EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-118 30 April 2013 29 April 2013 08.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 12 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Remove Grating & Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 & 03D030 Install Steel Structure For 04E014 Remove Pump 04P005A & 04P001B Install New Foundation Support Pipe Install Insulation Spray Foam for 05T009 Welding Pipe Overlay 800HT 28" Welding Pipe 304H 28" Shop Fabrication steel structure Area 03A 03B 03B 03B 04 04 05 05 Shop Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set Set Set Pcs. DB Kg. Q'ty 5 12 9 Q'ty 1 1 1 1 1 1 2 3 1 2 28 8908 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Remove Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 & 03D030 Grouting Pump Step 2 For 03P020A/B/C Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 36" Area 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Set Set Set DB Q'ty 1 1 1 1 1 1 3 1 3 36 No Activities No. Activities (Tomorrow) Area Unit Q'ty Centering & Leveling Equipment For 02E003A 02 Centering & Leveling Equipment For 02E003A02 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 7 18 14 10 2 9 4 5 3 3 8 3 1 56 56 144 112 80 16 72 32 40 24 24 64 24 8 3 2 8 3 1 4 7 7 17 14 10 2 21 25 51 42 30 8 12 11 6 24 9 5 7 7 18 14 10 2 9 4 5 3 3 8 3 1 113 77 81 195 154 110 24 72 44 40 35 30 88 33 13 1,187 Description 2 2 2 4 Indirect 1 1 4 1 1 1 8 8 32 8 8 8 16 16 16 32 2 1 1 3 1 3 1 1 3 9 3 3 6 3 3 9 1 1 4 1 1 1 2 2 2 4 8 11 41 11 11 8 22 19 19 41 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 3 1 No. 7 8 9 Crane 50T. Crane 500T. Trailer Description 3 3 8 3 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 7 22 16 10 2 9 4 56 56 176 128 80 16 72 32 24 24 64 24 8 7 7 22 16 10 2 9 4 3 3 8 3 1 114 Unit ea ea ea 56 56 176 128 80 16 72 32 24 24 64 24 8 912 Q'ty 1 2 2 2 4 Indirect 1 1 4 1 1 1 8 8 32 8 8 8 16 16 16 32 1 1 4 1 1 1 2 2 2 4 8 8 32 8 8 8 16 16 16 32

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1