Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Sign Up | Log In
Sub Code: ME 77Page 15 of 55Einstein College of Engineering ACTUATION OF SINGLE ACTING CYLINDER USING
ON AND OFF DELAY TIMERExpt. No.: Date:AIM: To develop an electro-pneumatic circuit for the activation of single acting cylinder using timer.
APPARATUS REQUIRED 1.
Provide power supply to electrical controller by interfacing the +ve to ve and veto ve2.
Provide power supply to pneumatic trainer for electrical controller by interfacing24+ve to +ve and ve to ve.3.
Using the SPDT switch energize the corresponding solenoid to get the desiredmovement of the cylinder4. Actual the time delay circuit.5.
From time delay, give connection to single acting cylinder to actuate the cylinderaccording to time set.6. Design and draw the pneumatic circuit.7.
Connect the air supply.8. Test the circuit9. Observe the working of the cylinder. Circuit diagram-OFF TIMER
www.EEENotes.in
Sub Code: ME 77Page 17 of 55Einstein College of Engineering OFF DELAY TIMER 1. Provide Power supply to pneumatic trainer from electrical controller
byinterfacing +24V and -24V2. Provide 24V power supply to timer3. Any one of the outputs of FRL unit is directly connected to 3/2 single solenoidvalve.4. Single solenoid
valve output is connected to single acting cylinder.5. Give +24V and -24V in timer6. Output of Timer is connected to solenoid coil.7. Check the all circuit8. Observe the working of
cylinder9. Observe the working circuit. RESULT: Thus the movement of single acting cylinder was carried out using time delay.
www.EEENotes.in
Sub Code: ME 77Page 18 of 55Einstein College of Engineering PLC CONTROL OF SINGLE ACTING CYLINDERS ON AND OFF DELAY TIMERExpt. No.: Date:AIM:
To design a circuit to extend and retract the single acting cylinder with the help of delaytimer controlled by PLC. APPARATUS REQUIRED: 1.
Single acting cylinder2. RS 232 cable3. Versa pro software4. 3/2 single solenoid valve5.
Draw the circuit diagram2. Provide +24V and 24V from PLC trainer to panel.3.
Open the versa pro software in desktop4. Interface PLC with PC using RS 232 cable.5.
Write a ladder diagram.6. Output of PLC (q1) is directly connected to input of solenoid coil.7. Following the opening procedure
of versa pro software.8. Check the ladder diagram.9. Connect the air supply to FRL unit.10. Run the PLC. After some delay the cylinder will be activated.
Leave a Comment
You must be logged in to leave a comment. Submit Characters: 400
Follow Us! scribd.com/scribd twitter.com/scribd facebook.com/scribd About Press Blog Partners Scribd 101 Web Stuff Support