Sei sulla pagina 1di 26

Project

REINFORCED CONCRETE
COUNCIL

Spreadsheets to BS 8110

Client
Advisory Group
Location 3rd Floor slab

Made by

from 1 to 5a

rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

LOCATION Supports from grid


MATERIALS
fcu
35
fy
460
fyv
460
Density
23.6

N/mm
N/mm
N/mm
kN/m

SPANS
SPAN 1
SPAN 2
SPAN 3
SPAN 4
SPAN 5
SPAN 6

L (m)

H (mm)

2.000
7.000
7.500

275
275
275

to grid

43

Revision

Job No

R68

5a

h agg
20
mm
gm
1.05
steel
gm
1.50
concrete
(Normal weight concrete)
Solid (mm)
Left
Right

450
1100
1100

chg

Page

3-Jul-13

1100
1100
450

COVERS (to links, or if no links, to reinf)


Top cover
20
mm
Btm cover
20
mm
Side cover
20
mm
RIBS
slab depth, hf
100
mm
Rib width
150
mm
Centres
900
mm
1 in
10
taper
SUPPORTS
Support No

Type

1
4

C
K

K(nife), C(antilever) or E(ncastre)

LOADINGUDLs (kN/m)
Span 1
UDL
PL 1
PL 2
Span 2
UDL
PL 1
PL 2
Span 3
UDL
PL 1
PL 2

Checked

2000-2003 BCA for RCC

Date

PLs (kN/m)

Position (m)

Self
Weight

Add Dead
Load

Imposed
Load

Position
from left

5.73
~~~~
~~~~
~
4.19
~~~~
~~~~
~
3.82
~~~~
~~~~

2.50

4.00

~~~~

~
2.50
8.50

~
4.00
1.00

~~~~
1.450

~
2.50

~
4.00

~~~~

Self

Span 4
Weight
UDL
PL 1
~~~
PL 2
~~~
Span 5
~
UDL
PL 1
~~~
PL 2
~~~
Span 6
~
UDL
PL 1 ~~~~
PL 2 ~~~~

LOADING PATTERN
DEAD
IMPOSED

Add Dead
Load

Imposed
Load

Position
from left

~~~~

~~~~

min

max

1
0

1.4
1.6

LOADING DIAGRAM

5a

REACTIONS (kN/m)
SUPPORT
Characteristic Dead
Max Imposed
Min Imposed
MAX ULTIMATE

43.0
20.4
7.3
94.9

58.0
34.9
17.3
133.0

18.2
13.3
-1.6
46.6

~
~
~
~

~
~
~
~

~
~
~
~

REINFORCED CONCRETE
COUNCIL

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
3rd Floor slab, from 1 to 5a

Made by

RIBBED SLABS to BS 8110:1997 (Analysis & Design)

Checked

rmw

Originated from RCC32.xls v2.6 on CD

2000-2003 BCA for RCC

Date

Page

Jul-2013
Revision

chg

10

15

44
Job No

R68

BENDING MOMENT DIAGRAMS (kNm/m)


120
100
80
60
40
20
0
-20
-40
-60
-80
-100

120
100
80
60
40
20
0
-20
-40
-60
-80
-100
0

10

15

5a

Elastic Moments

SUPPORT No

Elastic M
Redistributed M
b
Redistribution

Redistributed Envelope

0.0
0.0
1.000

35.9
35.9
1.000
0.0%

97.9
83.2
0.850
15.0%

0.0
0.0
1.000

~
~
~

~
~
~

~
~
#VALUE!

~
~
#VALUE!

~
~
#VALUE!

10

SPAN No

Elastic M
Redistributed M
b

20

0.00
0.00
1.000

66.48
62.29
0.937

75.34
71.04
0.943

20

5a

kNm/m
kNm/m
~

SHEAR FORCE DIAGRAMS (kN/m)


80

80

60

60

40

40

20

20

-20

-20

-40

-40

-60

-60

-80
0

10

15

Elastic V
Redistributed V

5a

Elastic Shears
SPAN No

-80

20

Redistributed Shears

0.0
0.0

35.9
35.9

58.2
59.1

66.8
67.1

70.3
68.3

47.9
46.6

~
~

~
~

~
~

~
~

~
~

~
~

SPAN No

Elastic V
Redistributed V

15

20

5a

Project

Spreadsheets to BS 8110

REINFORCED CONCRETE COUNCIL

Client
Location

Advisory Group
3rd Floor slab, from 1 to 5a

Made by

RIBBED SLABS to BS 8110:1997 (Analysis & Design)

Checked

Originated from RCC32.xls v2.6 on CD

SPAN 3
ACTIONS
DESIGN

M kNm/m
b
d
mm
As mm
As' mm

TOP STEEL

As prov

mm

BTM STEEL
SHEAR

LINKS
DEFLECTION
& CHECKS

As' prov mm
V kN/m
v N/mm
vc N/mm

rmw
chg

2000-2003 BCA for RCC

Date

Page

Jul-2013
Revision

/46
Job No

R68

LEFT
CENTRE
RIGHT
83.2 @col face
71.0
0.0
0.85
0.94
1.00
239.0
236.5 (x=26.3<hf/0.9)
239.0
753
650 (872 mm for defln)
0
0
As T 263
As'
0
2T
20
/rib
3T
12
/rib
2T
20
/rib
+ 4 T8 between
+ 4 T8 between
829
As T prov 339
As prov
829
2T
16
/rib
2T
25
/rib
3T
16
/rib
402
As prov 982
As' prov
603
68.30
V
46.55
1.152
v
0.890
0.935
Link
6
vc
0.935
2T6 @ 175 for 700
2T6 @ 1,200
.
L/d 31.712
Allowed 33.985 ok
(As increased by 34.2%)

% As
Bar & cover
Bar spacing

ok
ok
ok

ok
ok
ok

ok
ok
ok

Dist to link

ok

ok

ok

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
3rd Floor slab, from 1 to 5a

Made by

RIBBED SLABS to BS 8110:1997 (Analysis & Design)

Checked

REINFORCED CONCRETE COUNCIL


rmw

Originated from RCC32.xls v2.6 on CD

2000-2003 BCA for RCC

Date

Page

Jul-2013
Revision

/47
Job No

chg

R68

APPROXIMATE WEIGHT of REINFORCEMENT


TOP STEEL

No

Type

Dia

Length

Unit Wt

Weight

2
4
1
2
4
4
2
4
3
2
4

T
T
T
T
T
T
T
T
T
T
T

12
8
16
20
8
12
20
8
12
20
8

1025
1025
2225
2250
2250
4425
3625
3625
4675
2400
2400

0.888
0.395
1.578
2.466
0.395
0.888
2.466
0.395
0.888
2.466
0.395

1.8
1.6
3.5
11.1
3.6
15.7
17.9
5.7
12.5
11.8
3.8

Support 1
Span 1
Support 2
Span 2
Support 3
Span 3
Support 4

1
1
1
2
2
2
3

T
T
T
T
T
T
T

16
20
16
25
16
25
16

1150
400
3475
4750
3475
5900
1725

1.578
2.466
1.578
3.853
1.578
3.853
1.578

1.8
1.0
5.5
36.6
11.0
45.5
8.2

Span 1
Span 2
Span 3

1
9
9

T
T
T

6
6
6

800
800
800

0.222
0.222
0.222

0.2
1.6
1.6

Support 1
Span 1
Support 2
Span 2
Support 3
Span 3
Support 4

BOTTOM STEEL

LINKS

SUMMARY

All figures approximate - see User Guide.

Reinforcement density (kg/m) 12.89

Total rebar per rib, excluding mesh (kg)

201.9

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS I

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

SELF WEIGHT
ave bw
rib area
net self wt
E/O solid
cross rib
addn. solid
total SW

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

167.5
0.119
3.129
3.361
0
2.605055
5.734

167.5
0.119
3.129
3.361
0
1.056428
4.185

167.5
0.119
3.129
3.361
0
0.69468
3.823

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

140.0
0.076
1.993
-1.993
0
#DIV/0!
0.000

mm
mm
kN/m
kN/m
kN/m
kN/m
kN/m

ANALYSIS
1.0
0.4

Min load
Max load

x dead load
x dead load +

1.6

x imposed load

(Table 2.1)

Distribution Factors
SUPT 1
R

SUPT 2
L

Af
h -hf
Aw1
Aw2
A sum
sum Ax
x bar
sum Ad
Ix
Stiffness
Sum
Factor

SUPT 3

R
90000

SUPT 4

90000

SUPT 5

90000

SUPT 6

90000

SUPT 7

90000

L
90000

175

175

175

-100

-100

-100

26250

26250

26250

-15000

-15000

-15000

6125

6125

6125

2000

2000

2000

122375

122375

122375

77000

77000

77000

10391666.7 10391666.7

10391666.7

3883333.33

3883333.33

3883333.33

84.9165815 84.9165815

84.9165815

50.4329004

50.4329004

50.4329004

539513578

539513578

539513578

8902944.1

8902944.1

8902944.1

686716269
0

686716269
98102324.1

686716269
91562169.2 91562169.2

0
#DIV/0!

0
#DIV/0!

98102324
1

2.7446
0
0
0.00

16.46739
2.744565
0
0
16.47

1.3333
0
0
0.00

3.2312
0
0
0.00

98102324

189664493
0.51724 0.482759

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

0
#DIV/0!

#DIV/0!

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

Fixed End Moments


SPAN 1
Min load
Cant
UDL
PL 1
PL 2
FEM
Imposed load
Cant
UDL
PL 1
PL 2
FEM
Live load
Cant
UDL
PL 1
PL 2
FEM

SPAN 2

SPAN 3

SPAN 4

SPAN 5

SPAN 6

176.1091
27.29736
7.747772
0
35.05

27.2974
2.02419
0
29.32

177.8434
29.64056
0
0
29.64

29.64056
0
0
29.64

0
0
#DIV/0!
#DIV/0!
0.00

8
1.333333
0
0
8.00

99.45
16.33333
0.911503
0
17.24

16.3333
0.23814
0
16.57

112.5
18.75
0
0
18.75

18.75
0
0
18.75

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

19.38696
3.231159
0
0
19.39

229.5637
37.05228
4.557513
0
41.61

37.0523
1.1907
0
38.24

251.1374
41.85623
0
0
41.86

