ELEMENTAL COST DATABASE

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total Development Total (out of project total)

Unit % % %

Average 3.25% 5.29% 5.65% $2,416,088 11%

Wellington Inner City Bypass

Upper Harbour Bridge & Causeway

Kaitoke to Te Marua

Wainakarua & Sharpes Bend 1.76% 3.37% 3.05% $372,500 7.56%

Albany & Constellation Bus Ramps

Lindale Intersection Improvements 0.52% 2.21% 8.73% $774,747 10.28%

5.20% 9.25% $7,223,000 12.63%

2.69% 6.03% $2,930,575 8.02%

7.02% 5.85% $2,200,000 11.40%

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G) Construction Sub-Total Percentage (Excluding P&G)

Km M3 m2 Km M2 M2 M2 Km Km Km Km

$194,294 $18 $1,361 $484,292 $40 $1,559 $992 $481,861 $533,854 $589,337 $169,095 $15,092,131 80% 12% $17,146,697 1% $17,223,822 $8,894,055 21% $19,344,656

$1,464,668 $43 $257 $1,461,936 $219 $1,013 $2,416 $2,575,471 $9,636,375 $10,704,195 $875,976 $40,600,996 71.00% 23.05% $49,958,723 0% $49,958,723 $55,509,692 30% $57,181,723 Jun-07

$458,103 $58 $2 $443,219 $45 $1,673 $606 $723,555 $1,205,748 $525,200 $337,176 $27,740,397 75.92% 19.20% $33,065,385 1% $33,607,525 $23,501,766 16% $36,538,100 Aug-06

$19,004 $8 $88 $385,605 $24 $1,983 $441 $91,219 $4,866 $224,221 $54,089 $15,571,887 80.71% 9.77% $17,092,831 0% $17,092,831 $3,107,787 26% $19,292,831 Apr-06

$6 $6 $51,546 $19 $2,415 $70,700 $43,230 $18,307 $83,553 $4,095,030 83.13% 11.20% $4,553,690 0% $4,553,690 $1,441,041 27% $4,926,190 Feb-06

$97,671 $32 $50 $386,403 $96 $2,092 $918,029 $380,613 $220,581 $241,440 $8,327,441 90.90% 10.01% $9,161,311 0% $9,161,311 $7,157,274 -15% $9,161,311 Nov-05

$15 $19 $818,087 $45 $2,155 $335 $797,912 $1,093,485 $277,632 $175,357 $5,729,966 76.03% 18.00% $6,761,383 0% $6,761,383 $8,451,729 137% $7,536,130 Aug-05

2.12 Contractor's P&G (out of Construction Sub total) Construction Total (including P&G) Extraordinary Costs % (out of project total) Construction Total (including P&G and Extraordinary) Construction cost per km INCREASE FROM ORIGINAL TENDER PRICE PROJECT TOTAL Completion Date

Elevation Overbridge 1.01% 2.73% 4.84% $212,900 7.90%

Owen River Bridge 3.92% 6.78% 9.51%

Silverhope to Rata Reconstruction 2.15% 2.58% 4.29% $682,699

Airport to Taradale Rd 7.44% 7.03% 3.49% $7,385,954 15.23%

Grafton Gully 2.81% 8.27% 0.81% $7,385,954 10.63%

Kennedy Rd Interchange 5.89% 10.50% 13.33% $878,300 22.91%

Frankton Rd 1.29% 3.48% 6.22% $809,000 9.90%

Paremata Bridge

Rangiriri Ohinewai

Rural Section 12.08% 4.58% 10.42% $2,532,500 21.31%

Route J 2.15% 3.34% 8.65% $5,597,500 12.38%

Glenhope to Spooners Kawatiri Realignment 1.57% 3.61% 4.20% $579,400 8.57% 1.08% 1.85% 5.03% $445,100 7.38%

Fairfield

8.51% $465,730 7.85%

11.92% 2.07% $2,816,845 12.27%

7.65% 4.99% $2,516,200 11.22%

16.82%

8.27%

$2,867 $10 $3 $409,560 $35 $978 $456 $137,712 $222,148 $58,359 $23,478 $2,278,265 84.57% 4.97% $2,391,422 3% $2,481,070 $3,494,465 20% $2,693,970 Jul-05

$57,165 $11 $116,592 $14 $1,158 $116,701 $24,848 $28,567 $48,346 $1,946,379 74.20% 12.11% $2,182,150 0% $2,182,150 $1,983,773 20% $2,623,250 Feb-05

$4 $2 $127,720 $21 $1,256 $62,075 $14,360 $73,386 $11,402 $7,280,968 88.22% 3.97% $7,570,315 0% $7,570,315 $1,072,283 12% $8,253,014 Aug-04

$18,195 $15 $411,792 $19 $1,146 $152,715 $6,443 $60,995 $4,523 $9,371,169 72.54% 16.87% $10,952,000 0% $10,952,000 $1,991,273 4% $12,919,200 May-04

$443,686 $56 $20 $3,199,771 $84 $1,886 $886 $3,210,952 $2,160,997 $524,244 $2,106,587 $47,466,646 68.31% 28.38% $60,939,480 2% $62,100,768 $44,357,691 0% $69,486,721 Feb-04

$10 $9 $68,681 $21 $1,490 $469,355 $5,556 $212,583 $40,960 $2,572,396 67.09% 14.92% $2,956,073 0% $2,956,073 $3,284,525 8% $3,834,373 Dec-03

$34 $364,000 $16 $209 $111,631 $127,841 $138,217 $29,667 $6,957,742 85.13% 5.84% $7,363,882 0% $7,363,882 $1,636,418 5% $8,172,882 Dec-03

$36 $643 $70,138 $30 $1,784 $480 $918,082 $343,586 $2,605,830 $213,816 $4,938,914 83.21% 10.75% $5,469,709 0% $5,469,709 $35,984,925 8% $5,935,439 Nov-03

$29,329 $16 $5 $76,178 $30 $1,042 $774 $134,257 $22,601 $100,112 $83,555 $16,902,935 73.61% 19.19% $20,146,932 0% $20,146,932 $2,002,677

$12,499 $4 $4 $625,671 $23 $152 $251,638 $104,656 $160,238 $54,920

$304,905 $11 $10 $824,362 $48 $1,447 $1,216 $592,573 $264,767 $147,925 $3,606

$8 $34 $60,164 $17 $1,081 $32,862 $3,634 $27,096 $4,980 $5,864,729 86.71% 5.44% $6,183,854 0% $6,183,854 $624,632 25% $6,763,254 Apr-02

$3 $7 $118,035 $20 $537 $67,806 $1,067 $22,298 $9,210

$177,103 $4 $22 $185,868 $97 $1,472 $7,925 $162,403 $79,732 $179,319 $62,048

$8,714,599 $37,220,592 73.33% 7.31% 82.35% 6.39%

$5,390,306 $17,635,745 89.35% 4% 78.65% 12.87%

$9,351,966 $39,600,844 0% 0%

$5,587,628 $19,906,300 0% 0%

$9,351,966 $39,600,844 $2,671,990 $9,000,192 12% 25%

$5,587,628 $19,906,300 $859,635 $4,117,125 22% $6,032,728 $22,422,500 Feb-02 Jan-02

$22,963,778 $11,884,466 $45,198,344 Jun-03 Apr-03 Apr-02

Mokau Bridge 3.30% 10.11% 4.49% $1,200,427 14.51%

Hawkswood

Kamo Bypass 5.90% 3.16% 3.03% $1,146,825 10.78%

ETCART Overbridge

Stoke's Bypass 1.53% 6.11% 3.82% $3,000,000 10.27%

ALPURT A1 ALPURT A2

Otira Viaduct 1.74% 1.42% 2.93% $1,428,246 5.74%

Hawke's Bay Allan Rd to Omahu Rd 7.25% 13.50% 5.82% $3,165,800 21.00%

Orewa River Bridge

Rosebank Patiki I/C 1.85% 4.67% 4.40% $2,065,000 9.85%

Pokeno Bypass 1.54% 4.95% 4.52% $1,434,124 9.92%

Tamahere Deviation 1.55% 5.45% 6.36% $1,470,000 12.00%

2.32% 2.34% $250,900 4.46%

3.81% 8.89% $877,500 11.27%

3.76% 8.56% $7,643,400 10.96%

8.24% 3.62% $5,095,600 10.60%

1.65% 2.83% $312,000 4.29%

$19 $15 $226,583 $23 $1,061 $807 $207,669 $227,289 $150,344 $85,922 $6,132,834 74.11% 15.36% $7,075,125 0% $7,075,125 $8,524,246 14% $8,342,008 Jan-02

$3 $8 $304,886 $14 $151 $39,681 $9,329 $50,337 $2,742 $4,180,702 74.25% 17.36% $4,906,458 8% $5,379,458 $1,229,309 5%

$38,157 $13 $10 $415,154 $40 $4,496 $189,755 $135,658 $179,740 $45,190 $8,384,554 78.80% 11.30% $9,332,101 2%

$15 $35,381 $424,894 $44 $905 $395 $1,663,574 $35,160 $662,708 $445,625

$1,870 $9 $152 $883,197 $17 $1,741 $673 $139,113 $130,415 $228,594 $742

$103,556 $13 $11 $1,136,644 $43 $1,595 $506 $444,609 $173,694 $260,883 $85,191

$73,973 $9 $2 $887,602 $41 $1,489 $226 $253,633 $56,053 $275,564 $51,487

$22 $318,729 $36 $2,890 $664 $109,326 $747,202 $550,295 $48,665

$7 $92,252 $22 $1,171 $53 $52,706 $7,404 $54,144 $5,350 $11,215,019 74.38% 6.21% $11,911,647 0% $11,911,647 $1,422,286 12% $15,077,447 Apr-99

$40 $269 $127,799 $25 $1,172 $2,125 $88,829 $175,992 $159,723 $50,516

$246 $44 $17 $324,084 $47 $1,462 $314 $694,299 $102,910 $244,491 $240,332

$6 $6 $357,720 $24 $1,019 $233,403 $45,991 $200,552 $19,519

$4 $1,048 $276,778 $17 $681 $355 $187,159 $23,540 $121,444 $34,166

$6,337,654 $24,856,600 $58,724,420 $38,056,664 $17,420,665 81.39% 9.02% 85.13% 5.40% 84.23% 5.71% 79.15% 12.96% 69.96% 34.74%

$6,613,212 $17,098,938 90.89% 5.31% 81.56% 10.53%

$12,144,710 $10,267,261 83.97% 6.31% 82.33% 7.14%

$6,909,174 $26,200,000 $62,075,852 $42,987,248 $23,471,755 0% 0% 0% 0% 0%

$6,964,095 $18,899,827 0% 0%

$12,911,163 $11,000,688 1% 0%

$9,493,475 $6,909,174 $26,200,000 $62,075,852 $42,987,248 $23,471,755 $2,876,811 $10,629,499 $3,638,889 $9,223,752 $5,229,592 $22,354,052 65% -4% 3% 35% 36% 5% $7,786,674 $29,200,000 $69,719,252 $48,082,848 $24,900,001 Apr-00 Feb-00 Dec-99 Dec-99 Nov-99

$6,964,095 $18,899,827 $3,784,834 $6,289,460 17% 17% $7,276,095 $20,964,827 Aug-98 Dec-97

$13,028,820 $11,000,688 $3,521,303 $2,528,894 9% 54% $14,462,944 $12,470,688 Apr-97 1995

$5,630,358 $10,640,300 Aug-01 Dec-00

Elemental Cost Model Kaitoke to Te Marua Realignment

Project Name Contacts

Kaitoke to Te Marua Realignment Transit: Jonette Adams (04) 4968310 Opus: Keith Atkinson (04)4717830 Higgins Contractors Wgtn Ltd: David McIlroy Prepared By David Simes 26 October 2007 Rural realignment Project Type Terrain Hilly - steep, tortuous alignment. Project Length 5.5km. Lane length 12.8km Earthworks Variable consisting of weathered Greywacke, gravels and loess Combination of motorscrapers, excavators and dump trucks. 360,000m3 cut to fill & 220,000m3 cut to waste. Structures Two span bridge, 44m long, with single column pier and sill beam abutments. Precast I beam superstructure with reinforced concrete deck slab. Pier and abutments on reinforced concrete bored cylinders. Land span one end. Various mechanically stabilised earth walls. Various RCRRJ culverts to 1800mm dia. Two precast box culvert underpasses 2.0 or 2.5m square. Pavement 150mm basecourse on 250mm sub-base full length of works. I&R: included with D&PD Costs D&PD: $1.2m MSQA: $1.0m I&R: 1997 to 2000 Duration D&PD: 2000 to 2002 MSQA: Sept 2002 to April 2007 Works duration: 20/9/2002 (Acceptance) to 12/4/2006 (Practical Completion). Original completion due date 20/6/2004 extended to 26/4/2006 - 2 years extension CCI 1364 Procurement Tendered as Measure and Value, converted to LS before award. Comment Variability of materials met necessitated flattening of batter slopes (known risk). Remedial works due to slip. 370 wet days (100 allowed), 7.3m rainfall during construction period. Level 1 TTM with level 2 signage. Significant landscaping, environmental & archaeological work.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 17,092,831 17,092,831 17,092,831 11%

Unit % % %

Rate 0.0% 7.0% 5.9%

Amount

1,200,000 1,000,000 2,200,000

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

5.500 580,000 30,000 5.500 79,700 484 3,110 5.500 5.500 5.500 5.500 81% 15,571,887 8%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

19,004.28 7.54 87.85 385,605.17 24.40 1,983.33 441.43 91,218.75 4,866.14 224,221.38 54,089.06

104,524 4,374,534 2,635,519 2,120,828 1,944,524 959,934 1,372,849 501,703 26,764 1,233,218 297,490 15,571,887

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

9.8%

1,520,944 17,092,831

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

5.50

Km

3,107,787

17,092,831 19,292,831

Elemental Cost Model Wellington Inner City Bypass (WICB)

