y : Ujwal Chana, Project Lead, Polaris Software 4 years ago Add Industry : ConstructionFunctional Area : Project Management(Technology) Idea

Keywords : project management construction failure contractor builder project failure construction project management Activity: 17476 views; last activity : 6 months ago Well, I know there are about millions of reasons for failure of construction project. But what is the prime reason for the failure. Lets us identify and discuss the causes of failure in a construction project and what safeguards a builder can put into place to reduce the risk of failure. ReferinShare 12345

2 1 874 3 4

1 2 345 1 Bad Management 2 Due to lack of two factors. 1- Decisions. 2- Money 3 Bad Management, Planning, Design & lack of support from Head office 4 Poor Planning or No Planning 5 Lack of communication and intra coordination. 6 Lack of Communication 7 Basic fundamentals are ignored 8 Lack of Planning 9 lata sharma 10 Unawareness of actual problem 11 Obsolete Job Design 12 Why do construction Project Fail? 13 Many factors together 14 By not selecting the right people for the right job 15 Inapproperiate machines and compromise on safety aspects 16 Improper supervision and timley audits 17 Success Criteria defined are Unrealistic...!!!! 18 Lack of proper Design & planning and its effective implimentation 19 Improper Planning, Design,Implementation , Estimate Below Rate Analysis .Lack of Support From HQ 20 Functional,Financial,Environmental reasons

21 Mismatch of Cash flow & Men - Material management 22 5 M-Factors 23 Absence of Accountability 24 Lack of Coordination and Understanding in Responsibilties 25 Lack of Communication and co-ordination 26 Impracticable target period 27 Poor Planning or No Planning 28 Lack of well configured Construction ERP 29 Many factors together 30 bad or unknowledge of right direction of management 31 MORE REASONS LIKE BAD MANGEMENT IN CLUDES 32 Fore see everything from Initiation to Closeout 33 Bad Management 34 IILL conceivement and lack in planning, foresightedness 35 Jnana Ranjan Das 36 non utilisation of latest technology in optimum way. 37 NOTE 38 Poor corrective actions 39 Poor planning, local factors 40 Lack of risk management & evalution of bottlenecks 41 Lack of risk management & evalution of bottlenecks 42 Lack of risk management & evalution of bottlenecks 43 Lack of risk management & evalution of bottlenecks 44 High Expectation on Low Returns 45 High Expectation on Low Returns 46 Lack of proper Design & planning and its effective implimentation 47 bad finance management & bad planning 48 construction projects fail becuase of the potical influence , inluence of locals, 49 Lack of creation of "Value" 50 Corruption 51 Ineffective Organizational Set Ups 52 Functional,Financial,Environmental faiulres 53 Fuctional,Financial and envoronmental failures 54 lack of Will 55 Fuctional,Financial and envoronmental failures 56 Proper Project Management ( i.e. Planning ,Scheduling & Controlling)& Auditing during Construction. 57 construction projects fail because of improper planning 58 Mismatch of Cash flow & Men - Material management 59 Small or Big Developers, all tend to diversion of Funds and get caught in vicious circle of Financial Trap. 60 Planning for execution and its regular update is not synch with targets expected from construction project. 61 Unawareness of actual problem 62 Lack of planning 63 "misuse of each and everything"

64 Greed of builders 65 Greed of builders 66 Bad Intention...... 67 ENERGY BEHIND THE SYSTEM 68 TIME,COST &QUALITY IN PROJ. MGT. 69 ENERGY BEHIND THE SYSTEM 70 Bad policies 71 Bad policies 72 Bad policies 73 Poor tendering, planning and awarding contracts 74 Lack of Risk Analysis & its mitigation for the Contract 75 Why do construction project fails? 76 Long process to take decision 77 construction projects fails with more problems 78 POLITICS 79 Long process to take decision 80 I agree with you Rajiv and one more factor is that builders put money into new projects than completing the one in hand 81 Bad Management,Poor Coordination,Poor decision makings 82 Material Deficiencies 83 Change Managment 84 Project failure 85 Bidding 86 management & right decisions 87 Bad Management and Lack of coordination between depts 88 Bad Management 89 Govt. Policies 90 hi 91 Lack of Role Clearity 92 lack of awareness and education 93 Inadequate study at conceptual stage & improper estimate of ground condition 94 Prime reason for faliure of construction project. 95 failure of effective fund management 96 honesty is the best policy 97 Lack of Coordination & Communication 98 CLARITY OF SCOPE DURING BIDDING 99 Lack of Vision, Objective, Comittment towards the project by Management 100 WRONG BIDDING 101 Lack of self interest in Project 102 Placement of Improper officials / supervising authorities at Sr. level 103 DUE MANAGEMENT 104 Non clarity of project's objective. Add New Idea show all

Ideas in: "Why do Construction Projects Fail?"


Support idea

Bad Management
idea posted by Ujwal Chana Project Lead, Polaris Software What I feel is that, the prime reason for the failure of the construction project is bad 23 management. Poor management can shoot up the cost be it material or labour and the contractor has to bear the additional charges. This is what I feel is the prime reason for the failure of any construction project. 0

by Sumana , Executive, chardhamyatracompany | 08 14 2012 11:08:41 +0000

Toys are the immediate friends that your kid will love to have. Besides making your kid a fitter and healthier one, toys are responsible to insert a quick acting mindset among them as well. You get it all here. From www.rightshopping.in/Baby-care-toys-india-online.html
0

by Prashanta Bhaumik, Head/VP/GM-Tech. Support, ASPIRTEK Technology Ltd | 11 13 2011 07:40:20 +0000

I am not sure are we going to find scapegoat "Management " or try finding a root cause? my perception each company gets panicky when you speak about good configured internal control system thru a Good COnstruction ERP. Its not the management its people working in projects gets scared of loosing there"know All " supremacy attitude. I have a lot eterprenure and Owner who leaves to senior management for ERP implementation and finaly the to go forward with ERP or Configuring by so called Generals leads to failure of internal control system

by Prashanta Bhaumik, Head/VP/GM-Tech. Support, ASPIRTEK Technology Ltd | 11 13 2009 11:15:06 +0000

Management is always under constraint of money they have to be cautious but the their timely decision can be influenced by proper risk identification and mitigation processes. I have a failed project has been revived by team of "Management" and supervisors of the same project just by following a simple sytem of alerts on the impeding issues ( outstanding, quality and cost of not taking decision. According to me lack of a good congiured system ocnfigured system everybody follows the system no tweaking by management will!!
0

by Resmi Maxim, GENERAL MANAGER - OPERATIONS, SI PROPERTY (KERALA) PVT.LTD., | 10 28 2009 12:42:44 +0000

Bad management covers all reasons for failure.


0

by Ajay Ziz, Dy. Registrar,, University of Jammu | 10 20 2009 06:30:03 +0000

a general is employed by the king .. he/she is not the king ..


1

by N. Jain, contract, Group | 10 20 2009 06:20:36 +0000

A soldier is not better than his General ! If the top management is not good, then we can not expect the junior or middle management and team members to perform and get great results.