41.85623
0
0
41.86

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

0
0
#DIV/0!
#DIV/0!
0.00

0
#DIV/0!
#DIV/0!
0.00

Moment Distribution
SUPT 1
Min load

Sum

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 2

16.46739
0
0
0
0
0
0
0
0
0
0
0
0
0
16.47

-35.04513
18.57774
0.082504
-0.082504
1.430538
-1.430538
0.020626
-0.020626
0.357634
-0.357634
0.005156
-0.005156
0.089409
-0.089409
-16.47

SUPT 3

29.3215
0.16501
9.28887
2.86108
-0.04125
0.04125
-0.71527
0.71527
-0.01031
0.01031
-0.17882
0.17882
-0.00258
0.00258
41.64

-29.64056
0.154007
-14.82028
2.670337
-0.038502
0.038502
-0.667584
0.667584
-0.009625
0.009625
-0.166896
0.166896
-0.002406
0.002406
-41.64

SUPT 4

29.64056
-29.64056
0.077004
-0.077004
1.335168
-1.335168
0.019251
-0.019251
0.333792
-0.333792
0.004813
-0.004813
0.083448
-0.083448
0.00

SUPT 5

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 6

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

SUPT 7

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

ANALYSIS II

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Imposed on
Even Spans

Sum
Imposed on
Odd Spans

Sum
Live on
Odd Spans

Sum
Live on
Even Spans

Sum

-17.24
17.24484
-4.285726
4.285726
-2.229936
2.229936
-1.071431
1.071431
-0.557484
0.557484
-0.267858
0.267858
-0.139371
0.139371
0.00

16.57
-8.57145
8.62242
-4.45987
2.14286
-2.14286
1.11497
-1.11497
0.53572
-0.53572
0.27874
-0.27874
0.13393
-0.13393
12.16

-8
4.849138
-4.849138
3.459052
-3.459052
1.212284
-1.212284
0.864763
-0.864763
0.303071
-0.303071
0.216191
-0.216191
-8.00

9.69828
-4
6.9181
-2.42457
2.42457
-1.72953
1.72953
-0.60614
0.60614
-0.43238
0.43238
-0.15154
0.15154
12.62

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

-19.38696
10.82489
-10.82489
7.919377
-7.919377
2.706221
-2.706221
1.979844
-1.979844
0.676555
-0.676555
0.494961
-0.494961
-19.39
-41.60979
41.60979
-9.890425
9.890425
-5.380576
5.380576
-2.472606
2.472606
-1.345144
1.345144
-0.618152
0.618152
-0.336286
0.336286
0.00

21.6498
-9.69348
15.8388
-5.41244
5.41244
-3.95969
3.95969
-1.35311
1.35311
-0.98992
0.98992
-0.33828
0.33828
27.80
38.243
-19.7809
20.8049
-10.7612
4.94521
-4.94521
2.69029
-2.69029
1.2363
-1.2363
0.67257
-0.67257
0.30908
-0.30908
28.51

35.85434
35.85434
16.46739
0
(3.2.2.1)
1
1
35.85434
16.46739
35.85434
35.85434
16.46739
0

97.93742
69.43155
70.14237
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
8.00
0
0
0
0
0
0
0
0
0
0
0
0
0
8.00
19.38696
0
0
0
0
0
0
0
0
0
0
0
0
0
19.39

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Elastic Support Moments


Support

All spans
0
Odd Spans
0
Even Spans
0
Reverse
0
Redistribution
b 1
b +
1
Max M
0
Dead only
0
All spans
0
Odd Spans
0
Even Spans
0
Reverse
0
Total Ultimate Loads
Span

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

-8.000022
0
-4.162547
2.000005
-2.000005
1.040637
-1.040637
0.500001
-0.500001
0.260159
-0.260159
0.125
-0.125
-12.16
-18.75
9.051724
-9.375
6.456897
-2.262931
2.262931
-1.614224
1.614224
-0.565733
0.565733
-0.403556
0.403556
-0.141433
0.141433
-12.62
-41.85623
20.20645
-20.92811
14.78284
-5.051613
5.051613
-3.695709
3.695709
-1.262903
1.262903
-0.923927
0.923927
-0.315726
0.315726
-27.80

0
-4.000011
4.000011
-2.081273
2.081273
-1.000003
1.000003
-0.520318
0.520318
-0.250001
0.250001
-0.13008
0.13008
0.00
18.75
-18.75
4.525862
-4.525862
3.228448
-3.228448
1.131466
-1.131466
0.807112
-0.807112
0.282866
-0.282866
0.201778
-0.201778
0.00
41.85623
-41.85623
10.10323
-10.10323
7.391418
-7.391418
2.525807
-2.525807
1.847855
-1.847855
0.631452
-0.631452
0.461964
-0.461964
0.00

-18.46213
0
-10.04374
4.615532
-4.615532
2.510936
-2.510936
1.153883
-1.153883
0.627734
-0.627734
0.288471
-0.288471
-28.51

0
-9.231063
9.231063
-5.021871
5.021871
-2.307766
2.307766
-1.255468
1.255468
-0.576941
0.576941
-0.313867
0.313867
0.00

0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

(3.2.1.2.2)

0.85
1.15
83.2468
41.6365
83.2468
79.84628
80.66373
0

0
0
0
0
method 1
1
1
0
0
0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

1
1
0
0
0
0
0
0

1
1
0
0
0
0
0
0

1
1
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00

Dead only
All spans
Odd Spans
Even Spans
Imposed

UDL

PL1

PL2

UDL

PL1

PL2

UDL

PL1

PL2

16.467
35.854
35.854
16.467
8

0
0
0
0
0

0
0
0
0
0

46.7955
110.314
46.7955
110.314
28

8.5
13.5
8.5
13.5
1

0
0
0
0
0

47.4249
114.3949
114.3949
47.4249
30

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

35.85434
35.85434
16.46739
8.00
8.00
0.00

56.9914
25.3403
58.1925
12.40
-0.66
13.06

66.82227
29.95519
65.62111
16.60
0.66
15.94

70.25575
66.45497
33.06477
18.30
16.68
1.62

0
0
0
0.00
0.00
0.00

0
0
0
0.00
0.00
0.00

0
0
0
0.00
0.00
0.00

0
0
0
0.00
0.00
0.00

Span

Dead only
All spans
Odd Spans
Even Spans
Imposed
Elastic Shears

Span

All spans
Odd Spans
Even Spans
Imposed all
Imposed odd
Imposed even

0
0
0
0.00
0.00
0.00

Span

All spans
Odd Spans
Even Spans
Imposed all
Imposed odd
Imposed even

0
0
0
0.00
0.00
0.00

0
0
0
0
0

44.13911
47.93989
14.36013
11.70
13.32
-1.62
6

0
0
0
0.00
0.00
0.00

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

ANALYSIS III

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

Redistributed Shears
Span

Dead only
All spans
Odd Spans
Even Spans

0
0
0
0

Span

Dead only
All spans
Odd Spans
Even Spans

16.46739
35.85434
35.85434
16.46739

26.5414
59.09
23.8525
56.6895

0
0
0
0

0
0
0
0

0
0
0
0

28.75404
64.72361
31.44301
67.12416

29.26398
68.297
67.8436
34.46761

0
0
0
0

0
0
0
0

18.16092
46.09786
46.55126
12.95729
6

0
0
0
0

Imposed Reactions
Support

All spans
Odd Spans
Even Spans

0.00
0.00
0.00

20.40
7.34
13.06