Project Name Contacts

Wellington Inner City Bypass Transit: Jonette Adams (04) 4968310 Opus: Keith Atkinson (04)4717830 Fulton Hogan: Richard Fulton Prepared By David Simes 25 October 2007 Inner City Bypass trenched up to 7m deep including relocation of 19 heritage buildings. Project Type Terrain Urban, flat Project Length 900m. Plus extensive modifications to adjacent city streets. Earthworks Predominantly weathered greywacke. No R1 or R2. Removed with excavators and trucks. Major dewatering (temporary and permanent) required. Major monitoring / instrumentation for water, ground deformation, subsidence and buildings. Structures Reinforced concrete propped walls. 150m long trough shaped structure with walls up to 7m high & 1.2m thick. 750mm dia. Steel pipes at 5m centres as struts between top of walls. Connecting structural floor slab up to 1.0m deep and approx 15m wide between walls. Soil nail walls up to 7m high with post grouted nails and precast urban design facing panels Single span DHC bridge 14m long supported on trough walls (no sub-structure). Pavement 140mm asphaltic concrete on 200mm basecourse on up to 500mm sub-base for new road. Additional 75mm OGPA for trenched section of highway. I&R: included with D&PD Costs D&PD: $2.6m MSQA: $3.2m I&R: 1998 to 2000 Duration D&PD: 2000 to 2004 MSQA: 2004 to 2007 Works duration: 21/9/2004 (Acceptance) to 8/6/2007 (Practical Completion). Original completion due date 29/4/2007 extended to 22/6/2007 CCI 1510 Procurement Measure and Value Comment Includes relocation and external restoration of 19 heritage buildings, demolition or removal of non-heritage buildings. Includes archaeological investigations of more than $750k. Includes stormwater diversion for Wellington City $7m (services relocation element) Includes complex water drawdown issues, potential settlement of some adjacent buildings, design to meet potentially large earthquake forces.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 49,958,723 49,958,723 49,958,723 13%

Unit % % %

Rate 0.0% 5.2% 9.3%

Amount

2,600,000 4,623,000 7,223,000

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

0.900 67,000 5,250 0.900 8,757 147 4,243 0.900 0.900 0.900 0.900 71% 40,600,996 16%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

1,464,667.76 43.10 257.11 1,461,935.93 219.20 1,012.55 2,415.51 2,575,471.18 9,636,374.76 10,704,195.04 875,975.78

1,318,201 2,887,372 1,349,843 1,315,742 1,919,498 148,845 10,248,680 2,317,924 8,672,737 9,633,776 788,378 40,600,996

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

23.0%

9,357,727 49,958,723

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

0.90

Km

55,509,692

49,958,723 57,181,723

Elemental Cost Model Upper Harbour Bridge and Causeway Widening

Project Name Contacts Prepared By Project Type Terrain Project Length Earthworks

CA2184 Upper Harbour Bridge Causeway Widening Ross Frisby (09) 413 5192 David Simes & Ross Frisby 22 August 2006 Bridge duplication and causeway Esturine. Upper Waitemata Harbour 1430m. Lane length 3174m. (2 @ 900m and 3 @ 458m) Marine muds were mixed with cement to produce mudcrete for causeway. Balance of fill borrowed or imported. The causeway works widened an existing causeway to create apprx. 900m (21,000m2) of dual two lane carriageway. Balanced cantilever post tensioned box girder 458m long by 17.74m wide. 3 traffic lanes with 3.6m wide cycleway/ftpath. 7 spans (2 end spans of 47m 7 5 of 73m) supported on 6 twin column piers and 2 abutments. There are 3 land spans at the western end DHC unit deck 68m long by 17.74m wide giving total area 9400m2 Concrete edge barriers to TL5 with edge barrier separation to cycleway / footpath being Texas HT with F shape barrier Chip seal / OGPA I&R: D&PD: $905K MSQA: $2025k I&R: D&PD: Jan 2003 to July2003 (detailed design). MSQA: Jan 2003 to Oct 2006 (estimated) Works duration: June 2003 (let Jan 03) to August 2006 1407 Design and Build Piling risk transfer to contractor added $235k as variation Earthworks. Risk transfer. Insufficient suitable materials in borrow area. Additional cost approx $1.1m Retaining walls added as variation to optimise cost of watermain relocation

Structures

Pavement Costs

Duration

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 33,607,525 33,607,525 33,607,525 8%

Unit % % %

Rate 0.0% 2.7% 6.0%

Amount

905,010 2,025,565 2,930,575

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

1.430 85,000 21,000 1.430 29,300 9,400 800 1.430 1.430 1.430 1.430 76% 27,740,397 15%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

458,103.14 57.57 1.75 443,219.30 44.88 1,673.36 605.87 723,555.25 1,205,747.69 525,199.73 337,175.66

655,087 4,893,147 36,831 633,804 1,315,123 15,729,607 484,699 1,034,684 1,724,219 751,036 482,161 27,740,397

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1 Stormwater gutter collection system to old bridge. Excluded $1.3m Vector (reimbursed) & $0.2m ATMS Extraordinary Project Costs (C)

19.2%

5,324,988 33,065,385

542,140

1%

542,140

Construction Total (B + C) Project Total (A +B + C)

1.43

Km

23,501,766

33,607,525 36,538,100

Elemental Cost Model Wainakarua North Bridge and Sharpes Bend Realignment

Project Name Contacts

Wainakarua North Bridge and Sharpes Bend Realignment Transit: Peter Robinson (03) 4778527 Opus: Dave Eaton (03) 4748899 Works Infrastructure: Graeme Buchanan Prepared By David Simes 17 January 2007 Rural realignment and bridge widening Project Type Terrain Predominantly flat to rolling terrain Project Length 3160m. Lane length 6320m. Earthworks Excavators for bulk cut to fill. Dozer & vibrating roller to compact. Windrowed to dry, no lime Excavator & truck for borrow to fill. Alluvial gravels with lenses of high plasticity. Structures Hollow out (historic cat. 1) limestone arch bridge, line interior with reinforced concrete, cons to widen by 900mm, replace parapet stones to new edge of bridge. Corrugated steel culvert 73.5m long x 3.7m dia. - SH over rail bridge Note that deck area for bridge element is taken as full deck of historic bridge plus plan area Pavement 250mm subbase, 150mm AP65 basecourse (won locally), 2 coat chip seal 3/5 I&R: $80.2k Costs D&PD: $153.5k MSQA: $138.8k I&R: 1996 to 2000 Duration D&PD: 2000 to 2004 MSQA: 2004 to 2007 Works duration: 27 May 2004 to 3 February 2006 (programmed completion May 2005) CCI 1364 Procurement Measure and Value Comment Traffic Management: Includes Bailey Bridge bypass for bridge widening. Extensive consultation undertaken to meet Historic Places Trust requirements for category Significant overmeasurement of tender quants meant all variations contained within original Skilled limestone masons for bridge work Unforeseen ground conditions led to increased cut to waste / borrow to fill, and pavement d Alterations to bridges $235k, Additional guardrails and signage $96k, Escalation $56, misc.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A)

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1 Dayworks allowance in tender schedule

Extraordinary Project Costs (C)

Construction Total (B + C) Project Total (A +B + C)

harpes Bend Realignment

Bend Realignment

brating roller to compact. Windrowed to dry, no lime.

h bridge, line interior with reinforced concrete, construct cantilever deck nes to new edge of bridge. 7m dia. - SH over rail bridge s taken as full deck of historic bridge plus plan area of multiplate structure. urse (won locally), 2 coat chip seal 3/5

ruary 2006 (programmed completion May 2005)

dge bypass for bridge widening. eet Historic Places Trust requirements for category 1 Bridge quants meant all variations contained within original tender.

reased cut to waste / borrow to fill, and pavement depth. $463k guardrails and signage $96k, Escalation $56, misc. $100k

Quantity 4,553,690 4,553,690 4,553,690 8%

Unit % % %

Rate 1.8% 3.4% 3.0%

Amount 80,200 153,500 138,800 372,500

3.160 162,878 1,950 3.160 40,200 643 3.160 3.160 3.160 3.160 83% 4,095,030 9%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

5.72 6.09 51,545.72 18.78 2,415.24 70,699.76 43,230.26 18,306.56 83,553.43

931,539 11,881 162,884 754,771 1,552,057 223,411 136,608 57,849 264,029 4,095,030

11.2%

458,661 4,553,690

0%

3.16

Km

1,441,041

4,553,690 4,926,190

Comment

Tender

Change

693,143 11,700 141,900 495,648 1,293,038 115,630 138,900 55,416 225,000

34% 2% 15% 52% 20% 93% -2% 4% 17%

421,500 3,591,875

9% 27%

35500

3627375.00

Elemental Cost Model Albany & Constellation Bus Ramps

Project Name Contacts

Albany & Constellation Bus Ramps Transit: Brett Gliddon (09) 427 3693 Connell Wagner: Wim Frencken (09) 520 6019 AC Blackmore: Michael Caulfield Prepared By David Simes 11 January 2007 Motorway off and on ramps. Project Type Terrain Urban on hilly ground, within an existing developed motorway corridor. East Coast Bays Formation soils. Project Length 1280m. Lane length 1580m. (Albany ramps 1290m Constellation ramp 290m) (Albany site 990m) Earthworks Only bulk earthworks were on northbound off ramp. Excavator and truck for bulk cut to fill. Dozer to move and place. Attempted disc drying, but had to add lime instead. Significant temporary and permanent stormwater treatment. Structures No bridges. No major culverts. Motorway gantry extension included in Traffic Services element. Retaining Wall 1: Piled with shotcrete support between piles and concrete facing panels with urban design. 409m2 Retaining Wall 2: Soil nail retaining wall with concrete facing panel finish. Surface area 110m2 Retaining Wall 3: Proprietry mass block wall. Exposed aggregate finish. Surface area 410m2. Retaining Wall 4: Precast driven pile retaining wall, with precast panels. Standard concrete finish. Surface area 106m2. Retaining Wall 5: Precast concrete cantilever wall. Standard concrete finish. Surface area 30m2. Pavement Flexible pavement, typically: 30mm OGPA or SMA on 160mm basecourse on 200mm stabilised subbase on 250mm stabilised subgrade CBR 15%. I&R: Included in Busway, therefore not seperately identifiable. Costs D&PD: Included in Busway, therefore not seperately identifiable. MSQA: Included in Busway, therefore not seperately identifiable. I&R: Included in Busway, not seperately identifiable. Duration D&PD: 3 Mar 2003 to 30 Sept 2004 MSQA: 1 Oct 2004 to 5 Nov 2006 Works duration: 22 December 2004 to 15 October 2005 plus EOT granted to 5 November 2005 (actual completion) CCI Procurement Comment 1310 Measure and Value NZS 3910: 2003 Traffic Management: Shoulder closures for ramps, m/way lane closures for tie ins & line marking, ramp closure to extend gantry. Significant overmeasurement of tender quants meant all variations contained within original tender. Major variations: U/cut or lime dry $159k, pavement changes $144.5, scope increase (bus priority lane) $153.8k, other $171k

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 9,161,311 9,161,311 9,161,311 0%

Unit % % %

Rate 0.0% 0.0% 0.0%

Amount

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

1.280 61,412 500 1.280 13,152 1,065 1.280 1.280 1.280 1.280 91% 8,327,441 9%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

97,670.70 31.56 50.20 386,403.13 96.04 2,091.89 918,028.98 380,612.50 220,580.78 241,440.43

125,019 1,938,148 25,100 494,596 1,263,072 2,227,858 1,175,077 487,184 282,343 309,044 8,327,441

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1 Dayworks allowance in tender schedule

10.0%

833,870 9,161,311

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

1.28

Km

7,157,274

9,161,311 9,161,311

Elemental Cost Model Lindale Intersection Improvements

Project Name Contacts

Lindale Intersection Improvements Transit: Jonnette Adams (04) 8012598 MWH Ltd: Bob Barraclough (04) 3816700 Contractor: Juno Civil Ltd Prepared By David Simes 26 September 2006 Grade Separated Interchange with on/off ramps to local roads, including some local roads. Project Type Terrain Rural. Slightly rolling topography @ edge of coastal plain. Outwash fan clays silts & gravels overlying Otaki sandstone. Project Length 800m. 1950m lane length. Earthworks Excavation by excavator and road going tippers and trailers. Most material cut to waste. Structures Bridge is 3 span (8.15m + 14.575m + 8.15m). Deck width 14.95m over beams with provision for future widening to 23.0m. Constructed from existing road level. Piers are permanent cased bored in-situ concrete with precast driven plugs at toe. Piles are full length from founding level to beam bearing platform. Exposed steel casings are epoxy coated. DHC simply supported beams. Abutments include friction slabs. Retaining walls are timber pole and plank (and are off highway) Major culvert (off highway) is precast box 16.5m long x 3.0m x 1.5m New highway pavement on soft clay: Enkagrid TRC40 (geofabric/geogrid), 300mm AP65, 170mm M4 New highway pavement on granular fill (eg approaches) 150mm AP65, 170mm M4 2 coat chip seal to new work, plus shape correctionand OGPA to existing highway I&R: $35,315 D&PD: $149,166 MSQA: $590,266 I&R: Oct 1999 to Jan 2000 D&PD: Jan 2000 to Feb 2003. MSQA: Feb 2003 to July 2006 Works duration: April 2003 to April 2004 (contract), actual completion August 2005. 1310 Lowest Price Conforming. Measure and Value. Increases from tender include: Work suspended due to delay in issue of Resource Consent ($389k); Ground conditions unexpectedly poor leading to drainage variations & pavement redesign ($777); Piles redesigned due to unexpected fndtn conditions (work suspended during redesign); Bridge redesigned as a result of pile redesign ($155k); Piling delays due to difficulty obtaining set (peat layer in sandstone); Watermain relocation exceeded original est. ($460k); changed Rsrce Consent requirements incrsed sizes of culverts, & added large box culvert; Retaining walls added ($190k) to accomodated amended construction sequence following bridge redesign; Cost fluctuations applied as extended completion beyond 52 wk limit ($65k). L/scaping incrsed to meet changed Rsrce Consent requirements ($130k). EOT ($137k); Earthworks & Grnd Imprvmnts ($511k); Other P&G ($364k); Other ($504k).

