Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Cromwell Lane Reinstatement Over Green Tunnel Worksite 0330 / 012 = 142+450 Worksite 0330 / 019 = 46+130-146+650 W 4 16
9 K2
Worksite 0330 / 013 = 143+150 Canley Brook Viaduct Worksite 0330 / 010 = 142+250 Track And Footpath W168 Underpass Worksite 0330 / 014 = 143+250 Bridle W164 Overbridge Coventry - Kenilworth Railway Overbridge
9 6 1
9 2 K
Worksite 0330 / 017 = 145+000 - Track & Foot Path W168 Over Bridge
Culvert
0 4
9 6 1
1 6 8
7 8 1 M
0 0 +0 2 4 1
1 6 5 x
1 6 8
K2 9
0 0 +0 3 4 1
2 8 1
2 8 1
W1 6 7
2 8 1
0 0 +0 4 4 1
1 4 7 +0 0 0
1 8 2
Culvert
1 4 6 +0 0 0
0 0 +0 5 4 1
K 7
K 7
7 K
K 7
Worksite 0330 / 016 = 144+020 Crackley Lane Overbridge Bridleway W164 Overbridge Compound E Worksite 0330 / 011 = 142+840 -
Burton Green Tunnel Earthworks Treatment / Worksite 0330 / 021 = 146+650-146+720 - Retaining Wall Left Transfer 7
Kenilworth
0 METRES @ 1:10000
100
200
500
1000
JHI 31/01/13
JL 30/01/13
JT 30/01/13
These drawings should be read in conjunction with: Appendix B Design Element Worksite Plans Appendix C Local Construction Traffic Plans
Registered in England Registration No. 06791686 Registered office: Eland House, Bressenden Place, London, SW1E 5DU Drawing Title Drawn Checked Approved Design Stage Discipline/Function
Country North
NOR 04/12/12
JL 04/12/12
JT Crown Copyright and database right 2012. All rights reserved. 04/12/12 Ordnance Survey Licence number 100049190
Appendix D Demolition Plans Appendix E Earthworks and Site Haul Route Plans Appendix F - Regional Construction Traffic Plans 2. Refer to the Design Element Worksite Plans in Appendix B for details of the Worksites and Compounds. Refer to the Local Construction Traffic Plans in Appendix C for proposals of how access will be gained to the site from the local road network and for outline proposals of the road and footpath diversions. 3.
ET 23/11/12
JL 23/11/12
JT 23/11/12 Crown Copyright material is reproduced with the permission of Land Registry under delegated authority from the Controller of HMSO. This material was last updated on 2012 and may not be copied, distributed, sold or published without the formal permission of Land Registry. Only an official copy of a title plan or register obtained from the Land Registry may be used for legal or other official purposes.
Worksites Worksites Compounds Extent of Land Required for Construction Mitigation Earthworks
AM Appendix A
Creator/Originator Date Scale
1 4 0 +0 0 0
1 8 7
( 3 5 )
Scale with caution as distortion can occur. Rev Description Drawn Checked Con App HS2 App
) 5 3 (
t f a r D
3
W 1 6 5 x
3 3
Fo rCo n t i n u a t i o nr e f e rt o C2 2 3 CSI CL D
G A0 3 0 0 0 0 0 0 4
C ( ) 2K
A46 Overbridge
W1 6 4( C2 K)
3 3
1 4 1 +0 0 0
4.
Refer to the Demolition Plans in Appendix D for the temporary land take requirements and for details of the buildings to be demolished.
5.
Refer to the Earthworks and Site Haul Route Plans in Appendix E for details of the earthworks, the main earthworks compounds and the temporary Haul Route.
6.
Refer to the Regional Construction Traffic Plans in Appendix F for details of the wider access proposals onto site.
6 8 M1
7 6 1
M
6 18
4 16
M 7 8 1
C (
) 2K
W1 6 9
7 K
M1 8 4
M1 8 7
JL
Size
JT
19/11/2012
Drawing No.
1:10000
A1
Rev.
INTERNAL
C223-CSI-CL-DGA-030-000005
P03