PRELIMINARY INITIAL PRIORITY FLOOD RESTORATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) SUMMARY ($000s)
DEPARTMENT COMMUNITYSERVICES& PROTECTIVESERVICES CORPORATESERVICES $ 32,000 TRANSPORTATION $ 33,870 UTILITIES&ENVIRONMENTAL PROTECTION $55,800 CALGARYPOLICESERVICE $34,550 CIVICPARTNERS $66,200 ESTIMATEDCOST
$34,150
Total
Note:
$256,570
The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided.
Page 1 of 8
PRELIMINARY INITIAL PRIORITY FLOOD RESTORATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) COMMUNITY SERVICES & PROTECTIVE SERVICES ($000s)
PROJECT BUILDINGS Fire DESCRIPTIONS SERVICEIMPACT ESTIMATEDCOST
Thefloodeventcausedsignificantdamagetomultiplestations;possible Citizensafetyandfireresponse $200 time. damagetomechanicalandelectrical,HVACandwindows.Toidentify fullscopeofflooddamage,detailedassessmentisunderway. Multiplerepairsandrestorationtoparkbuildingsarerequiredasa resultofthesignificantflooding.Toidentifyfullscopeofflooddamage, detailedassessmentisunderway. Asaresultofthefloodevent,thereisdamagetoStanleyParkfacility, includingsignificantmechanicaldamageandbasindamagetothe outdoorpool.Toidentifyfullscopeofflooddamage,detailed assessmentisunderway. 3,800 Publicsafetyandinterruptions $ indeliveryofparksservicesto citizens. Publicsafetyandrecreation $ 3,000 servicestocitizens.
ParksFacilities
Recreation
$ 7,000 ENGINEEREDSTRUCTURES Fire Citizensafetyandfireresponse $800 8boatlaunchesusedforemergencyaccesswerecompromisedasa resultofthefloodevent.Toidentifyfullscopeofflooddamage,detailed time. assessmentisunderway. Publicsafetyandrecreation TherearesignificantimpactsonGlenmoreReservoirbuildings,docks $50 andrailsasaresultofthefloodevent.Toidentifyfullscopeofflood servicestocitizens. damage,detailedassessmentisunderway. $850 ThefloodeventhashadamajornegativeimpactonmajorCalgary parks.Thereissignificantdamagetoparksinfrastructurewhichcan createsignificantpublicsafetyissuesandlongtermservicedelivery delays.Restorationofvariousinfrastructure,includingboardwalks, culverts,bridgesandstructureswillberequired.Numerousareas remainunderwater.Toidentifyfullscopeofflooddamage,detailed assessmentisunderway. Asaresultofthefloodevent,multiplenaturalareashavebeen negativelyaffected,andtheirrestorationwillberequired.Numerous areasremainunderwater.Toidentifyfullscopeofflooddamage, detailedassessmentisunderway. Asaresultofthefloodevent,thesubbaseiscomprisedtoboth Shouldiceartificialturfs.Toidentifyfullscopeofflooddamage,detailed assessmentisunderway. $12,000
Recreation
LANDIMPROVEMENTS MajorParks
ParksNaturalAreas
Recreation
Publicsafetyandrecreation servicestocitizens.
$ 1,500
$17,600 MACHINERY&EQUIPMENT ABS $650 TheCCTbuildinghassufferedsignificantflood,whichcauseddamageto Publicandofficersafety, regulatorycompliance. officers'dutygearandequipment.Toidentifyfullscopeofflood damage,detailedassessmentisunderway. 6,500 Thefloodeventandwatercontaminationhascausedsignificantdamage Citizensafetyandfireresponse $ time. tovariousequipmentincludingdutygearandemergencyunits.To identifyfullscopeofflooddamage,detailedassessmentisunderway. Mechanicalandelectricaldamagewascausedbythefloodeventto MapleRidgeRiverandShaganappipumphouses.Toidentifyfullscope offlooddamage,detailedassessmentisunderway. Publicsafetyandrecreation serviceimpactstocitizens. $800
Fire
Recreation
$750
Total
$ 34,150
Page 2 of 8
Note:
Currently unable to access all scale of damages until water levels come down to seasonal norm, and until more information is available as a result of ongoing engineering and infrastructure assessments. Initial assessments have not been completed for the Parks pathways and urban forest. Parks remediation must take place after river bridges and other structures are fully accessed and repaired, and after river bank instability is addressed. The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided.
