Concrete Pour Card

CLIENT: PROJECT: LOCATION: STRUCTURE: DRG NO: LEVEL: CONCRETE GRADE / QTY : M Sl NO 1 2 3 BEFORE CONCRETING 4 5 ITEM Center Lines Checked Formwork and Staging Checked For Accuracy, Strenth & Finish Reinforcement Checked Cover to Reinforcement Checked Checked the Location of Construction Joint Civil Embeded parts Checked (Location Mechenical & plumb) Electrical 7 Slump / CUM YES NO REMARKS DATE:

Site Engineer _______________