Alcatel BSS

Add BTS(s), new cell(s)

O&M Documentation Scenario

3BK 17416 0841 RJZZA Ed.03

BLANK PAGE BREAK

Status Short title

RELEASED MPI 84 / 1 7
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel.

2 / 30

3BK 17416 0841 RJZZA Ed.03

Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Telecom / Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going On-site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before you start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Perform initial checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Create Abis (Case 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 Create BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.4 Create Cell(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.5 Insert BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.6 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.7 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.8 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Reverse procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Disconnect BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.4 Delete Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.5 Delete BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.6 Delete Abis (Case 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.7 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 9 10 10 10 10 11 12 12 13 13 13 15 16 16 16 17 19 20 20 21 21 21 21 22 25 26 26 27 28 28 28 28 29 29 29 30

3BK 17416 0841 RJZZA Ed.03

3 / 30

Figures

Figures
Figure 1: Grouped Task Sequence for Add BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

4 / 30

3BK 17416 0841 RJZZA Ed.03

Tables

Tables
Table 1: Sites/Personnel/Duration in Minutes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Table 2: Traffic Outage, Loss of Supervision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Table 3: Software tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Table 4: Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

3BK 17416 0841 RJZZA Ed.03

5 / 30

Tables

6 / 30

3BK 17416 0841 RJZZA Ed.03

Preface

Preface
Purpose Audience
To add a BTS. This document is intented for: Field service technicians Specialists Project managers Foremen.

Assumed Knowledge

You must have a basic understanding of the following: For planification purpose Network architecture and reshuffling principles Basic knowledge for scheduling. For realization purpose Alcatel operations and maintenance concepts for BSS Alcatel 1353RA OMC-R Equipment (BSC, BTS, MFS) hardware configurations Windows environment.

3BK 17416 0841 RJZZA Ed.03

7 / 30

Preface

8 / 30

3BK 17416 0841 RJZZA Ed.03

1 Overview

1 Overview
This chapter gives information needed for project managers and foremen, for presentation to the customer and site planning.

3BK 17416 0841 RJZZA Ed.03

9 / 30

1 Overview

1.1 Presentation
Note:
The logical configuration can be activated completely independently from the physical connection of the BTS. Creating adjacencies and call tests must be conducted after the BTS is functional and connected to the network. Coordination is needed between BTS and OMC-R sites to define the initial settings. The Qmux address must always be set. For A9100/A910 BTSs, the transmission mode is configured via OML. The GPRS option is not applicable when the Abis chain to the BTS is passing through a satellite connection. G1 MKII BTSs can only be used if they have a BIUMD card (Chain) and if they are equipped with DRFU. They cannot be used if they have a BIU2M card (Star). If they have the BIU2M card, either the BTS or the card must be replaced. G2 BTSs can only be used if they have a FUMO or DRFU card. They cannot be used if they have a FUCO card, in this case either the BTS or the card must be replaced. In order to create a required configuration it is also possible to add more than one new BTS and more than one cell. In this case it is better to perform all the logical parameters modification into a single PRC.

1.1.1 Cases
The following cases apply: C1: BTS is installed on a new Abis. There is no traffic outage. C2: BTS is installed on an existing Abis with downstream BTSs. This case causes a traffic outage on the downstream BTSs. C3: BTS is installed at the end of an Abis chain (no downstream BTSs). There is no traffic outage.

1.1.2 Options
The method takes into account one option: O1 : Configuring the GPRS for the cells O2 : Abis connection via satellite. O3: Create cell(s) shared (applicable only for A9100 BTSs ).

1.1.3 Restrictions
None.

10 / 30

3BK 17416 0841 RJZZA Ed.03

1 Overview

1.1.4 Grouped Task Sequence


Figure 1 shows the grouped task sequence for the Add BTS scenario.

MSC

OMCR
Initial checks

BTS

Create Abis (Case 1)

Create BTS

Create cell

Insert BTS

Final checks

Figure 1: Grouped Task Sequence for Add BTS

3BK 17416 0841 RJZZA Ed.03

11 / 30

1 Overview

1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply: BTS sites are clean, tidy and easily reachable. The Abis is installed and tested. For Case 2, the jumper linking the upstream and downstream BTSs has been installed. This jumper is removed during this scenario. BTS(s) is installed and commissioned. For option O3: Clock synchronization cable(s) must be already installed between BTSs involved into cell shared . BTS(s) must be configured with the correct initial settings. There are adequate resources to handle the new traffic channels and LapD. All BTS SW packages and OMU-CPF are loaded in BSC memory.

12 / 30

3BK 17416 0841 RJZZA Ed.03

1 Overview

1.2.2 Site Specific Information


You need the following site specific information: Identification of cases and options to perform BTS site topology Case 1: Characteristics of the Abis (name, Qmux TS if BTS(s) to insert is G1/G2 BTS). Characteristics of the BTS(s) (family, HW generation, name, Qmux address, number of sectors, mode of transmission, antenna diversity, master or slave, Qmux TS for G1/G2 BTS). List of cells to create with parameters value ( LAC, CI, frequency, TS definition). The list has to be exhaustive. List of cells supporting GPRS and parameters value ( RA code, RA color, Min_Pdch, Max_Pdch_High_Load, Max_Pdch ) List of adjacencies with parameters (list of impacted cells, direction of the HO)

1.2.3 External Tasks


The following external task is to be taken into account: 1. All cells are declared at MSC site 2. Ask the personnel at MSC to perform a MSC database update for taking into account the parameters for the new BTS. 3. In case of Option 2, check and update if needed the CRC4 for the Abis at the BSC site. 4. Update adjacencies on neighbours OMCs if necessary

1.3 Scheduling
Table 1 describes the sites, personnel and duration of each Grouped task and the total time to perform the scenario. Time based on technical constraints The times in the following table do not take into account individual customer or safety requirements.

Grouped Task Perform Initial Checks Create Abis (C1)

MSC

TSC

BSC

BTS

Imp. BTS -

OMC -R

Time/ Task

1 op 15

15

1 op C1:6

6, only for case C1

3BK 17416 0841 RJZZA Ed.03

13 / 30

1 Overview

Grouped Task Create BTS(s)

MSC

TSC

BSC

BTS

Imp. BTS -

OMC -R

Time/ Task

1 op 8/ BTS+1 C2,C3:+2/BTS O2: +3

8/ BTS+1 C2,C3:+2/BTS O2: +3

Create Cell(s)

1 op (3)

1 op 17/cell+2/BTS+6 O1: +7/cell O3: +3/cell

17/cell+2/BTS+6 O1: +7/cell O3: +3/cell

Insert BTS(s)

1 com C1:5 C2:10 C3:5

1 op 7/BTS+1/cell+1

7/BTS+1/cell+1 C1:+5

C2:+1+5/cell+2/BTS*C2:+10+5/cell+2/BTS* C3:+5/BTS 1 op 5 1 op 9/cell 9/cell 5+5/cell

Call Tests

1 com 5/cell

Create Adjancencies Final Checks

1 com

1 op 15

15

TOTAL TIME

49+17/BTS+32/cellC1:+11 C2: +2/BTS*+13+5/cell C3: +7 O1: +7/cell O2: +3 O3: +3/ cell(shared)

Table 1: Sites/Personnel/Duration in Minutes


Note : BTS for added BTS BTS* for downstream BTS.

14 / 30

3BK 17416 0841 RJZZA Ed.03

1 Overview

1.4 Telecom / Supervision Outage and Operating Impact


The following table describes the traffic outage and loss of supervision caused by each Grouped task. Out. ReF. Grouped Task Perform Initial Checks Create Abis (Case C1) Create BTS(s) Create Cell(s) Tel Out/ GPRS Out. Tel Red -

Sup Out -

OM Out -

Impacts... None

None

1/30

None Sup.out. 130 during the PRC activation For C2, outage on downstream BTSs For O2+C2 telcom and GPRS outage for downstream BTSs (same value)

Insert BTS

2/BTS*+2/cell+10

10+2/BTS*

Call Tests Create Adjacencies Final Checks Total

None None

C2: 10+2/BTS* for all cases: +1/30

None C2: 2/BTS*+2/cell+10 O2+C2:2/BTS*+2/cell+10 GPRS +telecom outage During the activation supervision outage:130.

C2: 2/BTS*+2/cell+10

Table 2: Traffic Outage, Loss of Supervision


Note : BTS for added BTS BTS* for downstream BTS.

3BK 17416 0841 RJZZA Ed.03

15 / 30

1 Overview

1.5 Resources
1.5.1 Tools
The following tables describe the tools that are needed.

Hardware Tools
Item Wiring tools for disconnection and reconnection of PCM Mobiles for call testing PC with associated cables Part Number Use at ... BTS

BTS BTS

Item BTS Terminal for B7.2 LMT-CT (Craft Terminal) for B7.2

Part Number -

Use at ... BTS BSC

Table 3: Software tools

Item None

Part Number

Use at ...

Table 4: Forms

1.5.2 Supplies
The following table describes the supplies needed for this operation. Item Topology regarding operation Part Number Use at ... BTS

16 / 30

3BK 17416 0841 RJZZA Ed.03

1 Overview

1.5.3 Applicable Documents


The following documents are needed:

A1353-RA Configuration Handbook A1353-RA Surveillance Handbook B7 BSS Methods Handbook . Network Configuration Recommendations BTS Terminal User Guide Transmission Terminal User Guide BTS Site Master/ Slave Synchronization

3BK 17416 0841 RJZZA Ed.03

17 / 30

1 Overview

18 / 30

3BK 17416 0841 RJZZA Ed.03

2 Scenario

2 Scenario
This chapter presents all checks needed before beginning the scenario, and all detailed tasks to be performed on each site.

3BK 17416 0841 RJZZA Ed.03

19 / 30

2 Scenario

2.1 Before Going On-site


Before going on-site, you must check the following information are available. All Prerequisites (Section 1.2.1) are fulfilled. The customer has been informed about the: Date Time Site name Site address Purpose of the operation. Personnel are available and ready for the operation (see Scheduling (Section 1.3)).

Site Specific Information (Section 1.2.2) is available and ready for operation. Tools (Section 1.5.1) are available and ready for operation. Supplies (Section 1.5.2) are available and ready for operation.
Documentation is available and ready for operation.

2.2 Before you start


Check that all Prerequisites (Section 1.2.1) in the overview are fulfilled. Well check the availability of all necessary tools and material Inform the operator. Among the cases (C1, C2, C3) described within Overview chapter 1.1.1, identify which are your cases. Identify as well the option you have choosen.

Required Knowledge

You must be familiar with the following:

Safety Rules and Precautions Telecom / Supervision Outage and Operating Impact (Section 1.4) Instruction for reverse procedure decision Grouped Task Sequence (Section 1.1.4) Operating Hints
How to document Faults and Anomalies.

20 / 30

3BK 17416 0841 RJZZA Ed.03

2 Scenario

2.3 Scenario Description


The detailed tasks for adding a BTS are described below.

Note:

Case specific tasks are marked with a C1, C2 or C3 in the Note column. Detailed Tasks that do not have C1, C2 and C3 in the note column are common to all three cases and must be performed. To add a BTS to: A new Abis, use Case 1 (C1) An existing Abis with downstream BTSs, use Case 2 (C2) A BTS to the end of an existing Abis (no downstream BTSs), use Case 3 (C3). Options are marked with O1, O2, O3 in the Note column. Detailed tasks that have O1, O2, O3 are applied only if that option is choosen.

2.3.1 Perform initial checks


Note Task Description Perform an Audit Alarm State on BSS. Site OMC-R OMC-R To Do 10 5 Outage None None

View Status of Managed Objects and Alarms on all the BTSs of the TSU and for the Abis, print it.

2.3.2 Create Abis (Case 1)


Note C1 Task Description Site OMC-R To Do 6 Outage None

Create Abis Chain/Ring . Wait for the transmission programming flag to change from Abis to idle.

2.3.3 Create BTS(s)


In order to create a required configuration it is also possible to add more than one new BTS .

Note C2, C3

Task Description If the BTS(s) to add is G1 or G2, check if the Abis is set with a TS for Qmux. If not, reserve one Qmux TS by Modify Abis Chain/Ring Characteristics

Site OMC-R

To Do 2

Outage None

3BK 17416 0841 RJZZA Ed.03

21 / 30

2 Scenario

Note

Task Description

Site OMC-R

To Do 7/ BTS

Outage None

Create BTS . Always set the Qmux address.


For option O3 : Declare the new BTS in slave and select the concerned Master BTS name, if is necessary. If you receive any error messages, see Checking for Sufficient Resources on Abis. Wait for the Information window confirming the creation of the new BTS, click on &ok. Wait for the transmission programming flag to change from Abis to idle Verify with the BTS site that the initial settings are correct. If it is not correct, change the Qmux address (see Modify Initial Settings ) at the BTS site for each new BTS. O2

OMC-R/BTS

1/ BTS

None

If the Abis is connected via satellite Check Cyclic OMC-R / BSC Redundancy at the BSC side using LMT-CT tool, and, if needed, Modify CRC4 Check that the newly created BTSs appear in the hierarchy view of the Radio Configuration Browser (SC). OMC-R

None

None

2.3.4 Create Cell(s)


In order to create a required configuration it is also possible to create more than one cell. In this case it is better to perform all the logical parameters modification into a single PRC

Note

Task Description

Site OMC-R

To Do 1

Outage None

Create PRC(PRC1). Enable the button Automatic opening in the Create PRC window. The PRC is opened once created.
O3

Copy OMC cells to PRC


, the cell(s) which becoming shared with the new BTS, if is necessary. Use Copy BTS to PRC , to copy the new BTSs from the SC to the PRC1.

OMC-R

2/ cell

None

OMC-R

2/ BTS

None

O3

Link Cell to a secondary BTS Sector

OMC-R

1/ cell

None

Note: for each cell which becoming shared

22 / 30

3BK 17416 0841 RJZZA Ed.03

2 Scenario

Note

Task Description

Site OMC-R

To Do 2/ cell

Outage None

Create Provisioning Cell or Duplicate Cell . The cell is created/duplicated in the PRC1 and is in a locked state. Create one cell for each sector is necessary.
Use Set Cell Telecom Parameters.

OMC-R OMC-R OMC-R

2/ cell 30/ cell 1 30/ cell

None None None

Create Radio Frequency. Create Frequency Hopping System , if you use Frequency Hopping. Create TRX.

OMC-R

30/ TRX

None

Note : For O3 select the TRX in [Secondary] TRX on a shared BTS sector, if is necessary.

Configure TRX Channel Hopping Law , to hopping or no hopping. Specify TRX Preference. Configure Logical Channels.
O1

OMC-R

1 30/ cell

None

OMC-R OMC-R OMC-R

30/ TRX 1/ cell 5/ cell

None None None

Set BSS/BSC Telecom Parameters in PRC1 to update GPRS parameters if needed. This task includes the modification of CAE data specific to the MFS.

Notice: the duration depends of the number of parameters to modify. Here is considered 10 parameters in different windows OMC-R 2/ cell None

O1

If GPRS parameters have to be modified on cell(s) then, Edit n Cells in PRC. Modify parameters such as Min_Pdch and Max_Pdch_High_Load, Max_Pdch, Routing Area Code or Routing Area Color

Notice1: To have GPRS on the cell GPRS Pref.mark must be different from 0. To modify it, use the java script Set/Update GPRS pref. Mark using script Notice2: to modify only one cell, the operator can use the edit cell command (see Set Cell Telecom Parameters ) Notice3:For O3 : GPRS Pref. mark =0, for secondary sector.

Click on <Apply and check> in the Edit Cell window to save cell modifications in the PRC1. Wait for the message No error or warning and click on &ok. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no errors occur. Click on <Close> to exit from the Edit Cell window.

OMC-R

30/ cell

None

OMC-R

30/ cell

None

3BK 17416 0841 RJZZA Ed.03

23 / 30

2 Scenario

Note

Task Description

Site OMC-R

To Do 1/ cell

Outage None

Map Cell to a BTS Sector.

Note:map each new cell Use the Check All option ( without forcing cell administrative state) in Check PRC to check the parameters, hardware and telecom impact of your PRC1. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no errors occur. Ask the MSC personnel to update the parameters in the MSC DB. OMC-R/MSC 3 None OMC-R 1 None

24 / 30

3BK 17416 0841 RJZZA Ed.03

2 Scenario

2.3.5 Insert BTS


To minimize traffic outage, you must keep the time between the lock and unlock cells to a minimum. For option O 3: Clock synchronization cable(s) must be already installed between BTSs involved into cell shared . If the cables are not installed perform this installation using chapter Install Synchronization Cables form BTS Site Master/ Slave Synchronization scenario.

Note C1, C3

Task Description If not done previously, the BTS must be physically connected to the new Abis link (use BTS Connection ). Inform the OMC-R you are ready to insert the BTS into the Abis link. In the Abis Interface View Window, select the Abis chain/ring where you insert the new BTS. Write down the BTSs that are downstream from the new BTS. Go to the SC and lock the cells, use Shut Down Cell of these downstream BTSs (WTC=3 min ). Inform the BTS site when the cells are locked.

Site BTS

To Do 5

Outage None

C2

BTS/ OMC-R OMC-R

None

C2

4/cell

START 1, start telecom+ GPRS outage for downstream BTSs.

C2

Lock BTS O&M Capability of the downstream BTSs. Inhibit Alarm Reporting on Abis TP, ( select Inhibit Alarm Reporting on TP Down) Jumper Disconnection. BTS Connection. Unlock BTS O&M Capability of the downstream BTSs.
Use Unlock Cell, to unlock the cells of the downstream BTSs. After connection the new BTS will enable its OML link. Unlock BTS O&M Capability of the added BTSs. It starts the download for each new BTS. After a time the OMC-R will automatically trigger a HW and alarm audit for the each new BTS. All the boards of the BTS must appear on OMC-R BSS equipment view. Wait until the end of BTS(s) audit.

OMC-R

1/ BTS*

OUTAGE 1

C2

OMC-R

OUTAGE 1

C2 C2 C2

BTS BTS OMC-R

5 5 1/ BTS*

OUTAGE 1 OUTAGE 1 OUTAGE 1

C2

OMC-R

1/cell

END1

OMC-R

1/ BTS

None

OMC-R

6/ BTS

None

3BK 17416 0841 RJZZA Ed.03

25 / 30

2 Scenario

Note

Task Description

Site OMC-R

To Do 5 / cell

Outage None

Activate PRC (PRC1). Choose to activate using the option Without forcing cell administrative state. This option keeps the cells locked.

The activation time depends on the number of cells activated. During the activation supervision outage(130).

Close PRC(PRC1).
C1, C2

OMC-R OMC-R

1 1

None None

Allow Alarm Reporting on Abis TP, ( select Allow Alarm Reporting on TP Down)
Use Unlock Cell , to unlock the cells of the new BTS(s).

OMC-R

1/ cell

None

2.3.6 Call Tests


Note Task Description Perform Call Test for the each new cell. Site BTS To Do 5/cell Outage None

Task must be done in parallel with the next task. . Unlock cell from Call Test detailed task not necessary here. CHECK

Display USD Detailed Cell Information . Check that the new cells are in traffic. If not, go to theReverse procedure (Section 2.4) .

OMC-R

None

2.3.7 Create Adjacencies


Note Task Description Site OMC-R To Do 5 /new cell(s) Outage None

Create Adjacency for the new cell with notes taken at preparation step assuming both adjacencies towards new internal cells and adjacencies towards new external cells.
For each cell on the same OMC that must be adjacent to the new added ones, Modify Adjacency to include the new added cells. For each cell on the neighbour OMCs that must be adjacent to the new added cells, Modify Adjacency on neighbour OMCs to include the new added cells.

OMC-R

2 /cell

None

neighbour OMC-R

2 /cell

None

26 / 30

3BK 17416 0841 RJZZA Ed.03

2 Scenario

2.3.8 Final Checks


Note Task Description Perform an Audit Alarm State on BSS. Site OMC-R OMC-R To Do 10 5 Outage None None

View Status of Managed Objects and Alarms on all the BTSs of the TSU. Compare this check to the initial check.

3BK 17416 0841 RJZZA Ed.03

27 / 30

2 Scenario

2.4 Reverse procedure


2.4.1 Lock Cells
Note Task Description In the SC, use Lock Cell to lock all the cells that correspond to the added BTSs. C2 In the SC, use Shut Down Cell for each cell of the downstream BTSs (WTC=3). Site OMC-R To Do 1/cell Outage -

OMC-R

4/ cell

C2

Lock BTS O&M Capability of the downstream BTSs. Lock BTS O&M Capability of the added BTSs.

OMC-R

1/BTS*

OMC-R

2.4.2 Disconnect BTS(s)


Note Task Description Site BTS OMC-R To Do 5 1 Outage -

BTS Disconnection ( for each added BTS).


C2

Inhibit Alarm Reporting on Abis TP, ( select Allow Alarm Reporting on TP Down) Jumper Connection.

C2

BTS

2.4.3 Unlock Cells


Note C2 Task Description Site OMC-R To Do 1/BTS* Outage -

Unlock BTS O&M Capability of the downstream BTSs. Allow Alarm Reporting on Abis TP, ( select Allow Alarm Reporting on TP Down)
In the SC, use Unlock Cell to unlock all cells of the downstream BTSs. Traffic is restarted on the cells of the downstream BTSs.

C2

OMC-R

C2

OMC-R

Traffic Restarts

28 / 30

3BK 17416 0841 RJZZA Ed.03

2 Scenario

2.4.4 Delete Cell


Note Task Description Use Open PRC to open the PRC1 O3 Site OMC-R OMC-R To Do 1 1/ cell Outage -

Unlink Cell from a secondary BTS Sector , unlink the cell(s) which is shared with the added BTS(s) Delete TRX, to delete all TRXs for the secondary sector Delete Radio Fraquency, to delete all frequency for the secondary sector Delete OMC Cell from PRC, delete all the cell(s) from the added BTS(s). Activate PRC(PRC1).
The activation time depends on the number of cells activated.

O3

OMC-R

1/cell

O3

OMC-R

1/cell

OMC-R

1/ cell

OMC-R

5 / cell

Close PRC(PRC1). Delete PRC(PRC1).


Ask the MSC personnel to update the parameters in the MSC DB.

OMC-R OMC-R MSC

1 2 3

2.4.5 Delete BTS


Note Task Description Site OMC-R To Do 6/ BTS Outage -

Delete BTS(s) from OMC-R . Wait for the transmission programming flag to change from Abis to idle.

2.4.6 Delete Abis (Case 1)


Note C1 Task Description Site OMC-R To Do 6 Outage -

Delete Abis Chain / Ring you created. Wait for the transmission programming flag to change from Abis to idle.

3BK 17416 0841 RJZZA Ed.03

29 / 30

2 Scenario

2.4.7 Final Checks


Note Task Description Site BTS To Do 5 Outage -

Display USD detailed Cell Information . Check that the downstream BTSs are in traffic.
Perform an Audit Alarm State on BSS.

OMC-R

10 5

View Status of Managed Objects and Alarms OMC-R on all the BTSs of the TSU. Compare this check to the initial check.

30 / 30

3BK 17416 0841 RJZZA Ed.03