) Vendor's name 1 a. Required major items Circulating pumps Enquiry Spec. DC Industrial Plant Services 100HP Pump Motor Set - 150m3/hr. 40HP Pump Motor Set - 90m3/hr. 25HP Pump Motor Set - 250m3/hr. 20HP Pump Motor Set - 70m3/hr. Circulation tank(10m3.approx.) Chemtreat India Dynamic Industrial & Cleaning Services Capacity : 150m3/hr.,80MWC. 75HP Motor,56kW,3000rpm. Remarks
Tanks
# Neutralising tank(20m3), Dissolving tank with steam heating arrangement. capacity 6m3.
turbidity difference between discharge
Pre-Flushing Cold water flushing temp./duration Hot water flushing temp./ duration Analysis criteria
# Details awaited. turbidity difference between discharge & feed - less than 10ppm
CHEMICAL CLEANING Alkali Degreasing Sodium Hydroxide(Conc. In % or Wt.) Sodium Carbonate (Conc. % or Wt.) 0.50% # Sodium Nitrate (NaNO3,conc.%) Tri-sodium phosphate 0.50% d. Wetting Agent (conc%) 0.05% e. Temp in deg.C 70-80 f Time required in hours 12Hrs. Minimum Temperature, pH, concentration of alkalinity to be checked every hour. Oil every 3hours. B. a. Rinsing DM water quantity/time pH Conductivity
3 A. a. b. c.
10(_+0.5)
Heating up & Acid Pickling Citric Acid in % or Wt. 3% Ammonium - bi - fluoride 0.30% Acq NH3 in pH 3 ~ 3.5 Corrosion Inhibitor 0.30% Temp in deg.C 75 ~ 85 Treating Time required in hours 6hrs. Minimum End Result of acid cleaning Iron Conc.(Fe+2/Fe+3) equilibrium for 1 ~2hrs. Fe ion, acid concentrations,pH to be checked every hour.
C. a. b. c. d. e f g
3% 0.3% (ABF) 3 ~ 3.5 0.30% 75 ~ 85 6-8 hrs. Minimum equilibrium for 1 ~2hrs.
2 ~ 3% 0.30% 3 ~ 3.5 0.20% (Rodine 92B ) 80 ~ 85 6 ~ 8hrs minimum # Equilibrium of acid% & total iron
steam.xls
D a. b. c.
Progressive flushing & draining for 6~8 hrs. Less than 50ppm. Not acceptable
E a. b. c. d. e.
Post Pickling & Passivation System temperature to maintain pH raised byNH3 injec. Charge NaNo3 Treating Time required in hours Completion test
F a.
b. c H a
Room Temperature
pH6~8,COD60~70ppm, SS50~100ppm.
pH - Highly alkaline, Res.phosphate : 4000 ~ 5000 ppm. Res.caustic : 400 ~ 500 ppm. Vendor to confirm # Hydrochloric acid
pH - 8~9 400~500m3
pH - 4~5
500m3 Approx.volume Neutralising chemical c Passivation Temperature,deg.c Typical analysis Approx.volume Neutralising chemical Note : # Rev.1 # Total DM water requirement = 1800m3. (approx.) LP steam flow 4~5 T/hr. Vendor to confirm pH6~8,COD5000~6000ppm., pH : 9~10,colour:Wine red, SS50~100ppm Iron : 5000~9000ppm.,Odour:Pungent pH - 7~8 100m3
75 ~ 85 Citric acid 0.5~1.0%, Iron2500~6000 ppm,pH3.5~4,Inhibitor0.05~0.1%, ammonia 600 Burnt lime & dilution with water
Sulphuric acid with dilution water *Add 0.5% citric acid # DM water requirement = 2250m3. # Steam = 170Tonnes.
steam.xls
DATE # 27.10.98 JOB NO. 6128A SUB : CHEMICAL CLEANING FOR WASTE HEAT RECOVERY SYSTEM TOTAL VOLUME FOR CHEMICAL CLEANING = 200(EQUIPMENT VOLUME+ PIPING VOLUME+BFW PIPING) + TEMPORARY PIPING VOLUME (BY CONTRACTOR) Vendor's name 1 a. Required major items Circulating pumps Enquiry Spec. (BORSIG Procedure) DC Industrial Plant Services 100HP Pump Motor Set - 150m3/hr. 40HP Pump Motor Set - 90m3/hr. 25HP Pump Motor Set - 250m3/hr. 20HP Pump Motor Set - 70m3/hr. Circulation tank(10m3.approx.) Chemtreat India Dynamic Industrial & Cleaning Services Capacity : 150m3/hr.,80MWC. 75HP Motor,56kW,3000rpm. Remarks
Tanks
Neutralising tank(20m3), Dissolving tank with steam heating arrangement. capacity 6m3.
turbidity difference between discharge & feed - less than 10ppm
Pre-Flushing Cold water flushing temp./duration Hot water flushing temp./ duration Analysis criteria CHEMICAL CLEANING Alkali Degreasing Trisodium phosphate (wt.%) Surfactant(wt.%), Dispersant (wt.%) sodium carbonate Temp. in deg.C Time required in hours
20 ~ 80deg.c Turbidity
3 A. a. b. c. d e
B. a.
9 50 microsiemens / cm.
C. a. b. c. d. e. f. g.
Acid Pickling Citric Acid in % or Wt. 3% *Ammonium - bi - fluoride Or Hydrofluoric acid 0.6% or 0.3% pH 3 Corrosion Inhibitor 0.25% Suspended Agent Temp in deg.C max.80deg.C Treating Time required in hours Till constant Iron Conc.
D a.
3 ~ 4 system volume
steam.xls
b. c. d E a. b. c. d.
pH Iron Conc. Conductivity **Post Pickling & Passivation System temperature to maintain pH raised byNH3 injec. charge NaNO2, wt% Treating Time required in hours
7 50 microsiemens / cm.
F a.
/ 6 ~ 8 hrs.
H a
40 pH 7
pH - Highly alkaline, Res.phosphate : 4000 ~ 5000 ppm. Res.caustic : 400 ~ 500 ppm. # Hydrochloric acid
70 ~ 80 P.Alk 2000~3000ppm,pH9.5 ~10.5 600m3 Sulphuric acid with dilution water 75 ~ 85 Citric acid 0.5~1.0%, Iron2500~6000 ppm,pH3.5~4,Inhibitor0.05~0.1%, ammonia 600m3 Burnt lime & dilution with water
1system volume
40 pH = 7
Approx.volume Neutralising chemical c Passivation Temperature,deg.c Typical analysis Approx.volume Neutralising chemical
Note : # Rev.1
steam.xls