Sei sulla pagina 1di 2

Reporting format: Interim Technical Report (suggested outline)

(max 12 pages) 1. 2. 3. 4. 5. 6. 7. 8. 9. Short Background Comments on Terms of Reference (if any) Approach to the assignment (methodology) Set up and members of the Technical Team (if any) Proposed work plan (including travel plan of experts) Results of initial document review, consultations and TNA etc Key issues to be addressed/solved (if any) Financial statement (brief, if required) Recommendations

Annexes: First proposed outlines for the technical document to be devised within the assignment (management plan, policy, legislation, study, training topics, etc) Note:
The Interim Technical Report is generally prepared shortly after arrival in the country by the Consultant. The objective is to set the scene for the future implementation of the assignment and ensure that at an early stage any potential problems or misunderstandings are identified. Also it is at this stage that any major changes in conditions that have occurred since the ToRs were prepared need to be acknowledged and incorporated into planning. The Interim Technical Report will demonstrate that implementation is on track at this early stage and also will ensure that inputs can be made and support provided at certain points in implementation e.g. to plan monitoring missions by the RFU and CU. The ITR is often prepared after the Inception Phase or after the Assessment phase (depending on the terminology in the ToR).

Reporting format: Final Technical Report (suggested outline) Cover page Table of contents List of Tables, list of Figures, list of photographs List of annexes Acknowledgements Abbreviations and acronyms Executive summary (max 2 pages in relevant language (French, Portugese or Spanish and English) where the assignment is in an English speaking country, the ES should be in French as well or any other relevant language) Main report 1. Background 2. Approach to the assignment 3. Comments on Terms of Reference 4. Organisation and Methodology 4a) Delivery of Terms of Reference (table as below) Terms of reference (each of the key activities from the ToR) How delivered through the assignment (has it been done? Or how has it been met as a clear basis for evaluation summary text only as details will be included in other parts of the report) ...... ............

1 2

Briefing by the ACP Fish II programme and Fisheries Department Hold Consultative Workshop for X day(s) with X participants And so on ..........

4b) Conduct of assignment/details of the assignment 5. Conclusions and recommendations Annexes (from): Terms of Reference Itinerary, institutions and individuals consulted Interim Technical Report List of reports and documents consulted Technical outputs (e.g. Fisheries management plan, Draft legislation or amendments, Report of stakeholder workshop, Training module)

Potrebbero piacerti anche