34.91
17.34
17.57

11.70
13.32
-1.62

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Left

< >

PL1

< >

PL2

< >

SPAN MOMENTS
SPAN 1
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
SPAN 2
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

0
0
0
0
0
0

Loadings

0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

17.9272
17.9272
8.23369
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

Left

< >

PL1

< >

PL2

< >

56.99139
25.34028
58.19254
59.09005
23.85246
56.68949

35.85434
35.85434
16.46739
35.85434
35.85434
16.46739

3.616413
3.790579
3.692633
3.749584
3.568021
3.597256
0
0
0
0
0
0

13.5
8.5
13.5
2.759765
2.519089
2.835984
2.892936
2.29653
2.740608
43.73365
-2.31827
66.48129
49.6652
-5.900654
62.29034

0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

(3.2.2.1b)
Max

35.85434
35.85434
16.46739
35.85434
35.85434
16.46739

0
0
0
0
0
0

0
0
0

Right

66.82227
29.95519
65.62111
64.72361
31.44301
67.12416

Loadings

15.7591
6.68507
15.7591
1.45
1.45
1.45
1.45
1.45
1.45
30.2164
-6.13862
51.3451
33.2595
-8.29596
49.1656

Right

35.85434
35.85434
16.46739
35.85434
35.85434
16.46739

2.759765
2.519089
2.835984
2.892936
2.29653
2.740608
43.73
-2.32
66.48
49.67
-5.90
62.29

(3.2.2.1b)
Max

97.93742
69.43155
70.14237
83.2468
79.84628
80.66373

43.73365
0
66.48129
49.6652
0
62.29034

1.135629
0
0.93696

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS IV

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

SPAN 3
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

< >

70.25575
66.45497
33.06477
68.297
67.8436
34.46761

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

PL1

< >

PL2

< >

Right

44.13911
47.93989
14.36013
46.09786
46.55126
12.95729

Loadings

97.93742
69.43155
70.14237
83.2468
79.84628
80.66373

4.606135
4.356946
5.22902
4.477715
4.447988
5.450873
0
0
0
0
0
0

15.2526
15.2526
6.32332
0
0
0
0
0
0
-97.9374
-69.4315
-70.1424
-83.2468
-79.8463
-80.6637

0
0
0
4.606135
4.356946
5.22902
4.477715
4.447988
5.450873
63.86632
75.33882
16.30579
69.66044
71.03749
13.27556

0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

4.606135
4.356946
5.22902
4.477715
4.447988
5.450873
63.87
75.34
16.31
69.66
71.04
13.28

0
0
0
0
0
0

SPAN 4
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

Left

< >

PL1

< >

PL2

< >

Right

SPAN 5
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even

0
0
0
0
0
0

(3.2.2.1b)
Max

Loadings

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0

Left

< >

PL1

< >

PL2

< >

Right

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

(3.2.2.1b)
Max

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0

Loadings

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1.090723
0.942907
0.814163

0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

63.86632
75.33882
16.30579
69.66044
71.03749
13.27556

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

(3.2.2.1b)
Max

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

ANALYSIS V

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

SPAN 6
Elastic V All
Odd
Even
Redist V All
Odd
Even
Elastic X- All
Odd
Even
Redist X- All
Odd
Even
Elastic M All
Odd
Even
Redist M All
Odd
Even
UDLs at solid (for shear)
UDL
PL left
PL right

Left

< >

0
0
0
0
0
0

0
0
0
0
0
0

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

PL1

< >

PL2

< >

0
0
0
0
0
0

Loadings

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00

Right

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

15.486
0
0

15.486
0
0

15.486
0
0

0
0
0

0
0
0

0
0
0

(3.2.2.1b)
Max

0
0
0
0
0
0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS I
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

REINFORCEMENT DESIGN

Date

2000-2003 BCA for RCC

SPAN 1

L = 2.000

h = 275
bw = 167.5

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

LEFT
1.000
0.00
0.00
243.0
900
0.1558
48.29
289.75
0.0000
230.85
27.00
34.0
0.0
0.00
0
438.1
0

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

%
mm
mm
mm
mm
mm

ok

mm
%
mm
mm

ok
ok

0.13%
322
dmid = 239.0
1.82
1.63
150
0.0053
230.85
27.00
0.0
0.00
0
438.1
16

SPAN
1.000
0.00
0.00
239.0
900
0.1558
46.71
265.92
0.0000
227.05
26.56
34.0
0.0
0.00
0
438.1
0
0.19
0.18%
83
d'mid = 36.0
20.17
18.15
150
0.0605
221.67
38.51
45.6
0.00
0
438.1
187

0
120
12
2
226
0.556
122.6
25.0
152.2

0
187
20
1
314
0.785
25.0
25.0
300.0

0.26%
96
8
4
201
0.00
157
16
1
201
0.494
0.0
0.0

ok

ok
ok
ok

ok

ok
ok

Job No R68
3-Jul-13

187
16
1
201
0.502
0.0
0.0

BS8110

RIGHT
1.000
35.85
32.27
239.0
900
0.1558
46.71
280.29
0.0179
227.05
26.56
34.0
0.0
0.00
0
438.1
324
0.13%
322
7.26
6.53
150
0.0218
227.05
26.56
0.0
0.00
0
438.1
66

ok

ok
ok
ok

ok

ok
ok

324
120
20
2
628
1.570
105.8
25.0
152.2
0.26%
0
8
4
201
0.00
126
16
1
201
0.502
0.0
0.0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

between bars
3.12.11.1
3.12.11.2.4

Table 3.25

3.12.6.1
between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS II
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Date

2000-2003 BCA for RCC

Job No R68
3-Jul-13

SPAN 1 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

0.0

N/mm

0.0
20.80
2.00
1.03
0.00
0.00
0.00

ok
%

ok

120.0
7.00
2.00
1.00
14.00
8.37
0.00

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from cl
V rib
v
vc (no links)
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
0.450
0.00
0.0000
0.6584
0.6584
67.0
6
175
0

kN/m
m
kN
N/mm
N/mm
N/mm
N/mm
mm
mm
mm
mm

ok

mm

REINFORCEMENT DESIGN

0.0

SPAN 2

ok
ok

NOMINAL
0.0
6
1200
0
0
0.0

L = 7.000

b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

0.0

3.12.7.2

h = 275

MAIN STEEL

35.85
1.100
16.94