Pavement

Costs

Duration

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 6,761,383 6,761,383 6,761,383 10%

Unit % % %

Rate 0.5% 2.2% 8.7%

Amount 35,315 149,166 590,266 774,747

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

0.800 68,030 15,354 0.800 15,846 462 566 0.800 0.800 0.800 0.800 76% 5,729,966 14%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

0.00 14.67 19.38 818,087.34 45.44 2,155.47 335.03 797,911.75 1,093,484.95 277,632.39 175,356.91

997,968 297,485 654,470 719,982 994,923 189,629 638,329 874,788 222,106 140,286 5,729,966

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

18.0%

1,031,417 6,761,383

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

0.80

Km

8,451,729

6,761,383 7,536,130

Elemental Cost Model Elevation Overbridge

Project Name Contacts

Elevation Overbridge Transit: Andrew Adams (03) 5771850 Connell Wagner: Richard Apperley (04) 4729589 Main Contractor: Fulton Hogan (Marlborough) Gareth Davie Prepared By David Simes 20 March 2006 Rural realignment - including multiplate structure. Including replacement of 32m long bridge over main trunk railway Project Type Terrain Hilly, railway line through middle. Project Length 750m. Lane length 1420m. Earthworks 20/30t tracked excavators into dump trucks. 1km haul road (upgraded existing track). Unexpected alluvial deposits in critical locations had significant effect on quantities and wastage rates, compounded by high number of wet days. Significant increase to drying, mixing and imported material. Unexpected ripping and blasting required in places. Structures Large diameter 7.7m wide x 65m long multiplate culvert 380m2 MSE retaining walls and 150m2 timber pole retaining walls Pavement Chip seal on 150mm AP40 basecourse on 300mm subbase Friction course 40mm at Ch340 to 390

Costs

Duration

CCI Procurement Comment

I&R: $25.1k D&PD: $67.8K MSQA: $120k I&R: Dec 1998 to Nov 1999 D&PD: Feb 2000 to June 2003 (long periods of inactivity due to land purchase problems and funding constraints). MSQA: Sept 2003 to Mar 2006 Works duration: Feb 2004 to April 2005 plus 64 days extension mostly for wet days. Actual completion of physical works July 2005 1285 M&V prequal Level 3B See above notes on earthworks. Alluvial deposits significantly worse than anticipated, resulting in large increase in earthworks volume (originally 30,000m3), wastage, imported fill, and treatment. Wet weather underestimated in contract, resultant extensions of time and increased costs were also significant.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 2,481,070 2,481,070 2,481,070 8%

Unit % % %

Rate 1.0% 2.7% 4.8%

Amount 25,100 67,800 120,000 212,900

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

0.710 67,712 3,410 0.710 7,556 501 553 0.710 0.710 0.710 0.710 85% 2,278,265 4%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

4,038.31 9.69 3.26 409,559.53 34.67 978.35 456.21 137,711.61 222,147.76 58,359.23 23,477.62

2,867 656,244 11,106 290,787 261,936 489,666 252,053 97,775 157,725 41,435 16,669 2,278,265

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

5.0%

113,157 2,391,422

89,648

Extraordinary Project Costs (C)

3%

89,648

Construction Total (B + C) Project Total (A +B + C)

0.71

Km

3,494,465

2,481,070 2,693,970

Elemental Cost Model Owen River Bridge

Project Name Contacts

Owen Bridge Realignment Transit: Andrew Adams (03) 55771850 Opus Nelson: Martin Crundwell (03) 5463668 Contractor: Works Infrastructure (Nelson) Ltd Keith Robinson Prepared By David Simes 29 September 2006 Rural realignment including a 2 lane bridge over river. Project Type Terrain Rural. Through existing cutting, some widening & fill embankment required. Variable ground conditions - gravely silt. 4000m3 rock encountered which wasn't expected. Project Length 1100m. (2200m lane length). Earthworks Excavation by 20/30t excavators, dozer, rollers, 2 dump trucks. Explosives used to break rock. Aggregates won from adjacent Owen and Buller Rivers. Mobile crusher on site. Transit paid royalties of $2.50/m3 (included below) to council. Structures Bridge is 4 span (14.7m+15m + 15m + 14.7m). Deck width 11.5m, length 29.4m. 10No. DHC beams 576mm deep per span. On cast insitu pier caps on single 1350mm dia. bored piles. Pavement 2 coat chip seal over 150mm b/course AP40 over 200mm subbase AP75. Soft spots undercut and filled with river run.

Costs

Duration

CCI Procurement Comment

I&R: $85.6k D&PD: $148k MSQA: $207.5k I&R: Oct 1999 to Jan 2000 D&PD: Jan 2000 to Feb 2003. MSQA: Feb 2003 to July 2006 Works duration: 29 Jan 2003 (awarded) to 18 Feb 2005 (Practical Completion). 1178 Lowest Price Conforming. Min level 3B and 4C (measure and value). Remote site. No work in river 30 April to 1 Sept. New 2 lane bridge on skew to river to improve approach road alignment. Removal of existing 1 lane bridge. Relocation of 2 adj. intersections to optimise safety. 3 low speed curves replaced with 2 high speed approach curves. Increases from tender include: Rock ($100k); Contractors claim (time extn from variations ($100k); Earthworks (additional cut to waste & therefore imported fill including access to river ($170k)

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 2,182,150 2,182,150 2,182,150 17%

Unit % % %

Rate 3.9% 6.8% 9.5%

Amount 85,600 148,000 207,500 441,100

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

1.100 47,532 1.100 13,176 683 1.100 1.100 1.100 1.100 74% 1,946,379 9%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

57,165.45 11.34 116,592.04 14.03 1,158.13 116,701.03 24,848.05 28,566.57 48,346.46

62,882 538,995 128,251 184,824 791,119 128,371 27,333 31,423 53,181 1,946,379

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

12.1%

235,771 2,182,150

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

1.10

Km

1,983,773

2,182,150 2,623,250

Elemental Cost Model Silverhope to Rata Reconstruction

Project Name Contacts

Silverhope to Rata Reconstruction Transit: Chris Jordan (06) 3454713 Montgomery Watson Harza Main Contractor Rick Goodman & Sons Ltd Prepared By David Simes 4 October 2005 Rural realignment Project Type Terrain Rural rolling terrain. Alluvial silty soils, some gravels. Project Length 7060m. Lane length 16,120m. (2 lane plus passing lanes). Earthworks Mostly scrapers, diggers & dump trucks for haul distance 1.5km + Dried by discing. Structures

3 bridges, all 2 spans with centre pier (2 drilled foundation pile and cast insitu columns, prec Guardrail barrier Wetlock seal grade 3/5 Subgrade CBR15 Subbase 200mm from local aggregate cement stabilised to 50% of project AP65 over remainder. 150mm AP40 M4 basecourse. I&R: $163k D&PD: $196K MSQA: $324k I&R: 1997 to 1998 D&PD: 1998 to 2000 MSQA: Dec 2000 to Dec 2004 Works duration 3 years 6 months incl 41 days wet weather extension of time. Actual completion of physical works 1 August 2004 1222 Lowest Price Conforming Volume of suitable salvaged aggregate suitable for re-use less than expected. Large multiplate culvert collapsed during construction.

Pavement

Costs

Duration

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A)

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

Extraordinary Project Costs (C)

Construction Total (B + C) Project Total (A +B + C)

us passing lanes). for haul distance 1.5km + Dried by discing. drilled foundation pile and cast insitu columns, precast log beam decks

ement stabilised to 50% of project

1 days wet weather extension of time.

suitable for re-use less than expected.

Quantity 7,570,315 7,570,315 7,570,315 8%

Unit % % %

Rate 2.1% 2.6% 4.3%

Amount 162,725 195,537 324,437 682,699

7.060 454,694 3,416 7.060 101,766 965 7.060 7.060 7.060 7.060 88% 7,280,968 4%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

0.00 4.18 1.56 127,720.48 20.85 1,255.73 62,075.31 14,360.38 73,385.92 11,401.54

1,902,021 5,329 901,707 2,121,892 1,211,784 438,252 101,384 518,105 80,495 7,280,968

4.0%

289,348 7,570,315

0%

7.06

Km

1,072,283

7,570,315 8,253,014

Comment

Tender

Change

1,805,127 5% 3,120 71% Geotextile separation medium 733,088 23% Includes failed multiplate culvert & additional work following 1 in 100 year storm 1,350,122 57% Specification changed by TNZ post contract. Wetlock seal required repair. 1,201,743 1% 324,547 35% Increased scope, additional guardrail quantity due to standard revision between documentation & construction. 366,948 -72% Telecom -$200k (funded elsewhere) & Power -$76k 466,618 11% Increases in landowner accom. Fencing quant increase $115k 85,621 -6%

Temp bypass -$80k, Temp fencing -$35k

398,335 6,735,269

-27% 12%

Elemental Cost Model Kennedy Road Interchange

Project Name Contacts

Kennedy Road Interchange Transit: Mike Wong (06) 8359259 Opus International Consultants Main Contractor Higgins Contractors HB Prepared By David Simes 31 August 2005 Expressway Interchange - grade separated half diamond, replacing signalised intesection Project Type Terrain Urban / rural. Flat. Interbedded sand, silt & clay which are compressible & liquifiable in a moderate earthquake. Project Length 900m. 1320m lane length. Earthworks Standard methodology cut to fill, and imported fill. Structures Four span bridge (2x18m, 2x17m), 11m wide o/a, with DHC deck on 1.4m dia. Columns. RC pile caps with 6 - 600 dia raked piles / pier. TL3 W section guardrail.

Pavement Costs

Duration

CCI Procurement Comment

Asphalt over concrete deck, G3/5 two coat chip seal on 150 b/course on 170 sub base. I&R: $174k D&PD: $310K MSQA: $394k I&R: 1993 to 1994 D&PD: 1998 to 2001 MSQA: Dec 2001 to Dec 2003 Works duration 25 months incl 6 months settlement period. 1162 M&V Groundwater at 2m, with artesian groundwater conditions in the sand and gravel aquifer at depth.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 2,956,073 2,956,073 2,956,073 23%

Unit % % %

Rate 5.9% 10.5% 13.3%

Amount 174,000 310,300 394,000 878,300

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

0.900 28,990 5,500 0.900 16,025 790 0.900 0.900 0.900 0.900 67% 2,572,396 10%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

0.00 10.32 8.66 68,681.17 20.67 1,489.74 469,355.45 5,555.56 212,583.44 40,960.00

299,268 47,653 61,813 331,161 1,176,892 422,420 5,000 191,325 36,864 2,572,396

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

14.9%

383,677 2,956,073

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

0.90

Km

3,284,525

2,956,073 3,834,373

Elemental Cost Model SH1 Paremata Bridge Duplication

Project Name Contacts

SH1 Paremata Bridge Duplication Transit: Catherine Worsley (04) 8012580 Beca Carter Hollings & Ferner Main Contractor Juno Civil Ltd Prepared By David Simes 23 August 2005 New 2 lane bridge alongside existing bridge Project Type Terrain Urban, coastal, over Pauatahanui Inlet entrance Project Length 152m. 305m lane length. Earthworks For bridge approaches and abutments only Structures 2200 dia. Reinf conc bored piles with 1800 dia columns Piled through medium dense sands over very dense sand/gravel, founded on greywacke bedrock between 20 & 40m below gl. Groundimprovement required at north abutment to densify loose sands and help prevent liquification. Hammerhead support beams, abutments, Tee-Roff deck units 1000 deep with insitu deck Asphalt over concrete deck I&R: Included with larger Plimmerton to Paremata Upgrade Project D&PD: as for I&R MSQA: $465,730 I&R: Part of larger project which ran from Feb 1996 to July 2001 D&PD: Part of larger project which ran from Oct 2000 to July 2003 MSQA: Oct 2001 to May 2005 (incl tender phase & defects liability) Works duration 70 weeks plus 48 days Extension of Time. May 02 to Nov 03 1162 M&V The new bridge built to duplicate the older existing 2 lane bridge as part of SH1 4 laning in this area. New bridge provides 2 northbound lanes while old bridge provides 2 southbound lanes. Approach pavement construction not included in this contract. Traffic management level 2. High volumes, but retaining existing bridge minimised disruption.

Pavement Costs

Duration

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 5,469,709 5,469,709 5,469,709 8%

Unit % % %

Rate 0.0% 0.0% 8.5%

Amount

465,730 465,730

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

0.152 1,791 570 0.152 2,025 2,025 423 0.152 0.152 0.152 0.152 83% 4,938,914 9%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

0.00 35.72 643.34 70,138.16 30.34 1,784.06 479.97 918,082.24 343,585.53 2,605,829.67 213,815.79

63,979 366,706 10,661 61,448 3,612,732 203,029 139,549 52,225 396,086 32,500 4,938,914

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

10.7%

530,795 5,469,709

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

0.15

Km

35,984,925

5,469,709 5,935,439

Elemental Cost Model SH1 Hawkswood Deviation

Project Name Contacts

SH1 Hawkswood Deviation Transit: Barry Stratton (03) 3664455 Montgomery Watson Harza (03) 3667449 Main Contractor Works Infrastructure Prepared By David Simes 25 February 2005 Rural realignment Project Type Terrain Hilly, rural Project Length 4,376m overall project length. 8,740m lane length. Earthworks Predominantly cut to fill or waste. Excavators & dump trucks for bulk earthworks. Type A, R1 or W material. Sand, gravel, clay & silt. Techspantm concrete arch used for rail underpass. Structures Stock Underpass 2850mm dia. Helcor culvert. 2250mm dia. Multiplate CSP culvert Homestead Gulley. 1650mm dia. Aluflo Culvert Filled Gulley 2840mm dia. Multiplate CSP culvert Hawkswood Stream 2200x1750mm box culvert extension Hawkswood Stream Culvert 2 Pavement Costs 150mm M4/40 basecourse on 275mm AP65 subbase. 2 coat chip seal. I&R: Not recorded on PROMAN D&PD: $125,000 MSQA: $125,900 I&R: Scheme assessment March 1989 D&PD: Dec 1997 to Jun 1999 MSQA: Mar 1999 to Jun 2004 Adjusted completion date Sept 2001, actual completion Aug 2001 1205 M&V Alternative designs by contractor resulted in $437k reduction from conforming tender (recorded below). Rail Underpass $473,000 included below as Extra-ordinary Cost. Additional cost of design change at Northern end of site was off-set by savings on adjacent contract. Works total on PROMAN includes $68k for works on adjacent contract. Not included below. Variation & time extension associated with weather difficulties.

Duration

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 5,379,458 5,379,458 5,379,458 4%

Unit % % %

Rate 0.0% 2.3% 2.3%

Amount

125,000 125,900 250,900

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

4.376 615,700 2,000 4.376 45,000 74 4.376 4.376 4.376 4.376 74% 4,180,702 13%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

0.00 2.82 7.82 304,885.57 14.14 151.15 39,681.10 9,329.07 50,337.12 2,742.23

1,736,781 15,640 1,334,179 636,173 11,185 173,645 40,824 220,275 12,000 4,180,702

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1 Rail Underpass

17.4%

725,756 4,906,458

473,000

Extraordinary Project Costs (C)

8%

473,000

Construction Total (B + C) Project Total (A +B + C)

4.38

Km

1,229,309

5,379,458 5,630,358

Elemental Cost Model Hawkes Bay Expressway Airport to Taradale Road Section

Project Name Contacts

Hawkes Bay Expressway - Airport to Taradale Road Section Transit: Mike Wong (06) 8351750 Opus International Consultants Ltd: Dave Cowlrick (06) 8335136 Main Contractor Fulton Hogan Prepared By David Simes 25 January 2005 2 lane limited acces arterial bypass. Project Type Terrain Coastal, estuary and flat. Project Length 5,500m overall project length. 14,500m lane length. Earthworks Predominantly cut to fill type A material. Excavators, off road & road trucks, graders, dozers & vibrating rollers. Graves north of estuary, silt & marine clays south of the estuary. Structures Estuary bridge - 150m long (7x20m spans), 4 x 600mm shell piles per abutmnt & pier, 1500m2 deck, AC surface, W beam TL3 barriers. Estuary Crossing Box Culverts - 9No pcast 3m wide x 34mlong x 1.5, 2.0, or 3.0m high (design & build) Purimu Drain Box Culvert - twin 5m x 3.25m x 45m long (design & build) County Drain Box Culvert - precast 4m x 2m x 40m long (design & build) Interconnecting Box Culverts - 3m x 1.5m x 1 @ 38m & 1 @ 30m long. All incorporated allowance for fish passage through culvert Rock rip rap to embankments across estuary

Pavement Costs

Duration

B3 Pavement specification. AC to bridge deck, 2 coat chip seal generally. I&R: $215,000 (1995) plus $600,000 (1999) D&PD: $770,000 (2001) MSQA: $339,000 I&R: 1995 to 1999 D&PD: 1995 to Sept 2001 MSQA: Dec 2001 to May 2004 1205 SIA (3 + 1 applicants). QPTO Crosses environmentally & historically sensitive wetlands. Design & build embankment, culverts & bridge. Deficit of available fill material resulted in additional $435,000 cost.

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 10,952,000 10,952,000 10,952,000 15%

Unit % % %

Rate 7.4% 7.0% 3.5%

Amount 815,000 770,000 382,200 1,967,200

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

5.500 160,000 5.500 87,000 1,500 5.500 5.500 5.500 5.500 73% 9,371,169 12%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

18,195.01 14.73 411,792.31 19.49 1,145.76 152,714.87 6,443.06 60,995.42 4,522.68

100,073 2,356,684 2,264,858 1,695,203 1,718,633 839,932 35,437 335,475 24,875 9,371,169

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

16.9%

1,580,831 10,952,000

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

5.50

Km

1,991,273

10,952,000 12,919,200

Elemental Cost Model State Highway 1 - Albany to Puhoi Realignment (ALPURT): Sector A1

Project Name Contacts

Albany to Puhoi Realignment (ALPURT): Sector A1 Transit: Peter Spies 09 368 2015 Opus International Consultants Ltd: M.M. Coup 09 3559585 Main Contractor Stevensons Prepared By David Simes 28 September 2004 Realignment and upgrading of SH 1 from two-lane Project Type highway to four-lane motorway Terrain Rural, hilly, with several stream and road crossings Project Length 6,730m overall project length. 36,700m lane length (including ramps & interchanges). Earthworks Predominantly cut to fill. Includes more than $8m of remediation for failure of partially completed fill at Gully 1. Structures Lucas Creek Bridge. M/way over creek. Total span 53m. Insitu piles. Double hollow core deck units. Okura River Bridges. 2 Parallel m/way over river bridges. Bridge 1 - Span 81.92m Insitu piles. P/cast U beams. Bridge 2 - Span 75.4m. Insitu piles. P/cast U beams. Awanohi Rd. M/way over road. Span 20m. Double core deck units. Hollow core capping beam on lngtdnl cntrline. Lonely Track Rd U/pass. M/way under road. Built prior to excvtn for m/way beneath. Span 106m. Insitu piles. Oteha Valley Road. M/way over road. Span 33.4m. Bored cylinder insitu piles. Double core deck units. McClymonts Rd. M/way under rd. Span 40m. Insitu piles. Double core hollow deck. Conc. trough beam @ 1 f/path. Greville Rd. M/way over road. Span 56.3m. Insitu cylinder piles, belled. U beams (26m, 16m & 12m span). Greville Rd O/bridge Widening. M/way over rd. Span 56.3m. 1 lane. Insitu piles. Insitu abtmnt extnsns. U beams. MSE r/walls @ abutmnts & embnkmnts. Soil nail & mesh r/walls 1520m2. Conc. soldier pile r/wall ??m2 Extensive drainage including both concrete & corrugated steel culverts. Pavement 2 coat chip seal. Hotmix to intersections and bridge decks. I&R: Refer Transit or Beca Costs D&PD: $8.851m (includes A2, includes Contract Management by SERCO) MSQA: $3.888m (includes A2) I&R: Refer Transit or Beca Duration D&PD: Sept '96 to Dec '97 (includes A2) Enabling contr. 2/97 - 6/97. Main contr. 12/97 - 12/99 (partial opening). Sep. portion L/scaping fin. 12/01 Final completion 12/00, (12 months late). CCI 1030 Procurement M&V. Altered during construction to LS with M&V components Comment Green fields site. Traffic Management to TNZ HCH manual & "Working on the Road" for minor rural roads. Includes flocculation for temp. s/water treatment during construction & construction of permanent treatment ponds. Increased scope of works & incentive payments varied into contract account for major cost increases. Significant repair & remediation costs arising from structural fill failure at "Gully 1".

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 62,075,852 62,075,852 62,075,852 11%

Unit % % %

Rate 0.0% 3.8% 8.6%

Amount

2,332,800 5,310,600 7,643,400

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

6.730 1,579,479 50,622 6.730 213,563 7,674 1,523 6.730 6.730 6.730 6.730 84% 58,724,420 5%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

103,555.72 13.37 10.62 1,136,643.73 43.15 1,595.17 505.53 444,608.85 173,693.88 260,882.95 85,191.30

696,930 21,122,423 537,450 7,649,612 9,216,074 12,241,645 770,029 2,992,218 1,168,960 1,755,742 573,337 58,724,420

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

5.7%

3,351,432 62,075,852

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

6.73

Km

9,223,752

62,075,852 69,719,252

Elemental Cost Model State Highway 1 - Albany to Puhoi Realignment (ALPURT): Sector A2

Project Name Contacts

Albany to Puhoi Realignment (ALPURT): Sector A2 Transit: Peter Spies 09 368 2015 Opus International Consultants Ltd: M.M. Coup 09 3559585 Main Contractor Downer Works Prepared By David Simes 28 September 2004 Realignment and upgrading of SH 1 from two-lane highway to four-lane motorway Project Type Terrain Rural, flat/rolling, with several stream and road crossings Project Length 8,220m lane length 32,700m main carriageway plus 2,700m ramps & merge lanes. Conventional cut/fill. Approx. 250,000m3 weak surface layer material cut to waste using excavators and trucks. Earthworks More than 100,00m3 of wet material replaced with dry fill from a nearby source, significantly reducing drying time. Structures Silverdale U/pass. Deck 838m2. 3 lane road over m/way. Span 60m. In situ piles. Double hollow core deck units. Wilks Rd. U/pass. Deck 538m2. 2 lane road over m/way. Span 58.45m. Insitu fndtn pads. Dble hollow core deck. Bawden Rd U/pass. Deck 620m2. 2 lane road over m/way. Span 59m. Insitu piles. Double hollow core deck units. Extensive drainage including culverts, and stream diversions. SH on 300 lime stabilised s/grade with 195 s/base & 165 b/course & 2 coat chip seal. AC on bridges & rndabts. Pavement I&R: Refer Transit or Beca Costs D&PD: $5.531m (includes A1) MSQA: $3.888m (includes A1) Duration I&R: Refer Transit or Beca D&PD: Sept '96 to Dec '97 (includes A1) Enabling contract 2/97 to 1/98. Main contract 12/97 to 12/99. Separable portion Landscaping complete 12/00 CCI 1030 Procurement M&V. Comment Green fields site. Traffic Management to TNZ HCH manual & "Working on the Road" for minor rural roads. Includes flocculation for temp. s/water treatment during construction & construction of permanent treatment ponds. Lighting at interchanges only. Increased scope of works & incentive payments varied into contract account for major cost increases.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 42,987,248 42,987,248 42,987,248 11%

Unit % % %

Rate 0.0% 8.2% 3.6%

Amount

3,540,400 1,555,200 5,095,600

2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11

8.220 1,512,193 50,650 8.220 198,964 1,996 204 8.220 8.220 8.220 8.220 79% 38,056,664 10%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

73972.64 9.08 1.72 887602.34 40.61 1488.66 226.25 253632.95 56052.85 275563.89 51487.08

608,055 13,734,322 87,142 7,296,091.26 8,079,912 2,971,011 46,155 2,084,863 460,754 2,265,135 423,223.81 38,056,664

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1

13.0%

4,930,584 42,987,248

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

8.22

Km

5,229,592

42,987,248 48,082,848

Elemental Cost Model Grafton Gully to Central Motorway Junction Auckland City

Project Name Contacts

Grafton Gully to Central Motorway Junction Auckland City Transit: Peter Spies 09 368 2015 Beca: Alan Powell 09 316 6164 Fletcher: Kim Barrett 025 747 901 Prepared By Gerard Kelly 14 May 2002, Updated by Marcus Lin 3 March 2004 Project Type Multi laned, varied laned urban motorway multiple access ramps (SH1ramps 1380 lane meters, SH16 ramps (5190), SH1/16 merge (1330), Stanley street widening (3840) Parnell rise (700), Grafton road (1370), Wellesley St (1680) Terrain Urban Project Length 15.490 lane Km's (varies 1-5 lanes throughout the project) or 1.4 km total length of project Earthworks Cut to fill, cut to waste, contaminated soils disposal, net disposal of material New Wellesley Street Bridge Span: 6 x 25m; Foundation: Bored piles cast in situ; Superstructure: Too Roff U beams + cast in situ combination Structures New Graftton Road Bridge Span: 20.5 +28m; Foundation: Bored piles cast in situ, contiguous abutments; Superstructure: cast in situ New Railway Bridge Span: 10m + 48m + 10m; Foundation: Bored piles cast in situ, contiguous abutments; Superstructure: post tensioned cast in situ SH 16 Tunnel: length: 83m; Foundation: Bored piles cast in situ, contiguous abutments; Superstructure: cast in situ Pavement Deep lift Asphalt 200 - 300 mm with strengthened (lime) subgrade I&R: $1,746,700 Costs Specimen Design: $933,400 IPAA: $1,934,639 Detailed design during construction = $2,265,604 Physical Works: $62,100,768 MSQA: $505,611 Duration Investigation: Undefined Specimen Design and iPAA from April 2001 to November 2001 Construction Commence December 2001 until 3 February 2004. CCI 1162 - previous quarter used Procurement Alliance = Full Delivery to Early Completion. Comment Project includes 83m underpass. Note, compensation model is similar to a DC lump sum, but refer to the Procurement Group for more information. A quick summary of the compensation model: Limb 1: Direct project costs that are reimbursed at cost + onsite overheads Limb 2: Lump sum figure to cover corporate overheads and profit margins Limb 3: Pain gain incentive payment, based on cost overrun/underrun and performance in non-cost areas Limb 1+Limb 2 = Target Cost Estimate = which determines the share of the pain/gain. Note Limb 2 and Limb 3 costs have been pro-rata-ed among the elements.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A)

Quantity 62,100,768 62,100,768 62,100,768 11%

Unit % % %

Rate 2.8% 8.3% 0.8%

Amount 1,746,700 5,133,643 505,611 7,385,954

Comment

Specimen Design + IPAA + Detailed Design during construction Alliance structure and close collaboration between designers /constructors/project managers reduces MSQA req

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

1.400 180,000 20,000 1.400 80,000 4,525 6,010 1.400 1.400 1.400 1.400 68% 47,466,646 19%

Km M3 M2 Km M2 M2 M2 Km Km Km Km

443,686 56.37 19.97 3,199,771 84 1,886 886 3,210,952 2,160,997 524,244 2,106,587

621,161 10,146,226 399,380 4,479,679 6,755,503 8,535,584 5,325,222 4,495,332 3,025,396 733,941 2,949,222 47,466,646

project length (excluding side roads and accommodation works) total vol of cut + borrow + imported fill These are costs associated with miscellaneous stabilisation activities Length of Project includes $454036 worth of lime and cement stabilisation ms between abutments & inner face of edge protection

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs 3.1 Underpass

28.4%

13,472,834 60,939,480

489

m2

2,375

1,161,287

Extraordinary Project Costs (C)

2%

1,161,287

Construction Total (B + C) Project Total (A +B + C)

1.40

Km

44,357,691

62,100,768 69,486,721

142252517.xls.ms_office - Grafton Gully (Auckland)

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model SH6A Frankton Road Carriageway Upgrade Project

SH6A Frankton Road Carriageway Upgrade Project Transit: John Jarvis (03 4778527) I&R: Keith Weale (Montgomery Watson Harza) D&PD and MSQA: Keith Weale (Montgomery Watson Harza) (03 4770885) Physical Works, Fulton Hogan Central (03 448 8119) Marcus Lin (04 4966692) Prepared By Carriageway improvements and safety improvement Project Type Urban, hilly Terrain Project Length 4.5 km Cut to waste, cut to fill Earthworks No major structures: Structures Culverts 300 mm to 1800 mm dia Rockbolting and shotcrete (833m2) Gabion Walls (total volume = 5888m3, assume average thickness = 2 m) Fortrac Walls (4,200 m2) Timber pole and panel walls (100m2) Timber boardwalk and balustrades 56,000m2 chip sealed double coat flexible pavement Pavement Costs Investigation and reporting - $95,000 D&PD: $256,000 MSQA: $ 458,000 Total PW: $7,423,000 I&R 6 months Duration D&PD 5 months MSQA 20 months PW 20 months. Completion Dec 2003 1162 CCI Original measure and value, but preferred Tenderer was over budget and alternative designs were offered, Procurement a final tender was accepted based on 45% lump sum. n/a Comment n/a Major Risks that Occurred Project Name Contacts

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 7,363,882 7,363,882 7,363,882 10%

Unit % % %

Rate 1.3% 3.5% 6.2%

Amount 95,000 256,000 458,000 809,000

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

28,000 4.500 56,000 7,744 4.500 4.500 4.500 4.500 85% 6,957,742 5%

M3 Km M2 M2 Km Km Km Km

33.94 364,000 16 209 111,631 127,841 138,217 29,667

950,389 1,638,001 917,090 1,619,161 502,341 575,284 621,975 133,501 6,957,742

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

5.8%

406,140 7,363,882

0%

Construction Total (B + C) Project Total (A +B + C)

4.50

Km

1,636,418

7,363,882 8,172,882

Elemental Cost Model Rangiriri to Ohinewai Four Laning

SH1 Rangiriri to South of Ohinewai Four Laning Transit: Garth Halpin (07-9571642) Consultant: John Kerr (Bloxam Burnett and Olliver - 07-8380144) Contractor: Dave Jewel/Andre Raymond 0272 735 242 (Fletcher-Higgins Joint Venture ) Marcus Lin (04 4966692) Prepared By 4L rural realignment Project Type Flat to rolling Terrain Project Length 10.06 km Strip topsoil, preload, trim, cut to fill, borrow to fill, cut and undercut to waste Earthworks Tahuna Overbridge, full diamond interchange with roundabouts at each side of bridge Structures Approximately 50% = 150mm M4, 180mm of GAP65, 150mm lime stabilised, min of 450mm of selected Pavement compacted fill. Other 50% = 150mm M4, 180mm of GAP65, min of 600mm of selected compacted fill Project Name Contacts Costs Investigation: Specimen Design: $718,144 MSQA: $416,245 (Principal's advisor) Total PW: $20,862,833 I&R 40 months Spec Design 14 months MSQA 18 months PW18 months. Completion June 2003 1164 Design Construct Unforeseen costs: Remediation of unforseen ground conditions: $105K Undercut and recompact, $446K on geotextile to prevent longwave settlement, $99K on geogrid reinforcement) total $650K, additional wire rope barrier $622K, flood mitgation $51K, additional lighting $135K None

Duration

CCI Procurement Comment

Major Risks that Occurred

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 20,146,932 20,146,932 20,146,932 12%

Unit % % %

Rate 0.0% 11.9% 2.1%

Amount

2,400,600 416,245 2,816,845

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

10.060 331,000 101,500 10.060 188,960 394 501 10.060 10.060 10.060 10.060 74% 16,902,935 14%

km M3 m2 km M2 M2 M2 km km km km

29,328.63 16.34 5.37 76,178 30 1,042 774 134,257 22,601 100,112 83,555

295,046 5,407,139 545,205 766,349 5,664,127 411,058 388,327 1,350,621 227,370 1,007,130 840,563 16,902,935

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

19.2%

3,243,997 20,146,932 -

0%

Construction Total (B + C) Project Total (A +B + C)

10.06

Km

2,002,677

20,146,932 22,963,778

Elemental Cost Model SH1 Pukerua Bay to Plimmerton Four Laning (Rural Section)

SH1 Pukerua Bay to Plimmerton Four Laning (Rural Section) Transit: Catherine Worsley (04-8012593) Consultant: Andrew Paterson, Beca Carter Hollings and Ferner (04-4737551) Contractor: John Hayes (Hayes Earthmoving Services Limited (025 435 556) Marcus Lin (04 4966692) Prepared By 4L rural realignment Project Type Flat to rolling Terrain Project Length 3.5 km A lot of unsuitable material (approx 550,000 m3), a few hardfills/bulkfills/cuts/fills Earthworks None - major culverts only Structures Subgrade 200 mm Pavement Costs Investigation: $881,300 for main consultant plus $248,800 for other consultant (both figures not in PROMAN) D&PD $428,000 MSQA: $974,400 Total PW: $9,351,966.35 I&R 40 months Duration D&PD 34 months MSQA 30 months PW 30 months. Completion April 2003 1164 CCI Measure and value Procurement Additional expense: Undercut due to a lot of unsuitable material, landowner issues, median barrier posts, Comment None Major Risks that Occurred Project Name Contacts

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 9,351,966 9,351,966 9,351,966 21%

Unit % % %

Rate 12.1% 4.6% 10.4%

Amount 1,130,100 428,000 974,400 2,532,500 Tender Change -2% 20% -90% 54% -5%

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

3.500 656,063 830 3.500 86,111 364 3.500 3.500 3.500 3.500 73% 8,714,599 5%

km M3 m2 km M2 M2 km km km km

12,498.81 3.66 3.79 625,671 23 152 251,638 104,656 160,238 54,920

43,746 2,403,054 3,148 2,189,847 2,019,371 55,354 880,731 366,295 560,834 192,219 8,714,599

44,500 2,010,645 33,000 1,423,476 2,121,419 746,288 451,030 597,292 160000

18% -19% -6% 20%

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

7.3%

637,367 9,351,966 -

756,244 8,343,894

-16% 12%

0%

Construction Total (B + C) Project Total (A +B + C)

3.50

Km

2,671,990

9,351,966 11,884,466

142252517.xls.ms_office - Rural Section

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model Route J, Tauranga

Route PJK (Contract TNZ 2061) Transit: Colin Crampton (04 499 6600), Colin Knaggs (07 957 1610) Opus International Consultants: Nick Lewis 07 579 5674, 027 294 7409 Fulton Hogan: Graeme Tonks 07 571 5366, 0274 475 157 Ian Gray/Nick Lewis 21 November 2002 Prepared By 4.4Km of 4 lane expressway Project Type Urban Bypass built through esturine areas plus constructing 2 other Local Roads with tauranga District Council Terrain Project Length 4.4 Km's ( 16,300 Lane KM's including access ramps, excluding side roads and accommodation works) 1,300,000 m3 topsoil strip,undercut, cut to fill, cut to waste, cut to surcharge. (eg EW balance, net import, or disposal of material) Earthworks Waihi J Bridge - DHC Beams, concrete piles 13 x 43 = 559m2 @ $ 1092 = $610,000 Structures Cambridge Road Bridge - Twin concrete box girder, concrete piles 16.5 x 71.1 = 1173m2 @ $1875 = $2,200,000 J stream Bridge - DHC Beams, concrete piles 30.6 x 20.8 = 636m2 @ $942/m2 = $600,000 15th Avenue Bridge - Twin concrete box girder, concrete piles 19.5 x 134.5 = 2623m2 @ $1296 = $3,400,000 - 47% Transit cost, 53% TDC cost K over K bridge (K Combined) 9.4 x 419 = 3898m2 $4,000,000 - 35% Transit cost, 65% TDC 2 Coat seal (104,400 m2) + OGPA for noise mitigation & Mix 10 overlay at minor junctions (33,490 m2) Pavement Costs Design: Not tendered. Negotiated under the No 1 agreement as % of PW costs Construction Tender: $68.009M (Transit Total $31.656m - $20.164m route J, $11.248m I/C TeAuetu $0.244m. TDC Total $36.353 - $18.673m route K, $4.874m Route P, $12.806m I/C ). Transit Allocation $46m (Note Allocation Transit cost only based on POMAN Allocation Oct 02), includes $4.7M contingency. Most Likely Outturn cost $43.15M , includes $1.883m allowance for rutting & contractual risk for route K, not yet completed. Outturn price includes escalation, borrow material royalties, median barrier changes, increased noise attenuation and barrier end treatments and all risks that have eventuated, $2.3M MSQA and $1.1M Transit costs & $37.717M PW costs MSQA Tender $2.5M; Outturn $2.32M. Change due to revised scope following acceptance of contractor's alternative design Transit Costs: Include Project Management, Audit, natural Gas, United Networks, iwi monitoring, royalties, miscelaneous, total $1,110,000 Detailed Design Commence 4Q 1997, completed Sept 1999 Duration Construction Commenced Sept 1999, Completed April 2002 (Planned completion June 2002) 1150. Outturn costs to 21 November 2002, include forecast for escalation to project cmpletion) CCI procurement model M&V contract award, subsequent alternative design with Lump sums agreed following contract award Procurement Project Name Contacts Comment Route PJK is a group of 3 sub projects of which route J was funded by Transit. P&K were funded by TDC. Contract had a joint client management board. Route J under development by Transit since 1985. Scheme assessment 1989, Environmental assessment 1990, land purchase 1997, Designation 1999. FH FFC $39.601M. Additional Noise walls; Client instructed scope change (median barrier, & end treatments); extracontractual claims (drying/handling, ambiguities in specifications, unforsen physical conditions, grey aras at change to LS); Services (actual cost > tender); Wet weather working (different methodology and risks due to agreed programme changes); Engineers Instructions (lead to new methodology); design changes (eg safety audit); additional retaining walls (due to ground conditions); Client instructed variations (eg viewing platform); Design development (unforsen development required between completing design, and completing construction); Resource consent issues; Gazetting.

Major Risks that Occurred

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 39,600,844 39,600,844 39,600,844 12%

Unit % % %

Rate 2.1% 3.3% 8.6%

Amount 850,400 1,323,100 3,424,000 5,597,500

Comment

Opus design No 1 Agreement $2.301M Opus $1.108m Transit costs

Tender 2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11 4.400 1,300,000 6,000 4.400 110,480 4,966 350 4.400 4.400 4.400 4.400 82% 37,220,592 5% % 6.4% Km M3 m2 Km M2 M2 M2 Km Km Km Km 304,905 11.41 9.58 824,362 48 1,447 1,216 592,573 264,767 147,925 3,606 1,341,580 14,837,824 57,508 3,627,191 5,306,473 7,185,557 425,430 2,607,320 1,164,973 650,870 15,866 37,220,592 2,380,252 39,600,844 0% 921,130 9,420,983 3,971,517 4,826,604 6,553,142 1,540,107 1,330,777 704,268 449,045 1,938,170 31,655,741

Change 46% 57% -9% 10% 10% -72% 96% 65% 45%

144,000 m2 chipseal + 33,500m2 OGPA. Lime used 3 structures Transit & 2 Structures split Transit/TDC Mixed types retaining walls

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

23% 25%

Construction Total (B + C) Project Total (A +B + C)

4.40

Km

9,000,192

39,600,844 45,198,344

142252517.xls.ms_office - Route J (Hamilton)

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model SH6: Glenhope to Kawatiri Realignment, Nelson

SH6: Glenhope to Kawatiri Realignment (TNZ 431T) RP 196/3.05 to 201/7.50, Contracts 40PT and 431T Transit: Gavin Gregg (07 957 1610) Montgomery Watson Harza Nelson, Andrew Ferguson (03) 5460686 Fulton Hogan: Scott Brookland (03) 547 9789 Marcus Lin (04 4966692) Prepared By Rural realignment including passing lanes (200 to 1460, seal width 15.5m) and bridge widening Project Type Rural , hilly except gradient was reasonably flat as it runs along the bottom of a valley beside the Hope River. Terrain Passes along the edge of Kahurangi National Park Project Length Prior to construction 10.4 km After construction 9.9 km (seal width 8.5 m) Cut to fill 90,000m3 (120,000), borrow to fill 27,000m3 (5,000), cut to waste 165,300m3 (86,000). Earthworks (Tendered volumes shown in brackets) Little Hope River Bridge - Existing single span concrete bridge widened from 6m to 10m.(length = 10.8 m) Structures Hope River Bridge - New, two single span concrete bridge (10m wide) which replaces the original single lane Glenhope Station Bridge (length 22.1m) Boulder Creek Bridge - Existing single span concrete bridge widened from 6m to 10m. (length 13 m) Sandy Creek Bridge - Existing singe span concrete bridge widened from 8m to 10m (length 10.7m) Woodhen Bend Culvert - New 1800 diameter Helcor steel culvert This is also a flexible unbound granular pavement with a total thickness of 300mm. The pavement was constructed in two layers with a 150mm layer of subbase of AP65 generally in Pavement accordance with TNZ M/4 except for grading and broken faces. The top layer is 150mm depth of AP40 basecourse again generally in accodance with TNZ M/4 except for the broken faces. The pavement was constructed in accordance with TNZ B/3 - April 2000 Project Name Contacts Costs Investigation and reporting $96,900 Design and Planning $223,000 Management and Supervision $259,500 Physical Works $6,190,400 Total $6,769,800 I&R Feb 98 to June 99 Physical Works Sept 00 to April 02 (Practical completion) D&PD July 99 to June 00 Jan 03 - End of all works MSQA July 00 to March 03 1150 Measure and Value contract assessed on weighted attributes. Towards the end of the physical works contract the contract was converted to a negotiated lump sum which covered the pavement construction and the balance of the works Additional earthwork expenditure of $120,000 for Works Infrastructure under network maintenance contract for slip removal The areas of risk specifically identified were: 1. Slope stability of insitu material - some slope failure did occur the extent of which was beyond that originally provided for 2. Pavement thickness - there was no necessity to increase the pavement thickness from that designed. However the Contractor did propose that the pavement costruction be carried out under TNZ Specification B/3 and this was adopted. There was no increase in cost to the project.

Duration

CCI Procurement Comment Major Risks that Occurred

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 6,183,854 6,183,854 6,183,854 9%

Unit % % %

Rate 1.6% 3.6% 4.2%

Amount 96,900 223,000 259,500 579,400 Tender Change

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

9.900 282,300 4,329 9.900 92,970 566 9.900 9.900 9.900 9.900 87% 5,864,729 5%

Km M3 m2 Km M2 M2 M2 Km Km Km Km

8.08 33.73 60,164 17 1,081 32,862 3,634 27,096 4,980

2,281,623 146,013 595,626 1,550,632 611,970 325,330 35,978 268,252 49,305 5,864,729

1,639,055 197,518 358,110 1,319,066 543,871 225,696 38,241 283,067 45,003

39% 66% 18% 13% 44% -6% -5% 10%

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

5.4%

319,126 6,183,854 -

313,397 4,963,024

2% 25%

0%

Construction Total (B + C) Project Total (A +B + C)

9.90

Km

624,632

6,183,854 6,763,254

142252517.xls.ms_office - Glenhope

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model SH6: Spooners Summit SH6: Spooners Summit Realignment RP 150/5.0 to 12.22 (original) Contracts 32PT ad 409T Transit: Gavin Gregg (07 957 1610) Montgomery Watson Harza Nelson, Andrew Ferguson (03) 5460686 Doug Hood Ltd, PO Box 403 Ashburton, (03) 308 6011 Marcus Lin (04 4966692) Prepared By Rural realignment including passing lanes (station 650 to 2000 and 5100 to 5800 inc tapers 12 m seal width) Project Type Rural , hilly through forestry land with grades up to 10% Terrain Project Length Prior to construction 7.5 km After construction 6.5 km (8.5 m seal width) + 0.5 km of side road (aprox 6 m seal width) Remove from stockpile 29035 (30000), spread from stockpile 29035 (30000), cut and undercut to fill 584323 (585000), cut and undercut to waste 121854 (50000), preparation of Earthworks undercut areas 45582 (10000), scarifying pavements, slip clearance None - except for major earthfills up to 30 m deep Structures Flexible unbound granular pavement with a total thickness of 300mm. The pavement is made up of two layers with the bottom layer being Pavement 150mm depth of AP75 subbase in accodance with TNZ M/4 except for the grading which was to the grading in the contract doc The top layer is AP40 basecourse in accordance with TNZ M/4. Both layers were constructed in accordance with TNZ B/2. Investigation and reporting $60,300 Costs Design and Planning $103,600 Management and Supervision $281,200 Physical Works $5,589,600 Total $6,034,700 I&R Nov 97 to Dec 98 Physical Works Jan 00 to Feb 02 (Practical Completion) Duration D&PD Dec 98 to Aug 99 Jan 03 (End of all works) MSQA Aug 99 to Jan 03 1134 CCI Measure and Value contract assessed on weighted attributes. There was no changes to the form of the physical works contract over the duration of the contract Procurement Traffic services include $71200 paid to Works Infrastructure under Contract 441T for the maintenance of the detour route and $36500 to Tasman DC for the Comment use of local roads for the same detour routes The areas of risk specifically identified were: Major Risks that Occurred 1. Slope stability of insitu material -this did occur but was more related to construction work as opposed to failure of insitu material 2. Pavement thickness - there were problems with the pavement but not related to the design thickness. The issue was with material used and construction techniques Project Name Contacts

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 5,574,392 5,574,392 5,574,392 7%

Unit % % %

Rate 1.1% 1.9% 5.0%

Amount 60,300 103,600 281,200 445,100 Tender Change

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

6.500 897,732 17,258 6.500 71,250 1 6.500 6.500 6.500 6.500 89% 5,377,070 3%

Km M3 m2 Km M2 M2 M2 Km Km Km Km

2.70 6.62 118,035 20 537 67,806 1,067 22,298 9,210

2,426,055 114,294 767,228 1,416,480 537 440,742 6,933 144,934 59,868 5,377,070

1,950,707 709,869 1,401,207 516 136,135 6,656 104,299 62,070

24% 8% 1% 4% 224% 4% 39% -4%

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

3.7%

197,322 5,574,392 -

207,126 4,578,586

-5% 22%

0%

Construction Total (B + C) Project Total (A +B + C)

6.50

Km

857,599

5,574,392 6,019,492

142252517.xls.ms_office - Spooners

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model Fairfield Bypass

Project Name Contacts

Prepared By Project Type Terrain

Project Name Transit Contact Person and contact details Consultant Contact Person and contact details (optional) Contractor Contact Person and contact details (optional) name and contact details of person who prepared analysis, together with date prepared X lkane motorway, x lane expressway, X lane highway, passing lane road reconstruction etc. rural or urban, terrain type, location, specific project information impacting on the unit costsof the elements

Project Length 4.835 lane Km's (excluding side roads and accommodation works) Earthworks details of relevent earthworks issues (eg EW balance, net import, or disposal of material) total vol of cut + borrow + imported fill details Structures Details of structures (span, superstructure type, foundation details) Details of structures (span, superstructure type, foundation details) Pavement details of pavement type (eg chipseal A/C) or % of each type if both are used total m2 of running course (chipseal or AC etc..) Programme Comencement & practical completion dates Design phase (design comission award to construction commencement) Comencement & practical completion dates Construction phase detail tender and outturn costs for detail tender and outturn costs for detail tender and outturn costs for detail tender and outturn costs for I&R phase & reasons for differences (eg scope change, claims etc) D&PD phase & reasons for differences (eg scope change, claims etc) C phase & reasons for differences (eg scope change, claims etc) MSQA phase & reasons for differences (eg scope change, claims etc)

Costs

Duration

Actual duration and planned duration I&R phase (& details of any changes) Actual duration and planned duration D&PD phase (& details of any changes) Actual duration and planned duration C phase (& details of any changes) Actual duration and planned duration MSQA phase (& details of any changes) 1134 procurement model (D&C, alliance, M&V, LS etc) any other peretinent information may be entered here eg joint principals, project particularities etc

CCI Procurement Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 19,906,300 19,906,300 19,906,300 11%

Unit % % %

Rate 0.0% 7.6% 5.0%

Amount 1,522,700 993,500 2,516,200

Comment

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

4.835 1,180,475 8,000 4.835 57,840 1,877 1.06 4.835 4.835 4.835 4.835 79% 17,635,745 10%

Km M3 m2 Km M2 M2 M2 Km Km Km Km

177,103 4.21 21.99 185,868 97 1,472 7,925 162,403 79,732 179,319 62,048

856,292 4,971,924 175,900 898,674 5,623,469 2,763,353 8,400 785,220 385,505 867,008 300,000 17,635,745

mine hazard mitigation

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

12.9%

2,270,555 19,906,300

0%

Construction Total (B + C) Project Total (A +B + C)

4.84

Km

4,117,125

19,906,300 22,422,500

142252517.xls.ms_office - Fairfield (Dunedin)

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model SH3 Mokau Bridge Replacement

SH3 Mokau Bridge Replacement Transit: Chris Allen (07 9571610) I&R: Martin Bloxam, Bloxam Burnett & Olliver (07) 8380144 D&PD and MSQA Roland Frost, Beca Carter Hollings and Ferner Ltd (09) 300 9000 Physical Works, Albert Smith, Smithbridge Ltd (07) 575 2325 Marcus Lin (04 4966692) Prepared By Bridge replacement and approach realignment Project Type Rural river crossing, northern approach is a fairly steep hill, southern approach is flat Terrain Project Length Total of 1.06 km: New Bridge approximately 230 m long Approx 520 m approache on northern side that includes an intersection with a local road (Te Mahoe Rd, 135 m) Approx 210 m approach on the southern side Import to fill, strip topsoil, cut to waste, undercut, cut to fill, demolish old bridge Earthworks 230 m 9 span prestressed concrete I girder superstructure with single pier columns, deck width varying between 12.00m and 13.75m Structures 2 reinforced soil walls 1 soil nail wall 10,900m2 Chip seal over flexible pavement, where approximately 2400 m2 on Mokau Bridge Pavement Costs Investigation and reporting - $233,456.54 Bridge Approaches: D&PD $104,600 Bridge Renewal: D&PD $610,889 MSQA: $317,938 Total PW: Price schedule = $7.009 million, Price schedule forecast: $7.075 million, PROMAN = $7.095 million spent so far (i.e. addition of $86k of works since) I&R 78 months Duration D&PD 24 months MSQA 34 months PW 23 months. Completion Jan 2002 1134 CCI Measure and value Procurement n/a Comment n/a Major Risks that Occurred Project Name Contacts

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 7,075,125 7,075,125 7,075,125 15%

Unit % % %

Rate 3.3% 10.1% 4.5%

Amount 233,456 715,489 317,938 1,266,883 Tender Change

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

42,700 3,000 0.830 10,900 2,961 1,400 0.830 0.830 0.830 0.830 74% 6,132,834 11%

M3 m2 Km M2 M2 M2 Km Km Km Km

19.14 15.17 226,583 23 1,061 807 207,669 227,289 150,344 85,922

817,185 45,503 188,064 254,270 3,140,909 1,129,788 172,365 188,650 124,785 71,315 6,132,834

230 m two way bridge

750,275 367 184,107 257,511 3,072,082 693,543 95,390 171,992 58,367 0

9% 12302% 2% -1% 2% 63% 81% 10% 114%

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

15.4%

942,290 7,075,125 -

Includes temporary works and temporary bridge

902,738 6,186,372

4% 14%

Based on forecast figures, which is closer to the current total spent of $7.095 million

0%

Construction Total (B + C) Project Total (A +B + C)

0.83

Km

8,524,246

7,075,125 8,342,008

142252517.xls.ms_office - Mokau

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model Kamo Bypass

Project Name Contacts

Prepared By Project Type

Kamo Bypass Transit: Peter Spies Tel: 09 3682000 Fax: 09 368 2059 Opus International Consultants, Private Bag 9017, Whangarei. Contact Barry Cure (09) 430 1700 Fulton Hogan Northland. P.O. Box 1547 Whangarei David Simes 31 MAY 2004 2 lane single road. Greenfield site. Forecast 7500 vehicles per day. Includes: T junction, roundabout, level crossing, noise attenuation near residential properties, landscaping, extensive use of Highway Safety

Guardrails, 2 lane overbridge. Semi-rural. Gently rolling terrain. Very variable with a lot of ground water. Numerous springs, volcanic soil, clays, onerahi chaos, "floating" volcanic rocks, isolated volcanic rock flows, swamps. Project Length 3,300m Earthworks Motorscrapers for bulk earthworks. Diggers and trucks for undercut, drainage etc. Major slip, repairs included earthworks, retaining structures & drainage. $1m. Structures 2 lane overbridge. Pre stressed beams cast off site & lifted into place. Bored and cast insitu reinforced concrete piles. Three span with provision for future retrofitting to 4 lanes. Proximity to railway underpass ARMCO culvert required additional sheet piling around excavations. Abutments comprise major retaining walls precast concrete plank & insitu columns on 850dia concrete piles. 12.9m long x 13.0m wide. 4.9m clearance. Pavement Chipseal, with some thin AC at the south end for noise attenuation Programme D&PD Start Apr '99 Finish Sept '99. MSQA Start Oct '99 Finish Apr '01. Physical works Start Oct '99 Finish Dec '00 - 4 months early. Costs Main scheme development undertaken by Works Consultancy in 1990/91. Not included here. I&R $560k D&PD $300k, MSQA $287k, PW $9493k Tendered price $5,763,303 Outturn costs $9,493,475 Significant variations: slip repairs $1.0m, Walker Cres reconstruction $431k (adjacent to SH), escalation $458k, early completion $233k, other earthworks $500k, drainage increase $400k, signs & gantries $120k, pavement improvements $590k Duration Physical works 14 months (4 months early) CCI 1132 Procurement M&V Comment Includes railway level crossing. Includes lighting full length. See earthworks for major slip compounded by extreme wet weather event during remedial work. Terrain

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 9,493,475 9,493,475 9,493,475 11%

Unit % % %

Rate 5.9% 3.2% 3.0%

Amount 559,779 299,815 287,231 1,146,825

Comment

Tendered

Change

main scheme development not included assumed (including Transit & misc costs)

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

3.300 192,960 23,596 3.300 38,628 168 3.300 3.300 3.300 3.300 79% 8,384,554 9%

km m3 m2 km m2 m2 m2 km km km km

38,156.80 13.17 9.69 415,154.46 40.09 4,495.94 189,754.90 135,658.31 179,739.75 45,190.29

