PART 1

CABLE TRENCHES
AND
CONCRETE FOUNDATIONS

Page 2 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

TABLE OF CONTENTS
CLAUSE

PAGE
NO.

DESCRIPTION

INTRODUCTION

SERVICE CONDITIONS AND CONSTRUCTION PARAMETERS

REVISION AND ADDITIONS

DEFINITIONS

RIGHT-OF-WAY

DIRECT BURIED CABLE INSTALLATION

TRENCH EXCAVATION

6.1.1

TRENCH SPECIFICATIONS

6.1.2

EXCAVATION

14

6.1.3

SAND AND BEDDING/COVER AND CABLE TILES

15

6.1.4

BACKFILLING AND REINSTATEMENT

15

CONCRETE

18

SOIL CLASSIFICATION

19

UNIT SUBSTATION, PACKAGE SUBSTATION AND R.M.U.

20

6.1

Page 3 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD
1


SDCS-02
DATE: MAY 2005G

INTRODUCTION
This standard specifies the design, and installation practices to be applied in the construction
of MV and LV cable of underground distribution system.
It is intended to assist the engineers and field personnel to achieve standardization in
construction and to ensure a satisfactory and economical level of service without operating
restrictions so that the operational errors should be minimum for safety and reliability.

SERVICE CONDITIONS AND CONSTRUCTION PARAMETERS


For construction and operation of underground cable distribution network, the service
conditions and system requirements shall be as given in the latest revision of SEC General
Specification

No.01-SDMS-01.

REVISION AND ADDITIONS


This standard is subject to revision as new materials and methods of construction are
developed. The latest revision of this standard shall be applicable. Revised sheets shall be
issued from time to time and should be inserted as soon as these are received. Superseded or
obsolete sheets shall be removed immediately upon receipt of revised sheets. The date of the
latest issue of each sheet is printed at the top corner under the standard number.

DEFINITIONS
Ultimate strength is the maximum load which a material will sustain when the load is
gradually increased until the rupture or failure takes place.

RIGHT-OF-WAY
If required by the local authority, the right-of-way (R-O-W) for the proposed route of an
underground cable must be obtained from the concerned authority (e.g. municipality,

Page 4 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

ministry of communication) during engineering stage of the project. Given below is the
procedure to be followed in obtaining R-O-W:

Prepare R-O-W drawing proposed showing proposed route of the underground cable,
cross-section of the trench or duct bank (if required ) and location of other utilities (e.g.
telephone, water, sewer) lines along proposed route (if known).

Submit R-O-W drawing to the relations section in the concerned operating area.

The actual construction work shall not be started until the digging permit from relevant
authorities is obtained.

Standard R-O-W locations for underground utilities in streets of new areas have been
developed by the Ministry of Municipal and Rural Affairs in coordination with the Ministry
of Communications and the ministries having authority over the concerned utilities.
6

DIRECT BURIED CABLE INSTALLATION



( )
:
. -
. -
-
.
. -
-
.
. -
:
:

Page 5 of 52


SDCS-02
DATE: MAY 2005G

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

- ) (
) ( .
-
/ .
- ) (
) (
.
- ) (
) ( .
-
.

.
:
-
.
- .
- .
- .
- ) ( .
- .
Being the most economical way, direct earth buried cable laying has been standardized
except where the cable route intersects road, street and other utility mains. The major
activities associated with direct buried cable installation are trench excavation, cable laying,
are described in the following sections. Fig. 1 through 6 is trench constructions for direct
buried cable.
Trench Excavation
Before proceeding with actual work of trench excavation, following preparations
should be completed:
Review the cable route drawings, R-O-W drawings, digging permit, and inspect the
cable route from end to end.

Page 6 of 52

6.1


SDCS-02
DATE: MAY 2005G

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

Decide locating where cable drums shall be unloaded at site, keeping in view the

actual cable lengths on drums.


Decide locations of cable joints. Avoid street intersections. Joints should preferably

be made not closer than 10 meters from edge of any street intersections.
Obtain necessary permissions from the traffic police for the work schedule,

warning and lights and design of detours.


Keep ready the necessary number of night warning lamps, stands, wooden/steel

bridges for maintaining pedestrian


Arrange necessary manpower keeping in view the work schedule and expiry date of

digging permit.
6.1.1 Trench Specifications
:
-
.
- ) ( ) (
.
- ) ( ) (

) ( % ASTM ) % ( ) ( # )
( % ) ( %
) .( #
-
.
- .
- ) ( ) ( .
- ..
%
.
Page 7 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

DEPTH & WIDTH OF TRENCH:

Finished Road/Sidewalk Surface or Final Ground Level

300

800mm

Warning Tape

Backfill
200

100

Cable

100
100
400

Fine Sand

MV TRENCH CONFIGURATION
FIG. 1

Page 8 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

Finished Road/Sidewalk Surface or Final Ground

300

800mm

Warning Tape

Backfill

200

100

Cable

100
100

Fine Sand
150

300

150

MV TRENCH CONFIGURATION
FIG. 2

Page 9 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

Sidewalk Surface or Final Ground Level

300

800mm

Warning Tape

200

Backfill

100
100

Cable

100

150

Fine Sand
300

300

150

MV TRENCH CONFIGURATION
FIG. 3
NOTE: The construction of lying three cables or more is the same as lying one or two
cables, but in three or more we required cement to obtain 5% concentration.

Page 10 of 52

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

Sidewalk Surface or Final Ground Level

200

650mm

Warning Tape

Backfill
200

100
80

Cable

70

Fine Sand

LV TRENCH CONFIGURATION
FIG. 4

Page 11 of 52

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

Sidewalk Surface or Final Ground Level

200

650mm

Warning Tape

Backfill

200

100

Cable

80
70

Fine Sand

LV TRENCH CONFIGURATION
FIG. 5

Page 12 of 52

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

Sidewalk Surface or Final Ground Level

200

650mm

Warning Tape

200

Backfill

100
80

Cable

70

Fine Sand

LV TRENCH CONFIGURATION
FIG. 6
NOTE: The construction of lying three cables or more is the same as lying one or two
cables, but in three or more we required cement to obtain 5% concentration.

Page 13 of 52


SDCS-02
DATE: MAY 2005G

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD


) ( ) (
) (
.

.

) ( .
6.1.2 Excavation
In deciding at what depth the trench should be excavated, it is necessary to take into
consideration the changes being made in the existing grade level by any earth cut or fill
work to be carried out later. Such information should be gathered from the Ministry of
communications or municipality so that ultimately the standard depth of cable can be
achieved.
Trenches may be dug by hand or, if site conditions permit, a mechanical excavator can
be used. Asphalt shall be cut by a motor driven saw. Manual digging shall be used at
locations where existing underground facilities are encountered. Existing facilities
uncovered during excavation shall be protected, shored, braced and supported, as
necessary. All protective covers, warning tapes, position markers, etc., pertaining to
existing underground utilities shall be preserved during excavation and restored in
position during backfilling.




.


.
.

Page 14 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD


SDCS-02
DATE: MAY 2005G

6.1.3 Sand Bedding/Cover and Cable Tiles


A bedding of Clean, fine sand shall be placed at the bottom of the trench. After laying
the cable, all stone and rubble that have fallen in to the trench during the cable laying
shall be removed. A cover of clean, fine sand shall be placed over the cable. The
thickness of sand bedding/cover shall be as per the relevant trench construction drawing.
The sand bedding and cover shall be spread by hand tools to maintain an even thickness.
:
: ( )

% -

% -

% -

% -

,
: -


.
6.1.4

Backfilling and Reinstatement

Backfilling and reinstatement of the trench shall be in accordance with the requirements
of the authority (e.g. municipality. MOC, etc.) under whose jurisdiction the area falls.
Warning tapes shall be laid in the backfill.

-
.

Page 15 of 52


SDCS-02
DATE: MAY 2005G

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

- ) (
) (
) ( %
.
- ) (
) ( )
( % .
-
:

% -

% -

% -

% -

% -

% -

% -

% -

-

.
-
.
-
%

%
) ( .
-
.
Page 16 of 52


SDCS-02
DATE: MAY 2005G

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

- :
...

