Submission No System Up to Last Month FA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 General Civil General Mechanical Boiler Fuel System Ash Handling FGD stack Main Cooling Water System Water Treatment System Fire Fighting Turbine-DEC Turbine-FES Central Control Building General Electrical-C&I DCS HVAC Switchyard
Total
This Month FA 3 0 0 0 0 0 0 0 0 0 43 0 0 1 0 0 0
47
This Month AP 37 0 0 1 2 0 0 0 0 0 18 0 0 -1 0 0 0
57
FI 2 5 14 5 9 0 0 0 0 0 0 0 0 0 0 0 0
35
AWC 74 35 0 25 6 0 0 2 5 0 26 23 3 201 0 3 1
404
AWC -38 0 0 0 0 0 0 0 0 0 -8 0 0 9 0 0 0
-37
AWC 36 35 0 25 6 0 0 2 5 0 18 23 3 210 0 3 1
367
(A)
unit: numbers Percentage of Approval(%)
(B)
82.2
(C)
( B + C ) / A x 100
Remarks ; 1 This tabulation intend to focus only on drawings submitted for approval (FA) and it's status (AP / AWC ). 2 Drawings submitted for information is counted for cumulative submission and status is not updated. 3 Repeatitive submissions after review of first submission are not accounted for submission and the final status after review is updated.
Submission No System Up to Last Month FA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 General Civil General Mechanical Boiler Fuel System Ash Handling FGD stack Main Cooling Water System Water Treatment System Fire Fighting Turbine-DEC Turbine-FES Central Control Building General Electrical-C&I DCS HVAC Switchyard
Total
This Month FA 3 0 0 0 0 0 0 0 0 0 43 0 0 1 0 0 0
47
This Month AP 37 0 0 1 2 0 0 0 0 0 18 0 0 -1 0 0 0
57
FI 2 5 14 5 9 0 0 0 0 0 0 0 0 0 0 0 0
35
AWC 74 35 0 25 6 0 0 2 5 0 26 23 3 201 0 3 1
404
AWC -38 0 0 0 0 0 0 0 0 0 -8 0 0 9 0 0 0
-37
AWC 36 35 0 25 6 0 0 2 5 0 18 23 3 210 0 3 1
367
(A)
unit: numbers Percentage of Approval(%)
(B)
82.2
(C)
( B + C ) / A x 100
Remarks ; 1 This tabulation intend to focus only on drawings submitted for approval (FA) and it's status (AP / AWC ). 2 Drawings submitted for information is counted for cumulative submission and status is not updated. 3 Repeatitive submissions after review of first submission are not accounted for submission and the final status after review is updated.