Page 3 of 8
PRELIMINARY INITIAL PRIORITY FLOOD REMEDIATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) CORPORATE SERVICES ($000s)
PROJECT CORPORATEPROPERTIES& BUILDINGS Program#880Facility Operations DESCRIPTIONS SERVICEIMPACT ESTIMATEDCOST
$26,500 OldCityHall,MunicipalBuilding,AdministrationBuilding,AlbertaTrade Citybusinessservicesto citizensandcustomersshut Centre,EMS#3:elevators,electrical,mechanical,siemenssystem, mould&hazardousmaterialabatement,hotwatertank,pipeinsulation, downfromJune21toJuly2. Staffnotabletoreturntothe concreterestoration,carpets.(Thefloodwaterscausedsignificant workplacefor2to7weeks. damagetobuildingfinishingswhichneedtobeaddressedtoavoid hazardousgrowthofmould.Materialsneedtobeassessedandproperly Partialworkplacereoccupancy inaphasedfashion.Daycare disposedtolimitexposuretohazardousmaterials.) closeduntilSeptember01. ThirdPartyCPBbuildingsandCalgaryHousingCorporationproperties ownedbyCPB ThirdpartytenantsinCity ownedbuildingsneedrepairs andclearancetolandlord responsiblebuildingitems $500
Program#698MiscLand Improvements
Program#770Space Management
AdminBuilding,AlbertaTradeCentre,EMS#3:furnitureandaudio visualequipment
$400 Furniture,audiovisual equipmentandspecialized equpmentforA&BSstaff workplacearenotavailablefor useorfortheprojectsthey wereintendedfor.Itemswill needtobereorderedor replaced. $27,400
$ 1,300
Phonerestoration Diskstorage,citrix,smartphones,laptops,etc
OFFICEOFLANDSERVICING& HOUSING AffordableHousing OLSHPropertiescontractors,appliancereplacement,other Ensuringminordamageis addressedtoenablere CalgaryHousingCorporationProvincialownedcontractors,appliance occupancy replacement,fan,buildingenvelope,other $50 $150 $200
Total
Note:
$ 32,000
The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided.
Page 4 of 8
PRELIMINARY INITIAL PRIORITY FLOOD RESTORATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) TRANSPORTATION ($000s)
PROJECT ROADWAY Restorationvarious TrafficSigning Signals,Streetlightinfrastructure,etc Criticalsignandinventoryreplacement Safety,servicedelays Safety,customerinterruption $ 580 $ 35 $ 35 $ 10,000 $ 1,860 $ 12,510 PUBLICTRANSIT VictoriaParkGarage Erlton/VicParkLRTStations SouthLRTCorridorRecovery Areaincludingtrackwork damage MAJORPROJECTS MacleodTrailNB@Victoria Bridge 25thAvenuebetweenSpiller RoadandMacleodTrail 25Ave(ScollenBridge) MacleodTrto2stSW Roadandtransitrepairs Entiresiteevacuated,extensivecleaning,cashprocessingequipment damaged Extensivecommroom&escalatordamage,2ticketmachinesrequire replacement CPR/CemeteryHillTunnelscompletelyflooded,extensivecleaning, pumpstation,signals,ventilationswitchgeardestroyed,LRTsignals rebuild $ 2,000 $ 1,500 $ 8,200 DESCRIPTIONS SERVICEIMPACT ESTIMATEDCOST
Safetyanddelays Underpasses Floodrestoration,lightingrepairs Bridgepedestrianandtraffic Safety,customerinterruption Replace3pedestrianbridgesandcleanup/repairsaroundmanyothers replacementand Buildingberms,cleaningroads,repairsaroundbridgeapproaches, Safety,majordelays Roadwayrepairs
Safety,majordelays,customer interruption
$ 11,700 Roadandbridgerepair Cleanupsiteandrepairofroadwayandsidewalk Roadrepairadjacenttobridge,bridgerepairandrelatedstructural, geotechnicalandenvironmentalconsulting ErltonRd,HighfieldRd,MemorialDr,61Ave,22ndAve,ElbowDr $625 $100 Safety,majordelays,customer interruption $250 $330 $ 1,305 CALGARYPARKINGAUTHORITY Structurerepairs Equipmentandmachinery Surfacelotrepairs CivicPlazaandMcDougallparkades Repairdamagetopaymachines,ITinfrastructure Repairwaterdamagetocrushbase,sinkholes,paving $ 8,000 Restrictsaccesstoavailible parkinginthedowntowncore. $235 $120 $ 8,355
Total
Note:
$ 33,870
The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided. The above are Capital costs only. Anticipated related repairs: slope stability,pavement degradation/settlements, St. Patrick Island bridge damage, other incurred costs.
