0913 Name of Activity: LOCATION OF 11 KV 3 CORE X 300 sq. mm XLPE CABLE Division - Palghar
Boisar
Sr. No. 1 2 Sub Division Boisar (Midc) Boisar (Midc) From Gangotri 500 kva Contessa 33/11KV DTC Contessa Feeding Sub Station Location To Siyaram Colony Total Length in actual length KM(as per DPR) 0 0.7 Touched/ untouched Completed resource to bill Balance work for commissioned remarks
untouched 100 M Cable laying,4 nos end termination joint,03 straight joint,01 nos dp pole erection,
Not req
Boisar (Midc)
Contessa
Substation
JB Textile
1.1
Touched
Balnce work
contractor absent,
Boisar (Midc)
Contessa
Substation
Kepro Industries
2.4
1.5
Touched
1.5
Balnce work
contractor absent,laid cable 4 nos end termination have been damage during the joint,05straight joint,01 midc work,so 30*2 cable nos dp pole erection, should be replaced to be done
5 6 7 8
0.6 4 0 3.2 1 2
untouched Touched
Touched
Balnce work
wip
9 10 11 12 13 14 15
Boisar (Midc) Boisar (Midc) Boisar (Midc) Boisar (Midc) Boisar (Midc) Boisar (Midc) Boisar (Midc)
kolwade Athmasakthi Near Manse Bangalow MIDC Office Chowk Plot F-4
0 0 0.57
Balnce work
wip
0.57
Completed
0 3.4 Bay Requried End termination, DP pole erection Road crossing balance
work can not start due to need of HT feeder Piller bay not avilable
Sr. No.
Sub Division
Location From Substation Substation To Petrol Pump Near VIRAJ industries Vasundra Diary
Touched/ untouched
Completed
resource to bill
remarks
16 17
EHV-1 EHV-1
10 2.4
untouched untouched
0 0 balance work in wip ,damage replacement End termination, DP pole erection cable balance work in wip , damage replacement End termination, DP pole erection cable balance work in wip , damage replacement End termination, DP pole erection cable
work can not start due to need of HT feeder Piller work can not start due to need of HT feeder Piller
18
Boisar (Midc)
EHV-1
Substation
Fibrosa
2.6
2.6
touched
2.6
Trench Requried
1.BOC
2.2
2.2
touched
2.2
2.Substation
2.Khurana
touched
Bay Requried
Trench Requried
20
Boisar (Midc)
EHV-1
0 balance work in wip , damage replacement End termination, DP pole erection cable
21
Boisar (Midc)
EHV-1
Substation
3.1
3.1
touched
3.1
Bay requried
Trench Requried
22
Boisar (Midc)
P-100
Substation
Hotel lalit
0.6
untouched
s/s deleated
23
Boisar (Midc)
N-Zone (EHV-1)
N-zone S/S
Galaxy
2.4
untouched
24
Boisar (Midc)
P-100
Substation
S-23
0.8
untouched
0 balance work in wip , damage replacement End termination, DP pole erection cable
s/s deleated
25
Boisar (Midc)
EHV-1
Near K-Plot
Near K-Plot
0.16
2.8
touched
2.8
Trench Requried
26
TOTAL
Sr. No.
Sub Division
Location From To
Touched/ untouched
Completed 24.17
resource to bill
remarks
Boisar (R)
27 28 29 30 31 32 33 34 35 Boisar (Midc) BOISAR R BOISAR R BOISAR R BOISAR R BOISAR R BOISAR R BOISAR R BOISAR R N-Zone TAPS TAPS TAPS Pathrali N-Zone N-Zone TAPS Substation Near Palm Panchyat KUMBAWALI 2.6 0.3 0.18 0.1 0.3 untouched touched for patrrale ss 0 touched Completed taken in midc bay not bay not nor req 60.97 5.374 0 bay not avilable
4.6 0.3
5.374 0
66.344
2.7
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Circle - Vasai Activity No.0913 Name of Activity: LOCATION OF 11 KV 3 CORE X 300 sq. mm XLPE CABLE, HT feeder Pillars required for commissioning of cable. Division - Palghar
Boisar
Sr. No. 1 2 3 Sub Division Feeding Sub Station EHV-1 EHV-1 EHV-1 Location From Camlin Naka Substation Substation To MIDC Office Chowk Petrol Pump Near VIRAJ industries Vasundra Diary Total Length in actual length KM(as per DPR) 2 10 2.4 2 10 2.4 Touched/ untouched Completed resource to bill Balance work for commissioned remarks work can not start due to need of HT feeder Piller work can not start due to need of HT feeder Piller work can not start due to need of HT feeder Piller balance work in wip , damage replacement End termination, DP pole erection cable 2.2
0 0 0
Boisar (Midc)
EHV-1
1. Substation
1.BOC
2.2
2.2
touched
2.2
16.6
16.6
Activity No.0913 Name of Activity: Laying & commissioning of Under Ground 11 KV 3 CORE X 300 sq. mm XLPE Cable
Sr. No.
Sub- Division
Scope
Completed/ WIP
Balance
Remarks
1 Boisar MIDC
52.89
30.27
For completing 16.6 Kms., 8 Nos.11 KV. HT 22.62 Pillars are required, for 6 Kms.alternate survey is required. For 4 Kms.Bay Required at TAPS S/s., for 3.6 7.68 kms. Alternate survey is reqd. 0
2 Boisar R
8.08
0.4
3 Palghar/ Dahanu
8.37
8.37
Total
69.34
39.04
30.3