0.4231
0.9345
0.9345
67.0
6
175
0

bw = 167.5
LEFT
1.000
35.85
32.27
239.0
900
0.1558
46.71
280.29
0.0179
227.05
26.56
34.0
0.0
0.00
0
438.1
324
0.13%
322
dmid = 236.5
13.66
12.29
150
0.0410
227.05
26.56
0.0
0.00
0
438.1
124

SPAN
0.937
62.29
56.06
236.5
900
0.1558
42.42
262.41
0.0318
224.68
26.28
32.0
0.0
0.00
0
438.1
570
0.19
0.18%
83
d'mid = 38.5
35.06
31.55
150
0.1074
203.72
72.84
314.4
0.00
0
438.1
354

RIGHT
0.850
83.25
74.92
239.0
900
0.1445
43.32
259.91
0.0416
227.05
26.56
34.0
0.0
0.00
0
438.1
753
0.13%
322
49.30
44.37
150
0.1480
191.00
106.67
422.5
1.05
12
438.1
494

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS III
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Date

2000-2003 BCA for RCC

Job No R68
3-Jul-13

SPAN 2 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm
%
mm
mm
mm
mm

ok

mm
mm

ok

%
mm

ok

mm

324
124
20
2
628
1.570
105.8
25.0
152.2
0.26%
0
8
4
201
0.00
393
16
2
402
1.004
72.8
25.0
120.0
7.00
2.00
1.00
0.00
0.00
0.00

N/mm

ok
%

ok

ok
ok
ok

ok

ok
ok

ok

649
649
25
2
982
2.478
55.7
25.0
247.5

354
12
4
452
1.142
32.9
25.0

ok

ok
ok
ok

ok

ok
ok

189.9
20.80
1.74
1.07
38.55
29.60
0.14

753
494
20
2
628
1.570
105.8
25.0
152.2
0.26%
125
8
4
201
0.00
393
16
2
402
1.004
72.8
25.0
327.7

between bars
3.12.11.1
3.12.11.2.4

Table 3.25

3.12.6.1
between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc (no links)
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

59.09
1.100
37.85
0.9455
0.9345
0.9345
67.0
6
175
175

kN/m
m
kN
N/mm
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

ok

0.0

ok
ok

NOMINAL
0.0
6
1200
2400
0
44.9

67.12
1.100
45.08
1.1261
0.9345
0.9345
67.0
6
175
525

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

0.0

3.12.7.2

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS IV
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

REINFORCEMENT DESIGN

Date

2000-2003 BCA for RCC

SPAN 3

L = 7.500

h = 275

bw = 167.5

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

LEFT
0.850
83.25
74.92
239.0
900
0.1445
43.32
259.91
0.0416
227.05
26.56
34.0
0.0
0.00
0
438.1
753

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

%
mm
mm
mm
mm
mm

ok

mm
%

ok

mm
mm

ok

0.13%
322
dmid = 236.5
46.57
41.92
150
0.1398
193.04
102.12
422.5
0.00
0
438.1
467

SPAN
0.943
71.04
63.93
236.5
900
0.1558
42.42
262.41
0.0363
224.68
26.28
32.0
0.0
0.00
0
438.1
650
0.19
0.18%
83
d'mid = 38.5
27.15
24.44
150
0.0832
212.12
54.18
187.0
0.00
0
438.1
263

753
467
20
2
628
1.570
105.8
25.0
152.2

872
872
25
2
982
2.478
55.7
25.0
218.4

0.26%
125
8
4
201
0.00
393
16
2
402
1.004
72.8
25.0

ok

ok
ok
ok

ok

ok
ok

Job No R68
3-Jul-13

263
12
3
339
0.857
55.3
25.0

BS8110

RIGHT
1.000
0.00
0.00
239.0
900
0.1558
46.71
280.29
0.0000
227.05
26.56
34.0
0.0
0.00
0
438.1
0
0.13%
322
0.00
0.00
150
0.0000
227.05
26.56
0.0
0.00
0
438.1
0

ok

ok
ok
ok

ok

ok
ok

0
120
20
2
628
1.570
105.8
25.0
152.2
0.26%
0
8
4
201
0.00
491
16
3
603
1.507
28.4
25.0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

between bars
3.12.11.1
3.12.11.2.4

Table 3.25

3.12.6.1
between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS V
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Date

2000-2003 BCA for RCC

Job No R68
3-Jul-13

SPAN 3 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

327.7
7.00
1.08
1.00
0.00
0.00
0.00

N/mm

ok
%

215.2
20.80
1.56
1.05
33.99
31.71
0.34

ok

1.0

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc (no links)
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

m
kN
N/mm
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

REINFORCEMENT DESIGN
MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

68.30
1.100
46.14
1.1525
0.9345
0.9345
67.0
6
175
700

kN/m

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

0.0

ok

SPAN 4
- No Span 4 LEFT
1.000
0.00
0.00
-36.0
900
0.1558
1.06
6.36
0.0000
-34.20
-4.00
34.0
438.1
0.00
0
438.1
0
0.13%
0
dmid = -36.0
0.00
0.00
150
0.0000
-34.20
-4.00
438.1
0.00
0
438.1
0

ok
ok

NOMINAL
0.0
6
1200
3600
0
67.3

L = 0.000

46.55
0.450
35.62
0.8899
0.9345
0.9345
67.0
6
175
0

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
from solid
3.4.5.5

ok

44.4

3.12.7.2

h= 0
bw = 140

SPAN
#VALUE!
~
#VALUE!
-36.0
900
#VALUE!
1.06
#VALUE!
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 36.0
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

RIGHT
~
~
#VALUE!
-36.0
900
0.1558
1.06
6.36
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
0.00
0.00
150
0.0000
-34.20
-4.00
438.1
0.00
0
438.1
0

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VI
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Date

2000-2003 BCA for RCC

Job No R68
3-Jul-13

SPAN 4 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm
%
mm
mm
mm
mm

ok

mm
mm
%

#VALUE!

mm
mm

#VALUE!

N/mm

ok
%

0
0
20
2
628
-12.467
50.8
25.0
152.2
0.26%
0
8
4
0
0.00
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.0
7.00
2.00
1.00
0.00
0.00
0.00

ok

#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!

#VALUE!
#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

ok
ok
ok

ok

#VALUE!
#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!
0
20
2
628
-12.467
50.8
25.0
152.2
0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#DIV/0!
between bars
3.12.11.1
3.12.11.2.4

Table 3.25

3.12.6.1
between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc (no links)
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m
m
kN
N/mm
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VII
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

REINFORCEMENT DESIGN

SPAN 5
- No Span 5 -

MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
mm
mm

ok

mm
%

ok

mm
mm
mm

ok
ok

%
mm
mm
mm
mm
mm

ok

mm
%

#VALUE!

mm
mm

#VALUE!

#VALUE!
0
20
2
628
-12.467
50.8
25.0
152.2
0.26%
#VALUE!
#VALUE!
#VALUE!
0
0.00
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

BS8110

SPAN
#VALUE!
~
#VALUE!
-38.5
900
#VALUE!
1.21
#VALUE!
#VALUE!
#VALUE!
#VALUE!
32.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 38.5
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

RIGHT
~
~
#VALUE!
-34.0
900
0.1558
0.95
5.67
#VALUE!
#VALUE!
#VALUE!
36.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
25
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

#VALUE!
0
16
2
402
-8.448
59.2
25.0
152.2

#VALUE!
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Job No R68
3-Jul-13

h= 0
bw = 140

0.13%
0
dmid = -38.5
0.00
0.00
150
0.0000
-34.20
-4.00
438.1
0.00
0
438.1
0

%
mm

mm

L = 0.000

LEFT
~
~
#VALUE!
-36.0
900
0.1558
1.06
6.36
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S

Date

2000-2003 BCA for RCC

0.13%
0
0.00
0.00
150
0.0000
-32.30
-3.78
438.1
0.00
0
438.1
0

ok

ok
ok
ok

ok

#VALUE!
#VALUE!

0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

between bars
3.12.11.1
3.12.11.2.4

Table 3.25

3.12.6.1
between bars
3.12.11.1

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS VII
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Date

2000-2003 BCA for RCC

Job No R68
3-Jul-13

SPAN 5 cont
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

N/mm

ok
%

#VALUE!
7.00
#VALUE!
1.00
0.00
0.00
0.00

#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!

Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc (no links)
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

m
kN
N/mm
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

REINFORCEMENT DESIGN
MAIN STEEL
b
M/m
M/rib
d
bf
K'
Web Mres
Flange Mres
K
z
x
d'
net fsc
Excess M
As' req
fst
As req
bw/b
Min %
Min As

kNm/m
kNm
mm
mm
kNm
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm
%
mm

At Edge of Solid

M/m
M/rib
bf
K
z
x
net fsc
Excess M
As' req
fst
As req

0.00
-0.036
0.00
0.0000
#VALUE!
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m

kNm/m
kNm
mm
mm
mm
N/mm
kNm
mm
N/mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

SPAN 6
- No Span 6 LEFT
~
~
#VALUE!
-34.0
900
0.1558
0.95
5.67
#VALUE!
#VALUE!
#VALUE!
36.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
dmid = -34.0
0.00
0.00
150
0.0000
-32.30
-3.78
438.1
0.00
0
438.1
0

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.034
0.00
0.0000
#VALUE!
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

L = 0.000

h= 0
bw = 140

SPAN
#VALUE!
~
#VALUE!
-34.0
900
#VALUE!
0.95
#VALUE!
#VALUE!
#VALUE!
#VALUE!
32.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.16
0.18%
0
d'mid = 34.0
0.00
0.00
150
0.0000
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!

BS8110

RIGHT
~
kNm/m
#VALUE!
-32.0
900
0.1558
0.84
5.02
#VALUE!
#VALUE!
#VALUE!
34.0
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.13%
0
0.00
0.00
150
0.0000
-30.40
-3.56
438.1
0.00
0
438.1
0

Ref

-=-

3.4.4.4
Fig 3.3
-=3.4.4.4
-=-=Fig 3.3

Fig 3.3

Table 3.25

3.4.4.4
-=-=Fig 3.3

Fig 3.3

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

Project
Location

CALCS IX
Made by rmw

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Date

2000-2003 BCA for RCC

Job No R68
3-Jul-13

SPAN 6 cont
TENSION STEEL
As deflection
As to provide
in rib
No
As prov
=%
Clear dist
Min S
Max S
Residual
Min
As resid
extra
No
As prov
COMPRESSION STEEL
Required

No
As' prov
=%
Clear dist
Min S
DEFLECTION
fs
Base ratio
Tens Mod
Comp Mod
Perm L/d
Actual L/d
As req increased by

mm
mm

ok

mm
mm

ok

%
mm

ok
ok

mm
mm
%
mm
mm
mm
mm

ok

mm
mm
%

#VALUE!

mm
mm

#VALUE!

N/mm

ok
%

#VALUE!
0
16
2
402
-8.448
59.2
25.0
152.2
0.26%
#VALUE!
#VALUE!
#VALUE!
0
0.00
#VALUE!
20
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
7.00
#VALUE!
1.00
0.00
0.00
0.00

ok

#VALUE!
#VALUE!
#VALUE!

ok

#VALUE!
#VALUE!

#VALUE!

#VALUE!
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
25.0
#VALUE!

#VALUE!
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

ok

ok
ok
ok

ok

#VALUE!
#VALUE!

#VALUE!
20.80
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!

#VALUE!
0
12
2
226
-5.049
67.6
25.0
152.2
0.26%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
#VALUE!
16
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

between bars
3.12.11.1
3.12.11.2.4

Table 3.25

3.12.6.1
between bars
3.12.11.1
Eqn 8
3.4.6.3/4
Table 3.10
Table 3.11
3.4.6.3
3.4.5.1

RIB SHEAR
V cl
distance from c/L
V rib
v
vc (no links)
vc
(v-vc)bv
Link
@
for
As Dist
As' Dist

0.00
-0.034
0.00
0.0000
#VALUE!
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

kN/m
m
kN
N/mm
N/mm
N/mm
N/mm
mm
mm
mm
mm
mm

#VALUE!

#VALUE!

#VALUE!
#VALUE!

NOMINAL
0.0
6
1200
#VALUE!
#VALUE!
#VALUE!

0.00
-0.032
0.00
0.0000
#VALUE!
#VALUE!
#VALUE!
6
#VALUE!
#VALUE!

from solid

#VALUE!

3.12.7.2

3.4.5.10
Eqn 3
Table 3.8
Table 3.7
3.12.7.1
Spacing
3.4.5.5

#VALUE!

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

GRAPH DATA I

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

LOADING DIAGRAM
Beam
Supports
UDL's
Dead
Imposed
PL's
Dead
Imposed

0
0
0
0
0
0
8.2337
0
12.234
12.234

16.5
0
0
0
0
8.23
12.23
0
12.23
12.23

-5.0463

2
8.2337
12.234

2
-5.0463
2
0
8.2337
0
12.234
12.234

2
0
2
6.69
10.69
0
12.23
12.23

9
6.6851
10.685

9
-5.0463
9
0
6.6851
3.45
10.685
19.185

9
0
9
6.32
10.32
3.45
19.19
20.19

16.5
6.3233
10.323

16.5
-5.0463
16.5
0
6.3233
2
10.685
10.685

16.5
0
16.5
0.00
0.00
2
10.69
10.69

16.5
0
0

16.5
-5.0463
16.5
0
0
9
10.323
10.323

16.5
0
16.5
0.00
0.00
9
10.32
10.32

16.5
0
0

16.5
-5.0463
16.5
0
0
9
10.323
10.323

16.5
0
16.5
0.00
0.00
9
10.32
10.32

16.5
0
0

16.5
-5.0463
16.5
0
0
16.5
0
0

16.5
0

16.5
0.00
0.00

16.5
0
0

16.5
0.00
0.00

MOMENT DIAGRAMS
SPAN 1
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

Edge of solid

0
0
0
0
0
0
0
0
0
0
0
0
0

0.1
0.0896
0.0896
0.0412
0
0.0896
0.0896
0.0412
0.0627
0.0288
0
0.0896
0

0.2
0.3585
0.3585
0.1647
0
0.3585
0.3585
0.1647
0.251
0.1153
0
0.3585
0

0.3
0.8067
0.8067
0.3705
0
0.8067
0.8067
0.3705
0.5647
0.2594
0
0.8067
0

0.4
1.4342
1.4342
0.6587
0
1.4342
1.4342
0.6587
1.0039
0.4611
0
1.4342
0

0.5
2.2409
2.2409
1.0292
0
2.2409
2.2409
1.0292
1.5686
0.7204
0
2.2409
0

0.6
3.2269
3.2269
1.4821
0
3.2269
3.2269
1.4821
2.2588
1.0374
0
3.2269
0

0.7
4.3922
4.3922
2.0173
0
4.3922
4.3922
2.0173
3.0745
1.4121
0
4.3922
0

0.8
5.7367
5.7367
2.6348
0
5.7367
5.7367
2.6348
4.0157
1.8443
0
5.7367
0

0.9
7.2605
7.2605
3.3346
0
7.2605
7.2605
3.3346
5.0824
2.3343
0
7.2605
0

1
8.9636
8.9636
4.1168
0
8.9636
8.9636
4.1168
6.2745
2.8818
0
8.9636
0

1.1
10.846
10.846
4.9814
0
10.846
10.846
4.9814
7.5922
3.487
0
10.846
0

1.2
12.908
12.908
5.9283
0
12.908
12.908
5.9283
9.0353
4.1498
0
12.908
0

1.3
15.148
15.148
6.9575
0
15.148
15.148
6.9575
10.604
4.8702
0
15.148
0

1.4
17.569
17.569
8.069
0
17.569
17.569
8.069
12.298
5.6483
0
17.569
0

1.5
20.168
20.168
9.2629
0
20.168
20.168
9.2629
14.118
6.484
0
20.168
0

1.6
22.947
22.947
10.539
0
22.947
22.947
10.539
16.063
7.3774
0
22.947
0

1.7
25.905
25.905
11.898
0
25.905
25.905
11.898
18.133
8.3284
0
25.905
0

1.8
29.042
29.042
13.339
0
29.042
29.042
13.339
20.329
9.337
0
29.042
0

1.9
32.359
32.359
14.862
0
32.359
32.359
14.862
22.651
10.403
0
32.359
0

2
35.854
35.854
16.467
0
35.854
35.854
16.467
25.098
11.527
0
35.854
0

0.45
1.8151
1.8151
0.8337

0.9
7.2605
7.2605
3.3346

1.8151
1.8151
0.8337
1.2706
0.5836

7.2605
7.2605
3.3346
5.0824
2.3343

1.8151

7.2605

0
2
35.854
35.854
16.467
0
35.854
35.854
16.467
25.098
11.527
0
35.854
0

0.35
2.35
16.873
27.395
-2.9348
0
16.138
27.915
-2.4087
19.176
-2.0543
-2.4087
27.915
0

0.7
2.7
-0.1787
19.754
-20.406
0
-1.6477
20.795
-19.354
13.828
-14.284
-19.354
20.795
0

1.05
3.05
-15.299
12.932
-35.948
0
-17.503
14.494
-34.369
9.0525
-25.163
-34.369
14.494
0

1.4
3.4
-28.49
6.9293
-49.558
0
-31.428
9.0123
-47.454
4.8505
-34.691
-47.454
9.0123
0

1.75
3.75
-35.699
4.2954
-57.188
0
-39.372
6.8991
-54.558
3.0068
-40.032
-54.558
6.8991
0

2.1
4.1
-40.304
2.9053
-62.213
0
-44.711
6.0298
-59.057
2.0337
-43.549
-59.057
6.0298
0

2.45
4.45
-42.978
2.3342
-65.307
0
-48.119
5.9794
-61.625
1.634
-45.715
-61.625
5.9794
0

2.8
4.8
-43.721
2.582
-66.471
0
-49.597
6.7479
-62.263
1.8074
-46.53
-62.263
6.7479
0

3.15
5.15
-42.534
3.6488
-65.704
0
-49.145
8.3354
-60.97
2.5541
-45.993
-60.97
8.3354
0

3.5
5.5
-39.416
5.5344
-63.007
0
-46.761
10.742
-57.746
3.8741
-44.105
-57.746
10.742
0

3.85
5.85
-34.368
8.239
-58.379
0
-42.448
13.967
-52.593
5.7673
-40.866
-52.593
13.967
0

4.2
6.2
-27.389
11.762
-51.821
0
-36.204
18.011
-45.508
8.2337
-36.275
-45.508
18.011
0

4.55
6.55
-18.48
16.105
-43.332
0
-28.029
22.874
-36.493
11.273
-30.333
-36.493
22.874
0

4.9
6.9
-7.6405
21.266
-32.913
0
-17.924
28.557
-25.548
14.886
-23.039
-25.548
28.557
0

5.25
7.25
5.1296
27.246
-20.563
0
-5.8884
35.058
-12.672
19.073
-14.394
-14.394
35.058
0

5.6
7.6
19.83
34.046
-6.2833
0
8.0777
42.377
2.1338
23.832
-4.3983
-4.3983
42.377
0

5.95
7.95
36.461
41.664
9.9274
0
23.974
50.516
18.871
29.165
6.9492
0
50.516
0

6.3
8.3
55.023
50.101
28.069
0
41.801
59.474
37.538
38.516
19.648
0
59.474
0

6.65
8.65
75.515
59.357
48.14
0
61.559
69.251
58.136
52.86
33.698
0
69.251
0

7
1.1
5.9
9
97.937 -17.302 33.967
69.432 12.025 40.525
70.142 -38.01 7.4934
0
83.247 -19.61 21.585
79.846 13.661 49.303
80.664 -36.357 16.361
68.556 8.4172 28.368
48.602 -26.607 5.2454
0
83.247 13.661 49.303
0

0
9
97.937
69.432
70.142
0
83.247
79.846
80.664
68.556
48.602
0
83.247
0

0.375
9.375
72.664
45.583
58.188
0
58.708
55.477
68.183
50.865
31.908
0
68.183
0

0.75
9.75
49.535
23.88
47.122
0
36.314
33.253
56.591
34.675
16.716
0
56.591
0

1.125
10.125
28.552
4.3218
36.946
0
16.065
13.174
45.889
25.862
3.0252
0
45.889
0

1.5
10.5
9.713
-13.092
27.659
0
-2.0395
-4.7599
36.076
19.361
-9.1642
-9.1642
36.076
0

1.875
10.875
-6.9808
-28.36
19.261
0
-17.999
-20.549
27.152
13.483
-19.852
-20.549
27.152
0

2.25
11.25
-21.53
-41.484
11.753
0
-31.813
-34.194
19.117
8.2268
-29.039
-34.194
19.117
0

2.625
11.625
-33.934
-52.463
5.1332
0
-43.483
-45.693
11.972
3.5932
-36.724
-45.693
11.972
0

3
12
-44.193
-61.296
-0.597
0
-53.007
-55.048
5.7158
-0.4179
-42.908
-55.048
5.7158
0

3.375
12.375
-52.307
-67.985
-5.4379
0
-60.387
-62.257
0.3488
-3.8066
-47.59
-62.257
0.3488
0

3.75
12.75
-58.276
-72.529
-9.3897
0
-65.622
-67.322
-4.129
-6.5728
-50.771
-67.322
0
0

4.125
13.125
-62.101
-74.929
-12.452
0
-68.712
-70.242
-7.7176
-8.7165
-52.45
-70.242
0
0

4.5
13.5
-63.78
-75.183
-14.625
0
-69.657
-71.017
-10.417
-10.238
-52.628
-71.017
0
0

4.875
13.875
-63.315
-73.292
-15.91
0
-68.457
-69.647
-12.227
-11.137
-51.304
-69.647
0
0

5.25
14.25
-60.705
-69.256
-16.304
0
-65.112
-66.132
-13.148
-11.413
-48.48
-66.132
0
0

5.625
14.625
-55.95
-63.076
-15.81
0
-59.622
-60.472
-13.18
-11.067
-44.153
-60.472
0
0

6
15
-49.049
-54.751
-14.426
0
-51.988
-52.668
-12.322
-10.099
-38.325
-52.668
0
0

6.375
15.375
-40.004
-44.28
-12.154
0
-42.208
-42.718
-10.575
-8.5076
-30.996
-42.718
0
0

6.75
15.75
-28.815
-31.665
-8.9917
0
-30.284
-30.624
-7.9395
-6.2942
-22.166
-30.624
0
0

7.125
16.125
-15.48
-16.905
-4.9404
0
-16.214
-16.384
-4.4144
-3.4583
-11.834
-16.384
