International Project Estimating System

Process & Power Project Workbreakdown Structure (WBS)


Estimate: 129 - Workbreakdown Process & Power Project
1.1 Item Magnet Systems 10 20 30 40 50 60 70 80 1.5 Vacuum Vessel 10 20 1.6 Blanket System 10 21 22 30 1.7 Diverter 10 20 2.2.P1 2.2.P2 2.3 Machine Assembly Operations Machine Assembly Tooling Remote Handling Equipment 10 20 30 40 50 60 2.4 2.6 Cryostat 10 Cooling Water System 10 20 30 2.7 3.1 Thermal Shield System 10 Vacuum Pumping & Fueling System 10 20 40 50 60 70 3.2 Tritium Plant 10 20 30 40 50 60 70 3.4 Cryodistribution 10 20 30 40 Cryoplant Cryolines & Manifolds Cryodistribution Components Cryoplant TFC Cold Test Facility Tokamak Exhaust Processing System Storage & Delivery System HTD Isotope Separation Atmosphere Detritiation Water Detritiation Tritium Plant Analytical System Tritium Plant Automatic Control System Roughing Pumps & Change over Boxes Torus Pumping System Cryostat Pumping System NB/DNB Pumping Systems Guard & Service Pumping System Leak Detection Systems Thermal Shield System PHTS and CVCS System Heat Rejection System Component Cooling & CW Systems Cryostat and Vacuum Vessel Pressure Suppression System Blanket Remote Handling Equipment Diverter in Vessel Remote Handling Equipment Transfer Cask System Viewing & Metrology Equipment Neutral Beam Remore Handling Equipment Hot Cell Repair & Maintenance Equipment Diverter Cassette Integration Diverter Plasma Facing Components Manifolds, Shields, & Purge Lines Blanket Shield Modules Port Limiters Module Connections Main Vessel Port Assemblies Activity Toroidal Field Coils Magnet Structures Poloidal Field Coil & Correction Coils Central Solenoid Coil Magnet Feeders Conductor Power Supply for TFC Cold Test Facility Cryogenic System Operation

9/2/03 10:08:12 AM

Page No 1 of 6

4.1

Item Power Supplies & Distribution 10 20 30 40 50 60 70 71 80 90

Activity

Operation

High Voltage Substation & AC Distribution System AC/DC Converters, Reactive Power Compensators & Harmonic Filters Switching Networks, Discharge Circuits, DC Distribution & Instrumentation EC H&CD Power Supplies-Initial IC H&CD Power Supplies-Initial LH H&CD Power Supplies-Initial NB H&CD Power Supplies DNB Power Supplies Steady State Electrical Power Network Power Supply for TF Coils Cold Factory Tests Icon Cyclotron Launcher Icon Cyclotron Main Transmission Lines Icon Cyclotron RF Power Sources Equatorial Launcher Upper Launcher Transmission Lines RF Power Sources & Controls Assembly & Testing Beam Source & High Voltage Bushing Beamline Components Confinement & Shields Active Correction Compensation Coils Lower Hybrid Launcher Lower Hybrid Main Transmission Line Lower Hybrid RF Power Sources Diagnostics Magnetics Neutron Systems Optical Systems Bolometry Spectroscopic Systems Microwave Systems Operational Systems Standard Diagnostics Tokamak Complex & Tritium Building Laydown & RFH Assembly Building Hot Cell Building Radwaste Building AC Distribution Building EPS Building Control Diagnostic Tunnels & Bridges Equipment Foundations Concrete Tank Foundations Site Infrastructure Hot Basin ET Building Personnel & Access Control Building Magnet Power Supply Building North Mag Power Converter Building South Mag Power Converter Building NBI Power Supply Building 3.3 KV Power Supply Building Cryoplant Cold Box Building Cryoplant Compressor Building

5.1

Icon Cyclotron Heating & Current Drive System 10 20 30 Electron & Cyclotrone Heating & Current Drive System 11 12 20 30 Neutral Beam Heating & Current Drive System 10 20 30 40 50 Lower Hybrid Heating & Current Drive System 10 20 30 Diagnostics 10 20 30 40 50 60 70 80 Reinforced Concrete & Site Infrastructure Elements 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 Steel Frame Buildings 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08

5.2

5.3

5.4

5.5

6.2.P1

6.2.P2

9/2/03 10:08:12 AM

Page No 2 of 6

Item 2.09 2.10 6.2.P3 6.3 Heat Rejection System 3.01 Waste Treatment System 10 20 30 40 50 60 70 80 6.4 Radiology & Environmental Monitoring Systems 10 20 30 40 50 60 70 80

Activity Site Services Building Laboratory & Office Building Heat Rejection System Engineering Fabrication Factory Testing Packaging & Transport Installation Testing Documentation Spares Engineering Fabrication Factory Testing Packaging & Transport Installation Testing Documentation Spares

Operation

9/2/03 10:08:12 AM

Page No 3 of 6

9/2/03 10:08:12 AM

Page No 4 of 6

on & Instrumentation

9/2/03 10:08:12 AM

Page No 5 of 6

9/2/03 10:08:12 AM

Page No 6 of 6