Page 5 of 8
PRELIMINARY INITIAL PRIORITY FLOOD REMEDIATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) UTILITIES & ENVIRONMENTAL PROECTECTION ($000s)
PROJECT PumpandLiftStations DESCRIPTIONS Severalsanitaryandstormliftstationsalongthefloodplainhavebeen submerged.Assessmentisunderwaytodeterminetheextentofthe damagebutatleastoneliftstationwillrequireacompletereplacement. Severalwaterpumpstationshavebeenfloodedandwillrequire extensivecleaning. SERVICEIMPACT CustomerInterruption Safety Regulatorycompliance PublicHealth FireProtection Riverbanks Safety Riverbankshavebeenerodedresultinginunstableandunsafe riverbanks.Anumberoferosionsiteswillneedtobeassessed,however CustomerInterruption thecostestimateisbasedonimmediateneed(5highprioritysites). Furtherassessmentisrequiredandaprioritizationprogramwillbe developed.TwoofthesitesareadjacenttoMemorialDrive. $34,000 ESTIMATEDCOST $3,000
Plants
Regulatorycompliance
$18,000
Waste&Recycling Infrastructure
$800
Total
Note:
$ 55,800
Currently unable to assess full scale of damages until water levels come down to seasonal norms and more information is available following thorough infrastructure inspection. Initial assessments have not been completed for: Outfalls Ponds River Crossings Underground Infrastructure (pipes)
The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided.
Page 6 of 8
PRELIMINARY INITIAL PRIORITY FLOOD RESTORATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) CALGARY POLICE SERVICE ($000s)
PROJECT DESCRIPTIONS PoliceAdministrationBuilding Thebuildinghasdevelopedstructuralfailuresandcontinuestobe assessed. SERVICEIMPACT ESTIMATEDCOST TemporarymovetoProvincial $31,300 CourtHouse(limitedcapacity toprocess&holdprisoners) Reducedvehiclesavailabitlity formembers. $ 3,250
Vehicles(50Patrol)
Writeoffofpatrolvehiclesduetowaterdamage.
Total
Note:
$ 34,550
The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided.
Page 7 of 8
PRELIMINARY INITIAL PRIORITY FLOOD RESTORATION PROJECTS: COST ESTIMATE (FOR INFORMATION ONLY) CIVIC PARTNERS ($000s)
PROJECT TalismanCentre DESCRIPTIONS SERVICEIMPACT Asaresultofthefloodevent,HVACandothermechanicalequipmentis Significantimpacttoservice. Timingtoresumeservices underwater.Toidentifyfullscopeofflooddamage,detailed unknown. assessmentisunderway. ESTIMATEDCOST $ 6,200
CalgaryZoo
Total
Note:
$ 66,200
The costs provided are for recovery only. Additional work may be required for full functionality and improved resiliency. Cost estimates provided are generally Class 5 estimates that include engineering and overhead but no contingency. Costs can be as much as 50% lower or 100% higher than the estimates provided.
Page 8 of 8