Lease and Block: OCS-G-Number: Prepared By: VENDORS: Casing Crews & Service: Cement & Cement Service: Cement Accessories: Liner Equipment & Service: Mudline Hanger & Service: Other Related Services: Wellhead Equipment: Permit MD: Permit TVD: Frank's Casing Crews Halliburton Gemoco, Centralizers. Davis Lynch, Float Equipment Well Name & No: KOP: Date:
Rig Ele
Cameron-Cooper
DEPTH CASING POINTS: Drive Pipe: Conductor: Surface: Intermediate: 1st Drilling Liner:
2nd Drilling Liner: Production Liner: Production Tie-back String: Production Long String:
1. DRIVE PIPE . . . .
OD Drive Pipe: Penetration BML: 20" 205' Wall Thickness: 0.50" Pre Driven: Slot: E Air Gap: 48' 104' Water Depth: Yes Wellhead: 20" 2M Swedge Flanged For NU Hydril and Diverter System
Setting
2. CONDUCTOR CASING . . . .
Hole Size: Setting Depth, MD:
INTERVAL From To Footage Wt/Ft Conn Grade
Drift Dia
DESIGN SAFETY FA
, ppg , ppg
Gas G
Cement Design % Excess OH: Cement Top: Thickening Time: Placement Time: Type Lead Cement: Type Tail Cement: Well head: Accessories: Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead:
Sacks
Slurry W
Yield,, ft/
Volume,
Page 1
3. SURFACE CASING . . . .
Hole Size: Setting Depth, MD:
INTERVAL From To Footage Wt/Ft Conn Grade
17.500" 3,400'
13.375" 3,400'
Cum Weight Tension Collapse
Drift Dia
3,400
3,400
61.00
Buttress
K-55
207,400
207,400
Design Conditions Backup Gradient: Cement Design % Excess OH: Cement Top: Thickening Time: Placement Time: 100 48' 5.0 hr 3.5 hr Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead: 1,366 11.4 2.81 3,840 8.942
, ppg
9.4 14.3
, ppg , ppg
Gas G
Sacks
Slurry W
Yield, ft/
Volume,
Type Lead Cement: PREMIUM + 3% ASM + .25% D-Air-1 Type Tail Cement: PREMIUM + .25% D-Air-1 Well Head: 13-3/8" x 13-5/8" 5M SOW Head with two 2 1/16" 5M Gate Valves on flanged outlets Backup SOW Head Configured same Accessories: Cementing Head and Swage with Buttress connection Pre-installed 13-3/8" Float Shoe and Collar, Top and Bottom Plugs, 6-Turbolators.
4. INTERMEDIATE CASING . . . .
Hole Size: Setting Depth, MD:
INTERVAL From To Footage Wt/Ft Conn Grade
12.250" 9,746'
9.625" 9,128'
Cum Weight Tension Collapse
Drift Dia
9,746
9,746
47.00
LT&C
S95
458,062
458,062
Design Conditions Backup Gradient: Pore PSI For MASP: Cement Design % Excess OH: Cement Top MD: Thickening Time: Placement Time: 50 3,000' 6.0 hr 3.0 hr Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead: 1,960 14.5 1.61 3,156 8.942 12.0
, ppg , ppg
Mud W
Sacks
Slurry W
Yield, ft/
Volume,
Spacer: 50 bbls Dual Purpose @ 13.5 ppg Type Lead Cement: Premium + 15% Salt + 4% Gel + 3/4% CFR-2 + Retarder for 6 hr. Pumping Time Type Tail Cement: None Well head: 13-5/8" 5M x 10" 5M Tubing Spool with flg outlets, two 2-1/16" 5M Gate Valves Installed Type "S" Slip and Seal Ass'y Accessories: Pre-installed Float Shoe and Collar, Top and Bottom Plugs 50 Turbolators, Cementing Head and Swedge with LT&C threads
