LP Rim line Machine Foundation Work 22/4/13 to 29/4/13

Sr No.
A
1
2

Description of Work
Edge Rolling Machine
Breaking of Floor
Concreting for Foundation footing
Concreting for pedastal

1
1
1

2.4
2.4
1.6

3 Reinforcement Steel for column footing 10mm dia 13


stirrups

10
6

1.8
2.5
4.6

Column bars dia 20mm

16

1.5

4
1

4.9

4 Grouting Pockets
5 Cement Finish plaster for the same

Width

Depth

1.7
1.7
0.85

0.3
0.3
0.45

0.45

Coning Machine

1 Breaking of Floor

2 Concreting for Foundation

3 Reinforcement steel 10mm dia

4 Cement Finish plaster for the same

Nos. Length

2
1
2

1.7

0.6

0.45

3.2

1.2

0.05

3.4

0.3

0.3

2
1
2
1

1.7

0.6

0.45

3.2

1.2

0.05

3.4
3.2

0.3
1.1

0.3
0.45

7
17
7
17

4.15
2.1
1.2
3.2

8.6

1
1
1
1
4
2

2.35
1.88
3.8
2.1
0.3
0.3

1.75
1.5
1.05
0.7
0.3
1.8

0.3
0.3
0.25
0.25
0.1
0.05

1
1
1
1
1

2.35
1.88
3.8
2.1
2.2

1.75
1.5
1.05
0.7
1.6

0.3
0.3
0.25
0.25
0.2

0.45

Roll Former I

1 Breaking of Floor
Existing Foundation
Power Pack Beam 2 nos

2 Concreting for Foundation

Power Pack Beam 2 nos

4
2
1

0.3
1.8
1.1

9
12
10
7
5
9
4
5
8
18

2.65
2.05
3.35
2.3
2.65
4.5
1.45
1.05
1.8
1.21

1
2

7.6
1.1

1 Breaking of Floor

1
1

2.35
1.88

1.75
1.5

0.15
0.3

2 Concreting for Foundation

1
1
1
1

2.2
2.35
1.88
1.1

1.6
1.75
1.5
0.64

0.1
0.15
0.3
0.1

9
10

2.45
1.85

1
2

7.6
1.1

3 Reinforcement steel 10mm dia

In floor

In power pack beam

4 Cement Finish plaster for the same

4 Cement Finish plaster for the same

0.1
0.45
0.2

0.2
0.2

Roll Former II

3 reinforcement steel 10mm dia

0.3
0.23
0.64

Roll Former III


1 Breaking of Floor for Pockets & Concreting

0.1
0.1

Expander

1 Breaking of Floor for Pockets

2
1

1.4
3.7

0.7
1.2

0.45
0.05

2 Concreting for Foundation

2
1

1.4
3.7

0.7
1.2

0.45
0.1

7
20

3.95
1.45

3 reinforcement steel 10mm dia

4 Cement Finish plaster for the same

Vent Hole D(20 T)


Breaking of Pocket & concreting

Vent Hole D(20 T)


Breaking of Pocket & concreting

1
1
-1

1.5
1.5
0.7

0.1

Leak Test Machine

1 Breaking of Pocket & concreting


2 Concreting for Foundation
less

9.8

missilinious floor patch repairs

1.3
1.3
0.9

0.3
0.3
0.1

0.15

Quantity Rate
1.224
1.224
0.612
1.836
23.4
23.75
27.6
74.75
46.345
24
59.28
105.625
4
2.205

0.918
0.192
0.612
1.722
0.918
0.192
0.612
1.584
3.306
29.05
35.7
8.4
54.4
127.55
79.081
3.87

1.23375
0.846
0.9975
0.3675
0.009
0.027
3.48075
1.23375
0.846
0.9975
0.3675
0.704

Amount

4500

5508

7500

13770

64
150
380

6760
600
837.9
27476

4500

7749

7500

24795

64
380

5061.18
1470.6
39075.8

4500

15663.4

0.036
0.3726
0.1408
4.69815
23.85
24.6
33.5
16.1
13.25
40.5
5.8
5.25
14.4
21.78
199.03
123.399
1.52
0.44
1.96

0.616875
0.846
1.46288
0.352
0.616875
0.846
0.0704
1.88528
20.825
19.24
40.065
0.76
0.22
0.98

0.441
0.222
0.663
0.441
0.444
0.885
27.65
28.275
55.925
34.6735

7500

35236.1

64

7897.51

380

744.8
59541.8

4500

6582.94

7500

14139.6

64

2564.16

380

372.4
23659.1

2250

9000

4500

2983.5

7500

6637.5

64

2219.1

0.98

380

372.4
12212.5

2250

9000

2250

9000

0.585
0.585
-0.063
0.522

4500

2632.5

7500

3915
6547.5

0.9

7500

6750

WCT

Total Amount 202263


8%
16181
Net Amount 218444