Sei sulla pagina 1di 28

LIST OF DOCUMENTS

LIST DOC - 001-1 LIST DOC - 001-2 LIST DOC - 002 LIST DOC - 003 LIST DOC - 004 LIST DOC - 005-1 LIST DOC - 005-2 LIST DOC - 005-3 LIST DOC - 005-4 LIST DOC - 006 LIST DOC - 007-1 LIST DOC - 007-2 LIST DOC - 007-3 LIST DOC - 008-1 LIST DOC - 008-2 LIST DOC - 008-3 LIST DOC - 008-4 LIST DOC - 008-5 LIST DOC - 008-6 LIST DOC - 008-7 LIST DOC - 008-8 LIST DOC - 008-9 LIST DOC - 009-1 LIST DOC - 009-2 LIST DOC - 009-3 CODES AND SPECIFICATION CODES AND SPECIFICATION TEXT BOOKS HANDBOOKS AND MANUALS PRODUCT GUIDES SOIL REPORTS SOIL REPORTS SOIL REPORTS SOIL REPORTS SOFTWARE BOOKS SUPPORTIVE DOCUMENTS SUPPORTIVE DOCUMENTS SUPPORTIVE DOCUMENTS PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN LATEST PROJECTS LATEST PROJECTS LATEST PROJECTS

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE TB - 01 TB - 02 TB - 03 TB - 04 TB - 05 TB - 06 TB - 07 ISSUE STATUS REV.

TEXT BOOKS
AMD.MT DATE ISSUED 29/11/04 23/08/00 09/12/09 09/12/09 19/7/01 08/07/97 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

1 Reinforced Concrete Design 2 Structural Design in Practise 3 Building Construction Illustrated 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Geotechnical Engineering Pile Design & Construction Reinforced Concrete Design Theory & Examples Engineering Properties of Soils and their measurements Problems in Soil mechanics and Foundation Engineering

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 1 General Notes 2 Testing of Piles 3 Liebherr Tower Crane 4 Potain 5 Vibration 6 Soil 7 Formwork 8 Water Tank 9 General 10 Steel (ABSL) 11 Cracks 12 Elevators 13 Formats 14 Derrick Crane 15 Self Compaction Concrete 16 Steel Work 17 Bearing Pads 18 Pilling 19 Reinforcement 20 Concrete TITLE DOCUMENT CODE SD 01 SD 02 SD 03 SD 04 SD 05 SD 06 SD 07 SD 08 SD 09 SD 10 SD 11 SD 12 SD 13 SD 14 SD 15 SD 16 SD 17 SD 18 SD 19 SD 20 ISSUE STATUS REV.

SUPPORTIVE DOCUMENTS
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE SD 21 SD 22 SD 23 SD 24 SD 25 SD 26 SD 27 SD 28 SD 29 SD 30 SD 31 SD 32 SD 33 SD 34 SD 35 SD 36 SD 37 SD 38 SD 39 SD 40 SD 41 ISSUE STATUS REV.

SUPPORTIVE DOCUMENTS
AMD.MT DATE ISSUED LOCATION RESPONSIBILITY INT EXT REMARKS

21 H25/14C Tower Crane 22 Architectural Details 23 Pre Tension 24 Concrete Ingradients Testing 25 Details of water tanks/Soakage pit/Water Sump 26 Dewatering & Shoring 27 Design of Formwork 28 Heat resistant Paint 29 Quotations 30 Tiling on Post tension floors 31 Post tension' 32 Alternative to River Sand (Sea Sand) 33 Concrete paved Roads 34 Scour depth of bridge piers 35 Open Channel flow calculation 36 Sign board on roads structural details 37 Automatic fire alarm system 38 DEMING water proofing 39 Ground improvement methods 40 Composite Structures 41 Bvar bending machine

Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE SD 42 SD 43 SD 44 SD 45 SD 46 SD 47 ISSUE STATUS REV.

