EPL/ OP/ B/95.

07/ 2011

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

ENNORE PORT LIMITED


[A Mini Ratna Government of India Undertaking]

Tender No. EPL/OP/ B/95.07/2011

Tender
for

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited.

Volume II Price Bid

Section 7/ Volume II

Bill of Quantities

Page 1 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

CONTENTS DC - 1 SECTION-7 SECTION-8 Bid Reference Bill of Quantities Forms of Securities

DC-1
Section 7/ Volume II Bill of Quantities Page 2 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

ENNORE PORT LIMITED


(A Government of India Undertaking)

COMPETITIVE BIDDING TENDER NO. EPL/OP/B/95.07/2011 Name of the work : Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

Period of sale of Bidding document Last date & time for Receipt of bids Time & date of Opening of bids Place of opening

: From 26.12.2011 to 23.01.2012

: 24.01.2012 up to 15.00 Hours

: Will be intimated later. : Will be intimated later.

General Manager (Operations)

Section 7/ Volume II

Bill of Quantities

Page 3 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

SECTION 7 BILL OF QUANTITIES

Section 7/ Volume II

Bill of Quantities

Page 4 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

PREAMBLE 1) The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General Conditions of Contract, Conditions of Particular Application, Technical Specifications, Drawings, Schedules and Annexure. 2) The quantities given in the Bill of Quantities are estimated and provisional and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract. 3) The rates and prices bid in the priced Bill of Quantities except insofar as it is otherwise, provided under the Contract, include all constructional plant, labour, supervision, materials, all temporary works and false works, erection, maintenance, establishment and overhead charges, profit, foreign taxation and levies, local levies and other charges, together with all general risks, liabilities and obligations set out or implied in the Contract and including remedy of any defects during the Defects Liability Period. 4) The rates and prices shall be quoted entirely in Indian Rupee. 5) The rate or price rounded off to the nearest Indian Rupee shall be entered against each item in the Bill of Quantities both in figures and words, whether quantities are stated or not. The cost of items against which the Contractor has failed to enter a rate or price shall be deemed to be covered by other rates and prices entered in the Bill of Quantities. 6) The whole cost of complying with the provisions of the Contract shall be included in the items provided in the priced Bill of Quantities, and where no items are provided, the cost shall be deemed to be distributed among the rates and prices entered for the related items of work. 7) General directions and descriptions of work and materials are not necessarily repeated or summarized in the Bill of Quantities. References to the relevant sections of the contract documentation shall be made before entering rates or prices against each item in the Bill of Quantities. 8) The method of measurement of completed work for payment shall be in accordance with the requirements as stated in the individual sections of the Technical Specifications. 9) Errors will be corrected by the Employer for any arithmetical errors in computation or summation as follows:
Section 7/ Volume II Bill of Quantities Page 5 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of the Stack yard of Ennore Port Limited

a) where there is a discrepancy between amounts in figures and in words, the amount in words will govern; and b) where there is a discrepancy between the unit rate and the total amount derived from the multiplication of the unit price and the quantity, the unit rate as quoted will govern, unless in the opinion of the Employer, there is an obviously gross misplacement of the decimal point in the unit price, in which event the total amount as quoted will govern and the unit rate will be corrected. 10) This BOQ covers all concrete works, including fencing and gates.

Section 7/ Volume II

Bill of Quantities

Page 6 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of yard of Ennore Port Limited

the

Stack

ENNORE PORT LIMITED (A Government of India Undertaking) Bill of Quantities and Rates Rate (in Figures and in words) 4 Units(in Figures and in words) 5 1 Cu.m (One Cubic Metre) Amount (in Figures and in words) 6

SL. No 1 1

Probable Quantity 2 2270 Cu.m.

Description of work

3 Earthwork excavation in ordinary soil, sand, clay mixed with roots, boulders weighing individually less than 250 Kg, debris, rubbish etc., as existing at site of work for foundations, and other such works as directed for depth upto 1.5m including dressing of sides ramming of bottom, dewatering if any as specified relevant schedules and drawing, depositing the excavated earth within a lead of 50m for including shoring, shuttering, labour, tools, tackles, equipment, fuel etc complete. Note: While carrying out the excavation care should be taken to protect adjoining structures. Any disturbance or damage caused will be made good by the contractor at his own cost. Providing and laying plain cement concrete (P.C.C). in volumetric proportion 1:4:8 (1 Cement: 4 Coarse river Sand: 8 granite stone aggregate of size 40 mm) for leveling course in foundation as per drawings and technical specification and as directed at site including mixing, ramming / vibrating, including cost of tools & plants, equipments, all leads, lifts, including dewatering, labour etc. complete Note: Shuttering /form work will be paid separately under relevant item. Providing and laying plain cement concrete (P.C.C). in volumetric proportion PCC 1:2:4 (1 Cement: 2 Coarse river Sand: 4 graded stone aggregate of size 20 mm) for foundation as per drawings and technical