%
. %
) ( %
) ( %
) (
) . ( %

)
( DCI ) / (
.
) (


) ( RC2
:


)) ((


)) ((

% -

% -

% -

% -

% -

% -

% -

% -

% -

% -

% -

%-

%-

) ( % -
) ( RC2 : /
%
.

Page 17 of 52


SDCS-02
DATE: MAY 2005G

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

-

.



) ( RC2 .




.



.
CONCRETE:
:
( ) (.
( ) (.
.
All concrete surfaces in contact with ground shall be provided with two (2) layers of
polyethylene vapor barrier / Each layer shall be six (6) Mil Thickness and in Accordance
with ASTM-2103.
Concreting shall not be allowed with out vibration at any time.
Curing of concrete shall be done by gunny bags for curing compound.

Cement shall be type 1 and in areas having water logging and salinity, Sulphate resistant
cement type 5 may be used. SEC Engineer shall direct to the type of cement to be used.
Water shall be free from silt, organic matter, alkalies or other impurities.
Page 18 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD


SDCS-02
DATE: MAY 2005G

The average grain size of sand is 0.35mm and the mud content shall not be more than 5%.
Forms to be used, these shall be sufficiently tight to prevent loss of mortar from concrete
and shall be maintained rigidly in position until concrete has hardened enough to prevent
damage by the removal.
If required by SEC Engineer, the concrete foundation sample test of Pole and anchor shall
be carried out. The concrete sample to be crushed after seven days.
All lean concrete under reinforced base to be premixed from factory with 250 kg
cement/M2 of concrete minimum strength 14 N/mm2.
Lean concrete 15 Cm thick shall be used all around the 15 Cm Dia P.V.C Pipes running
underground.
All R.C.C to be premixed from factory with 350 kg cement/M2 of concrete minimum
strength 21 N/mm2 (3000 P.S.I).
Sand should be coarse grained, clean and free from all foreign matter.
Aggregate should be well graded (19mm Max size), clean and free from all foreign
matter.
All steel reinforcing bar to be high yield deformed type conforming to metric BS 444.9
Min yield strength 410 N/mm2.
Reinforcement cover with in concrete to be as follows:
Roof Slab 20 mm, Footing 60mm, others 40 mm.
8

SOIL CLASSIFICATION:
The soils are classified according to the A. B. Chance test probe method. The chance test
probe is a mechanical tool to identify soil in a simple and quick way from the earth surface
without core samples. To find out the soil bearing capacity the soil test probe is screwed into
the soil. As it displaces the soil, probe torque readings are measured in inch-pounds on a
torque gauge. The torque values obtained are translated into soil classification using the

Page 19 of 52

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

SEC DISTRIBUTION CONSTRUCTION STANDARD

chance Soil Classification Data chart. The table below shows the soil classification as per A.
B. Chance method and the relevant SEC soil classification to be followed.

Class
0
1
2
3
4
5
6
7

Description of Soil Type


Sound hard rock, un-weathered
Very dense and / or cemented sands coarse
gravel and cobbles
Dense fine sand, very hard silts and clays
(may be preloaded)
Dense clays, sands and gravel, hard silts
and clays
Medium dense coarse sandy gravel, very
stiff to had silts and clays
Medium dense coarse sand & sandy
gravels, stiff to very stiff silts and clays
Loose to medium dense fine to coarse
sand, firm to stiff clays & silt
Loose fine sand, alluvium, loess, soft firm
clays, varied clays, fill

Probe Values Ibs


(N-m)

SEC Soil
Type
Classification

N. A.
750-1600
(90-208)
600-750
(78-98)
500-600
(65-78)
400-500
(52-65)
300-400
(39-52)
200-300
(26-39)
100-200
(13-26)

Rock / Dense
Soil

Medium
Soil

Loose
Soil

MINIMUM BREAKING CAPACITY OF SOIL IS 1.5 KG/CM2


9

UNIT SUBSTATION, PACKAGE SUBSTATION AND R.M.U.

