Sei sulla pagina 1di 2

PDR OUTLINE PURPOSES: GRP III ENHANCEMENT/MITIGATION PROJECTS PD REPORT REQUIRED; ALL OTHER GRP III PROJECTS PD REPORT

RT OPTIONAL; GRP V UNCLASSIFIED/ UNLISTED/NEW TECHNOLOGY PROJECT PD REPORT REQUIRED Table of Contents (1 page) 1. BASIC INFORMATION ON PROJECT and PROPONENT (1 page) 2. PROJECT DESCRIPTION (15 pages) Project Location and Area (at the minimum, shown in an official NAMRIA topographic or nautical map (whichever type is applicable and of appropriate scale); Show title, legend, scale, project location 2.1. and political boundaries (from sitio/barangay to region); indicate any known ECA category encompassing the project area Project Rationale state need for & purpose of the project., particularly environmental enhancement 2.2. or mitigation purpose of the project Project Development Plan, Process and Components - Attach tentative/option of Physical Plan/Site Development Map being considered at the FS stage; briefly describe process/technology; 2.3. list/describe and indicate project components (facilities/infrastructures, other single projects supporting the main project) on the topographic map Description of Project Phases - For Group III non-covered projects: focus on activities and processes which may cause residual impacts; For Unclassified/Unlisted/New Technology Projects: 2.4. focus on critical activities and processes per phase which place a demand on local resource uses and which generate emissions, effluent, hazardous waste, solid waste, other wastes) 2.4.1. Pre-Construction/ Pre-Development phase

2.4.2. Construction/Development phase


Operational phase For Unclassified/Unlisted/New Technology Projects: Specifically present if processes and substances to be used are listed and fall within the limits covered 2.4.3. by Environmental Risk Assessment as enumerated in Section C of Annex 2-7a of the Revised Procedural Manual ) 2.4.4. Abandonment phase Project Emissions/Effluent/ Hazardous Waste/Solid Waste/Other Wastes - Present integrated summary of types of wastes (residual for Group III non-covered projects) ; estimate waste generation 2.5. rate; identify built-in waste management measures and facilities planned or committed to be built into the project design Manpower - Present manpower requirements per project phase; specify expertise needed; nature & estimated number of jobs available for men; nature and number of jobs available for women; specify 2.6. strategy and tentative scheme for sourcing locally from host and neighboring LGUs and those from outside 2.7. Project Cost 2.8. Project Duration and Schedule OVERVIEW/GENERIC DESCRIPTION OF THE BASELINE ENVIRONMENT (4 pages on land, water, air, people) focus on the environmental components and factors likely to be affected by the projects impacts; only secondary data or qualitative environmental description is necessary ENVIRONMENTAL MANAGEMENT PLAN (3 pages - focused only on the residual management scheme on the relevant land, water air & people module) ANNEXES (3-6 pages) 5.1 Original Sworn Accountability Statement of Proponent (Use Annex 2-21 of RPM) Photos or plates of proposed project site, cumulative/residual impact areas and surrounding 5.2 communities (N, S, E, W of the project; key sectoral features - land, water, air, people)

3.

4.
5.

Potrebbero piacerti anche