505 Cu.m

1 Cu.m (One Cubic Metre)

1375 Cu.m

1 Cu.m (One Cubic Metre)

Volume II

Page 7 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of yard of Ennore Port Limited

the

Stack

SL. No 1

Probable Quantity 2

Description of work

24.00 Cu.m.

11.70 MT.

3 specification and as directed at site including mixing, ramming / vibrating, including cost of tools & plants, equipments, all leads, lifts, including dewatering, labour etc. complete. Note: Shuttering /form work will be paid separately under relevant item. Providing and laying cement concrete mix 1:1.5:3 in volumetric proportions (1 cement: 1.5 coarse river sand:3 graded hard granite stone aggregate of size 20mm) for in-situ RCC works for Raft, Columns, as per the details shown in the drawing and as specified in relevant schedules including finishing all the exposed surfaces of the concrete members with cement mortar 1:3 (1Cement: 3 river Sand) to a thickness varying from 6mm to 12mm as directed and / or as directed at site including mixing, placing including consolidation, curing tools & plants, equipments, machinery, all leads, lifts, including cost of all materials , labour etc complete. Note: 1. Supplying and fabrication of steel will be measured and paid separately under relevant items. 2. Shuttering /form work will be paid separately under relevant item. 3. while casting the columns, necessary provision for gate fixing (spindles) as per drawing shall be provided without extra cost Supplying transporting , fabricating and placing in position HYSD steel reinforcement as per IS: 1786 Fe 415/500 bars RCC work including straightening, cutting, bending, binding & placing of reinforcement with contractors annealed binding wire of 16 SWG and placing with correct spacing in position in all works as shown in the

Rate (in Figures and in words) 4

Units(in Figures and in words) 5

Amount (in Figures and in words) 6

1 Cu.m (One Cubic Metre)

1 MT (One metric Tonne)

Volume II

Page 8 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of yard of Ennore Port Limited

the

Stack

SL. No 1

Probable Quantity 2

Description of work

3 drawing including cost of all materials, handling, labour, lifting, tools, equipments, etc. complete. Note: Authorized laps shall only be paid based on the nominal weights as Specified in IS:1786.

Rate (in Figures and in words) 4

Units(in Figures and in words) 5

Amount (in Figures and in words) 6

785.00 Cu.m.

Refilling with available excavated earth (excluding boulders, rubbish, debris etc.) In basement, sides of foundation etc. in layers not exceeding 200mm thick and/or as directed at site including watering, consolidating, including all labours, tools, equipment, etc complete.

1 Cu.m (One Cubic Metre)

3.15 MT

Supplying and fabricating MS Gate made out of structural members allround and GI weld mesh insideas per the drawing and /or as directed at site including painting the members with one coat of zinc chromate all as per specifications an as directed including cost of all labour, materials, tools, equipment, brushes etc complete. 1). The weighment of the M.S Gates and accessories will be done at site using the approved weighing scale in the presence of Engineer. Necessary charges for transport, weighment etc will be borne by the contractor. 2). 90% of the payment will be made after the gate is fixed in position after painting with zinc chromate primer. 3). The balance will be released after the work is completed in all respects. 4) In case the specified M. S section is not available in market, the nearest alternative section may be used with the approval of the EPL or his representative.

1 MT(One metric tonne)

Volume II

Page 9 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of yard of Ennore Port Limited

the

Stack

SL. No 1 8

Probable Quantity 2 300.00 Sq.m.

Description of work

4600.00 Sq.m.

3 Preparing the surfaces of the frames of the steel surfaces of and painting with two coats of epoxy paint of approved colour, shade over one coat of primer including all labour, scaffolding, brushes, materials etc all complete. Providing and fixing formwork using plywood/wooden planks or steel sheets including necessary centering for alignment and levels for foundation concrete, beams, fencing posts, gate pillars etc., including strutting, shoring, bracing, propping, staging etc, keeping the same in position during the concreting and removal of the same after a specified period etc complete as per drawing and specifications and /or as directed at site including the cost of all materials, shuttering oil, labours, transportations & proper stacking at site, tools, equipment, lead, lift, etc complete. Note: a) The shutter should be cleaned before each use if re-useable shutter are used. b) The shutter to be used should give good surface finish. c) Distorted shutters will be made good at once before put to use to the satisfaction of EPL. d) The rate includes coating formwork with approved quality of non-staining mineral oil. Providing and laying cement concrete for Pre-cast RCC works in mix 1:1.5:3 in volumetric proportions (1 cement: 1.5 coarse river sand:3 graded hard granite stone aggregate of size 20mm) for fencing posts/struts, as per the details shown in the drawing and as specified in relevant schedules including finishing the posts, transporting the posts and placing in position as per drawing /as directed including mixing, placing ,

Rate (in Figures and in words) 4

Units(in Figures and in words) 5 1 Sq. m (One Square Metre)

Amount (in Figures and in words) 6

1 Sq.m (One Square Metre)

10

132 Cum.

1 Cu.m (One Cubic Metre)

Volume II

Page 10 of 11

EPL/ OP/ B/95.07/ 2011

Providing Barbed wire fencing on the perimeter of yard of Ennore Port Limited

the

Stack

SL. No 1

Probable Quantity 2

Description of work

3 consolidation, curing, tools & plants, equipments, machinery, all leads, lifts, including cost of all materials , labour etc complete. Note: 1. While pre-casting the fencing posts, necessary 8mm HYSD bars shall be embedded as per the drawing/as directed at site. The payment of such bars will be measured and paid separately under relevant items. 2. Supplying and fabrication of steel will be measured and paid for separately. 3. Shuttering /form work will be paid separately under relevant item. Providing and fixing PVC coated galvanized steel barbed wire of 2.50 mm dia, 2 ply with 4 points at a distance of 75 - 100 mm c/c as specified in the drawing and/ or as directed at site including placing the barbed wire in position including tying with the post as specified in the drawing and /or as directed at site including the cost of all materials , transportation , lead , lift, labour, tools, plant, equipment etc. complete. Note: The probable quantity is the leaner measurements of barbed wires. Total Amount

Rate (in Figures and in words) 4

Units(in Figures and in words) 5

Amount (in Figures and in words) 6

11

79710 RM

1 RM (One Running Metre)

(Rupees.......................................................................................................................................... ....................................................................................................................................................... ...........................................................................................only)

Signature of the contractor, with seal

General Manager (Operations) Ennore Port Limited.