resources

B3.2.7

B3.2.8
B3.6
B3.6.1

Mobilisation For Project Management,Engineering,Procurement,Offices,key Personnel and Resources


2

B3.6.2

Mobilisation of temporary construction camp,offices&storage yards completed

Flawless Project Delivery

FDP Implementation

Project Management

B3.3.1

Document submission and approval

B3.3.3

Provisions to Company

B3.4
B3.4.1
B3.3

B3.5

Engineering

16

B3.5.6

Residual Engineering

B3.5.7

Drawings and MTO for LLI

13

MTO for Bulk Items

13

B3.5.7.1

B3.5.7.1.2

Drawings

B3.5.7.1.8

Develop MTO and Raise MR for LLI

B3.5.7.1.1

MTO for Bulk Items

B3.8

Procurement

B3.8.3
B3.8.3.2

108

RFQ,Technical evalution,Company approval

28

Long Lead Items

16

B3.8.3.2.5

Composite cable (11KV intersite composite cable & HT Cable)

B3.8.3.2.3

Discreet HV and FOC

B3.8.3.2.4

Cathodic Protection Materials

B3.8.3.2.1

Commissioning Capital Spares

B3.8.3.1

Bulk items

12

B3.8.3.1.2

Warning Mat

B3.8.3.1.4

Joint Coating Material

B3.8.3.1.8

Markers

B3.8.1
B3.8.1.2

Manufacturing and Delivery

49

Long Lead Items

28

B3.8.1.2.5

Composite cable (11KV intersite cable & Optical Fibre Cable)

B3.8.1.2.2

Discreet HV and FOC

7
Page 1 of 4

Oracle Corporation

06 Jan 11 14:43
WBS Code

WBS Name
B3.8.1.2.4

Cathodic Protection Materials

B3.8.1.2.1

Commissioning Capital Spares

B3.8.1.1

Total
Activities
7
7

Bulk items

21

B3.8.1.1.2

Warning Mat

B3.8.1.1.4

Joint Coating Material

B3.8.1.1.3

Markers

B3.8.2

Subcontracts

10

B3.8.2.1

Agency for External Coating of Line pipe and concrete coating

B3.8.2.2

Agency QA/QC NDT

B3.8.4
B3.8.4.1

5
5

Free Issue Materials (FIM)

21

Line Pipes

B3.8.4.1.1

6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)

B3.8.4.1.9

12'' x 6km pipeline (Koroama 12" P 10004 CS)

B3.8.4.1.3

12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.8.4.1.4

10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

B3.8.4.1.5

8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

B3.8.4.1.6

8'' x 5.5km pipeline (EPU 8" P 10006 CS)

B3.8.4.1.7

10'' x 8 km pipeline (EPU 10" P 10883 CS)

Bends

B3.8.4.2.1

6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)

B3.8.4.2.9

12'' x 6km pipeline (Koroama 12" P 10004 CS)

B3.8.4.2.3

12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.8.4.2.4

10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

B3.8.4.2.5

8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

B3.8.4.2.6

8'' x 5.5km pipeline (EPU 8" P 10006 CS)

B3.8.4.2.7

10'' x 8 km pipeline (EPU 10" P 10883 CS)

Insulation Joints

B3.8.4.3.1

6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)

B3.8.4.3.9

12'' x 6km pipeline (Koroama 12" P 10004 CS)

B3.8.4.3.3

12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.8.4.3.4

10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

B3.8.4.3.5

8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

B3.8.4.3.6

8'' x 5.5km pipeline (EPU 8" P 10006 CS)

B3.8.4.3.7

10'' x 8 km pipeline (EPU 10" P 10883 CS)

B3.8.4.2

B3.8.4.3

B3.9

Construction

B3.9.2
B3.9.2.1

1
337

Phase 1

40

6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)

40

B3.9.2.1.1

Pre Construction

B3.9.2.1.2

Construction Pipeline

B3.9.2.1.3

Construction Intersite Cable

B3.9.2.1.7

Cathodic Protection

B3.9.2.1.6

Mechanical Completion

B3.9.8
B3.9.8.9

Phase 2

66

12'' x 6km pipeline (Koroama 12" P 10004 CS)

33

B3.9.8.9.1

Pre Construction

B3.9.8.9.2

Construction Pipeline

B3.9.8.9.7

Cathodic Protection

B3.9.8.9.6

Mechanical Completion

B3.9.8.3

3
18

3
18
4
8

12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.9.8.3.1

Pre Construction

B3.9.8.3.2

Construction Pipeline

33
3
18

Page 2 of 4

Oracle Corporation

06 Jan 11 14:43
WBS Code

WBS Name
B3.9.8.3.7

Cathodic Protection

B3.9.8.3.6

Mechanical Completion

B3.9.1
B3.9.1.4

Total
Activities
4
8

Phase 3

84

10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

44

B3.9.1.4.1

Pre Construction

B3.9.1.4.2

Construction Pipeline

B3.9.1.4.3

Construction Intersite Cable and OFC

B3.9.1.4.4

Crossings

B3.9.1.4.7

Cathodic Protection

B3.9.1.4.6

Mechanical Completion

B3.9.1.5

3
18

8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

40

B3.9.1.5.1

Pre Construction

B3.9.1.5.2

Construction Pipeline

B3.9.1.5.3

Construction Intersite Cable and OFC

B3.9.1.5.7

Cathodic Protection

B3.9.1.5.6

Mechanical Completion

B3.9.3
B3.9.3.6

3
18

Phase 4

88

8'' x 5.5km pipeline (EPU 8" P 10006 CS)