SUPPORTIVE DOCUMENTS
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

42 Concrete drains and Channels 43 Details from RDA 44 Cathodic Protection 45 Treatment Plant 46 Thermometer 47 Curing of Concrete 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE Documents of Structural Design & Build Contract Nelung Arts Centre Nelung Art Claims Handing Over lists and gurantee certificates Received Drawings Roof-Bluescope Foundation Documents COC Approval Bill of Quantities Other DES/2 DOCUMENT CODE DES/1 ISSUE

MISSALENIOUS
STATUS REV. AMD.MT DATE ISSUED LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY INT EXT REMARKS

1
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8

2.0 Head Office General 2.1 2.2 2.3 2.4 2.5 2.6 Monthly Reports Information of Trainees Meeting Minutes MAGA General- Memorandums

Record Room
DES/3

3.0 Fairmount Rajagiriya 3.1 3.2 3.3 3.4 Priced BOQ 01 - Fairmount Recidencies Priced BOQ 02 - Fairmount Recidencies Bored Pile Details 2 Bored Pile Details 3

Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 4.0 Master file 5.0 List of Inward Drawings 6.0 Out side Letters & Documents 7.0 Drawing Issue Sheets 8.0 Design office Training for Corporate Membership of IESL TITLE DOCUMENT CODE DES/4 DES/5 DES/6 DES/7 DES/8 ISSUE

MISSALENIOUS
STATUS REV. AMD.MT DATE ISSUED LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY INT EXT REMARKS

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE SW-1 SW-2-1 SW-3 SW-4 SW - 5 ISSUE STATUS REV.

SOFTWARE BOOKS
AMD.MT DATE ISSUED LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

1 SAP 2000 Basic Analysis Reference 2 SAP 2000 Introductory Tutorial 3 SAP 2000 Introductory Tutorial 4 SAFE - Post Tensioned Concrete Design Manual

5 Mstower V6 - User's Manual 6 7 8 9 10 11 12 13 14 15 16 17 18

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 1 TITLE Proposed Twelve storied building at Havelock Road , Thibirigasyaya DOCUMENT CODE SR-1 SR-2 SR-3 SR-4 SR-5 SR-6 SR-7 SR-8 SR-9 ISSUE STATUS REV.

SOIL REPORTS
AMD.MT DATE ISSUED March-05 15.03.04 July-05 Sep-05 05.03.206 Feb-06 May-06 Aug-06 Mar-07 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

2 Twelve story building with basement at Union Place 3 Proposed four story building at Malabe 4 Proposed six storied building at Park street 5 Radion way residencies at Colombo 05 6 Proposed Ten storied building at Havelock Road Proposed Six storied Apartment Building -Handala Wattala Proposed Eighteen Storied Apartment complex for 8 Fairmount Project Geotechnical Investigation for Proposed Chocolate 9 Factory & Ware House at Ranala 7 10 Geotechnical Investigation for Proposed Building Complex at No.81,HydePark Corner,Colombo 02 Proposed 10 storied Office Building at Premises No 23 Foster Lane Appartment Complex at NO 18 Gregory's Road,Colombo 7

SR-10

14.06.08

Cupboard No-1

Design Engineer

11 12

SR-11 SR - 12 SR-13 SR-14 SR-15 SR-15-1 SR-16 SR - 17 SR - 18 - 1

Feb-08 13.08.09 Mar-07 Jun-09 22.10.09 29.10.09 20.11.09 20.01.2010 29.12.2009

Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1

Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer

13 Proposed 54 Stroied Building at T.B. Jayamawatha 14 Proposed New Filling Station at J Ela 15 16 Proposed 30 storied Building at No.200 ,Nawala Road Proposed 30 storied Building at No.200 ,Nawala Road (Additional Soil Investigation)

17 Proposed Bridge at Trirukowil 18 19 Proposed 8 storied buddhist multifunctional building at Havelock Road-Colombo 05 Proposed 15 storied building at No.200, nawala Road, Colombo 05

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 20 21 22 23 TITLE Proposed 30 storied building at No.200, nawala Road, Colombo 05 Proposed apartment building at empire theatre premises, braybrooke place, colombo 02 Geotechnical investigation of Proposed Fairway Mega Mall at Rajagiriya Geotechnical investigation of Proposed 12 storied apartment at colombo 05 DOCUMENT CODE SR - 18 - 2 SR - 19 SR - 20 SR - 21 SR - 22 SR - 23 SR - 24 SR - 25 SR - 26 SR - 27 SR - 28 SR - 29 SR - 30 SR - 31 SR - 32 SR - 33 SR - 34 SR - 35 ISSUE STATUS REV.

