Rammed Aggregate Pier Construction

Houston Fuel Oil Terminal Company, Houston, TX

Rammed Aggregate Pier elements are constructed by drilling a cavity (Geopier replacement process) or driving a hollow mandrel (Impact or Rampact displacement processes) to the design depth and ramming select aggregate in thin lifts. Rammed Aggregate Pier (RAP) construction results in very dense aggregate piers used to reinforce soft soils and ll for support of large diameter storage tanks and industrial foundations.

1.

The process begins by drilling a hole (Geopier) up to 30 feet or driving a hollow mandrel (Impact or Rampact) to design depths up to 45 feet. The Geopier process allows for visual inspection of the spoils between borings, conrming the reinforcement of poor soils. The Impact and Rampact processes are displacement approaches that are well-suited in high groundwater conditions. The installation process eliminates spoils and the risk of casing while signicantly improving granular soils. Layers of aggregate are placed into the cavity and compacted in thin lifts. A patented beveled tamper rams each layer of aggregate using static downforce and vertical impact ramming energy, resulting in superior strength and sti ness. The tamper densies aggregate vertically and forces aggregate laterally into the loose or soft matrix soil. This results in improved soil sti ness and excellent coupling with surrounding soils to deliver highly reliable settlement control. Following installation, the Rammed Aggregate Pier (RAP) systems support tanks, mats, industrial foundations and oor slabs eliminating the need for deep foundation or overexcavation and replacement. Loads are concentrated to the sti piers, resulting in improved bearing support and engineered settlement control.

2.

3.

800.371.7470 www.geopier.com

T H E

I N T E R M E D I A T E

F O U N D A T I O N

L E A D E R

FLOOR SLABS TRANSPORTATION UPLIFT BIOFUEL FACILITIES

INDUSTRIAL TANKS

LIQUEFACTION/SEISMIC RAILROAD FOUNDATIONS WIND TURBINES

Improves Edge Stability


Construction of industrial tanks results in high shearing stresses at the edges of tanks. In weak soils, high applied edge pressures may result in edge instability, di erential settlement and mushrooming of the tank shell. Friction angles of 50 degrees allow RAP elements to improve shear resistance, preventing mushrooming and improving edge stability problems.

Settlement Control
RAP solutions demonstrate superior strength and sti ness to provide demonstrated settlement control of tanks, mats, shallow foundations and other structures. The system is engineered to provide a cost-e ective approach to meet both total and di erential settlement requirements. Our engineered solutions and site specic modulus testing combined with the experience of providing settlement control for hundreds of heavy tanks, provide an unmatched level of support and reliability.
Valero Energy Tanks, Houston, TX

Accelerated Construction Schedule


The RAP system is installed at rates of 30 to 60 per day or more. The rapid installation rate signicantly reduces the construction schedule compared to deep foundations, overexcavation and replacement or other forms of ground improvement. High production rates combined with our unique ability to work in inclement weather a ords both time and cost savings on your project.
Castle Oil Port Morris Terminal, Bronx, NY

Rammed Aggregate Pier Foundation System Advantages


INCREASES bearing support IMPROVES settlement performance ACCELERATES construction schedule OFTEN RESULTS in 20% to 50% savings

IPR Pharmaceuticals, Canovanas, PR

TransMontaigne Terminaling, Tampa, FL

150 Fairview Road, Suite 335 Mooresville, NC 28117 P: 704.799.3185 800.371.7470


Atlanta Boston Charlotte Chicago Des Moines Detroit Hawaii Houston Indianapolis Jacksonville Kansas City Los Angeles Memphis Mexico City Milwaukee Minneapolis Nova Scotia Philadelphia Portland Raleigh Sacramento Salt Lake City San Francisco San Juan Seattle St. Louis Toronto Washington, DC Geopier, Rammed Aggregate Pier, Impact, Rampact, and Intermediate Foundation are registered trademarks of Geopier Foundation Company, Inc.

800.371.7470 www.geopier.com

Potrebbero piacerti anche