Sei sulla pagina 1di 5

1.

Dimensioning of the isolated foundations under columns

Geological investigations and land stratification: Two geotechnical drills were executed, reaching the depth of -2.00 m. The geotechnical drills aimed at establishing of the following particularities of the site: - ground stratification; - the position of the groundwater hydrostatic level and variability; - physical and mechanical characteristics of soil layers; - estimation of absolute deformations, which can appear; - assessments on the overall stability of the site; Foundation soil stratification: 0,00...-0,40 m topsoil - 0,40...-1,10 m - light brown hard clay - 1,10...-2,00 m - brown clay The recommended minimum foundation depth Df = -1,1 m Geotechnical parameters for foundation at the recommended depth: = 23,3 kN/m3 Ic = 0,79 (consistency index) w = 38,4 (natural humidity) = 18 (angle of internal friction) c = 25 KN/m2 (specific cohesion) e = 0,8 (porosity index) a) Foundation predemensioning calculation based on conventional pressure. 1.1 Establishing minimum depth of foundation: Df1 = 1.00 m Df1 = Hfrost + 0,10...0,30 m; Hfrost = -0,70 m Df2 = 1.60 m Df2 = Hter.bun + 0.30...0.50 m; Hter.bun = -1,10 m Df = max(Df1 , Df2) = 1.60 m 1.2 Establishing the plan dimensions of the base isolated foundation under the rigid connected column. = 1.20 Condition: pef.max pcon and pef.min 0 Plan dimensions of the foundation are: length L, width B L = 1,4 m; B = 1,4 m; L/B = 1 1.2.1. Establishing conventional pressure: pcon = 300 kN/m2

Conventional pressure corrections: a) Depth correction: Df < 2 m => CD = pcon kN/m2

pcon = 300 kN/m2


b) Correction of pcon function of foundation width B: B< 5 m K1 = 0,05 cohesive soils => CB = pcon k1 (B-1) = 300 B = 1,4 m The corrected value of pcon bevomes: pconv = pcon + CD + CB = 276 kN/m2

(1,6-1) = 6 kN/m2

p1.2 =
Gf = 1,20 Df L B med = 1,20 1,60 1,40 1,40 19,8 = 74,51 kN NEd = 242,43 kN MEd = 40,47 kNm VEd = 26,48 kN 250.19 kN/m2 < 1,20 pconv = 331,2 kN/m2

p1 = p2 =

73,21 kN/m2

>0

1.3. The dimensions on vertical direction of the foundation: prismatic bearing with the dimensions: length lc, width bc, height hc

=> lc = bc = 0,8 m hc > 0,3 m => hc = 0,55 m


the height of the solid foundation block H = 0,7 m

2. Checking the subsoil deformation for limit state: a) Max effective contact pressure pef.max 1,2 ppl ppl = ppl = 1,4 m1 = 1,4; Ic > 0,5 (cohesive soils)

kN/m2

B = 1,4 m q = 1 h1 + 2 h2 + 3 h3 = 17,5 0,35 + 18,6 0,75 + 23,3 0,5 = 31,72 kN/m2 c = 25 kN/m2 N1 = 0,43; N2 = 2,72; N3 = 5,31

med =

21,32 kN/m3

Vc = 0,55 0,8 0,8 = 0,352 m3 Vb = 1,4 1,4 0,7 = 1,372 m3 VS1 = 0,8 0,8 0,35 = 0,224 m3 VS2 = 1,4 1,4 0,2 + 0,8 0,8 0,55 = 0,744 m3 VS3 = 1,4 1,4 0,5 = 0,98 m3 NEd = 294 Gf = 1,20 Df L B med = 1,20 1,60 1,40 1,40 21,32 = 80,23 kN MEd = 47,7 kNm ppl = kN/m2

pef.max =

= 295,2 < 1,20 ppl = 387,98 kN/m2

3. Establishing the plan dimensions of the base isolated foundation under the pinned connected columns. = 1.20 Condition: pef.max pcon and pef.min 0 Plan dimensions of the foundation are: length L, width B L = 1,5 m; B = 1,5 m; L/B = 1 1.2.1. Establishing conventional pressure: pcon = 300 kN/m2 Conventional pressure corrections: a) Depth correction: Df < 2 m => CD = pcon kN/m2

pcon = 300 kN/m2


b) Correction of pcon function of foundation width B: B< 5 m K1 = 0,05 cohesive soils => CB = pcon k1 (B-1) = 300 B = 1,5 m The corrected value of pcon bevomes: pconv = pcon + CD + CB = 277,5 kN/m2

(1,6-1) = 7,5 kN/m2

p1.2 =

Gf = 1,20 Df L B med = 1,20 1,60 1,50 1,50 19,8 = 85,53 kN NEd = 472,56 kN MEd = 0 kNm VEd = 29,53 kN 249,37 kN/m2 < 1,20 pconv = 333 kN/m2

p1 = p2 =

249,37 kN/m2

>0

1.3. The dimensions on vertical direction of the foundation: prismatic bearing with the dimensions: length lc, width bc, height hc

=> lc = bc = 0,8 m hc > 0,3 m => hc = 0,55 m


the height of the solid foundation block H = 0,7 m

2. Checking the subsoil deformation for limit state: a) Max effective contact pressure pef.max 1,2 ppl ppl = ppl = 1,4 kN/m2 m1 = 1,4; Ic > 0,5 (cohesive soils) B = 1,5 m q = 1 h1 + 2 h2 + 3 h3 = 17,5 0,35 + 18,6 0,75 + 23,3 0,5 = 31,72 kN/m2 c = 25 kN/m2 N1 = 0,43; N2 = 2,72; N3 = 5,31

med =

22,38 kN/m3

Vc = 0,55 0,8 0,8 = 0,352 m3 Vb = 1,5 1,5 0,7 = 1,575 m3 VS1 = 0,8 0,8 0,35 = 0,224 m3 VS2 = 1,5 1,5 0,2 + 0,8 0,8 0,55 = 0,802 m3 VS3 = 1,5 1,5 0,5 = 1,125 m3 NEd = 472,56 Gf = 1,20 Df L B med = 1,20 1,60 1,50 1,50 22,38 = 96,68 kN MEd = 0 kNm ppl = kN/m2

pef.max =

= 253 < 1,20 ppl = 389,41 kN/m2

Reinforcement dimensioning for bearings dab = 30mm bolt quality 8.8 M3 = 1.25 (for rigid connection) fub = 800 N/mm2 fud = fub/ M3 = 640 N/mm2 Aab = 6,291 cm2 (area of one anchorage bolt) dab = 24mm bolt quality 8.8 M3 = 1.25 (for pinned connection) fub = 800 N/mm2 fud = fub/ M3 = 640 N/mm2 Aab = Concrete Class 25/30 fck = 25 N/mm2 (characteristic compressive strength) c = 1.50 (partial safety factor) fcd = fck/ c = 16,67 N/mm2 fctd = 1,20 N/mm2 (tensile strength of concrete) Steel PC52 fyk = 345 N/mm2 s = 1.15 fyd = fyk/ s = 300 N/mm2 4,02 cm2 (area of one anchorage bolt)

Potrebbero piacerti anche