A.K.ASTHANA
Bureau of Energy Efficiency (BEE) PAT Capacity Building 2, Aug 11, Mumbai
German Technical Co-operation (GTZ)
Sr.Technical Expert
The National Action Plan on Climate Change was released by Honorable Prime Minister of India in June 2008 The Action Plan Outlines 8 Missions including National Mission on Enhanced Energy Efficiency (NMEEE)
The market based mechanism to enhance cost effectiveness of improvements in EE in energy intensive industries through certification of energy saving which can be traded. (Perform, Achieve & Trade) Accelerating the shift to energy efficient appliances in designated sectors through innovative measures to make the product more affordable Creation of a mechanism that would help finance DSM programs in all sectors by capturing future energy saving Developing fiscal instruments to promote energy efficiency
The energy usage pattern varies widely in industries of a particular sector due to various diversities like
Scale of Production (Installed Capacities)
a) a) a) a) a) a)
Total No of DCs = 142 Threshold limit to be DC = 30,000 tons of oil equivalent (TOE) per annum
Coal/Lignite Fired
Distribution of No. of DCs
Gas Fired
Distribution Of No. of DCs
36, 37%
State
61, 63%
Central / Private
Capacity(MW)
State
Capacity(MW)
33416 , 43%
45026 , 57%
Central / Private
Targets in PAT - I
Variation in Net Station Heat Rate from Design Net Heat Rate % Reduction Target for Deviation in Net Station Heat Rate (%) No. Of DCs Fuel Target Reduction Range (Kcal/KWh) Target Savings (TOE)
Coal/Lignite Up to 5 % 10 % Gas Coal/Lignite More than 5% and Up to 10 % 17 % Gas Coal/lignite More than 10% and Up to 20% 21 % Gas Coal/Lignite More Than 20 % Sub Total 24 % Gas
21 20 20 12 30 4 26 4
0 12.8 0 9.64 21.2 48.2 17.9 48.1 53 130 50 - 81 128 - 528 86 - 220
137
3090543
*Additionally there are 5 diesel plants where the target has been calculated on the basis of KWh/ Litre.
Total
142
3094670
(3.1MTOE)
Reduction in APC
Improvement in HR
1. 2. 3. 4. Sl. No
4 x 500 MW 2 x 500 MW 5 x 200 + 2 x 500 MW 3 x 200 + 3 x 500 + 1 x 500 MW Coal Based Power Station
90 90 88 88 Average PLF %
1.
4 x 210 MW
2274
5.95
95
2.
3. 4. 5. 6.
4 x 210 MW
2 x 210 + 2 x 210 + 1 x 210 5 x 250 MW 2 x 250 MW 6 x 210 MW
2301
2295 2234 2227 2301
2432
2412 2498 2285 2390
5.7
5.08 6.67 2.58 3.87
8.79
8.2 NA NA NA
90
90 NA NA NA
Target Setting of Power Plants for PAT Mechanism would mainly depend upon Net Heat Rate (NHR) to include both i.e. GHR & APC
Gross HR(GHR)
2500 Kcal/Kwh
2500 Kcal/Kwh
APC
8%
10%
Net HR (NHR)
2777(=2500/0.90) KCal/Kwh
Annual Generation (MUs) & PLF(%) Design Gross Station Heat Rate (Kcal/Kwh) Annual Operating Gross Station Heat Rate (Kcal/Kwh) Annual Operating Auxiliary Power Consumption (%) Quality of Coal i.e.
Average GCV (Kcal/Kg) & Ash Content(%)
Or
Example - 1
Installed Capacity = 420MW Station Design Heat Rate = 2450 Kcal/Kwh Annual PLF = 55.72 % Annual Average Operating Station Heat Rate = 2650 Kcal/Kwh Average APC = 9.7 % Annual Production in MUs = 2050.28 Net Operative Heat Rate = 2936.29 Net Design Heat Rate = 2714.68 Deviation from Design NHR = 221.61 % Deviation = 8.16
Target % Reduction = 17% of Deviation = 17 % of 221.61= 37.67
1
2 3 4 5 6 7 8 9 10
Gujarat
Haryana Karnataka M.P Maharastra Punjab Rajasthan Tamil Nadu U.P West Bengal Sub Total
12
2 2 3 9 3 4 9 5 7 56
1
1 2 3 5 1 1 1 1 1 17
1470
1367 1970 2932.5 5770 1260 1080 600 1382 1260 19092
10844
8954 12375 15363 33537 9008 3612 3632 4466 6632 108423
67230
150244 107590 268371 441889 82839 59354 117839 57902 93328 1446585
Total
58
18
33537
425000
30000
375000
15363
15000
225000
Capacity (MW)
12375
10000
9008 5770
82839
9627
117839
125000 69440
5000
67230
1470
0
1367
1970
2932
3632 600
4466
57902
93328
75000
1080
1382
1260
1470
25000