PROJECT: PROPOSED SPA AND SALON LOCATION:RUBLOU MARKET PLACE-COGEO Date:22 NOV 2010 Contractor:TRADEMARK DESIGN AND CONSTRUCTION

Subject: Bill of Quantities and Materials DESCRIPTION I. GENERAL REQUIREMENTS A. Mobilization/Demobilization/Housekeeping/Site Administration II. CONCRETE AND MASONRY WORKS A. Masonry and plastering works for toilet and bath B. Masonry wall for water falls C. Waterproofing works D. Sandstone finish for waterfalls area IV. GLASS AND GLAZING A. 3/8" thk glass for water falls feature B. 1/8" thk face mirror for salon V. CARPENTRY WOODWORKS and SPECIAL FINISHES A. New wall, fiber cement boards on metal studs (spa partition)/3/4" plywood partitions B. Ceiling works ( gypsum board on metal furrings) C. Doors c.1 800x2100 single core/plywood door with overhead track c.2 600x2100 PVC Door *cost includes jambs, hinges, locks and hardwares D. Woodworks d.1 Wall Panels with backlighting (spa) d.2 100x100x2400 false column/stained fin. d.3 Woodworks for reception counter d.4 Decorative drop ceilings d.5 Woodworks for display areas d.8 Misc. Cabinet works d.9 Massage Bed VI. FINISHES INTERIOR FINISHES A. Boysen Flatwall Latex/Enamel finish (ceiling area) C. Boysen Flat Eggshell Latex/Paint finish (wall area) D. Decorative Wood Panellings (duco painting) E. 400x400 Ceramic floor tiles F. Toilet and shower room tileworks VII. PLUMBING WORKS A. Rough-in works B. Sanitary Fixtures b.1 Water Closet (pozzi brand) b.2 Shower Fixture b.3 Counter Lavatory VIII. ELECTRICAL WORKS A. Electrical rough-ins/Tapping/Installations (pvc pipings and accessories) B. Wires and Cables (thhn wirings/main entry wires) C. Fixtures IX. Waterfalls pump QUANTITY UNIT 1.00 lot UNIT COST 15,000.00
Sub-Total

CAPITAL EXPENSES / 10,000.00 10,000.00 8,500.00 2,500.00 3,000.00 4,500.00 18,500.00 22,500.00 10,000.00 32,500.00 33,150.00 29,150.00 62,300.00 21,250.00 9,000.00 30,250.00 18,000.00 8,000.00 18,000.00 12,000.00 15,000.00 15,000.00 86,000.00

1.00 1.00 10.00 1.00

lot lot sq.m lot

8,500.00 2,500.00 300.00 4,500.00


Sub-Total

3.00 set 1.00 lot

7,500.00 10,000.00
Sub-Total

51.00 sq.m 53.00 sq.m

650.00 550.00
Sub-Total

5.00 sets 3.00 sets

4,250.00 3,000.00
Sub-Total

6.00 8.00 1.00 1.00 1.00 1.00 4.00

lm nos lot lot lot lot sets

3000.00 1,000.00 18,000.00 12,000.00 15,000.00 15,000.00


Sub-Total

55.00 252.00 1.00 52.00 1.00

sq.m sq.m lot sq.m lot

150.00 120.00 15,000.00 750.00 13,000.00


Sub-Total

8,250.00 30,240.00 15,000.00 39,000.00 13,000.00 105,490.00 18,000.00 6,500.00 6,000.00 4,500.00 35,000.00 12,000.00 15,000.00 12,000.00 39,000.00 4,500.00 423,540.00 400,000.00

1.00 lot 1.00 set 2.00 sets 3.00 sets

15,000.00 6,500.00 3,000.00 1,500.00


Sub-Total

1.00 lot 1.00 lot 1.00 lot 1.00 lot

12,000.00 15,000.00 12,000.00


Sub-Total

4,500.00 TOTAL say

inclusions: 4 sets massage bed (wood)/mats to be provided by client 2 sets single point water heater installation of signage from other outlet installation of face mirrors from other outlet Terms of Payment and Duration of Contract 50% downpayment upon acceptance 40% progress billing 10% retention - 15days after turn-over Duration of Work: 30 working days except Sundays and Holidays