Sei sulla pagina 1di 1

Coventry

Coventry - Kenilworth Railway

A429 Kenilworth Road Overbridge

Coventry-Kenilworth Rail Overbridge Finham Brook Viaduct Dalehouse Lane Overbridge

Worksite 0330 / 020 = 146+300 - Cromwell Lane

Millburn Grange Farm Overbridge

Worksite 0330 / 008 = 141+300 Dalehouse Lane Overbridge

Cromwell Lane Reinstatement Over Green Tunnel Worksite 0330 / 012 = 142+450 Worksite 0330 / 019 = 46+130-146+650 W 4 16

Worksite 0330 / 007 + 141+000 Footpath K29 Overbridge

Kenilworth Road Overbridge

Burton Green Green Tunnel

9 K2

Worksite 0330 / 013 = 143+150 Canley Brook Viaduct Worksite 0330 / 010 = 142+250 Track And Footpath W168 Underpass Worksite 0330 / 014 = 143+250 Bridle W164 Overbridge Coventry - Kenilworth Railway Overbridge

9 6 1

9 2 K

Worksite 0330 / 017 = 145+000 - Track & Foot Path W168 Over Bridge

Fo rCo n t i n u a t i o nr e f e rt o C2 2 3 CSI CL DGA0 3 0 0 0 0 0 0 6

Culvert
0 4

9 6 1

1 6 8

7 8 1 M

0 0 +0 2 4 1

1 6 5 x

1 6 8

K2 9

0 0 +0 3 4 1

2 8 1

2 8 1

W1 6 7

2 8 1

Finham Brook Viaduct

0 0 +0 4 4 1

1 4 7 +0 0 0

1 8 2

Culvert

1 4 6 +0 0 0

0 0 +0 5 4 1

Footpath K29 Overbridge

Earthworks Arisings Treatment / Transfer 6

K 7

K 7

Bridleway W165x Overbridge

7 K

K 7

Worksite 0330 / 018 = 146+130-146+130 4 8 M1

Worksite 0330 / 016 = 144+020 Crackley Lane Overbridge Bridleway W164 Overbridge Compound E Worksite 0330 / 011 = 142+840 -

Retaining Wall Left

Burton Green Tunnel Earthworks Treatment / Worksite 0330 / 021 = 146+650-146+720 - Retaining Wall Left Transfer 7

Worksite 0330 / 015 = 143+790 Bridleway W165x Overbridge

Kenilworth Restrained Cut

Crackley Autotransformer Substation

Kenilworth

0 METRES @ 1:10000

100

200

500

1000

Fit for Condition B


HS2 accepts no responsibility for any circumstances which arise from the reproduction of this document after alteration, amendment or abbreviation or if it is issued in part or issued incompletely in any way. Legends/Notes: Zone Project/Contract

Revised Initial Condition B3 P03

JHI 31/01/13

JL 30/01/13

JT 30/01/13

1. Workers Living Accommodation Sites Main Compound Areas

These drawings should be read in conjunction with: Appendix B Design Element Worksite Plans Appendix C Local Construction Traffic Plans
Registered in England Registration No. 06791686 Registered office: Eland House, Bressenden Place, London, SW1E 5DU Drawing Title Drawn Checked Approved Design Stage Discipline/Function

Country North

Country North Design

Revised Initial Condition B1A P02

NOR 04/12/12

JL 04/12/12

JT Crown Copyright and database right 2012. All rights reserved. 04/12/12 Ordnance Survey Licence number 100049190

Appendix D Demolition Plans Appendix E Earthworks and Site Haul Route Plans Appendix F - Regional Construction Traffic Plans 2. Refer to the Design Element Worksite Plans in Appendix B for details of the Worksites and Compounds. Refer to the Local Construction Traffic Plans in Appendix C for proposals of how access will be gained to the site from the local road network and for outline proposals of the road and footpath diversions. 3.

Excavated Material Treatment / Transfer Compound

Preliminary - Initial Condition B3

Construction and Logistics

Initial Condition B1 P01

ET 23/11/12

JL 23/11/12

JT 23/11/12 Crown Copyright material is reproduced with the permission of Land Registry under delegated authority from the Controller of HMSO. This material was last updated on 2012 and may not be copied, distributed, sold or published without the formal permission of Land Registry. Only an official copy of a title plan or register obtained from the Land Registry may be used for legal or other official purposes.

Worksites Worksites Compounds Extent of Land Required for Construction Mitigation Earthworks

AM Appendix A
Creator/Originator Date Scale

1 4 0 +0 0 0

1 8 7

( 3 5 )

Scale with caution as distortion can occur. Rev Description Drawn Checked Con App HS2 App

) 5 3 (

t f a r D
3
W 1 6 5 x

Crackley Road Overbridge

3 3

Fo rCo n t i n u a t i o nr e f e rt o C2 2 3 CSI CL D

G A0 3 0 0 0 0 0 0 4

C ( ) 2K

Worksite 0330 / 006 = 1140+570 - A46 Overbridge

A46 Overbridge

W1 6 4( C2 K)

3 3

1 4 1 +0 0 0

4.

Refer to the Demolition Plans in Appendix D for the temporary land take requirements and for details of the buildings to be demolished.

5.

Refer to the Earthworks and Site Haul Route Plans in Appendix E for details of the earthworks, the main earthworks compounds and the temporary Haul Route.

6.

Refer to the Regional Construction Traffic Plans in Appendix F for details of the wider access proposals onto site.

6 8 M1

7 6 1

M
6 18

4 16

M 7 8 1

C (

) 2K

New Flood Relief Channel

Worksite 0330 / 009 = 141+400 -

W1 6 9
7 K

M1 8 4
M1 8 7

JL
Size

JT

Capita Symonds Ineco JV


HS2 Security Classification

Construction General Arrangement Plans Sheet 05 of 13

19/11/2012
Drawing No.

1:10000

A1
Rev.

INTERNAL

C223-CSI-CL-DGA-030-000005

P03

Potrebbero piacerti anche