SOIL REPORTS
AMD.MT DATE ISSUED 01.10.2010 1-Dec-03 10.01.2011 16.03.2011 1-Jan-11 14.01.2010 21.09.2011 21.09.2011 21.09.2011 21.09.2011 21.09.2011 26.09.2011 26.09.2011 26.09.2011 26.09.2011 21.09.2011 21.09.2011 26.09.2011 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

24 PDA Test-Proposed City Mall at Rajagiriya 25 Geotechnical investigation for twelve storied administrative complex at Hambanthota Harbour

26 Thonigala-Galkulama Road- 103+750 27 Thonigala-Galkulama Road- 117+860 28 Thonigala-Galkulama Road- 118+260 29 Thonigala-Galkulama Road- 118+275 30 Thonigala-Galkulama Road- 118+350 31 Anuradhapura-Rambawe Road-0+700 32 Anuradhapura-Rambawe Road-3+000 33 Anuradhapura-Rambawe Road-6+200 34 Anuradhapura-Rambawe Road-11+630 35 Navathkuly-Kerativu Road - 2+400 36 Navathkuly-Kerativu Road - 7+700 37 Manipay-Kaithady Road - 1+150

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE SR - 36 SR - 37 SR - 38 SR - 39 SR - 40 SR - 41 SR - 42 SR - 43 SR - 44 SR - 45 SR - 46 SR - 47 SR - 48 SR - 49 SR - 50 SR - 51 SR - 52 SR - 53 ISSUE STATUS REV.

SOIL REPORTS
AMD.MT DATE ISSUED 26.09.2011 26.09.2011 26.09.2011 26.09.2011 30.08.2011 30.08.2011 12.08.2011 30.08.2011 30.08.2011 20.09.2011 20.09.2011 20.09.2011 20.09.2011 20.09.2011 30.11.2011 01.03.2013 01.03.2013 05.03.2013 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

38 Manipay-Kaithady Road - 9+510 39 Manipay-Kaithady Road - 10+225 40 Manipay-Kaithady Road - 12+025 41 Manipay-Kaithady Road - 13+075 42 Mankulam-Mulativu Road - 1+010 43 Mankulam-Mulativu Road - 1+670 44 Mankulam-Mulativu Road - 2+800 45 Mankulam-Mulativu Road - 3+076 46 Mankulam-Mulativu Road - 3+290 47 Mankulam-Mulativu Road - 4+400 48 Mankulam-Mulativu Road - 6+440 49 Anuradhapura-Rambawe Road-7+050 50 Anuradhapura-Rambawe Road-8+810 51 Navathkuly-Kerativu Road - 11+990 52 Sky Garden- Rajagiriya 53 Treatment Plant - mahiyanganaya 54 Treatment Plant - mahiyanganaya 55 Clearpoint Residencies - Rajagiriya

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE SR - 54 SR - 55 ISSUE STATUS REV.

SOIL REPORTS
AMD.MT DATE ISSUED 05.04.2013 31.03.2011 LOCATION Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer INT EXT REMARKS

56 Deal Place - Colombo 03 57 Plate Bearing Test at Jaffna Teaching Hospital 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PG - 01 PG - 02 PG - 03 PG - 04 PG - 05 PG - 06 PG - 07 PG - 08 PG - 09 PG - 10 ISSUE STATUS REV.

PRODUCT GUIDES
AMD.MT DATE ISSUED LOCATION RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

1 SC 200/200W Construction Hoist 2 Sc200/200W Hoist 3 Form Work Scaffolding & Accessories 4 HILTI Applications & Products 5 Sin Seng Uuat Hardware (Pte) Ltd 6 FINCO World Class Construction Chemicals 7 Product Guide- Chuan Eu International (Pte) Ltd 8 HILTI Fastening Technology Manual 9 Technical Manual 10 Steel Product Guide 11 12 13 14 15 16 17 18

08/12/09 Cupboard No-1 08/12/09 Cupboard No-1 08/12/09 Cupboard No-1 08/12/09 Cupboard No-1 9/2/1999 Cupboard No-1 08/12/09 Cupboard No-1 08/12/09 Cupboard No-1 08/12/09 Cupboard No-1 08/12/09 Cupboard No-1 08/12/09 Cupboard No-1

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE HB - 01 HB - 02 HB - 03 ISSUE STATUS REV.