125,917 2,541,252 228,626 1,370,010 1,548,647 753,970 626,191 447,672 593,141 149,128 8,384,554

drainage blankets & geotextiles

abutments are major retaining walls

greenfield site

54,000 1,037,960 64,610 968,228 957,666 623,559 0 501,785 277,229 364,999 36,206

71,917 1,503,291 164,016 401,782 590,981 130,411 0 124,406 170,443 228,142 112,922

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

11.3%

947,547 9,332,101 161,374


railway level crossing

714,958

232,588

162102.14 -728 5,763,303 64.72%

Extraordinary Project Costs (C)

2%

161,374

Construction Total (B + C) Project Total (A +B + C)

3.30

Km

2,876,811

9,493,475 10,640,300

Elemental Cost Model ETCART Motorway Overbridge

Project Name Contacts

ETCART Motorway Overbridge Transit: Peter Spies Beca: Jon Ewew 09 3009195 Roadstone Construction Stage 1; Fulton Hogan Stage 2 Prepared By David Simes 15 March 2004 Overbridge on SH1 at Te Iringa Drive Manukau. Over Southern Motorway including embankments & motorway Project Type ramps. Embankment contract let prior to main contract. Terrain Urban. Flat, crossing 6 lane motorway Project Length 650m overall. Lane length:- 1300m bridge plus 1100m motorway ramps = 2400m total lane length. Earthworks Primarily imported fill to form bridge approaches & motorway ramps. Existing ground weak alluvial silts overlying sandstone. Structures Motorway overbridge 59m long with 4 spans (central pier in m/way median), precast hollow core beams supported on 900 & 1200 bored insitu concrete piles. Deck area 1370m2. With steel pedestrian barriers. Precast units cast adjacent to final location & craned directly into place during m/way closure. M/way lanes temporarily remarked twice, incorporating shoulders, to facilitate side & central pier construction. Bridge beams erected over 2 nights with total m/way closure. MSE Keystone block retaining wall (335m2) to South East approach embankment. Pavement 75mm mix 20 AC on 100mm M4 AP40 Basecourse on 250mm Cement Treated Subbase. M/way ramps had additional 25mm OGPA. Total area 20,254m2 Programme D&PD Start Aug '98 Finish Feb '99. Stage 1 (Landscape & Embankments) Start Nov '98 Finish May '99. Main Contract Start May '99 Finish April 2000. Costs I&R not included here. Manukau Consultants. D&PD & MSQA combined cost $877.5k Tendered price $7,193,413.52. Outturn costs $6,909,174.33 (from final payment certificate) PROMAN reports Construction Outturn cost as $2,809.8k compared to $2,636 on final payment schedule. This is Transit's share of the construction cost. Variance in cost primarily changes in scope. Duration I&R not included here Construction period 18 months CCI 1049 Procurement M&V Comment Rates distorted because m/way ramps not included in Project Length. Traffic Services Element is inflated by necessary improvements to m/way (barriers $234k, signage $186k, lighting $73k, others $56k)

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 6,909,174 6,909,174 6,909,174 11%

Unit % % %

Rate 0.0% 3.8% 8.9%

Amount 263,250 614,250 877,500

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

0.650 121,790 5,000 0.650 20,254 1,369 347 0.650 0.650 0.650 0.650 81% 6,337,654 7%

Km M3 m2 Km M2 M2 M2 Km Km Km Km

0.00 14.72 7.08 653,683.46 43.69 904.52 395.05 1,663,573.80 35,160.18 662,708.42 445,625.14

1,792,785 35,381 424,894 884,818 1,238,101 137,081 1,081,323 22,854 430,760 289,656 6,337,654

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

9.0%

571,521 6,909,174

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

0.65

Km

10,629,499

6,909,174 7,786,674

Elemental Cost Model SH6 Stoke Bypass, Nelson

SH6: Stoke Bypass Transit: Catherine Worsley (04-8012593) Opus International Consultants: Martin Crundwell (03) 5463668 Fulton Hogan: Kevin Hasson (03) 3571400 Marcus Lin (04 4966692) Prepared By Urban bypass - single dual-carriageway Project Type Flat, along coastal area, in residential and industrial areas Terrain Project Length Total of 7.2 km: 1.0 km arterial link from Waimea Road to Annesbrook Drive (SH6) 6.2 km bypass of Stoke from annesbrook Drive to Richmond Deviation (becoming the new SH6) Additional road linkages provided from bypass to: Saxton Road and Main Road Stoke Major borrow to fill (450,000m3), major cut and undercut (230,000m3), cut to waste, strip topsoil, cut to fill, and misc site clearance, strip topsoil = $6.3 million Earthworks Additional $1.6 million includes preparation of undercut areas and extraovers Bridges: Staford Ave Extension Overbridge- Precast wall panels, precast single core deck units, 11.8 m x 26 m Structures Annesbrook Drive Pedestrian/Cycle overbridge- Concrete piers and beam-slab spans Nayland Road Overbridge - Precast concrete piles and tie beams, precast concrete abutments, prestressed concrete deck beams, 12.5 x 40 m Kidson Access Overbridge - Precast concrete piles and tie beams, concrete abutments, precast concrete deck slabs, 12 x 12.5 m Songer Street overbridge - Presrtessed concrete piles, precast tie beams, precast wall panels, precast single core deck units, 10.8 x 25 m Underpasses (precast concrete box) - Quarantine Road Pedestrian underpass, Link Road Stock Underpass, Bypass Stock underpass Major Box Culverts - Jenkins Stream, Arapiki Stream, Poorman's Stream, Orchard Creek, Orphanage Creek, Saxton Creek, Reservoir Creek MSE retaining walls, associated with bridge approaches Chip seal over flexible unbound granular layers (138 6882m2), 40 mm AC (21,011m2). Pavement layers comprised 250AP 40 over 400-500 mmm Greenhill bulkfill material. Alternative Pavement design of contractor of 150 mm AP40 and 100mm AP75 layers combined into a single AP40 layer. Investigation and reporting - $400000 (estimate) Costs Design and Planning $1,600,000 Management and Supervision $1,000,000 Physical Works $26,200,000 Total $29,200,000 I&R 1991-1993 Duration D&PD 1994-1996 MSQA and physical works 1997- Feb 2000 1040 CCI Major culverts, underpasses and MSE retaining walls - lump sum Procurement Bridges converted to lump sum "design and build" due to market submitting higher than expected prices Critical issues which influenced the successful completion of this project included the requirement to construct a temporary split level crossing over State Highway 7 to allow 410,000 Comment cubic meters of borrow to fill material to be utilised, reclamation of tidal estuary margins and liaison with major processing & manufacturing companies to ensure construction work had no detrimental effect. Major value engineering was completed with all 4 overbridges being negotiated to be undertaken as design & build. Project Name Contacts Major Risks that Occurred 1. When the tender estimate was submitted for independent assessment, it was found to be 2 M under market value, hence market value was a known risk 2. Noise and dust was a risk due to the borrow site operation within residential and industrial areas, watering kept it in control and complaints were dealt on a case by case basis 3. Establishment of landscape planting was identified as a risk, thus a 5 year maintenance programme incorporated into the contract 4. Relocation of Nelson Regional Sewer Authorities services was a high risk to the community, special contingency measures were specified and came into play during construction

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 26,200,000 26,200,000 26,200,000 10%

Unit % % %

Rate 1.5% 6.1% 3.8%

Amount 400,000 1,600,000 1,000,000 3,000,000


Approximate, no accurate data available

Note: $1.6 million of contingencies, ongoing maintenance, price fluctuations etc has been pro-rata in addition to the tender schedule item's costs

Tender 6,622,671 1,536,856 5,819,842 3,552,500 1,807,076 1,535,351 1,004,793 636,759 1,668,598 5,000

Change

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

7.200 848,075 3,037 7.200 159,699 1,227 2,488 7.200 7.200 7.200 7.200 85% 24,856,600 5%

Km M3 m2 Km M2 M2 M2 Km Km Km Km

1,870 9.30 151.66 883,197 17 1,741 673 139,113 130,415 228,594 742

13,464 7,891,228 460,583 6,359,018 2,731,176 2,135,490 1,673,818 1,001,611 938,990 1,645,879 5,344 24,856,600

Price includes extraovers, preparation of undercut areas

19% 9% -23% 18% 0% 47% -1% 7%

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

5.4%

1,343,400 26,200,000 -

1,196,000 25,385,445

12% 3%

0%

Construction Total (B + C) Project Total (A +B + C)

7.20

Km

3,638,889

26,200,000 29,200,000

142252517.xls.ms_office - Stoke

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model Otira Viaduct

Project Name Contacts

Otira Viaduct & Approaches Transit: Peter Connors (03) 3664455 Beca Carter Hollings & Ferner: Richard Holyoake 03 3419205 McConnell Smith Ltd: Mark Happer Prepared By David Simes 7 May 2004 Rural realignment. Single lane in each direction. Project Type Terrain Alpine Project Length 1,050m Earthworks 70t excavator loading CAT769 dump trucks carted to fill on site. Compaction with heavy vibrating rollers. Structures Viaduct: concrete piles with insitu concrete abutments & piers, insitu post tensioned concrete box girder, steel guardrails. Length 442m with 134m span. Bridge: precast, pretensioned deck, concrete piles. Retaining walls: Reinforced earth up to 6m high 554m2. Timber crib 65m2. Buried rock retaining wall 21m long x 3m high concreted & dtacked into trench in ground. Pavement 160mm GAP65 sub-base. 140mm NRB M4 AP40 basecourse. 2 coat chip seal. Grouved AC surfacing on viaduct & western approach. Total paved area 12,194m2. Programme I&R start approx 1973. D&PD Start Dec '93. MSQA start Dec '93 PW Start 24 Dec '96. PW substantially complete Nov '99 Costs I&R not included on PROMAN estimated $409k (included below). Separate contract. D&PD $332k, MSQA $687k, PW $23,472k Tendered price $22,429,702 Outturn costs $22,141,077 (from final payment certificate) Significant variations: unexpected foundation material beneath 1 pier, covered by contingency allowance. Other significant variations were changes in scope initiated by Client. Duration Contract period: 35 months for physical works. Note I&R spanned approximately 20 years. CCI 1030 Procurement M&V - weighted attribute, 70% price. Comment Minimal traffic management required, mostly at time of tie in. Includes $784k Transpower charges to move 33kva cable & 3 pylons.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 23,471,755 23,471,755 23,471,755 6%

Unit % % %

Rate 1.7% 1.4% 2.9%

Amount 408,786 332,471 686,989 1,428,246

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

1.050 95,174 1.050 12,194 4,342 682 1.050 1.050 1.050 1.050 70% 17,420,665 24%

km m3 km m2 m2 m2 km km km km

0.00 22.23 318,729.23 36.07 2,890.14 663.90 109,325.67 747,202.43 550,295.25 48,665.00

2,115,550 334,666 439,827 12,549,581 452,779 114,792 784,563 577,810 51,098 17,420,665

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

34.7%

6,051,090 23,471,755

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

1.05

km

22,354,052

23,471,755 24,900,001

Elemental Cost Model SH50A Hawkes Bay Expressway: Allan Road to Omahu Road

SH50A Hawkes Bay Expressway: Allan Road to Omahu Road Transit: Mike Wong (06) 8351750 Consultant: Colin Stuart (06) 833 5100 Roading works: Allan Tuck, Higgins Contractor's (HB) Ltd (06) 835 7288 Stopbank Raisiing: East Coast Contractors, Ngaruroro Bridge: Allan Bell, Smithbridge (07) 575 2325 Marcus Lin (04 4966692) Prepared By 2 lane rural expressway, under 3 separate contracts: Project Type Ngaruroro River Bridge: 511/W6/0 Pakowhai Road to Omahu Road: 510/W6/0 Ngaruroro River Stop Bank Rising: 480/W6/0 Flat rural Terrain Project Length Total of 8375 m Pakowhai Road to Omahu Road (510): Top soil to stockpile & respread, cut to waste, cut to borrow to fill (148,149 m3), undercut to waste & replace (Total: 232804 m3) Earthworks Ngaruroro River Stop Bank Rising (480): Stripping topsoil and undercutting, cut to fill, borrow to fill (total: 38482 m3) Structures 4 bridges: Ngaruroro River Bridge: 325 x 10 m (13 x 25 spans): Superstructure consists of pre-cast concrete I beams with reinforced concrete deck. Tutaekuri Bridge: 28 x 10 m (2x 14 m span): Pre-cast concrete double hollow core unit beams, 600 diam steel shell piles Franklin Road Bridge: 24 x 4.6m (2 x 12 m span): single lane precast concrete double hollow core unit beams, 600 diam steel shell reinforced concrete piles Raupere Stream Bridge: 12 x 11.7 m (1 x 12 m span): precast concrete double hollow core unit beams, 600 diam steel shell reinforced concrete piles 7 major culverts: Links Road culvert, Garden Steam culvert, Wadi culvert, Ferries Drain culvert, Petersons drain culvert, Evenden Road culvert, Motorway culvert 200 mm Stabilised sub grade (142,000m2), 150-200 mm granular unbound sub base, 150 mm granular unbound base course, First coat seal area = 101,100 m2 Pavement Investigation and reporting - $863,730 Costs Design and Planning $1,608,600 Management and Supervision $693,470 Physical Works Total: $11,911,646 Ngaruroro River Bridge: 511/W6/0: $3,612,656 Pakowhai Road to Omahu Road: 510/W6/0: $8,097,963 Ngaruroro River Stop Bank Rising: 480/W6/0: $201,027 I&R December 1994 to June 1995 Duration D&PD July 1995 to October 1997 MSQA and physical works: November 1997 to april 1999 1004 CCI Weighted Attribute, Measure and Value Procurement 1. Most cut materials was wet silt, and unsuitable for fill without drying or other conditioning. Comment 2. High risk of having to import material, hence schedule of quantities included only one item (Item 5.3) for cut and borrow to fill. 3. Contractor chose to minimise the quantity of materials required for drying by using temporary drains, temporary stock piling and cement stabilising subgrades. n/a Major Risks that Occurred Project Name Contacts

