DIVISION 2 - SITE WORK SECTION 02050 - DEMOLITION PART 1 - GENERAL 1.

01 DESCRIPTION This Section covers providing the demolition WORK and removal and/or replanting of all items as shown on the Drawings and as required for execution of the new WORK. PART 2 - PRODUCTS (Not used) PART 3 - EXECUTION 3.01 Materials to be Salvaged: Prior to demolition, the CONTRACTOR shall reconfirm from the Company Representative what materials are to be salvaged. Materials identified for salvage shall be carefully disassembled and delivered to reclamation or to SAUDI ARAMCO for storage as and where directed by Company Representative. Items to be reused on this project shall be stored by the CONTRACTOR. Structures: Remove structures and foundations to one and one half (1) meters below existing finish grade or deeper if required to eliminate conflicts with new construction. Abandoned underground tanks and manholes shall be removed in their entirety, regardless of depth. Utilities: Remove utilities and appurtenance to one and one half (1) meters below existing finish grade. Removal may be required to be deeper than one and one half (1 ) meters at selected locations, if required to eliminate conflicts with new construction. All utilities deeper than one and one half (1) meters shall be abandoned in place. All abandoned sewer lines shall be flushed and capped. All electrical systems shall be disconnected per Company Representative and where required, SCECO or STC direction. Pavement: Saw-cut pavement to be removed. Pavement shall be carefully removed so as to avoid damage to areas not intended to be demolished. Existing Parking Space and Sidewalk: Remove existing parking concrete/asphalt sidewalk as shown on the Construction Drawings. space and

3.02

3.03

3.04 3.05 3.06

Existing Concrete Curb and Gutter: Remove existing concrete curb and gutter to provide access to the new parking space. Cut existing concrete curb up to 25mm above the gutter flow link to provide an easy approach for new pedestrian/vehicular ramp as shown on the Construction Drawing.

SECTION 02050
CONSTRUCTION SPECIFICATIONS
DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

1 of 2

3.07

Existing Chain Link Fence: Carefully dismantle and remove existing boundary chain link fence which are to be replaced by a SABG School Standard boundary fence/wall and store as per Company Representative's instructions. Existing Planting: Remove and dispose of existing trees, shrubs and planting as shown on the Construction Drawings. Mark and protect with tags and or barricades, as required, trees, shrubs and planting areas indicated on the Construction Drawings to remain. Confirm plants and procedure with Company Representative for planting shown on the Construction Drawings to be removed and replanted in a new locations. Use of Explosives: Use of explosives for demolition WORK is prohibited. Disposal: Disposal of demolished items shall be in accordance with Section-02110 Clearing and Grubbing. Fill: Fill and compact all excavated holes, hazardous openings or base course resulting from demolition WORK in accordance with Section-02210, Earthwork. Asbestos: Should there be any asbestos materials found while demolition WORK is in process, it shall be handled/disposed of per SAUDI ARAMCO GI.150.001. END OF SECTION

3.08

3.09 3.10 3.11 3.12

SECTION 02050
CONSTRUCTION SPECIFICATIONS
DOC

SABG GIRLS ELEMENTARY SCHOOL AND BOYS INTERMEDIATE SCHOOL MUBARRAZ AND HOFUF

089/ 090

A 2050

BE-315756

2 of 2

Potrebbero piacerti anche