Date of Commencement 19th April 2010 Original : 8th January 2012 Amended: 31st December 2012
General Information
Bridge Type and Dimensions
Bridge Length Span Arrangement Bridge Width 288.35 m 6 x 48.05 + 0.05 m Carriageway : 3.70m x 2 = 7.40m Cycle Lane: 1.50m x 2 = 3.00m Side Walk: 1.80m x 2 = 3.60m Total 14.00m 6 Spans Simple PC Box Beam Abutments RC Reversed T Type Piers Foundation Approach Roads RC T Type Cast-in-situ RC pile D=1,200mm, (A1:D=1,500mm) 196m (Kalmunai) + 95m (Batticaloa)
3
900 1645 1800 SIDE WALK
Superstructure Substructure
6 x 1485 = 8910
1645
900
2050
theoretical height filled and actual height filled. of bentonite or sand in the pile.
y Reinforcement cage is kept in the bore with careful attention, with the y The length of tremie to be removed should be decided accordingly. y At the cut-off level, either additional concrete casted and flushed for
the removal of bentonite slurry mixed concrete or hacked for further construction.
6
could be analyzed and the settlement also could be measured Abutment -12200kN & Pier-9500kN (1m height)
y Pile Integrity Test (PIT): Consistency of the casted concrete could be
A. I -girders is suitable for beam length around 35 m. Longer beams are with higher self weight and bending moment. So, box section satisfies the section criteria. B. Box beams are good torsion resistant sections. Launching is easier and safer for less torsion structure.
9 10
Losses
Balance 50%.
11
Stress
13
14
Fluidity test < 25 sec Expansion test - (-1) to 5% Bleeding test < 2% (3-Hours) Casting cubes (4 4) to determine the strength as per desired to suit the construction. Normally for this kind of work 30N/mm2 in 28 days is desired.
Admixtures used
y y
Old Beams- Glenium B233 & Flow cable New Beams - STROAEG
15
16
Photographs
A1
48 6 54
2 0
0 2
2 0
3 4
7 0
31 0
A2 Total
31
A2
P5
P4
P3
P2
P1
A1
Total number of beams launched from A1 side: 48 Total number of beams launched from A2 side: 6
P2 P1
P3
P4 P5 A2
21
22
Substructure
Abutment
Capping Beam
Stem
Pile Cap
20 Nov 2012
e. Beam Concreting
f. Stressing Work
g. Grouting Work
34
35
36
37
38
39
40
A1 Abutment
P1 Pier
Rear Trolley
Front Support
Platform
41
42
Platform PSC Beam PSC Beam A1 Abutment P1 Pier A1 Abutment P1 Pier Platform
Rear Trolley
Front Support Rear Trolley Gantry Crane Front Trolley Rear Support Rear Crane Front Crane Launching Beam Front Support
Trolley Platform
Platform
43
44
Gantry Crane Rear Trolley Front Trolley Front Crane Rear Support Launching Beam
Front Support
Gantry Crane
Rear Trolley
Rear Crane
Rear Crane
Trolley A1 Abutment
45
46
PSC Beam
PSC Beam
A1 Abutment
P1 Pier
P1 Pier
PSC Beam Gantry Crane Rear Trolley Front Trolley Front Crane Rear Crane Rear Support Launching Beam Front Support Gantry Crane Rear Trolley Front Trolley Rear Support Rear Crane Front Crane Rear Crane Front Crane Front Support
PSC Beam Rear Crane Rear Trolley Platform Trolley A1 Abutment Platform PSC Beam
47
A1 Abutment
P1 Pier
48
7. Lateral Shifting and Moving Down PSC Beam by Front Crane & Rear Crane
A1 Abutment Launching Beam P1 Pier
PSC Beam Gantry Crane Rear Crane Rear Crane Front Support Rail Line Front Support Front Crane Front Crane Platform Gantry Crane Rear Trolley Rear Crane
v
Front Support Front Crane
Front Trolley
PSC Beam Platform PSC Beam A1 Abutment P1 Pier Platform A1 Abutment Launched Beams Span-1 Front Support P1 Pier P2 Pier P3 Pier
P1 Pier
49
50
1.
After Rectification
2.
3.
4.
5.
After Rectification
66