5. PRODUCTION CASING . . . .
Hole Size: 9.875" Casing OD: Setting Depth, TVD: 7.625" 10,830'
Drift Dia
Page 2
Estimate
Interval Weight
DESIGN SAFETY FA
Collapse
11,712
11,712
33.70
LT&C
S95
394,694
394,694
1.98
1.18
Design Conditions Backup Gradient: Pore PSI For MASP: Cement Design % Excess OH: Cement Top: Thickening Time: Placement Time: 50 3,400' 5.0 hr 4.0 hr Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead: 777 14.5 1.61 1,251 12.0 11.8
, ppg , ppg
13.2 10,830'
, ppg
Mud W
Sacks
Slurry W
Yield, ft/
Volume,
Spacer: 50 BBLS Dual Purpose mixed @ 15.0 ppg Type Lead Cement: PREMIUM + 8%KCl + .6%Halad 22-A + 3/4% CFR-2 + Retarder for 6 hrs Pumping Type Tail Cement: None Well head: 1-12" x 7 5/8" Type 'CA' Slip and Seal Ass'y and 1-12" x 7-5/8" X-bushing 10" 5M Dry Hole Tree w/one 2-1/16" 5M Gate Valved installed Accessories: 7-5/8" Float Collar and Shoe Pre-installed, 60-Turbolators, Top & Bottom Plugs. Cementing Head and Swage with LT&C Connections, Thread Lock, Casing Dope
Operational comments for special tubulars, handling tools, running procedures, cementing procedures, cementing accessories, cement testing, casing and shoe testing, wellhead equipment, or other relevant to string in question.
Drive Pipe :
Install 6" Air Operated Valve 12' above water line for lost returns.
Conductor Casing :
None required.
Surface Casing :
Intermediate Casing :
Page 3
6. PRODUCTION LINER . . . .
Hole Size: Setting Depth, MD: Top of Liner, MD:
INTERVAL From To Footage Wt/Ft Conn Grade
Drift Dia
DESIGN SAFETY FA
, ppg
Mud W
, ppg
Cement Design % Excess OH: Cement Top: Thickening Time: Placement Time: Spacer: Type Lead Cement: Type Tail Cement: Well head: Accessories: Liner Equipment: Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead:
Sacks
Slurry W
Yield, ft/
Volume,
Page 4
Drift Dia
DESIGN SAFETY FA
, ppg
Mud W
, ppg
Cement Design % Excess OH: Cement Top: Thickening Time: Placement Time: Spacer: Type Lead Cement: Type Tail Cement: Well head: Accessories: Liner Equipment: Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead:
Sacks
Slurry W
Yield, ft/
Volume,
Page 5
Drift Dia
DESIGN SAFETY FA
Design Conditions Backup Gradient: Pore PSI For MASP: Cement Design % Excess OH: Cement Top: Thickening Time: Placement Time: Spacer: Type Lead Cement: Type Tail Cement: Well head: Accessories: Liner Equipment: Sacks of Lead: Slurry Wt. Lead: Yield, ft/sx Lead: Volume, ft Lead:
, ppg
, ppg
Mud W
, ppg
Sacks
Slurry W
Yield, ft/
Volume,
Page 6
Rig Elevation:
19.0" 357'
Sacks of Tail: Slurry Wt. Tail: Yield,, ft/sx Tail: Volume, ft Tail:
Page 7
12.515" 1.563"
Btm Burst
1.41
1.84
Gas Gradient: MASP, psi: Sacks of Tail: Slurry Wt. Tail: Yield, ft/sx Tail: Volume, ft Tail:
8.681" 0.813"
Btm Burst
1.62
1.10
Sacks of Tail: Slurry Wt. Tail: Yield, ft/sx Tail: Volume, ft Tail:
None
Page 8
1.87
1.30
13.2 5,021
Sacks of Tail: Slurry Wt. Tail: Yield, ft/sx Tail: Volume, ft Tail:
None
ing tools, running procedures, cementing procedures, cementing sting, wellhead equipment, or other relevant to string in question.
Page 9
Sacks of Tail: Slurry Wt. Tail: Yield, ft/sx Tail: Volume, ft Tail: