The 70th edition of this bestselling cost guide has been updated and expanded to provide you with the information you need to: Estimate projects with confidence and accuracy Improve project planning and budgeting Reduce risk Explore detailed construction costs, arranged in the CSI MasterFormat 2010 system, and leverage the resources available in the reference section to construct a winning estimate.
2012
C O ST DATA F RO M T H E M O ST Q U OT E D N A M E I N C O N ST R U C T I O N
Plus:
Get access to free quarterly cost index updates for a full year!
Material
Total
62.50 112 36.50 50.70 6.25 240 23 29 29 35
13 18.20
Ea.
02 41 Demolition
02 41 13.15 Hydrodemolition
Sample Estimate
9.50 Location Factor is added at the bottom of the 10.55 11.85 11.60 Work Performed: The body of the estimate shows the RSMeans 13.60 data selected, including line number, a brief description of each item, its take-off unit and quantity, and the bare costs of materials, 15.85 labor, and equipment. This estimate also includes a column titled 14.45 SubContract. This data is taken from the RSMeans column Total 16.95 Incl O&P, and represents the total that a subcontractor would 19.85 charge a general contractor for the work, including the subs
markup for overhead and profit.
0010 HYDRODEMOLITION 0015 Hydrodemolition, concrete pavement, 4000 PSI, 2 depth 0120 4 depth 0130 6 depth 0410 6000 PSI, 2 depth 0420 4 depth 0430 6 depth 0510 8000 PSI, 2 depth 0520 4 depth 0530 6 depth
This sample demonstrates the elements of an estimate, including a tally of the RSMeans data lines, and a summary of the markups on a contractors work to arrive at a total cost to the owner. The RSMeans estimate to adjust the cost of the work to a specific location.
Project Name: Location: Line Number 03 30 53.40 3950 03 30 53.40 3940 03 31 05.35 0300 03 31 05.70 4300 03 11 13.65 3000 03 22 05.50 0200 03 39 23.13 0300 03 35 29.30 0250 03 35 29.35 0160 Division 03 08 33 23.10 0100 08 33 23.10 3300 Division 8 13 34 19.50 1000 13 34 19.50 6050 13 34 19.50 6100 13 34 19.50 6200 13 34 19.50 5750 13 34 19.50 7750 13 34 19.50 6550 13 34 19.50 8650 13 34 19.50 6900 Division 13 Estimate Subtotal
Pre-Engineered Steel Building Anywhere, USA Description Strip footing, 12" x 36" Strip footing, 12" x24" Concrete ready mix, 4000 psi, for slab Placing concrete, slab on grade Concrete forms WWF Curing Concrete nishing Control joints Subtotal 10' x 10' OH Door Add for enamel nish Subtotal Pre-Engineered Steel Building Framing for doors, 3' x 7' Framing for doors, 10' x 10' Framing for windows, 3' x 4' PESB doors PESB windows Gutters Roof vent Insulation Subtotal
Architect: As Shown Qty 33.33 14.8 185.2 185.2 500 150 150 15000 650 8 800 15,000 4 8 6 4 6 380 15 25,000 Unit C.Y. C.Y. C.Y. C.Y. L.F. C.S.F. C.S.F. S.F. L.F. Ea. S.F. SF Flr. Opng. Opng. Opng. Opng. Opng. L.F. Ea. S.F. Material $4,699.53 $2,175.60 $19,631.20 $0.00 $190.00 $3,975.00 $787.50 $0.00 $84.50 $31,543.33 $14,000.00 $1,216.00 $15,216.00 $0.00 $0.00 $0.00 $1,740.00 $2,100.00 $2,679.00 $382.50 $12,750.00 $19,651.50 $66,410.83 Gen. Requirements 4,648.76 Sales Tax 3,320.54 Subtotal 74,380.13 GC O & P 7,438.01 Subtotal 81,818.14 Contingency @5% Subtotal Bond $12/1000 +10% O&P Subtotal Location Adjustment Factor Grand Total Labor $2,383.10 $1,324.60 $0.00 $2,666.88 $1,010.00 $3,450.00 $795.00 $7,500.00 $247.00 $19,376.58 $4,080.00 $0.00 $4,080.00 $0.00 $0.00 $0.00 $572.00 $483.00 $851.20 $2,685.00 $7,000.00 $11,591.20 $35,047.78 2,453.34 37,501.12 3,750.11 41,251.24
5.40 8.85 5.80 General Requirements: This item covers project-wide needs 14.60 provided by the general contractor. These items vary by project, 18.60 but may include temporary facilities and utilities, security, testing, project cleanup, etc. For small projects a percentage can be used, 113 typically between 5% and 15% of project cost. For large projects 155 the costs may be itemized and priced individually. 1.55 1.84 2.11 3.86 4.92 Bonds: Bond costs should be added to the estimate. The figures 6.45 here represent a typical performance bond, ensuring the owner 4.92 that if the general contractor does not complete the obligations in 3.36 the construction contract the bonding company will pay the cost for
completion of the work.
B-80
254 440 137 254 Location Adjustment: RSMeans published data is based on 14.75 national average costs. If necessary, adjust the total cost of the 26 project using a location factor from the Location Factor table or
the City Cost Index table. Use location factors if the work 29 is general, covering multiple trades. If the work is by a single trade (e.g., masonry) use the more specific data found in the City Cost Indexes.
102.30
Visit us online:
RSMeans offers an extensive line of cost data products in book, online, and CD format, along with professional development seminars, reference books, market analytics, and more. Visit www.rsmeans.com to learn what RSMeans can do for you!