Nickel
Bauxite
Frequency Spectrum 700 MHz outside Java, Potential arrangeme nt for Java area 2300-2360 MHz urban nationwide
Key Metrics
Abundant resources for gas-based energy and petrochemical industries Not including NonConventional Gases, from Coal Bed Methane and Coal Gassification
Will be at least partially processed domestically by 2013 (new mining law: 4/2009)
Economic Growth
Inflation Unemployment Poverty
5,5- 5,6
4-6 7,6 12,0 - 13,5
6,2
7 7,1 13,33
6,0 - 6,3
4,0 - 6,0 7,3 - 7,4 11,5 - 12,5
6,5
3,8 6,6 12,49
6,4 - 6,9
4,0 - 6,0 6,7 - 7,0 10,5 - 11,5
6,23
4,30 6,14 (Agt) 11,66 (Sept)
2013
TARGET RPJM Economic Growth Inflation Unemployment Poverty *) Tentaive figure 6,7 - 7,4 3,5 5,5 6,0 - 6,6 9,5 - 10,5 TARGET APBN 2013 6,8 4,9 5,8 6,1 9,5 10,5 TARGET RPJM
2014
TARGET RKP 6,8 7,2 4,5 + 1 5,0 6,0 8,0 10,0 STATUS 2 1 1 2
5
On Track/on Trend
=Need Efforts
Directly elected
Appointed 38%
2007
2009
Legislative
Demokrat
107 94 57
46
Golkar PDI-P
37 148 17 26 28
PKS
PAN PPP
PKB Gerindra
Courtesy of Antara
Masterplan
Perpres 32/2011 27 May 2011
Basically MP3EI is based on these strategic initiatives: 1. Encourage a large scale investment realization in 22 main economic activities 2. Synchronization of national action plan to revitalize the real sector performance 3. The development of center of excellence in 6 (six) economic corridors Main strategy of MP3EI: 1. Economic potential development through economic corridor 2. Strengthening the national connectivity 3. Strengthening national human resources capability and science and technology
8
MP3EI aims at accelerating Indonesias economic transformation through cross-entity synergy and collaboration
In creating economic transformation for Indonesia, MP3EI employs three pillars and revolves in the cross-entity efforts to ensure sound projects coordination, consisting of:
Coordinating Ministry of Economic Affairs, National Development and Planning Agency, Ministry of Finance, Ministry of Public Works, Ministry of Transportation, Ministry of Forestry, Ministry of Energy and Mineral Resources (other relevant Ministries), Governors, Chamber of Commerce leaders, experts, business players 9 Working Groups: 3 Cross-sector Working Groups (Regulation, Connectivity, HR & Tech) and 6 Working Groups of Economic Corridors)
Chairman : President Vice Chairman: Vice President
1 2 3
Developing economic potential through economic corridors Strengthening national connectivity Strengthening national human resources capability and science & technology
2025
2014 2010
GDP: US$ ~ 1,2 T GDP: US$ 3,8 4,5T GDP/c: 13.000 16.100 US$ 12 high income country
DAILY IMPLEMENTATION TEAM Chairman: Coordinating Minister of Economic Affair Vice Chairman 1: Minister of National Dev Planning Agency Vice Chairman 2: Chairman of National Economic Committee
SECRETARIAT
GDP ~ US$ 700 B GDP/c: US$ ~ 4.800 GDP/c US$ 3,005 14 major 17th major nation economy
Java EC Team
Kalimant an EC Team
Sulawe si EC Team
Bali-NT EC Team
PapuaKep.Maluku
EC Team
MP3EI infrastructure project offers potential opportunity of ~USD 64 billion for private sector participation
MP3EI Infastructure Project Funding Source (Rp Trilion*):
300
Funding Gap (614) 152 250 (7%) APBN 599 200 (28%) Funding Gap 41%
150 100
19,4
Railway
170,7 4,8 0,0 35,0 0,1 50,5 Seaport
61,3
27%
50
Private (402)
1%
8%
12,1 Bali-NT
Kalimantan
PapuaKep.Maluku
Funding gap calculation based on: MP3EI Database per 31 August 2012 (477 Projects) Funding gap formula: Investment value (allocated budget from APBN + SOE). Private sector funded projects are assumed 100% fully covered. ICT sector is not included in the calculation as the projects list still under progress of validation Energy funding gap requires further validation with PLN 10
Samples of top down initiatives to debottleneck MP3EI infrastructure development facilitated by KP3EI (Secretariat of MP3EI program)
Project/ Investor Bottleneck issues
Delay in land acquisition process due to delay in the issuance of Provincial Spatial Planning State Law (Perda RTRWP) Infrastructure availability in time of the investment (Kuala Tanjung seaport expansion, road, railway and Kuala Namu airport) by local government due to different interpretations of the power plant Requires acceleration for land acquisition and certification area Delay in issuance of IPPKH (Forest land area use permit) discussed for ~20 years with no significant progress, while financial loss due to traffic has reached IDR 12.8 T in 2012
PTPN III
Enhance coordination between line ministries/agencies, other government entities and stakeholders, which resulted in acceleration of RTRW finalization KP3EI ensures additional budget is provided and allocated to support infrastructure projects implementation in timely manner
unlocked in 3 months following KP3EI involvement KP3EI continues support of de-bottlenecking for land acquisition process to reach financial close by Oct 2013 resulted in clearance of dispute settlement KP3EI facilitated the provision of ~9.881 ha forest area to be used by PT Bukit Asam with the plan as per initial timeline The recent development is that Central Government accelerating their support and plans to increase Central Government funding portion 11 from the current 42% to >48% for MRT project
Location permit has not been issued The location permit that was stuck for 20 months was
Jakarta MRT
In addition to debottlenecking initiatives, KP3EI is currently leading the MP3EI priority project screening initiative by emphasizing on enablers for production centers development
Production centers with high investment readiness require commitment from government in the form of infrastructure accelleration.
