Addendum-Request for Proposal (RFP)Technical Specification Distributed 1MW Solar PV Roof-top Power Plant at IIT Bombay
Scope of Supply
1. 15 Nos. of Solar PV power plants inclusive of Data Acquisition Systems installed on 15 different buildings with total of min. 1MW peak PV capacity. 2. 1 No. of Solar Radiation and Environment Monitoring System installed on one of the buildings with the PV power plant. 3. 1 No. of Remote Server and 2Nos. of remote display units installed in IIT Bombay Main Powerhouse Control Room.

PV Array
1. Indigenous or imported PV module may be used.

Inverter
1. The inverter shall have high overload capacity.

Balance of Systems (BoS)


1. String/Array combiner boxes shall be used with central inverter. Use of string/array combiner boxes shall be optional with string inverters.

Civil
1. A inch water tap shall be provided on terrace at a location central to the PV array to facilitate periodic cleaning of PV array. An outdoor grade water hose/pipe of sufficient length shall be also provided.

Mechanical
1. The bird repellent spike shall be simple mechanical pole structure with a spike. 2. The min. thickness of galvanization used for the GI Array support structure shall be 80 microns. The amount of galvanization shall be verified by vendor supplied test 1

INDIANINSTITUTEOFTECHNOLOGY,BOMBAY MATERIALSMANAGEMENTDIVISION
Direct:25768800(DR)/8803(Local)/8804(Import) 8805(Enquiry&Billtracking),8802(Progress) Email:drmm@iitb.ac.in,bkganesh@iitb.ac.in

certificate from approved laboratory. The structure fabricated using alternate material shall have equivalent protection against corrosion. 3. The support structure shall be pre-fabricated. There shall be no requirement of welding or complex machinery on the site.

Electrical
1. Energy meters shall be supplied with required CTs and PTs and protections. The meters shall be tested and certified based on utility requirements.

Data Acquisition System


1. Data monitoring during the period of grid shutdown shall be optional. 2. The data shall be downloaded automatically by remote monitoring unit of the data acquisition system and the same shall be transmitted over web to the remote server supplied by vendor. 3. A remote LCD display unit and browser software shall be provided to view instantaneous and cumulative data from all the plants. 4. An additional 52 inches LCD display unit shall be provided to view data from all the plants. 5. The central server and the two LCD display units shall be located in IIT Bombay Main Power House Control Room.

Solar Radiation and Environment Monitoring System


1. Third party calibration certificate shall be provided for global solar radiation measurement device. The measurement shall be done in the plane of array of modules. 2. The data shall be downloaded automatically by remote monitoring unit of the system and the same shall be transmitted over web to the remote server supplied by vendor for monitoring plant data. 3. The two remote LCD display units and browser software provided shall be also used to view data from Solar Radiation and Environment Monitoring System.

Sub-assembly Testing
1. PV panel (Support Structure) coating thickness: Certificate from approved laboratory shall be provided. Test

INDIANINSTITUTEOFTECHNOLOGY,BOMBAY MATERIALSMANAGEMENTDIVISION
Direct:25768800(DR)/8803(Local)/8804(Import) 8805(Enquiry&Billtracking),8802(Progress) Email:drmm@iitb.ac.in,bkganesh@iitb.ac.in

Plant Energy Performance Ratio Testing


Module power output degradation factor of 1% per year shall be applied. The min. guaranteed energy performance ratio of the system for the first 5 years shall be as listed in the table below. The table shall be used for monitoring the plant performance. Please refer penalty clause in Integrity Pact in the event of non-compliance with min. energy performance ratio. No. of years 1 2 3 4 5 Min. Energy Performance Ratio (%) 75 74.25 73.5 72.75 72

The energy performance ratio testing shall be based on PV power plant AC energy meter reading (installed at the inverter output and provided separately by vendor) and NOT based on energy output recorded by inverter or data acquisition system. Example: 100kWp PV power plant PV power plant AC energy meter reading for 48 hrs = 800 kWh Global solar insolation in POA for 48 hrs = 10 kWh/m2 Energy Performance Ratio = 800/(100x10) = 0.8 or 80%

Operation and Maintenance


1. Detailed specification sheets for solar module, inverter, DC and AC protection and isolation components, GFDI, DC and AC cables and energy meters shall be provided. 2. Detailed specifications shall be also provided for data acquisition system and solar and environment monitoring system. 3. Operation and maintenance manuals shall be provided for all equipment supplied. 4. As-built array layout and wiring diagrams shall be provided. 5. List of recommended spares shall be provided for the systems supplied. 6. The supply of spare parts on site shall be provided on yearly

INDIANINSTITUTEOFTECHNOLOGY,BOMBAY MATERIALSMANAGEMENTDIVISION
Direct:25768800(DR)/8803(Local)/8804(Import) 8805(Enquiry&Billtracking),8802(Progress) Email:drmm@iitb.ac.in,bkganesh@iitb.ac.in

basis for the first 5 years. 7. The repair and maintenance service after 5 years shall be provided on payment basis.

Warranties and Guarantees


1. All component and installation guarantees shall be in addition to the power plant energy performance guarantee.

Standards and Compliance


1. The string inverter shall be rated for IP65.

SPV Power Plant Specification Sheet


1. PV Array Structure: Add parameter of coating thickness. 2. Inverter: Add parameter of overload capacity.

Drawings
1. AC Side Layout: Main Distribution Board-Include additional circuit breaker to be supplied by vendor and installed in series with input from AC Distribution Box.