Sei sulla pagina 1di 8

AM TRIS HARDIYANTO

Jl.Mahoni No 66 Depok Utara Depok 16421, Indonesia. amtris@centrin.net.id Home : +62-21-77200420 Cell : +62-811146052

INFRASTRUCTURE - WATER & WASTEWATER / SANITATION ENVIRONMENTAL SPECIALIST


More than Fourteen (18) years of diversified experience primarily within the infrastructure investment, Project management, assess and identify environmental, health and safety risks, provide recommendations for action plan in the project development process; Supervise the environmental performance of a portfolio of allocated projects, across all subsectors, power, transport, utilities, and renewable energy; water and wastewater. Assist in the development and implementation of an annual supervision work plan including definition of resource requirements and coordination with others Departments; and - Facilitate communication among various investment project stakeholders to promote environmentally sound project implementation with sustainable development outcomes. Identify and solve complex environmental and social problems, and to find value-added opportunities in their business operations. Experience in environmental assessment and management, pollution prevention and abatement, and occupational health and safety to collaborate with other specialists of the Department in support of investments in the infrastructure sector.

CORE COMPETENCE
Management Project Business Development Project Control & Supervision Site Survey and Investigation Feasibly Study and DED Water Supply ( Surface & Ground Water) Wastewater & Solid Waste Management Cost & Benefit Project Analysis Expense Analytical & Operation Control Environmental Protection EIA & ESIA EPC Process Tender Evaluation AMD Bio Remediation

PROFESIONAL EXPERIENCE
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned 1 Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed : : : : : : : Umbulan Bulk Water System Capacity 4000 m3/sec 2012 East Java, Indonesia IFC International Finance Corporation Feasibility Study for Water PPP project Water-Wastewater & Environmental Expert MottMac Donald Indonesia Project Design and Construction for Water Supply,Process Design,Include design of various water, tender preparation and technical for PPP Project 1

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

Aquatico Due Diligent Project 2012 Jakarta-Indonesia ADB Due Diligent Water Consetion Project Water Supply Specialist MottMac Donald Review DED, Effluent assessment, make alternative for Municipal WWTP ,Develop program monitoring and Environmental Evaluation Master Plan Municipal Sewerage System 2010 -2011 Indonesia Indii Ausaid Design Master Plan for Municipal Sewerage system Piping,pump station,and centralise operation Expert Wastewater Treatment & Sanitation Review all data Effluent assessment, make alternative for Municipal WWTP ,Develop program monitoring and Environmental Evaluation : : : : : Evaluation of Infrastructure Enhancement Grant for Solid Waste and Sanitation for 8 Town in Indonesia 2010 Indonesia Indii Ausaid The Government of Australia is supporting the Go I by providing Infrastructure Enhancement Grants (IEGs) to help Local Government accelerate sanitation programs, Grants allocation can be used to invest in Investigation and Verification program Analysis of Problems and Issues in the Water Supply and sanitation Sector, verification and help Local government to budget preparation Pre Feasibility Study of The Umbulan Water Supply for Sidoarjo Surabaya And Adjacent Town (Utilization Spring Water Produce 4000 litter/second 2009 Sidoarjo, East Jawa,Indonesia PT.Amerta Bumi Capital Pre Feasibility Study Water Supply Team Leader Conduct Pre FS regional water supply, estimate costs for water related in infrastructure, estimated 2

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

Name of Assignment or project Year Location Client Main Project Features

Position held Activities Performed

: :

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : :

economic benefits due to development of Spring Water Transmission Pipe, complete final report Pre FS Water supply 6 Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed : Review and Evaluation Water Sanitation Program Small Towns Phase 1 and make Recommendation for Phase 2 Program for 8 Province and 39 Small Town in Vietnam. 2009 Vietnam WSP Finland Review and Evaluation Water Sanitation International Consultant Review all data project, site visit, communication with local Vietnam government and WSP Finland base on Finding during site visit program. Evaluate all program achievement and make recommendation report Infrastructure for Tsunami Recovery Management Program 2007-2009 Banda Aceh UNDP Implementation Infrastructure housing, water & sanitation Senior Consultant Enviro Solution Pte.Ltd Singapore Responsible for pre feasibility study, acted as the liaise officer for the sanitary landfill site assignment in Aceh, Indonesia between the Government ,UNDP and consultants as well as engineer in several designs of the project; Participated in the evaluation of potable water systems, water supply and sanitation systems, and solid waste management projects; Involved in a number of Environmental Impact Assessment s (EIA) of various projects including sanitary landfill In the 9 District province Aceh , Tsunami Recovery Waste Management Program Various Environment program, Risk Assessment, Due Diligent, HSE audit 2005 2007 Singapore Various Company Project Implementation Agency Assignment Project Manager Glowtec Environmental Pte.Ltd Project Design and Construction for Water and Wastewater Treatment; Designing effective 3

: : : : : :

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : : :

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : : :

Project Operational procedures to ensure the smooth running of all operations; Responsible for Environmental assessment and management for the project construction; Investigating and understanding weekly shrinkage issues, construction a user friendly guide, and subsequently testing and commissioning and completion of the project. 9 Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed : : : : : : : Water Treatment Plant capacity 20 m3/hour January 2006 July 2006 Jakarta PT Damai Indah Golf, Kapuk Engineering, Procurement, Construction Water treatment Project Manager Participate in bidding ,implementation requirement from tender document plan resources and budged for implementation and manage the construction project Water Treatment Plant , with UF Capacity 40 m3/hour July 2005 December 2005 Jakarta PT United Can Engineering, Procurement, Construction Water treatment Project Manager Lead for civil, Mechanical and Electrical, infrastructure project, construction, test and commissioning the system. Medco Ethanol Lampung 2004 July 2005 Lampung Medco Ethanol Lampung Infrastructure for Ethanol Factory ,Engineering, Procurement, Construction Project Manager Pre feasibility study for the Medco Ethanol Lampung, Capacity 180 klpd, location Kota Bumi, Lampung; Communicate the Project Schedule to construct Civil Work together with Consultant; Review the Detail Engineering Design Wastewater Treatment with the Principal and consultant; Serve as project Manager.