Unit Substation, Package Substations and R.M.U. with out boundary wall. Gate which
is likely to be damaged by traffic shall be provided with protective barriers.

Sub-Base layer of 20cm thick will compacted under equipment foundation (min. 1.5
Kg/cm)

Lean concrete of 10 cm thick should be placed under equipment foundation.

Page 20 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

DRAWINGS
UNIT SUBSTATION:
DRAWING NO. 1 300/500 3 WAYS OVER ALL PLAN
DRAWING NO. 1A 300/500 4 WAYS OVER ALL PLAN
DRAWING NO. 2 300/500 PLAN AND SIDE VIEW
DRAWING NO. 3 300/500 RINFORCEMENT DETAILS
DRAWING NO. 4 1000 3 WAYS OVER ALL PLAN
DRAWING NO. 4A 1000 4 WAYS OVER ALL PLAN
DRAWING NO. 5 1000 PLAN AND SIDE VIEW
DRAWING NO. 6 1000 RINFORCEMENT DETAILS
DRAWING NO. 7 1500 3 WAYS OVER ALL PLAN
DRAWING NO. 7A 1500 4 WAYS OVER ALL PLAN
DRAWING NO. 8 1500 PLAN AND SIDE VIEW
DRAWING NO. 9 1500 RINFORCEMENT DETAILS

Page 21 of 52

Note:

Soil Bearing Capicity 150 KN/M

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

RMU
3 Ways

SEC DISTRIBUTION CONSTRUCTION STANDARD

LIFTING HOOK

LT

TRANSFARMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 22 of 52

Note:

Soil Bearing Capicity 150 KN/M

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

RMU
4 Ways

SEC DISTRIBUTION CONSTRUCTION STANDARD

LIFTING HOOK

LT

TRANSFARMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 23 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

SIDE VIEW
FRONT VIEW

CABLE ENTRY

PLAN

LT

TRANSFARMER

G.L

LIFTING HOOK

G.L

CABLE
ENTRY

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 24 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

DIA 16mm

212 DIA 200mm


C/C (TYPE)

G.L
G.L

212 DIA 200mm


C/C (TYPE)

DRAWINGS
A

LIFTING LUG (HOT DIP GALVANIZED)

SECTION C C

212 DIA 200mm


C/C (TYPE)
STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
10 DIA 150mm
C/C (TYPE)

CABLE
ENTRY

SECTION B B

G.L

212 DIA 200mm


C/C (TYPE)

SEC DISTRIBUTION CONSTRUCTION STANDARD

PLAN

DRAWING NO. 10 300/500 3 & 4 WAYS OVER ALL PLAN


DRAWING NO. 11 300/500 PLAN AND SIDE VIEW
DRAWING NO. 12 300/500 RINFORCEMENT DETAILS
DRAWING NO. 13 1000/1500 3 & 4 WAYS OVER ALL PLAN

SECTION A A

PACKAGE SUBSTATION TYPE A:

DRAWING NO. 15 1000/1500 PLAN AND SIDE VIEW

STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
10 DIA 150mm
C/C (TYPE)

DRAWING NO. 14 1000/1500 PLAN AND SIDE VIEW

Page 25 of 52

Note:

Soil Bearing Capicity 150 KN/M

LIFTING HOOK

RMU
3 Ways

SEC DISTRIBUTION CONSTRUCTION STANDARD

Cement 350 Kg/m3


2
Concrete Compresive Strength 300 Kg/cm

LT

TRANSFORMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 26 of 52

Note:

Soil Bearing Capicity 150 KN/M

RMU
4 Ways

SEC DISTRIBUTION CONSTRUCTION STANDARD

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

LIFTING HOOK

LT

TRANSFORMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 27 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

SIDE VIEW

FRONT VIEW

G.L

CABLE ENTRY

PLAN

LT

TRANSFORMER

G.L

G.L

LIFTING HOOK

CABLE
ENTRY

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 28 of 52

SECTION A A

PLAN

LT

TRANSFORMER

G.L

DIA 16mm

LIFTING LUG (HOT DIP GALVANIZED)