HANDBOOKS AND MANUALS


AMD.MT DATE ISSUED 21/07/95 20/08/05 25/04/02 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer INT EXT REMARKS

1 Reinforced Concrete Designer's Hand Book 2 Standard method of Detailing Structural Concrete

3 Concrete Manual HandBook of Applied Sanitary Engineering for Architects & Building Services Engineers

HB - 04

9/12/2009

Cupboard No-1

Design Engineer

5 Reynold Hand Book Part2 6 Manual for the Designm of Reinforced Concrete Structures

HB - 05 HB - 06 HB - 07 HB - 08 HB - 09

23/08/00 04/11/95 2009 2009 2009

Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1

Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer

7 High Rise Manual 8 Technical Specification Part 1 9 Technical Specification Part 2 10 11 12 13 14 15 16 17

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PD - 01 PD - 02 PD - 03 PD - 04 PD - 05 PD - 06 PD - 07 PD - 08 PD - 09 PD - 10 PD - 11 PD - 12 PD - 13 PD - 14 PD - 15 PD - 16 PD - 17 PD - 18 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

1 JKH Apartment at Union Place 2 Ranjanas 3 Zahira College 4 JA Ela Filling Station 5 JA Ela Quotation 6 Modification Work-Residence BuildingMr.Dayan Gomas

7 Water Tower at Kesbewa 8 Weeraketiya Temple 9 Fly over Bridge at Maho 10 Ambatale Batching Plant 11 Kandy Water Supply Project 12 Corporate Office-Vauxhall Street 13 Gregory's Road Apartment 14 Temple Trees 15 Advanced Technological Institute-Mattakkuliya 16 Southern International Airport- Hambathota 17 Peoples bank- Nugegoda 18 Water Supply Project - Kanthale

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PD - 19 PD - 20 PD - 21 PD - 22 PD - 23 PD - 24 PD - 25 PD - 26 PD - 27 PD - 28 PD - 29 PD - 30 PD - 31 PD - 32 PD - 33 PD - 34 PD - 35 PD - 36 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

19 Nelung Arts Centre - Phase ii Plumbing 20 Colombo Sewarage Rehabilitation Project 21 Potuvil - Akkarai Pattu Bridge Design 22 Head Office Building 23 Unilever Sri Lanka 24 Environmental & Natural Resources at Pitakotte 25 Electricity Board 26 Buddhist Centre (Superseded) 27 Keththarama Stadium 28 Proposed scaffolding yard (Sunvita) 29 Nestle Lanka Factory 30 Nochchiyagama 31 Kirindi Oys Water Supply Project 32 Kandy Water Supply Project 33 Royal College 34 Photovoltaic Power Plant Hambanthota 35 Hambanthota harbour 36 Auditor General's Department-Battaramulla

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PD - 37 PD - 38 PD - 39 PD - 40 PD - 41 PD - 42 PD - 43 PD - 44 PD - 45 PD - 46 PD - 47 PD - 48 PD - 49 PD - 50 PD - 51 PD - 52 PD - 53 PD - 54 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

37 Greater Kandy water supply project 3A 38 Ramada Resort 39 Kandy 4A 40 40 storied Building Colombo 41 Ware house 42 Airport Hotel Building 43 Anliana hotel at Nilaveli 44 House (Mr.Piyadasa) 45 MAS Factory at Muhamale 46 500 Houses 47 Imperial Tower 48 Mini Hydropower project 49 Head office building 50 M.D.Gunasene Building 51 Fairway Mega Mall at Rajagiriya 52 General Sir john kothalawala defence university medical faculty

53 Hambanthota Tower Crane 54 Improvements of Hatton - Nuwar Eliya road

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PD - 55 PD - 56 PD - 57 PD - 58 PD - 59 PD - 60 PD - 61 PD - 62 PD - 63 PD - 64 PD - 65 PD - 66 PD - 67 PD - 68 PD - 69 PD - 70 PD - 71 PD - 72 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