0
0

7.5
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

SPAN 2
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

SPAN 3
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

1.1

7.05

29.884 -18.318
5.5589 -20.029
37.597 -5.8218
17.348
-19.2
14.446 -19.404
46.575 -5.1905
26.318 -4.0753
3.8913 -14.02
46.575

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

SPAN 4
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

155627330.xls.ms_office

12:50 PM

7/3/2013

16.5
0
0

16.5
0.00
0.00

16.5
0
0

16.5
0.00
0.00

16.5
0
0

16.5
0.00
0.00

16.5
0
0

Project
Location

Spreadsheets to BS 8110
3rd Floor slab, from 1 to 5a

GRAPH DATA II

RIBBED SLABS to BS 8110:1997 (Analysis & Design)


Originated from RCC32.xls v2.6 on CD

Made by rmw Job No R68


Date
3-Jul-13

2000-2003 BCA for RCC

SPAN 5
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

2
2
-35.854
-35.854
-16.467
-35.854
-35.854
-16.467
-35.854
-16.467
0

0
2
56.991
25.34
58.193
59.09
23.852
56.689
23.852
59.09
0

1.45
3.45
34.141
15.647
35.342
36.239
14.159
33.839
14.159
36.239
0

1.45
3.45
20.641
7.1469
21.842
22.739
5.6591
20.339
5.6591
22.739
0

1.45
3.45
20.641
7.1469
21.842
22.739
5.6591
20.339
5.6591
22.739
0

7
9
-66.822
-29.955
-65.621
-64.724
-31.443
-67.124
-67.124
-31.443
0

0
9
70.256
66.455
33.065
68.297
67.844
34.468
34.468
68.297
0

0
9
70.256
66.455
33.065
68.297
67.844
34.468
34.468
68.297
0

0
9
70.256
66.455
33.065
68.297
67.844
34.468
34.468
68.297
0

0
9
70.256
66.455
33.065
68.297
67.844
34.468
34.468
68.297
0

7.5
16.5
-44.139
-47.94
-14.36
-46.098
-46.551
-12.957
-46.551
-12.957
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

9
-75.339

9
97.937

SPAN 6
Local X
X
M(e) all
M(e) odd
M(e) even
Beam
M(r) all
M(r) odd
M(r) even
70% max
70% min
Lower bound
Upper bound
Beam

SHEAR FORCE DIAGRAMS


SPAN 1
Local X
X
V(e) all
V(e) odd
V(e) even
V(r) all
V(r) odd
V(r) even
Lower bound
Upper bound
Beam
GRIDS

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

2
-75.34

2
97.937

155627330.xls.ms_office

SPAN 2

16.5
16.5
-75.339 97.937

1.45
3.45
20.641
7.1469
21.842
22.739
5.6591
20.339
5.6591
22.739
0

16.5
16.5
-75.339 97.937

SPAN 3

16.5
16.5
-75.339 97.937

SPAN 4

0
9
70.256
66.455
33.065
68.297
67.844
34.468
34.468
68.297
0

16.5
16.5
-75.339 97.937

12:50 PM

7/3/2013

0
16.5
0
0
0
0
0
0
0
0
0

SPAN 5

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

SPAN 6

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

0
16.5
0
0
0
0
0
0
0
0
0

Made by rmw

Job No R68
3-Jul-13

16.5
0.00
0.00

155627330.xls.ms_office

12:50 PM

7/3/2013

Made by rmw

Job No R68
3-Jul-13

SPAN 6

0
16.5
0
0
0
0
0
0
0
0
0

155627330.xls.ms_office

12:50 PM

7/3/2013

Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete Council is intended
those who will evaluate the significance and limitations of its contents and take responsibility for its use
application. No liability (including that for negligence) for any loss resulting from such advice or informatio
accepted by the BCA, RCC or their subcontractors, suppliers or advisors. Users should note that all B
software and publications are subject to revision from time to time and should therefore ensure that they ar
possession of the latest version.

This spreadsheet should be used in compliance with the accompanying publication 'Spreadsheets for concr
design to BS 8110 and EC2' available from British Cement Association, Telford Avenue, Crowthorne, Berks
RG45 6YS.

Status of spreadsheet
Public release version.
Revision history RCC32 Ribbed Slabs (A & D)

Date

Version

6-Dec-04

RCC32 v2.6

3-Nov-03

RCC32 v2.5

18-Aug-03

RCC32 v2.4

26-Jun-03

RCC32 v2.3

21-Jan-03

RCC32 v2.2

1-Dec-02

RCC32 v2.1

11-Oct-02

RCC32 v2.0

8-Apr-02

RCC32 v1.6

5-Apr-02

RCC32 v1.5

5-May-01

RCC32 v1.4

1-Jun-00

RCC32 v1.3

15-Feb-00

RCC32 v1.2

2-Feb-00

RCC32 v1.1

4-Aug-99

RCC32 v1.0

mation from the British Cement Association and/or Reinforced Concrete Council is intended for
valuate the significance and limitations of its contents and take responsibility for its use and
iability (including that for negligence) for any loss resulting from such advice or information is
BCA, RCC or their subcontractors, suppliers or advisors. Users should note that all BCA
blications are subject to revision from time to time and should therefore ensure that they are in
latest version.

should be used in compliance with the accompanying publication 'Spreadsheets for concrete
10 and EC2' available from British Cement Association, Telford Avenue, Crowthorne, Berkshire

This spreadsheet is shareware. It may be distributed freely, but may not be


used for commercial purposes until the user has registered with the RCC.
RCC32 Ribbed Slabs (A & D)

Action

Size (kB)

Display and use of reverse support moments and shears.


Correction to deflection enhancement for cantilevers in span 3 (Robert
Povey).
Routine for calculating imposed reactions upgraded.
Correction to ANALYSIS cells H179:184 etc (negative values of Xp2 Xp1)
DETR logo replaced by DTI.

864

Correction for cantilever at span 1.

852

Version 2 enhancements

856

Similar correction at BAR!G563.


Deflection base ratio bug for spans >10m fixed at Bar!G74, E164 etc
(v1.2 fix had reverted).
Warning message corrected in MAIN:L30 etc
Compresion steel mod factor now based on bf, and in spans, x limit of
hf/0.9 checked.

833

Deflection base ratio bug for spans >10m fixed at Bar!G74, G164 etc.

758

Single span deflection base ratio added


First public release.
Includes b version comments

758

863
863
835
834

833
762
762

761

Potrebbero piacerti anche