SITE ADDRESS: ...........Document number: ......................... Guard Name and contact No. Date of submission of Report:. Notation:
S.N o. 1 2 3
Not correct
Check point
GBT INDOOR
RTT OUTDOOR
Shelter
5 6 7
Antistatic
Lighting
Operational
Earthing system
DG,DG-N,Tower,Shelter are conneted to EP Earthing Values EP1 Ohms 10 Earthing Bus Bars EGB under feeder entry IGB under feeder entry EMP BUS BAR EP2 EP3
2 (5)
11
PIU/ACDB
12
Mains Incomer
Mains available
13
DC Power Availability
DC Power Available
14
DG
DG installed
DG Commissioned
15
Air-conditioning
Installed
16
WFT
No of Openings made
17
Tower
GBT
RTT
18
Type
Tower Type
19
20
Length of Vertcal ladder(above HCT till antenna mount) mtrs. Length of HCT ladder in mtrs.
in
21
Lightening Protection
Lightening Rod
LA connected to Earthpit
22
Aviation Light
Installation
COMMISSIONED
3 (5)
23
Cable Inlet
24
Antenna Mount
25
GSM antenna Mount hts.(as per TND) GSM antenna Mount hts. (existing)
26
27
28
MW Antenna Mount ht. (Existing) GSM antenna Azimuth(As per TND) GSM antenna Azimuth (existing) MW Antenna Azimuth(As per TND) MW Antenna Azimuth (Existing)
29
30
31
near end
Far End
32
near end
Far End
4 (5)
Problems / Comments (Refer to applicable activity Sl. No.) _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________
Access ladder for shelter is required. DG/PIU/SMPS Cabling is not done, DG not commissioned. HCT Grouting is not done. Tower/DG/Shelter/Equipment Earthing not done, EGB/IGB not available.
5 (5)
Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)