G.L

STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
C/C (TYPE)
10 DIA 150mm

212 DIA 200mm


C/C (TYPE)

SECTION C C

CABLE
ENTRY

SECTION B B

CABLE
ENTRY

G.L

G.L

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

SEC DISTRIBUTION CONSTRUCTION STANDARD

STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
10 DIA 150mm
C/C (TYPE)

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 29 of 52

Note:

Soil Bearing Capicity 150 KN/M

LIFTING HOOK

RMU
3 Ways

SEC DISTRIBUTION CONSTRUCTION STANDARD

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

LT

TRANSFARMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 30 of 52

Note:

Soil Bearing Capicity 150 KN/M

LIFTING HOOK

RMU
4 Ways

SEC DISTRIBUTION CONSTRUCTION STANDARD

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

LT

TRANSFARMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 31 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

SIDE VIEW
FRONT VIEW

CABLE ENTRY

G.L
G.L

PLAN

LT

TRANSFARMER

LIFTING HOOK

CABLE
ENTRY

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 32 of 52

SECTION A A

PLAN

LT

TRANSFARMER

DIA 16mm

G.L

LIFTING LUG (HOT DIP GALVANIZED)

G.L

STIRRUPS
10 DIA 150mm
C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

G.L

212 DIA 200mm


C/C (TYPE)

SECTION C C

CABLE
ENTRY

STIRRUPS
10 DIA 150mm
C/C (TYPE)

SECTION B B

CABLE
ENTRY

212 DIA 200mm


C/C (TYPE)

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
10 DIA 150mm
C/C (TYPE)

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 33 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

DRAWINGS
PACKAGE SUBSTATION TYPE A:
DRAWING NO. 10 300/500 3 & 4 WAYS OVER ALL PLAN
DRAWING NO. 11 300/500 PLAN AND SIDE VIEW
DRAWING NO. 12 300/500 RINFORCEMENT DETAILS
DRAWING NO. 13 1000/1500 3 & 4 WAYS OVER ALL PLAN
DRAWING NO. 14 1000/1500 PLAN AND SIDE VIEW
DRAWING NO. 15 1000/1500 RINFORCEMENT DETAILS

Page 34 of 52

LT

PLAN

TRANSFARMER

Note:
3

Soil Bearing Capicity 150 KN/M

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

SEC DISTRIBUTION CONSTRUCTION STANDARD

LIFTING HOOK

RMU

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 35 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

CABLE ENTRY
G.L

LT

FRONT VIEW

CABLE ENTRY

LIFTING HOOK

PLAN

TRANSFARMER

RMU

G.L

SIDE VIEW

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 36 of 52

STIRRUPS
10 DIA 150mm
C/C (TYPE)

LT

SECTION AA

PLAN
B

RMU

DIA 16mm

LIFTING LUG (HOT DIP GALVANIZED)

DETAILA

G.L

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

CABLE ENTRY

SECTION CC

CABLE ENTRY

SECTION BB

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

STIRRUPS
10 DIA 150mm
C/C (TYPE)

TRANSFORMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 37 of 52

LT

PLAN

TRANSFARMER

Note:
3

Soil Bearing Capicity 150 KN/M

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

SEC DISTRIBUTION CONSTRUCTION STANDARD

LIFTING HOOK

RMU

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 38 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

CABLE ENTRY
G.L

LT

FRONT VIEW

CABLE ENTRY

LIFTING HOOK

PLAN

TRANSFARMER

RMU

G.L

SIDE VIEW

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 39 of 52

STIRRUPS
10 DIA 150mm
C/C (TYPE)

LT

SECTION AA

PLAN
B

RMU

LIFTING LUG (HOT DIP GALVANIZED)


DIA 16 mm

DETAILA

G.L

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

CABLE ENTRY

SECTION CC

CABLE ENTRY

SECTION BB

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

STIRRUPS
10 DIA 150mm
C/C (TYPE)

TRANSFORMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 40 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

