Addendum-Request for Proposal (RFP)Technical Specification Distributed 1MW Solar PV Roof-top Power Plant at IIT Bombay
Scope of Supply
1. 15 Nos. of Solar PV power plants inclusive of Data Acquisition Systems installed on 15 different buildings with total of min. 1MW peak PV capacity. 2. 1 No. of Solar Radiation and Environment Monitoring System installed on one of the buildings with the PV power plant. 3. 1 No. of Remote Server and 2Nos. of remote display units installed in IIT Bombay Main Powerhouse Control Room.
PV Array
1. Indigenous or imported PV module may be used.
Inverter
1. The inverter shall have high overload capacity.
Civil
1. A inch water tap shall be provided on terrace at a location central to the PV array to facilitate periodic cleaning of PV array. An outdoor grade water hose/pipe of sufficient length shall be also provided.
Mechanical
1. The bird repellent spike shall be simple mechanical pole structure with a spike. 2. The min. thickness of galvanization used for the GI Array support structure shall be 80 microns. The amount of galvanization shall be verified by vendor supplied test 1
INDIANINSTITUTEOFTECHNOLOGY,BOMBAY MATERIALSMANAGEMENTDIVISION
Direct:25768800(DR)/8803(Local)/8804(Import) 8805(Enquiry&Billtracking),8802(Progress) Email:drmm@iitb.ac.in,bkganesh@iitb.ac.in
certificate from approved laboratory. The structure fabricated using alternate material shall have equivalent protection against corrosion. 3. The support structure shall be pre-fabricated. There shall be no requirement of welding or complex machinery on the site.
Electrical
1. Energy meters shall be supplied with required CTs and PTs and protections. The meters shall be tested and certified based on utility requirements.
Sub-assembly Testing
1. PV panel (Support Structure) coating thickness: Certificate from approved laboratory shall be provided. Test
INDIANINSTITUTEOFTECHNOLOGY,BOMBAY MATERIALSMANAGEMENTDIVISION
Direct:25768800(DR)/8803(Local)/8804(Import) 8805(Enquiry&Billtracking),8802(Progress) Email:drmm@iitb.ac.in,bkganesh@iitb.ac.in
The energy performance ratio testing shall be based on PV power plant AC energy meter reading (installed at the inverter output and provided separately by vendor) and NOT based on energy output recorded by inverter or data acquisition system. Example: 100kWp PV power plant PV power plant AC energy meter reading for 48 hrs = 800 kWh Global solar insolation in POA for 48 hrs = 10 kWh/m2 Energy Performance Ratio = 800/(100x10) = 0.8 or 80%
INDIANINSTITUTEOFTECHNOLOGY,BOMBAY MATERIALSMANAGEMENTDIVISION
Direct:25768800(DR)/8803(Local)/8804(Import) 8805(Enquiry&Billtracking),8802(Progress) Email:drmm@iitb.ac.in,bkganesh@iitb.ac.in
basis for the first 5 years. 7. The repair and maintenance service after 5 years shall be provided on payment basis.
Drawings
1. AC Side Layout: Main Distribution Board-Include additional circuit breaker to be supplied by vendor and installed in series with input from AC Distribution Box.