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 11,911,647 11,911,647 11,911,647 21%

Unit % % %

Rate 7.3% 13.5% 5.8%

Amount 863,730 1,608,600 693,470 3,165,800 Tender Change

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

271,286 8.375 142,000 3,781 2,230 8.375 8.375 8.375 8.375 74% 11,215,019 5%

M3 Km M2 M2 M2 Km Km Km Km

6.64 92,252 22 1,171 53 52,706 7,404 54,144 5,350

1,802,597 772,613 3,093,223 4,427,169 117,725 441,417 62,012 453,454 44,808 11,215,019

1,368,195 636,805 2,753,315 4,451,950 118,820 286,247 4,790 277,341 29,968

-100% 386% 61% -97% 272% -78% 9367% -84% -100%

Gabion batters for the Ngaruroro Bridge abutments

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

6.2%

696,628 11,911,647 -

663,024 10,590,454

5% 12%

0%

Construction Total (B + C) Project Total (A +B + C)

8.38

Km

1,422,286

11,911,647 15,077,447

142252517.xls.ms_office - Hawke's Bay Allen Rd

Printed: 4/27/2013 - 6:16 PM

Elemental Cost Model Orewa River Bridge Replacement

Project Name Contacts

SH1 Orewa River Bridge Replacement Transit: Terry Brown (09) 3682000 Opus International Consultants Ltd: M.M. Coup 09 3559585 Downer & Co Ltd Prepared By David Simes 29 APRIL 2004 2 lane bridge replacement, incorporating large (9.5m max retained height) retaining wall for realigned road. Project Type Terrain Estuary crossing in urban area Project Length 1,840m Earthworks Primarily for retaining wall and bridge approaches Structures Bridge 113m long x 14.5m wide with 5 spans supported on 6 pairs of insitu cylinder piles 1850 or 1500 dia. Precast U beams spanning 22m between piers. Deck incorporating 2 footpaths (2.0m ea), 2 shoulders (2.0m ea) and 2 traffic lanes (3.5m ea). Power, telecom, gas and water mains attached to superstructure. Retaining wall max. 9.5m high x 224m long. Precast concrete planks between insitu columns on 1200dia insitu piles piles @ 2.0m c/c. Soldier piles 1200 dia. insitu for ground strengthening on opposite side of approach road to retaining wall. Plan length 80m. Most work undertaken behind temporary concrete barriers. Pavement Mix 10 AC to deck. 2 coat chip seal on friction course on 150 NRB/M4 basecourse on 250 or 150 sub-base to approaches. Total seal area 17900m2 Programme I&R start May 1995. D&PD Start Jul '96 Finish Dec '96. MSQA start April '97 Finish July '98. PW Start Jan '97 but delayed to April, Finish Aug '98 (Practical Completion including demolition of existing). Costs I&R not included here. Separate contract. D&PD $115k, MSQA $197k, PW $6964k Tendered price $5,964,031 Outturn costs $6,964095 (from final payment certificate) Significant variations: retaining wall costs resulting from delayed start $400k, changes in scope $400k, watermain revisions $70k Duration I&R not included here Contract period: Bridge construction 9 months, demolition of existing bridge 12 months. Delayed start due to discovery of Maori midden, moved retaining wall work into unusually wet winter season with consequential delays and costs. CCI 1005 Procurement M&V Comment

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 6,964,095 6,964,095 6,964,095 4%

Unit % % %

Rate 0.0% 1.7% 2.8%

Amount 115,000 197,000 312,000

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

1.840 14,665 1,200 1.840 17,893 1,643 1,042 1.840 1.840 1.840 1.840 91% 6,613,212 5%

km m3 m2 km m2 m2 m2 km km km km

0.00 40.42 268.88 127,798.99 25.08 1,172.16 2,125.13 88,828.99 175,992.15 159,722.54 50,516.10

592,780 322,660 235,150 448,701 1,925,420 2,214,390 163,445 323,826 293,889 92,950 6,613,212

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

5.3%

350,884 6,964,095

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

1.84

Km

3,784,834

6,964,095 7,276,095

Elemental Cost Model Rosebank Rd / Patiki Rd Interchange

Project Name Contacts

SH16 Rosebank Patiki Interchange Transit: Phillip Sutton Tel: 09 3682003 Fax: 09 368 2059 Beca Carter Hollings and Ferner Ltd, PO Box 6345 Auckland Contact : Jon Ewer tel:09 3009195 Contractor: Works Civil Prepared By David Simes 29 MAY 2004 2 contracts (preload & main). Embankment, ramps, single lane bridge structures & cycleway with bridge. Project Type Terrain Urban, flat, coastal - upper reaches of Waitemata Harbour. Project Length 3,005m Earthworks Preload contract consisted of 3,900m3 existing material excavated to waste off site, 34,000m of wick drains were constructed with a sand banket, then 14,800m3 imported granular fill placed.(9 piezometer & settlement markers). Further 21,500m3 imported granular fill in main contract. Existing ground = weak alluvial silts overlying sandstone. Structures Two m/way overbridges with extended elevated structures over marine estuary for on ramp (9 span total length 290m) and off ramp (4 span total length 110m) at Rosebank Rd., and off ramp at Patiki Rd. (10 spans, total length 310m). Each pier founded on 4no. X 450square precast driven concrete piles, concrete pile cap, single 1250dia columns, pier cap & either 3 or 4 precast prestressed concrete girders with reinforced insitu deck. Total deck area 5250m2. Cycleway overbridge over Patiki Rd. (10 spans total length 120m) on concrete pad footing with 550dia. reinforced concrete piers and precast double beam deck units. Timber crib wall to reinf. earth embnkmnt & Patiki abutment. Timber pole retaining wall at R/bank abutmnt Pavement 75mm Mix 20 on 100mm M/4 AP40 basecouse on 250mm cement treated subbase. M/way ramps had additional 25mm OGPA. Total area 26,164m2 Programme D&PD Start Dec '94 Finish Jun '95. MSQA (Pre-Load Embankment) Start Jan '96 Finish June '96. MSQA (Main Contract) Start Aug '96 Finish Dec '97 Costs I&R not included on PROMAN. Separate contract, estimated $350k (included below) between 1989 & 94. D&PD $883k, MSQA $832k, PW $6964k Tendered price (including Preload Embankment) $16,122,469 Outturn costs $18,327,421 Significant variations: piling $767k; roundabout $380k; additional signage $235k; fluctuations $242k; early completion $230k; unforeseen events $360 Duration I&R separate contract between approx 1989 & 1994 Physical works including Pre Load Embankment contract 24 months CCI 1000 Procurement M&V Comment Pre-load Embankment contract ($1,327k) let separately to same contractor, included below. Main Contract includes: 4no. 20m x 2m x 2m stormwater treatment tanks; cycleway ($656k paid by ACC); M/way lanes remarked (twice) for working space for piers. Bridge beams erected using 2 night m/way closures.

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 18,899,827 18,899,827 18,899,827 10%

Unit % % %

Rate 1.9% 4.7% 4.4%

Amount 350,000 883,000 832,000 2,065,000

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

3.005 55,491 44,576 3.005 26,164 5,250 603 3.005 3.005 3.005 3.005 82% 17,098,938 9%

km m3 m2 km m2 m2 m2 km km km km

246.26 43.85 16.71 324,084.33 46.95 1,462.19 313.89 694,298.68 102,910.16 244,491.20 240,332.32

740 2,433,048 744,720 973,873 1,228,333 7,676,502 189,216 2,086,368 309,245 734,696 722,199 17,098,938

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs

10.5%

1,800,889 18,899,827

Extraordinary Project Costs (C)

0%

Construction Total (B + C) Project Total (A +B + C)

3.01

Km

6,289,460

18,899,827 20,964,827

Elemental Cost Model SH1 Pokeno Bypass

Project Name Contacts

SH1 Pokeno Bypass Transit: Chris Allen (07 9571610) I&R: Murray North Auckland (Liquidated) D&PD and MSQA: Martin Bloxam, Bloxam Burnett & Olliver (07) 8380144 Physical Works, Roland ODriscoll, Downer Construction (NZ) Ltd, (09) 270 6801 Prepared By Marcus Lin (04 4966692) Project Type Four lane divided expressway - two separate contracts = Pre-loading and main construction Terrain Rural rolling terrain Project Length 3.7 km Earthworks Import to fill, strip topsoil, cut to waste, undercut, cut to fill, demolish old bridge, total earthworks 589,500m3 Two state highway overbridges. (categorised as "structure") = 10.35 x 44.65 (identical for both bridge 1 and 2) Structures One single lane on-ramp underpass. (categorised as "structure") = 28 x 8.2 m Existing bridge superstructure widening, raising and shape alteration for state highway over railway bridge. (categorised as "extra-ordinary" structure) New state highway over railway bridge (categorised as "structure") = 18.4 x 16.1 m Large single span segmental concrete techspan arch culvert invert structure with reinforced earth headwalls. (categorised as "structure") 48 x 13.7 m Roundabout and other associated local roading. Twin 2.1-dia culvert. 61 x 7.4 m (total length and width of structure) 94,000m2 chip sealed flexible pavement Pavement Costs Investigation and reporting - $ 200,000 estimated - from Transfund allocations $194,500 D&PD: $645,299 - from BBO MSQA: $ 588,825 - from BBO Total PW: Preload contract of $765547.13 and main works of $12,263,272 Duration I&R n/a D&PD n/a MSQA 50 months PW 33 months. Completion April '97 CCI 996 Measure and value Procurement n/a Comment n/a Major Risks that Occurred

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 13,028,820 13,028,820 13,028,820 10%

Unit % % %

Rate 1.5% 5.0% 4.5%

Amount 200,000 645,299 588,825 1,434,124

2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

3.700 589,448 42,485 3.700 94,000 2,559 3.700 3.700 3.700 3.700 84% 12,144,710 5%

km M3 m2 Km M2 M2 Km Km Km Km

6.42 6.10 357,720 24 1,019 233,403 45,991 200,552 19,519

26,150 3,785,288 259,062 1,323,565 2,295,347 2,607,273 863,592 170,167 742,044 72,222 12,144,710

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

6.3%

766,453 12,911,163 117,657

1%

117,657

Construction Total (B + C) Project Total (A +B + C)

3.70

Km

3,521,303

13,028,820 14,462,944

Elemental Cost Model SH3 Tamahere Deviation

Tamahere Deviation Transit: Chris Allen Consultant: John Herbert, Opus International (formerly Works Consultancy Services) (07) 838 9344 Contractor: Downers Construction Ltd (09) 270 6801 Marcus Lin (04) 49 66692 Prepared By Four lane dual carriageway with grasses central median, with sections protected by median barrier. Project Type Rural and flat, but passes right through the largest orchard in NZ. Terrain Project Length 4.35 km See comment below. Import to fill, strip topsoil, cut to waste, undercut, cut to fill Earthworks Project Name Contacts Structures 1 x 3 span 4 lane overbridge over Tauwhere Road (40 m x 24 m) Grade separated interchange with two small roundabouts on both sides. 1.35 m culvert approx 500 m long Pit sand base, 200 mm sub-base WHAP 65, 150 mm of M4 basecourse, two coat chip seal and 25 mm A/C approx 90,000 sqm Investigation and reporting - 170,000 D&PD $600,000 MSQA: $700,000 Total PW: $11,000,688 I&R- 1 year (guess estimate) D&PD: 2 years MSQA and PW: 2.5 years 970 Measure and value Massive changes during construction due to original area to provide bulk fill turned out to be unsuitable. New fill had to be found, and was located in a field adjacent to the works and 250,000 cu-m of pit sand was to form the main embankment across the stream gully. 1. Toxic sprays used in the ochard on either side of road halted work. 2. Fill material was bad. 3. Constructability issues due to cut from old road required as fill on new road, but old road had to be kept open. 4. Small portions of land had not been acquired. 5. Laying of culvert in the bottom of the stream valley required dewatering which was not included in the contract.

Pavement Costs

Duration

CCI Procurement Comment Major Risks that Occurred

Item 1 1.1 1.2 1.3

Description Development (Non Construction Costs) Investigation & Reporting Detailed Design MS&QA (Include Transit Costs) Development Total (A) Construction Environmental Compliance Earthworks Ground Improvements Drainage Pavement and surfacing Bridges Retaining Walls Traffic Services Service Relocations Landscaping Traffic Management Construction Sub-Total (Excluding P&G)

Quantity 11,000,688 11,000,688 11,000,688 12%

Unit % % %

Rate 1.5% 5.5% 6.4%

Amount 170,000 600,000 700,000 1,470,000


From NLTP records Guess estimate Guess estimate

Tender 2 2.1 2.2 2.3 2.4 2.5 2.6. 2.7 2.8 2.9 2.10 2.11

Change

866,310 740 4.350 120,000 960 900 4.350 4.350 4.350 4.350 82% 10,267,261 6%

M3 m2 Km M2 M2 M2 Km Km Km Km

4.23 1,047.81 276,778 17 681 355 187,159 23,540 121,444 34,166

3,664,526 775,378 1,203,985 2,056,088 653,953 319,893 814,140 102,397 528,280 148,620 10,267,261

1,240,702 299,075 1,233,738 2,044,777 712,809 290,243 644,550 38,153 243,823 138,535

195% 159% -2% 1% -8% 10% 26% 168% 117%

2.12 Contractor's Preliminaries and General Construction Total (Including P&G) (B) 3 Extraordinary Project Costs Extraordinary Project Costs (C)

7.1%

733,428 11,000,688 -

238,660 7,125,065

207% 54%

0%

Construction Total (B + C) Project Total (A +B + C)

4.35

Km

2,528,894

11,000,688 12,470,688

142252517.xls.ms_office - Tamahere

Printed: 4/27/2013 - 6:16 PM