REPORT OF COMPLET D WORKS - SEACOAST FORTIFICATIONS
(Gun and liortar Batteries)
COAST DEFENSES 01
FORT. I2IURUS,, 0980.
BATIORY. LBWLS.+....,.,
Wo. of guns tone
Form 1 Corrected to June 50, 1921,
Ba cua...
Caliber
Settery commenced Sept., 1896
Sources of electric current {Central or Resorva Fowor Plante
Battery complete April, 1898 :
Bice oe feeestee eT ig? ee, § 2858) nox. mw. requited for lightel 247 ir.
Meterial of constructio: enictate Max. kw. recuized for motore|iione. Battery not in uses
und or Rosencale cement| Portland
tc cate of transfer — | 3302, 014,00*
yommected to water supsly [Yes Present condition of tattery| dood.
Joruected to sever Stoim sewer dnkgoms wet or dry Dry .
ype of latrine Urinals only
Type of data transmission | xone How ventileted 8" aia, chetts, conical tov. No-ventila~
ing doors.
‘romion elevation in Enpsf1, 34 .2q/ Remareo-
Dattery Bupe#2, 54.3 “Cost includes Batteries Walker and Nishler.
Tatum plane ite. Lae
ARARE:IT. :
Baplacenont Cexames bie i 2
~ OF mortar No| Manufacturer x . Serial Fo. Mamfasturer Motor __
L Bethlehem Tro} Co. B.D DisabF .189 an a bik B5067ScRbgep
oa 8 feCod Ko
2 Watervliet arf. ED. fpis.de 16 ADby Mfg.Cod Kok knowns
a Carfisges old and renpved.
5
6
7
£
Emplacement Remodeled tor
Munber | Type | Delivery ‘Type of control Date of transfer | long points
4 ay Back 220 Jocont67 con.#138307 ff april 29, 1905 | xo,
aysR.4 Back St 220 1060R"67 Con.#i56299 " spril’29, 1905 No.REPORT OF Ci rED WORKS ~ SEACOAST FORTIFICATIONS. COAST DEFENSES OF THE COLUMBIA
tery Plan) FORT STEVENS
BATTERY LEWIS
Corrected to No of Guns Caliber Carriage.
Form 7. #2 =
J Armament Removed \
Section CD
Section AB:
Leen
a~ Shot Room
b- Powder Room
Rear ELEVATION
Note: Plane of Reference~Mean Lower Low Water.ie mee male Cretan}
Cora)
er tL a)
el edgar caer BULLY
ead ry
Cara aad
Dead lear
a
oO
Zz
‘s}
a
ie)
ry
oO
4]
Armament Removed
eH}
FE
felon dlo eG)
BIT aNI}
Cog
ener
Cn tis
Peano)
Cater)
eR rai
ere konica)
Pot)
ers
ene’
Note: Plane of Reference-Mean Lower Low Water: