ID 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Task Name

Duration

Start

2 Sep '12 Oct '12 Nov '12 Dec '12 Jan '13 Feb '13 Mar '13 Apr '13 May '13 Jun '13 12 19 26 02 09 16 23 30 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16

My Project Design Schedule


Data Collection Possible Project Site Selection Acquiring of Topographical and Raster Data Acquiring of Hydrological and Hydrographical Data Acquiring of Geotechnical Information Gathering of Seismic Data Gathering of Wind Speed and Average Temperature Readings Traffic Data Site Selection Collecting Design Requirements Researching Design Standards Traffic Loading Conceptual Design Stage Editing of Topographical Data Modelling of Site Surface Conceptual Modelling of Chosen Bridge Bridge orientation selection Generating of Rendered Views Generating of rendered walkthrough and fly-by Preliminary Cost Estimation Environmental Impact Assessment Road Network Modification Modelling of existing road network Modelling of proposed road networks Modelling of Roads Modelling of Intersections Selection of Bridge Alignment Detail Bridge Design Stage Super Structure Modelling Layout Definition Material Property Definition Road Deck Design Pylon Design Cable Design Sub Structure Modelling Material Property Definition Abutment Design Soil Structure Modelling Foundation Design Design Analysis Load Type and Case Definition Load Pattern Definition Load Combination Definition Time History Analysis Response Spectrum Analysis Staged Construction Analysis Wind Tunnel Analysis Pylon Entire Bridge Final Model Generation

169 days Sat 01/09/12


75 days 15 days 15 days 15 days 15 days 15 days 10 days 30 days 30 days 7 days 7 days 7 days 154 days 16 days 20 days 20 days 20 days 22 days 30 days 20 days 30 days 50 days 7 days 43 days 10 days 10 days 10 days 114 days 67 days 7 days 20 days 30 days 30 days 20 days 97 days 20 days 20 days 20 days 30 days 70 days 20 days 20 days 20 days 25 days 25 days 30 days 20 days 10 days 10 days 17 days Sat 01/09/12 Sat 01/09/12 Sat 01/09/12 Sat 22/09/12 Sat 22/09/12 Sat 01/09/12 Sat 01/09/12 Sat 22/09/12 Tue 06/11/12 Sat 01/09/12 Sat 01/09/12 Sun 09/09/12 Sat 22/09/12 Sat 22/09/12 Tue 16/10/12 Sat 22/09/12 Sun 21/10/12 Sat 08/12/12 Sat 17/11/12 Sat 13/04/13 Sat 22/12/12 Sat 22/09/12 Sat 22/09/12 Wed 03/10/12 Wed 03/10/12 Wed 03/10/12 Thu 22/11/12 Sun 21/10/12 Sun 21/10/12 Sat 08/12/12 Sun 21/10/12 Sun 16/12/12 Sun 16/12/12 Sun 16/12/12 Sun 21/10/12 Sun 21/10/12 Thu 22/11/12 Sun 21/10/12 Sat 02/02/13 Sun 21/10/12 Sun 21/10/12 Thu 22/11/12 Thu 22/11/12 Sat 22/12/12 Sat 22/12/12 Sat 22/12/12 Sun 21/10/12 Sun 21/10/12 Tue 06/11/12 Sun 17/03/13 Google Earth Google Earth Travelling [$2,000.00],Research [$5,000.00] Research [$5,000.00],Travelling [$2,000.00] Ecotect Analysis,Hydrognomon Research [$5,000.00],Travelling [$4,000.00],Stationery [$2,000.00] Google Earth Research Research Research ,Travelling [$5,000.00] Civil 3D 3D Max Design,Civil 3D 3D Max Design Civil 3D,3D Max Design,Google Earth 3D Max Design 3D Max Design,AIM Ecotect Analysis,Google Earth,Research [$5,000.00],Travelling [$2,000.00] Civil 3D,Google Earth Civil 3D Civil 3D Civil 3D

Research ,SAP 2000 SAP 2000 SAP 2000,Revit Structure SAP 2000 SAP 2000 SAP 2000 SAP 2000 CSI Safe,SAP 2000,MS Excel 2007/2010 SAP 2000,Revit Structure,Robot Structural Analysis,CSI SAP 2000 SAP 2000 SAP 2000 SAP 2000 SAP 2000 SAP 2000 Project Vasari Project Vasari SAP 2000

Project: My Project Design Schedule Date: Wed 05/09/12

Task Split

Progress Milestone

Summary Project Summary Page 1

External Tasks External Milestone

Deadline