KCSD Board 2013 of Education Meeting Bond Follow Up Design Initiatives 6 Dec. 2012 KHS Second Century Capital Plan
5 June 2013
Agenda
1) Guiding Principles of the Capital Plan
2013 Bond Follow Up Design Initiatives 6 Dec. 2012
4) Review of Phasing / Swing Space Strategy and Schedule for Recommended Plan 5) Discussion of Updated Bond Cost for Recommended Plan 6) Next Steps
2) Correct ADA compliance issues 3) Repair / replace building systems that are beyond their serviceable life 4) Enhance campus security & safety 5) Improve campus pedestrian & vehicle circulation 6) Develop a budget cost model that is prudent
2013 Bond Follow Up Design Initiatives 6 Dec. 2012
New Const. 2013 Bond Follow Up Design Initiatives 6 Dec. 2012 Main Salzmann
MJM
Site Plan
Site Plan
Maker Space
Music
per le p u ( 1 # SLC
vel)
6 Dec. 2012
Wellness
SLC #2 (u
pper level)
9
SLC #3
2013 Bond Follow Up Design Initiatives 6 Dec. 2012
6 Dec. 2012
AP / Specials
SLC #4 (u
pper level)
11
Construction Delivery
Construction Time Period: Spring 2015 to Fall 2018
2013 Bond Follow Up Design Initiatives 6 Dec. 2012
13
Summer Work
2013 Bond Follow Up Design Initiatives 6 Dec.st2012 1 Summer: Field House and Salzmann Classrooms 2nd Summer: Salzmann Cafe, Kitchen and Media Center
14
Site Improvements Provide new all-weather athletic field Increase site lighting Remove deteriorated covered walkways Upgrade primary site utility entrances Repair damaged site stairs
SUB_TOTALS:
5,000,000
15
SUB_TOTAL:
KHS Second Century Capital Plan
18,700,000
16
SUB_TOTAL:
$ 65,700,000
17
Energy / Mechanical Upgrades Replace steam HVAC system with hot water Add Air Conditioning to Field House Replace electrical service entrance & equipment Renovate/upgrade plumbing system Upgrade sprinkler system for assembly space
SUB_TOTAL:
MJM Demolish the building in lieu of extensive renovations and additions
14,100,000
SUB_TOTAL:
Tobin/Whiston Demolish the building in lieu of extensive renovations and additions
1,500,000
SUB_TOTAL:
KHS Second Century Capital Plan
1,400,000
18
6 Dec. 2012
19
20
21
22
23
24
KHS Second Century Capital Plan Celebrating the History a Vision to the Future
25
Discussion
1) Other discussion items
2013 Bond Follow Up Design Initiatives 6 Dec. 2012
26
Thank You !