55 Proposed G.S. Tower 56 Proposed officesfor MAGA and Wakachiku, Jaffna Hospital

57 9th Lane Nawala 58 Outer Circular Road 59 HNB office building Jaffna 60 Apartment complex at kirimandala Mawatha 61 Intake- mahiyanganaya 62 Rehabilitation of Kandy to Jaffna Road 63 HNB Jaffna/ Shoring before 06/01/2011 64 Fairway Residencies 65 66 67 68 69 70 Construction of new tunnel at mahiyawa on kandy-jaffna road (A 09) China electric design and research institute of MMI Diyawannarma purana viharaya at temple road nawala The project for the reconstruction of five briges In eastern province, Detail Design Housing project relocation of underserved settlement Proposed branch office for peoples bank at no 50,Matara Road, Tangalle

71 Siribopura flyover Hambanthota 72 Multy Purpose gamma-radiator facility for atomic energy authrity at biyagama

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PD - 73 PD - 74 PD - 75 PD - 76 PD - 77 PD - 78 PD - 79 PD - 80 PD - 81 PD - 82 PD - 83 PD - 84 PD - 85 PD - 86 PD - 87 PD - 88 PD - 89 PD - 90 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

73 Pandal Smbuddhathwa Jayanthiya 74 75 76 Proposed utility building for M/S peoples leasing company Ltd Proposed class room block (Building Type 3)Hakmana Structural Drawings from PLP for proposed utility Building

77 Bridge 6/2 Collupitiya-battaramulla road 78 Proposed branch office for peoples bank at moratuwa road, Piliyandala

79 Southern Transport Development Project 80 81 Main Gate and Boundary wall for ananda sastralaya Greater Kandy water supply project Phase 01Stage 02

82 Puttalam-Nochchiyagama Road, Foot Walk 83 Proposed house for MAGA employee S jayasena-Anuradhapura

84 House for Mr.Chandrasena 85 Moibile Crusher Plant 86 Circuit Bungalow 87 Proposed Apartment complex for L&T 88 Northern connectivity road project 89 Mihindupura housing at baseline road 90 Buddha Statue

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE PD - 91 PD - 92 PD - 93 PD - 94 PD - 95 PD - 96 PD - 97 PD - 98 PD - 99 PD - 100 PD - 101 PD - 102 PD - 103 PD - 104 PD - 105 PD - 106 PD - 107 PD - 108 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-1 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

91 PrintXcel Private limited 92 93 94 Modifications to official Residence of Governor Central Bank Nugawela Service Reservoir- Greater Kandy Water Supply Project Proposed 12 + Roof top head office building for Department of census & statistics

95 MAS Intimates Thurulie 96 Havelock City 97 INOAC Polymer Lanka New Factory Building 98 Proposed head office building for Prime lands (pvt) ltd

99 Ceylon Synthetic-Textile Mills Limited (Stage ii) 100 "OZO Hotel" at Clifford Road, Colombo 03 101 RDA Circuit Bungalow, Mihinthale 102 Apartment complex for aelian gunawardana 103 Proposed jana sevana housing programme at homagama

104 Mt.Clifford development Homagama 105 Box culvert at Rajagiriya Junction 106 Keels City Project 107 Prime minister's Office 108 Government Building Complex, Sri Lanka cement corporation

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 109 Low cost House 110 Proposed national nanotechnology park phase 1a,pitipana,Homagama TITLE DOCUMENT CODE PD - 109 PD - 110 PD - 111 PD - 112 PD - 113 PD - 114 PD - 115 PD - 116 PD - 117 PD - 118 PD - 119 PD - 120 PD - 121 PD - 122 PD - 123 PD - 124 PD - 125 PD - 126 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

111 Point Pedro water supply scheme 112 Extension for Design Office 113 Extension for the chamber of commerce 114 Proposed Multy-Storied Building at Wellawatte 115 116 Proposed 15 storied apartment complex at no.16 Deals place Proposed factory for Wikins Spence Packing Lanka (pvt) Ltd

117 Proposed 5 storied resort at Waskaduwa 118 Hakmana-Beliaththa Road 119 Proposed City Hotel Development at Marine Drive

120 Sky Garden 121 Proposed Mercedez Benz centre 122 Proposed Luxury Hotel at Clock tower road, Jaffna

123 Customer Complains for Batching Plants 124 Improvement and Rehabilitation of ThihagodaKamburupitiya- Mawarata-Kotapola road

125 Sithulpawwa Stupa 126 Proposed Vidiyal factory for MAS Intimates (pvt) Ltd

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 127 TITLE Proposed building for the royal Thai Embassy at alexxandra place, Colombo 07 DOCUMENT CODE PD - 127 PD - 128 PD - 129 PD - 130 PD - 131 PD - 132 PD - 133 PD - 134 PD - 135 PD - 136 PD - 137 PD - 138 PD - 139 PD - 140 PD - 141 PD - 142 PD - 143 PD - 144 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

128 Head office kotte site 129 Proposed house for sanath and awanthi 130 Proposed Show room and office building for Mr.D.U.Jayasinghe

131 Council for the Blind 132 Proposed city hotel at Chathem Street 133 Temple for Mr.Saman 134 Proposed Awasage at Sooriyawewa 135 Proposed apartment complex at no.18 Gregory's road, Colombo 07

136 Epilepsy Hospital and Health Centres Project 137 HSBC 138 City Hotel 139 Warter Supply Project- dambulla 140 DFCC 141 LOLC 142 Australian Embassy 143 Clear Point Residencies 144 Brandix Intimates

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 145 Jetwing City Hotel 146 Royal Thai Embassy 147 Ayurveda hospital-Borella 148 Temple-Athurugiriya 149 Mr & Mrs Ranjith 150 Water supply Scheme-Puttalam and Chilaw 151 152 153 154 155 156 157 158 159 160 161 162 TITLE DOCUMENT CODE PD - 145 PD - 146 PD - 147 PD - 148 PD - 149 PD - 150 ISSUE STATUS REV.

PRELIMINARY DESIGN
AMD.MT DATE ISSUED LOCATION Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 Cupboard No-2 RESPONSIBILITY INT EXT REMARKS

Water Supply Project - Kanthale Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE DOCUMENT CODE DC - 01 DC - 02 DC - 03 DC - 04 DC - 05 DC - 06 DC - 07 DC - 08 DC - 09 DC - 10 DC - 11 DC - 12 DC - 13 DC - 14 DC - 15 DC - 16 DC - 17 DC - 18 DC - 19 ISSUE STATUS REV.

CODES AND SPECIFICATION


AMD.MT DATE ISSUED 17/08/07 15/08/06 15/08/06 15/08/06 15/08/06 15/08/06 15/08/6 15/08/06 06/07/08 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer INT EXT REMARKS

1 BS 8004: 1986 Foundation 2 BS 6399 :Part 1&3 1996 Loading for Buildings 3 BS 8110: Part2 1985 Structural Use of Concrete 4 BS 8110: Part3 1985 Structural Use of Concrete 5 CP3-ChapterV Part2:1972 Wind Load 6 BS 5628 Part1 1978 Structural Use of Masonry 7 CP112 Part2 1971 -The structural Use of Timber 8 9 BS8298 1989 Design and instalation of Natural Stone Cladding and Lining BS 5268 Part2 1991 The Structural Use of Timber

10 SS213 - 1998 Unplasticizied PVC pipes & fitting 11 BS8110 :part1 1997 structural use of concrete 12 13 14 15 Bs 882-1983 Aggregats from Natural Source of Concrete BS8007 1987 Design of Concrete Structures for Retaining aqueous Liquids BS 5950 Part1 -1990 Design of Structural Steel Work Bs 5950 Part1 -2000 Design of Structural Steel Work

15/08/2006 Cupboard No-1 17/08/2007 Cupboard No-1 15/08/06 17/08/07 15/08/06 17/08/07 17/08/06 23/08/00 15/08/06 15/08/06 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1 Cupboard No-1

16 BS 6399 :Part 1 1996 Loading for Buildings 17 Design of Buildings for High Winds BS 5400 Part6 1999 -Steel,Concrete and 18 Composite Bridges 19 BS 5400 Par3 2000 -Steel,Concrete and Coposite Bridges

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. 20 21 22 TITLE Reinforcement Detailing to mitigate seismic effects Standard specification for construction and maintenance of roads and bridges Minimum Design loads on structures-Part 4Earthquakes Load DOCUMENT CODE DC - 20 DC - 21 DC - 22 ISSUE STATUS REV.