SUMATERA Production center of natural resource and national energy source KALIMANTAN Production center of mining and national energy source
CPO industry in Sei Mangke PT Unilever Indonesia and PT Feroostat are investing USD $ 1 INTERNATIONAL HUB billions.
PORT WEST
CPO industry di East Kalimantan Existing 200 palm plantation companies and 42 CPO industries in East Kalimantan
Special Economic Zone Bitung and Palu Estimated investment interest of Rp 1.7 Trillion with potential GDP of Rp 13 Trillion
INTERNATIONAL HUB PORT EAST
Coal Industry in Southern Sumatera 39% national coal reserve is in southern Sumatera, with estimated 18,13 billion tons stock.
Coal industry in Central Kalimantan Potential production of USD $4.5 billion/year, existing production is USD $750 millions
Karawang Industrial Area More than 7 industrial areas exporting 65% out of Indonesias total export. Loreal has invested USD $ 1 billion, PT Toyota Astra Motor is in the middle of Rp 15 Trillions worth of plant construction.
JAWA Industrial and services
Energy Intensive Industry in Nabire Potential PLTA Membramo of 14,000 MW is suitable to be the center of energy intensive industry, such as smelter, etc Agricultural Industry in Papua (MIFEE) Potential investment of Rp 57 Tourism Industry in Lombok Trillions. Sugar industry is Number of tourists to Lombok increased 35% per year from almost ready for operation in 2010 to 2012. Mandalika potentially attract Rp 3 Trillions of Merauke. investment and Sengigi attracts many foreign investors
BALI-NUSA TENGGARA Tourism and livestock PAPUA KEP. MALUKU Natural resources
12
ICT Seaport
Project Title 6. Makassar New Port 7. Kuala Tanjung Seaport 8. Maloy Seaport 9. Lembar Bay Seaport 10. Sorong Seaport Investment Value (IDR Bio) N/A 7,700 4,800 390 N/A Target GB 2014 2014 2014 2014 2014 Project Title 14. Palapa Ring Energy Project Title 15. PLTU Pangkalan Susu 2 x 200 MW 16. PLTU Takalar 2 x 100 MW Investment Value (IDR Bio) 4,300 2,800 Target GB 2014 2014 Investment Value (IDR Bio) 2,800 Target GB 2014
13
1. Palu Parigi Hub 2. Balikpapan Samarinda Toll Road 3. Manado - Bitung Toll Road 4. Medan Binjai Toll Road 5. Palembang Indralaya Toll Road 6. Pekanbaru - Kandis Dumai Toll Road 7. Bakauheni - Terbanggi Besar Toll Road 8. Tebing Tinggi - Kisaran - Rantau Prapat Toll Road 9. Panimbang Serang Toll Road 10. Enarotali - Tiom Road 11. Access Road for Purwakarta Industrial Area 12. Lubuk Pakam Tebing Tinggi Toll Road
Water and Sanitation
Project Title
Target GB
2013 (SPAM Penet) 2016 (SPAM Ayung)
21. PLTU Indramayu 4 (1 x 1000 MW) 22. PLTU Asamasam 5-6 (2 x 100 MW)
14
Eddy Satriya
Head of International Cooperation Division, Secretariat of KP3EI
Jalan Medan Merdeka Barat No. 7, Jakarta Pusat - Indonesia Phone: +62 21 34832611; Fax: +62 21 34832609 email: satriyaeddy@gmail.com @EddySatriya
15
Eddy Satriya
1989 :Graduated from Bandung Institute of Technology (Telecommunication Engineering) 1997 :Graduated from University of Connecticut (MA in Economics)
2002-present : Actively writes various article and column in national papers and magazines.
62.21.3511464 f