44

B3.9.3.6.1

Pre Construction

B3.9.3.6.2

Construction Pipeline

B3.9.3.6.3

Construction Intersite Cable and OFC

B3.9.3.6.4

Crossings

B3.9.3.6.7

Cathodic Protection

B3.9.3.6.6

Mechanical Completion

B3.9.3.7

3
18

10'' x 8 km pipeline (EPU 10" P 10883 CS)

44

B3.9.3.7.1

Pre Construction

B3.9.3.7.2

Construction Pipeline

B3.9.3.7.3

Construction Intersite Cable and OFC

B3.9.3.7.4

Crossings

B3.9.3.7.7

Cathodic Protection

B3.9.3.7.6

Mechanical Completion

B3.9.4
B3.9.4.4
B3.9.4.4.2

3
18

Precommissioning and Commissioning

56

Precommissioning

42

Phase 1

B3.9.4.4.2.2
6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)
B3.9.4.4.2.2.5
Asset Management Deliverables (before Pre Commissioning)
B3.9.4.4.2.2.1
6'' x 4.5km pipeline (Gbaran 6" P 10816 CS) precommissioning
B3.9.4.4.8

Phase 2

6
2
4
12

B3.9.4.4.8.1
12'' x 6km pipeline (Koroama 12" P 10004 CS)

B3.9.4.4.8.1.5
Asset Management Deliverables (before Pre Commissioning)

B3.9.4.4.8.1.9
12'' x 6km pipeline (Koroama 12" P 10004 CS) precommissioning

B3.9.4.4.8.2
12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.9.4.4.8.2.5
Asset Management Deliverables (before Pre Commissioning)

B3.9.4.4.8.2.3
12'' x 6km pipeline (EPU 12" P 10015 CS) precommissioning

B3.9.4.4.1

Phase 3

12

B3.9.4.4.1.2
10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

B3.9.4.4.1.2.1
Asset Management Deliverables (before Pre Commissioning)

B3.9.4.4.1.2.4
10'' x 4.2km pipeline (Koroama 10" P 10915 CS) precommissioning

B3.9.4.4.1.3
8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

B3.9.4.4.1.3.1
Asset Management Deliverables (before Pre Commissioning)

B3.9.4.4.1.3.5
8'' x 5.5km pipeline (Koroama 8" P 10913 CS) precommissioning

Page 3 of 4

Oracle Corporation

06 Jan 11 14:43
WBS Code

WBS Name
B3.9.4.4.3

Total
Activities

Phase 4

12

B3.9.4.4.3.6
8'' x 5.5 km pipeline (EPU 8" P 10006 CS)

B3.9.4.4.3.6.2
10'' x 8 km pipeline (EPU 10" P 10006 CS) precommissioning

B3.9.4.4.3.2
10'' x 8 km pipeline (EPU 10" P 10883 CS)

B3.9.4.4.3.2.1
Asset Management Deliverables (before Pre Commissioning)

B3.9.4.4.3.2.7
10'' x 8 km pipeline (EPU 10" P 10883 CS) precommissioning

B3.9.4.1

Commissioning

B3.9.4.1.2

14

Phase 1

B3.9.4.1.2.1
6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)
B3.9.4.1.8

Phase 2

1
2

B3.9.4.1.8.9
12'' x 6km pipeline (Koroama 12" P 10004 CS)

B3.9.4.1.8.3
12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.9.4.1.1

Phase 3

B3.9.4.1.1.4
10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

B3.9.4.1.1.5
8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

B3.9.4.1.3

Phase 4

B3.9.4.1.3.6
8'' x 5.5km pipeline (EPU 8" P 10006 CS)

B3.9.4.1.3.7
10'' x 8 km pipeline (EPU 10" P 10883 CS)

B3.9.4.1.4

Asset Management Deliverables (after Commissioning)

B3.9.4.1.4.2
Phase 1

7
1

B3.9.4.1.4.2.1
6'' x 4.5km pipeline (Gbaran 6" P 10816 CS)
B3.9.4.1.4.8
Phase 2

1
2

B3.9.4.1.4.8.9
12'' x 6km pipeline (Koroama 12" P 10004 CS)

B3.9.4.1.4.8.3
12'' x 6km pipeline (EPU 12" P 10015 CS)

B3.9.4.1.4.1
Phase 3

B3.9.4.1.4.1.4
10'' x 4.2km pipeline (Koroama 10" P 10915 CS)

B3.9.4.1.4.1.5
8'' x 5.5km pipeline (Koroama 8" P 10913 CS)

B3.9.4.1.4.3
Phase 4

B3.9.6

B3.9.4.4.3.6.1
Asset Management Deliverables (before Pre Commissioning)

B3.9.4.1.4.3.6
8'' x 5.5km pipeline (EPU 8" P 10006 CS)

B3.9.4.1.4.3.7
10'' x 8 km pipeline (EPU 10" P 10883 CS)

Demobilization