DRAWINGS
PACKAGE SUBSTATION TYPE B:
DRAWING NO. 16 300/500 3 & 4 WAYS OVER ALL PLAN
DRAWING NO. 17 300/500 PLAN AND SIDE VIEW
DRAWING NO. 18 300/500 RINFORCEMENT DETAILS
DRAWING NO. 19 1000/1500 3 & 4 WAYS OVER ALL PLAN
DRAWING NO. 20 1000/1500 PLAN AND SIDE VIEW
DRAWING NO. 21 1000/1500 RINFORCEMENT DETAILS

Page 41 of 52

LT

PLAN

TRANSFARMER

Soil Bearing Capicity 150 KN/M

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

SEC DISTRIBUTION CONSTRUCTION STANDARD

Note:

LIFTING HOOK

RMU

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 42 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

G.L

FRONT VIEW

CABLE ENTRY

PLAN

LIFTING HOOK

LT

TRANSFARMER

RMU

G.L

SIDE VIEW

CABLE ENTRY

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 43 of 52

PLAN

SECTION AA

RMU

DETAILA

DIA 16mm

LIFTING LUG (HOT DIP GALVANIZED)

G.L

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)
212 DIA 200mm
C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

SECTION CC

SECTION BB

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
10 DIA 150mm
C/C (TYPE)

LT

TRANSFORMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 44 of 52

LT

TRANSFARMER

Note:
3

Soil Bearing Capicity 150 KN/M

Cement 350 Kg/m


Concrete Compresive Strength 300 Kg/cm

SEC DISTRIBUTION CONSTRUCTION STANDARD

PLAN

LIFTING HOOK

RMU

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 45 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

FRONT VIEW

G.L

CABLE ENTRY

PLAN

LT

TRANSFARMER

RMU

LIFTING HOOK

G.L

SIDE VIEW

CABLE ENTRY

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 46 of 52

SECTION AA

PLAN

RMU

DETAILA

212 DIA 200mm


C/C (TYPE)

LIFTING LUG (HOT DIP GALVANIZED)


DIA 16 mm

G.L

212 DIA 200mm


C/C (TYPE)

212 DIA 200mm


C/C (TYPE)

SECTION CC

CABLE ENTRY

SECTION BB

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

STIRRUPS
10 DIA 150mm
C/C (TYPE)

STIRRUPS
10 DIA 150mm
C/C (TYPE)

LT

TRANSFORMER

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 47 of 52

Saudi Electricity Company


SEC DISTRIBUTION CONSTRUCTION STANDARD

SDCS-02
DATE: MAY 2005G

DRAWINGS
RING MAIN UNIT:
DRAWING NO. 22 3 WAYS PLAN AND SIDE VIEW
DRAWING NO. 23 3 WAYS RINFORCEMENT DETAILS
DRAWING NO. 24 4 WAYS PLAN AND SIDE VIEW
DRAWING NO. 25 4 WAYS RINFORCEMENT DETAILS

Page 48 of 52

LIFTING LUG

G.L

G.L

SEE DETAILA

LIFTING LUG

DETAILA

DIA 16mm

LIFTING LUG (HOT DIP GALVANIZED)

SIDE VIEW

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

FRONT VIEW

CABLE ENTRY

PLAN

RMU

G.L

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 49 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

SECTION CC
12 DIA 150 mm
C/C (TYPE)

SECTION AA

PLAN

RMU

G.L

A
A

12 DIA 150 mm
C/C (TYPE)

SECTION BB

G.L

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

Page 50 of 52

LIFTING LUG

G.L

G.L

SEE DETAILA

LIFTING LUG

DETAILA

DIA 16mm

LIFTING LUG (HOT DIP GALVANIZED)

SIDE VIEW

G.L

SEC DISTRIBUTION CONSTRUCTION STANDARD

FRONT VIEW

CABLE ENTRY

PLAN

RMU

G.L

Saudi Electricity Company


SDCS-02
DATE: MAY 2005G

Page 51 of 52

Saudi Electricity Company

SDCS-02
DATE: MAY 2005G

SECTION CC
12 DIA 150 mm
C/C (TYPE)

SECTION AA

PLAN

RMU

G.L

A
A

12 DIA 150 mm
C/C (TYPE)

SECTION BB

G.L

G.L