The connection to the National Grid of the wind electrical plant park Somova (35 x 3 MW=105 MW) (The investment costs evaluation) A. Works in the new electrical substation 110/20kV One new 110kV switchgear in the ISACEA substation The 110kV cable link between the new electrical substation and the existent one Works in the new electrical substation 110/20 kV, 2 x 63 MVA, 2 cells of 110kV and one compact 20kV substation, container type, with 12 cell (included the cell of the end row of the cells) 110 kV substation 110 kV LINE bay (module) 2 pcs. 610.000 110 kV TRANSFORMER bay (module) 1 pc. 410.000 110 kV bus bars 7.000 110 kV surge arresters 6 pcs. 15.000 20 kV surge arresters for trafo 6 pcs.. 13.500 110/20 kV - 63 MVA Power Transformer 6 pcs.. 1.330.000 Transformer neutral earthing disconnector 2 pcs. 14.000 Metallic suports for the equipment 4 pcs. 6.000 Fire-fighting instalation 2 pcs. 140.000 Cell mounting 3 pcs. 260.000 SF 6 cylinders, gas detector, filling device 30.000 Power transformer mounting works 2 pcs. 30.000 Lightning roads mounting and earthing works 15.000 Surge arrester mounting works 10.000 110K OHL and power transformer protection cabinets (including the protection cabinet in the opposite substation) 4 pcs. 140.000 SCADA implementation 50.000 DC Battery + charger (including the DC panels distribution) 75.000 Container 20 kV - 7 cells 435.000 Auxiliary transformer (mounting included) 1 pc. 15.000 Neutral earthing transformer +Resistor (mounting works included) 2 pcs.. 90,000 Civil works (cable trenches, railways, fences, fire-fighting an anti-burglary systems, access roads, etc) 100.000 Secondary circuits 80.000 Total (tools + mounting works): 3.875.500 Underground 110kV cable layout: - 1 cable 110 kV - 650 mm2 Al - XLPE insulation 167.000 /km x 32 km 5.344.000 - Joints 110kV cable drams contain 350 m cable length

Certificare

Certificare

Certificare

S.C. ELECTROEXPERT `96 S.R.L.


Str. Bruxelles, nr. 21, sector 1, Bucuresti CIF: RO 9311086; Reg.Com: J40/3504/1996 Tel/fax: E-mail 021/3361936 021/3320201 0722558907 electroexpert96@yahoo.com
SR EN ISO 9001: 2001 Certificat nr. 112 SR EN ISO 14001: 2005 Certificat nr. 62 Specificatia OH SAS 18001: 2004 Certificat nr. 57

(2.500 /pc. x 280 pcs.) 700.000 Terminals - 2 sets 7.500 Optical fiber in PVC tube protection (16,8 /m x 32 km) 537.600 Total canalizare si accesorii 110 kV: 6.589.100 Total A : 10.464.600 B. 30kV cables underground layout works among the wind electrical plants and the new substation 110/30kV Single phse cable 20 kV 3 x 1 x 150 mm2 Al with XLPE insulation 50 km MV layout length 50 000 x 60 /m Terminals: 7 sets x 200 /set Total: TOTAL costs (A + B) = 10.464.600 +3.001.400 = 13.466.000 3.000.000 1.400 1.514.000

The compensation for the connection achievement will be negotiated between the partners (The cost evaluated by ISPE is 10.000.000 ). The above amounts dont comprise VAT