1 0

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : : :

1 1

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : : :

1 2

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : : :

Various Infrastructure Project 1996 - 2004 Jakarta Various Company Infrastructure,Engineering,Procurement,Construction Project Manager PT.Sarana Adiniagatam Project Design and Construction for Water and Wastewater Treatment; Process Design, Include design of various water, wastewater and sewage treatment plant, tender preparation and technical proposal and equipment procurement; Provides day today leadership and works with staff to ensure a high-performance, customer service oriented work environment that supports achieving the departments and the Districts mission, objectives and values regarding team building and employee empowerment Waste Water Treatment Plant, Capacity 600 m3/day PT.Bimoli Palm Oil,Bitung North Sulawesi Waste Water Treatment Plant, Capacity 750 m3/day PT.Indo Sentra Pelangi, Semarang Waste Water Treatment Plant, Capacity 800 m3/day PT. Indofood Sukses Makmur Waste Water Treatment Plant, 200 m3/day PT.Saritama, Narogong, Bogor Waste Water Treatment Plant, 1500 m3/day PT.Indolakto, Sukabumi Waste Water Treatment Plant , Capacity 10500 m3/day PT.Bataminto, Batam Wastewater Treatment Plant, Capacity 5400 m3/day PT. Bukit Indah City ,Cikampek, Indonesia Quality Engineering Manager PT.Pacific Indonesia 1994 1995 Cikampek,Indonesia Engineering Manufacturing To manage day to day operation of Engineering for ensuring all aspect of the production operation work efficiency and effectively; Involve in project management for plastic injection molding, maintenance and repair of production machine; Work closely with design/ product engineer providing technical support in areas of production; Prepare corrective measurement technical system. 5

2003 2004 2002 2003 2001 - 2002 2000 - 2001 1999 2000 1996 - 1999 1995-1996

1 3

Name of Assignment Year Location Type Company Activities Performed

: : : : :

Technical operation (achieving planned engineering, maintenance schedules, inventory management, assets and equipment management, quality management 1 4 Name of Assignment Year Location Type Company Activities Performed : : : : : Engineering Manager PT. Indoroc Manufacturing 1992 - 1994 Cileungsi, Bogor Manufacturing Developing and Implementation production, Responsible in monitoring the process of projects to ensure timely delivery of assignments while maintaining standards and cost effectiveness, Analyze & execute project based on contract, ensure the quality, cost, and time management for the project Product Engineer PT.Mattel Indonesia 1990 - 1992 Cikarang Industrial Estate Manufacturing Developing Product and improvement Quality, Promoted to Develop and implement policies and management system in product safety, Supported quality and laboratories, analyzed processes for potential modifications, functioned as primary liaison between company and buyer regulatory agencies Research & Development PT. Panasonic Matsushita Electronic 1989-1990 Jakarta Electronic Manufacturing R & D work closely with management production to ensure they get all the support they need to enable them to support new design release and easy in the applications when the product running with standard and specification. Research & Development Engineering PT.YKK Alumico Indonesia 1988 Tangerang, West Jawa Aluminium Extrusion Responsible for monitoring design progress, checking structural analysis from consultant, Fully Support Engineering Department; Ensure, upon completion of 6

1 5

Name of Assignment Year Location Type Company Activities Performed

: : : : :

1 6

Name of Assignment Year Location Type Company Activities Performed

: : : : :

1 7

Name of Assignment Year Location Type Company Activities Performed

: : : : :

repairs, that equipment is in good operating condition, ready to meet operational requirements, fully inspected, tested, clean and safe 1 8 Name of Assignment Year Location Type Company Activities Performed : : : : : Quality & Product Control PT. Siemens Indonesia 1988 Cilegon,West Jawa Manufacturing Provide mechanical design, correction based on standardized plant or customer requirement. Manage Complaint and Part Data Based. Preparing/ Updating Offering Tools; Ensure that all the necessary materials are available for the planned operations and meet the required quantity and quality timely.

EDUCATION

Graduated Master Degree in Environmental Science from University of Indonesia 2004 Graduated Bachelor in Economic from University of Indonesia 1996 Graduated in Mechanical Engineering from University of Indonesia, 1989 Graduated Kolese Loyola High School Semarang ,1983

PUBLICATION
The implementation of industrial liquid Waste Management (Study on the implementation of Wastewater Treatment Plant in Tugurejo Sub District, Semarang, Central Java Indonesia) Library University of Indonesia Cost and Benefit to Built Wastewater Treatment Plant for Environmental Sustainability; Library University of Indonesia. Soft Loan for Environmental Protection, Minister Environmental Digital Publishers

TRAINING & CERTIFICATE

Environmental Impact Assessment-Level A ,2003 Purchasing Course, PT.National Gobel Panasonic, 1989 Technical Calculation Water Resources, Ministry of Public Work-JICA 1994 Review of Project Management Manual for Urban Water Sanitation Project, Ministry of Public Work-World Bank 2007 7

ADDITIONAL INFORMATION Computer Skills, AutoCAD, Microsoft project, Primavera, Excel, Word, Power Point, Water Supply program Epanet, Process Design & Calculation Water Wastewater

Potrebbero piacerti anche