Estimate for a Minor Repair Kit

Number of Houses To Supply Kits To

15000 Grand Total Quantity For All Kits Total Cost

Description PLASTIC Plastic Sheeting WOOD

Unit

Qtty

Unit rate

Total

Purpose

Comments

No.

$7.20

$21.60 Temporary cover for Oppenings.

Each Unit has 20m2 of Sheeting, Total 60m2 No Need To Procure Locally.

45,000

$324,000.00

Wooden Lats (MDF Cut From 18mm Thick Board 122cm x 244 cm Standard) the wooden Lats will be cut at 5.5cm Width Along the Length of The Board Resulting with 13No. X 244cm Lats = 31m Board Plywood 3mm Thick Board (122cmx244cm) No.

1 4

$20.00 $5.50

Timber Props (7.6 x 7.6 x 300 cm) TOOLS

No.

10

$4.50

The outcome of one MDF Board would be 31m of Lats at 244cm Long Each. The none water Proof Aspect of the MDF should be Lats are used as a Support Frame Around taken into consideration, therefore internal Use would be Recommended. $20.00 the Plastic Sheeting Same Use as Plastic Sheets but for areas Total 12 m2 mainly to cover 4 to 5 Oppenings $22.00 with Strong Wind Load. Multi purpose use of which most importantly would be Safety Support of Market Price of 1 m3 of Timber = $260 $45.00 Structure.

15,000 60,000

$300,000.00 $330,000.00

150,000

$675,000.00

Hardened Nails With Washers Claw Hammer Hand Saw (Wood)

kg No. No.

1 1 1

$6.00 $4.00 $4.00

Lump Hammer Shovel Reinforced Plastic Bags Bucket Polypropylene Rope (Nylon Rope) 5 cm wide Duct Tape Total per one Minor Repair Kit

No. No. No. No. m No.

1 1 10 1 20 3

$4.00 $7.00 $0.15 $5.00 $0.20 $2.00

Carbon Reinforced to penetrate concrete and Block wall. Washers are Used for $6.00 Better Support of Plastic Sheeting or MDF. $4.00 $4.00 Breaking and demolishing of loose none structural materials (Block work, loose $4.00 Plaster etc.) $7.00 Rubble removal. $1.50 Rubble removal. $5.00 For Water Transport and Cleaning For Tying Plastic Sheet as Partition or $4.00 Cover Openings Closure around Plastic Sheet as well as $6.00 Repair Total $150.10

15,000 15,000 15,000

$90,000.00 $60,000.00 $60,000.00

15,000 15,000 150,000 15,000 300,000 45,000

$60,000.00 $105,000.00 $22,500.00 $75,000.00 $60,000.00 $90,000.00 $2,251,500.00

4/11/2013

Construction Repair Kit

Number of Houses To Supply Kits To

5000 Grand Total Quantity For All Kits Total Cost

Description Unit Qtty Unit rate Total / Kit Grand Total Quantities For Basic Material will be calculated 1 Kit For 1 Home Basic Materials Cement Bags 87.5 $4.75 $415.63 Sand m3 5 $15.00 $75.00 3 Aggregates m 12.5 $12.00 $150.00 Steel Reinforcement Ton 1.15 $660.00 $759.00 Hordi Block Block 187.5 $0.34 $63.75 Concrete Hollow Blocks 100mm Block 57.5 $0.24 $13.80 Concrete Hollow Blocks 200mm Block 450 $0.48 $216.00

Purpose

Concrete and Plaster Concrete and Plaster Concrete Concrete (Includes Tie Wire) For Concrete Slabs For internal Partitioning For External Wall

437,500 25,000 62,500 5,750 937,500 287,500 2,250,000

$2,078,125.00 $375,000.00 $750,000.00 $3,795,000.00 $318,750.00 $69,000.00 $1,080,000.00

Grand Total Quantities For FormWork and Tools will be calculated as 1 Kit For 4 Homes FORMWORK Timber m3 2.5 $260.00 $650.00 For Formwork and propping Plywood 18mm Thick (122cm x 244cm) Board 5 $35.00 $175.00 Slab Formwork Props No. 5 $50.00 $250.00 Slab and Vertical Columns Propping Clamps TOOLS Steel Fixers Plyers Reinforcement Steel Cutter Hardened Nails Wood Nails Claw Hammer Hand Saw (Wood) No. 75 $2.00 $150.00 Support for Concrete Formwork (Columns)

3,125 6,250 6,250 93,750

$812,500.00 $218,750.00 $312,500.00 $187,500.00

No. No. kg kg No. No.

2 1 5 5 2 2

$5.00 $28.00 $3.00 $2.00 $4.00 $4.00

$10.00 For Steel Fixing $28.00 For Reinforcement Steel Cutting $15.00 $10.00 $8.00 $8.00 Carbon Reinforced to penetrate concrete. For Formwork Formwork Tool Formwork Tool Breaking and demolishing of loose none structural materials (Block work, loose Plaster etc.) Rubble removal. Rubble removal. Water and Concrete Transport Demolition Block walls etc. Carpenter tool Allignment Tool Allignment Tool

2,500 1,250 6,250 6,250 2,500 2,500

$12,500.00 $35,000.00 $18,750.00 $12,500.00 $10,000.00 $10,000.00

Lump Hammer Shovel Reinforced Plastic Bags Bucket Pick Axe Tape Measure Nylon String Steel Ruler Pulley and Rope (16mm) Trowel Sledge Hammer Value of Repair Kit Per Home

No. No. No. No. No. No. No. No. No. No. No. $2,043.05

2 2 10 2 1 2 1 2 1 1 1

$4.00 $7.00 $0.15 $5.00 $10.00 $10.00 $2.00 $4.00 $5.00 $2.00 $15.00

$8.00 $14.00 $1.50 $10.00 $10.00 $20.00 $2.00 $8.00

2,500 2,500 12,500 2,500 1,250 2,500 1,250 2,500

$10,000.00 $17,500.00 $1,875.00 $12,500.00 $12,500.00 $25,000.00 $2,500.00 $10,000.00

$5.00 Vertical Handling of Material to Roof Slab $2.00 For Plaster Works $15.00 For Demolishing Unsafe Structure

1,250 $6,250.00 1,250 $2,500.00 1,250 $18,750.00 Total Value $10,215,250.00