Sei sulla pagina 1di 5

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River From Wong Tai Sin police

Station to Tung Tau II Estate DC/2011/04 Risk Assessment Ref. No. 1121/RA/ Risk Assessment for Erection of Bamboo Scaffold 1. Work Sequence: Item Activities 1. Erection of Bamboo Scaffold 2. Working at Height 3. Working within the nullah Affected person(s) Laborers, Workers Laborers, Workers Laborers, Worker
Prepared By : Checked By : Approved by : Date : Date : Date :

Associated Risk Items 1 2 3

Remark

Page 1 of 5

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River From Wong Tai Sin police Station to Tung Tau II Estate DC/2011/04 Risk Assessment Ref. No. 1121/RA/
Item No. Cause / Initial Event Consequence 1 Erection of Bamboo Scaffold Collapse scaffold Risk Ranking Existing Mitigating Controls of A brief training is conducted to certified worker on scaffolding safety. L 3 S 4 R/R S Additional Mitigating Controls (A.L.A.R.P.) Risk Ranking Required L S R/R The bamboo scaffold should be 1 3 M checked by competent person and fill in CSSR Form 5 every 14 days. The erection of bamboo scaffold should be done by certified worker. Secure the bamboo scaffold by anchor the scaffold to anchor bolts and the fencing nearby. The bamboo members should be checked for their fitness before dispatching to the site. 1 1 By Whom

Engineer Foreman CP of Scaffolding CW of Scaffolding

Working adjacent to the sea

Falling water

into

Erect rigid barriers along the edge of Landing Steps Provide working platform with suitable access ladder Workers should wear life jacket Provide life buoys and adequate length of rescue ropes close to the works area Work in a team of at least two.

Enhance site safety supervision Workers known swimming are advised to engage for working over water

L Engineer Foreman Superintendent

Page 2 of 5

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River From Wong Tai Sin police Station to Tung Tau II Estate DC/2011/04 Risk Assessment Ref. No. 1121/RA/
Item No. Cause / Initial Event Consequence Working at height Fall from height - Falling object Risk Ranking Existing Mitigating Controls Provide suitable working platform - Provision of safety harness - Provide safety training to related workers L 2 S 4 (A.L.A.R.P.) Risk Ranking R/R Required L S R/R S - Competent workers to erect the 1 4 S working platform - CP to inspect the working platform daily and record its working condition in CSSR Form 5 - Display warning notices to remind the workers on the associated hazards Additional Mitigating Controls By Whom Engineer Foreman Safety Officer

Page 3 of 5

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River From Wong Tai Sin police Station to Tung Tau II Estate DC/2011/04 Risk Assessment Ref. No. 1121/RA/
Item No. Cause / Initial Event Consequence 2 Risk Ranking Existing Mitigating Controls Provide safe access and egress Provide adequate personal protective equipment Provide guardrails and toeboard for working platform. Conduct daily inspection by foreman in charge or superintendent. Workers should wear safety harness and secured to independent lifeline or anchorage point when they need to work outside the working platform temporarily. Heavy materials should not be stored or stacked on working platform Material should never be thrown, tipped or dropped from heights, they should always be lowered by proper lifting receptacle. L 3 S 4 (A.L.A.R.P.) Risk Ranking R/R Required L S R/R S - The working platform should be 1 3 M checked by competent person and fill in CSSR Form 5 every 14 days. - The working platform should be checked after adverse weather by competent person. Additional Mitigating Controls By Whom Engineer Foreman CP of Scaffolding

Working at Height

Fall of person

Fall of object

- Do not leave tools or materials lying around and placing at the edge of platform.

M -

Engineer Foreman Superintendent

Page 4 of 5

Leader-Sunnic Joint Venture Reconstruction, Improvement and Rehabilitation of Kai Tak River From Wong Tai Sin police Station to Tung Tau II Estate DC/2011/04 Risk Assessment Ref. No. 1121/RA/
Item No. Cause / Initial Event Consequence 3 Risk Ranking Existing Mitigating Controls All workers must wear anti-slip safety shoes and reflective vests. Workers must wear safety harness and secure to lifeline or anchorage point. Provide safe access and egress. Close monitoring of nullah water flow. Display safety notices and warning signs in every entrance/ exit of nullah. All workers sign in and out before they enter the nullah and after finished their work. L 3 2 2 S 3 4 4 R/R S S S Additional Mitigating Controls (A.L.A.R.P.) Risk Ranking Required L S R/R Provide lifebuoy at nullah or 1 2 L workplace. Provide toolbox training on emergency procedure of working in 1 3 M nullah.. Provide emergency escape ladders for emergency use in case of 3 3 M flooding. Foremen in charge or supervisory staff should release the worker back to assembly point on the ground once the water level is over 600mm. Foremen in charge or supervisory staff should release the worker back to assembly point on the ground when the raining and thunderstorm warning is hoisted during working hours. Workers should contact the key man before enter the nullah. Foremen in charge or supervisory staff should conduct a short briefing before entering into the nullah, i.e. instruction, associated risk of flooding, use of P.P.E., the indicated water levels mark, escape route, sign before leave etc. By Whom Engineer Foreman Superintendent Safety officer Safety Supervisor

Working within the nullah

-Slipping -Person fall into the nullah -Flooding

Page 5 of 5

Potrebbero piacerti anche