CODES AND SPECIFICATION


AMD.MT DATE ISSUED 15/08/06 15/08/06 15/08/06 LOCATION Cupboard No-1 Cupboard No-1 Cupboard No-1 RESPONSIBILITY Design Engineer Design Engineer Design Engineer INT EXT REMARKS

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE PROPOSED APARTMENT COMPLEX,FAIRMOUNT RESIDENCIESRAJAGIRIYA 1 Correspondance 2 Design Calculations 3 Design Calculations DES/FMR/1 DES/FMR/2 DES/FMR/3 DOCUMENT CODE ISSUE STATUS REV.

LATEST PROJECTS
AMD.MT DATE ISSUED LOCATION RESPONSIBILITY INT EXT REMARKS

Rack No - 1 Rack No - 1 Rack No - 1

Design Engineer Design Engineer Design Engineer

PROPOSED APARTMENT COMPLEX, SKY GARDEN-RAJAGIRIYA 1 Design Calculations 2 Design Calculations 3 Concrete Check List 4 Concrete Cube Test Result DES/SG/1 DES/SG/2 DES/SG/3 DES/SG/4 Rack No - 1 Rack No - 1 Rack No - 1 Rack No - 1 Design Engineer Design Engineer Design Engineer Design Engineer

PROPOSED ADMINISTRATIVE BUILDINGSETHSIRIPAYA STAGE II 1 Design Calculations 2 Design Calculations DES/ACS/1 DES/ACS/2 Rack No - 1 Rack No - 1 Design Engineer Design Engineer

CEYLINCO CELESTIAL RESIDENCIESCOLOMBO 03 1 Design Calculations DES/CCR/1 Rack No - 1 Design Engineer

Validity Period Number of Documents as at the Date

Prepared by Approved by
N.S.A. Wanigarathne

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE HIGH RISE OFFICE COMPLEX FOR MAGA ENGINEERING (Pvt) Ltd 1 Pilling Details from Nawaloka 2 Concrete pouring details for Piles 3 Design Calculations 4 Design Calculations 5 Concrete Approval Sheets 6 Approvals for Setting-out DES/HO/1 DES/HO/2 DES/HO/3 DES/HO/4 DES/HO/5 DES/HO/6 DOCUMENT CODE ISSUE STATUS REV.

LATEST PROJECTS
AMD.MT DATE ISSUED LOCATION RESPONSIBILITY INT EXT REMARKS

Rack No - 1 Rack No - 1 Rack No - 1 Rack No - 1 Rack No - 1 Rack No - 1

Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer Design Engineer

PROPOSED APARTMENT COMPLEX, CLEAR POINT RESIDENCIES-RAJAGIRIYA 1 Design Calculations DES/CP/1 Rack No - 1 Design Engineer

PROPOSED MODEL GREEN FACTORY, LINEA SENSUAL (PVT) LTD-THULHIRIYA 1 Design Calculations 2 Design Calculations 3 Drawings Superseded DES/MAS/1 DES/MAS/2 DES/MAS/3 Rack No - 1 Rack No - 1 Rack No - 1 Design Engineer Design Engineer Design Engineer

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date

MASTER LIST OF DOCUMENTS - Mga Engineering ( Pvt ) Ltd.


NO. TITLE CENTRAL WORKSHOP HOMAGAMA BATCHING PLANT - AMBATHALE DOCUMENT CODE DES/CW/1 DES/BP/1 ISSUE STATUS REV.

LATEST PROJECTS
AMD.MT DATE ISSUED LOCATION Rack No - 1 Rack No - 1 RESPONSIBILITY Design Engineer Design Engineer INT EXT REMARKS

Validity Period Number of Documents as at the Date

Prepared by Approved by

Signature Signature

Date Date