Criteria C: Plan
Gantt Chart
From this Gantt chart we can see that to create our whole design cycle, this will take
us about 880 minutes this translates to about 14.6 hours. We think that this amount
of time is reasonable. Because we have about 6 weeks to finish the design cycle,
and every week we have 3 classes of 50 minutes. This means we have 900 minute
to work on this project in class; and also an April break. This gives us enough
flexibility to work on our own pace.
Evaluation of Plan:
Our plan is detailed, it shows what we did every day, we will do what, but most
important of all we have a Gantt chart. This chart helps us to plan how much time
we need for all the different steps of our design cycle. Because we used so much
detail in our plan this will help us a lot to finish our design cycle on time. Since we
planned our work in groups of days and not in single days it is easier to stick to the
plan since this way we can plan our homework more easily.
We have chosen multiple ways of showing what has to be done in what amount of
time on what days, therefore it should be pretty straightforward for someone else to
follow our plan.
We are with three people for this assignment therefore, it will be easier to finish this
design cycle on time. We planned a lot, and are positive that our plan is good,
detailed enough and has prepared us for knowing exactly how much we have to do
in order to finish.