Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
For Oracle Internal and licensed customer use only. This report is compiled from the Profile Options Database created and maintained by the VCP Support Team and contains knowledge gathered from the Documentation, Notes, Bugs, and other internal sources. We do not guarantee this data to be without flaw and offer no warranty to its fitness for use. We will update and maintain this document when possible to present the best available information. (c) Oracle Corporation 2010
Table of Contents
Advanced Planning and Scheduling Profile Options....................................................................18 BOM: Hour UOM...................................................................................................................19 CRP:Spread discrete requirements......................................................................................20 CSD: Default Repair Order...................................................................................................21 CSD: Default Repair Organization........................................................................................22 CSD: Default Repair Type..................................................................................................... 3 2 CSD: Default Service Request Severity for Internal Repair Order........................................24 CSD: Default Service Request Type for Internal Repair Order.............................................25 CSD: Repair Mode for Depot Repair Orders......................................................................... 6 2 CSD: Repair Type Internal Repair Order..............................................................................27 CSP: Repair Supplier Organization's Defective Subinventory..............................................28 CSP: Repair Supplier Organization's Usable Subinventory..................................................29 INV:Capable to Promise........................................................................................................ 0 3 MO: Operating Unit...............................................................................................................31 MRP: 2-Cuttoff Date Offset Months......................................................................................32 MRP: Calculate MATO Demand...........................................................................................33 MRP: Calculate Plan Performance.......................................................................................34 MRP: Calculate Supply Demand........................................................................................... 5 3 MRP: Category Set for Backlog Form...................................................................................36 MRP: Compute Standard Mandatory Components for ATO Models....................................37 MRP: Cutoff History Days.....................................................................................................39 MRP: Disable Project Validation...........................................................................................40 MRP: Explode Demand Through Phantom Component.......................................................42 MRP: Firm Internal Req Transferred to OE........................................................................... 3 4 MRP: Hash Area Size (Bytes)...............................................................................................44 MRP: Ignore Alternate BOM/Routing....................................................................................45 MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting 46 MRP: Net All Purchase Orders Prior To Requisitions...........................................................47 MRP: Old Sales Orders Cutoff Days.....................................................................................48 MRP: Persist ATP Results....................................................................................................49 MRP: Plan Revenue Discount Percent.................................................................................50 MRP: Plan Revenue Price List..............................................................................................51 MRP: Planning Manager Run First Time..............................................................................52 MRP: RHX Check Profile......................................................................................................53 MRP: Round Source Entries.................................................................................................54 MRP: Sort Area Size (Bytes)................................................................................................. 5 5 MRP: Update Requested Completion Date when Releasing Reschedules..........................56 MRP: Use Alternate SQL for Daily Cleanup.......................................................................... 7 5 MRP: Use Progress Bar for Backlog Workbench.................................................................. 8 5 MRP: i2 Batch Client Timeout...............................................................................................59 MRP: i2 Calc Cumulative Yield.............................................................................................60 MRP: i2 Check if FP installed................................................................................................ 1 6 MRP: i2 Data Load Timeout..................................................................................................62
MRP: i2 Date Constant.........................................................................................................63 MRP: i2 Debug Mode............................................................................................................64 MRP: i2 Factory Planner Exec Dir Attr Number....................................................................65 MRP: i2 Factory Planner User Attribute Number..................................................................66 MRP: i2 Job Change Attribute Number.................................................................................67 MRP: i2 Log Directory...........................................................................................................68 MRP: i2 Net Change Dir........................................................................................................ 9 6 MRP: i2 RHYTHM Aggregate Resource Attribute Number...................................................70 MRP: i2 RHYTHM BC Delimiter............................................................................................71 MRP: i2 RHYTHM BOM Attribute Consumed attribute number............................................72 MRP: i2 RHYTHM BOM Attribute Produced attribute number..............................................73 MRP: i2 RHYTHM Batch Client Filter.................................................................................... 4 7 MRP: i2 RHYTHM Cooldown Time Attribute Number...........................................................75 MRP: i2 RHYTHM Delimiter..................................................................................................76 MRP: i2 RHYTHM Enable Attribute Base Planning..............................................................77 MRP: i2 RHYTHM Estimated Queue Time Attribute Number...............................................78 MRP: i2 RHYTHM Factory Planner Data Dir Attribute Number............................................79 MRP: i2 RHYTHM Factory Planner Host Attribute Number..................................................80 MRP: i2 RHYTHM Factory Planner Port Attribute Number...................................................81 MRP: i2 RHYTHM Inventory Attribute Alias Separator.........................................................82 MRP: i2 RHYTHM Minimum Queue Time Attribute Number................................................83 MRP: i2 RHYTHM OE Attribute Consumed attribute number...............................................84 MRP: i2 RHYTHM Offloadable To Attribute Number............................................................85 MRP: i2 RHYTHM Offloadable from Attribute Number.........................................................86 MRP: i2 RHYTHM PO Attribute Alias attribute number........................................................87 MRP: i2 RHYTHM Part Buffer Style Attribute Number.......................................................... 8 8 MRP: i2 RHYTHM Resource Type Attribute Number...........................................................89 MRP: i2 RHYTHM released as firm manufacturing order.....................................................90 MRP: i2 RhythmLink Data Directory.....................................................................................91 MRP: i2 RhythmLink Executable Directory...........................................................................92 MRP: i2 RhythmLink Host.....................................................................................................93 MRP: i2 RhythmLink Port Number........................................................................................94 MRP: i2 RhythmLink User.....................................................................................................95 MRP: i2 Start Factory Planner Client....................................................................................96 MRP: i2 Start RhythmLink Client........................................................................................... 7 9 MRP: i2 WIP Job Load Timeout............................................................................................98 MRP:ATP Assignment Set....................................................................................................99 MRP:ATP Database Link....................................................................................................100 MRP:Activate OLP..............................................................................................................101 MRP:Allow Safety Stock Pegging.......................................................................................102 MRP:Backlog Progress Timeout.........................................................................................103 MRP:Calculate Excess Exceptions on Time Fence............................................................104 MRP:Combine Sugg Rep Schedules..................................................................................105 MRP:Complete Supply Chain ATP.....................................................................................106 MRP:Compute Sales Order Changes.................................................................................107 MRP:Consume Fcst Set Summary.....................................................................................108 MRP:Consume Forecast.....................................................................................................109 MRP:Consume MDS...........................................................................................................110 MRP:Consume MPS...........................................................................................................111 MRP:Create Time fence...................................................................................................... 12 1
MRP:Cutoff Date Offset Months.......................................................................................... 13 1 MRP:Debug Mode............................................................................................................... 14 1 MRP:Default Criteria Set.....................................................................................................115 MRP:Default DRP Plan Name............................................................................................116 MRP:Default Forecast Date................................................................................................117 MRP:Default Forecast Name..............................................................................................118 MRP:Default Plan Name.....................................................................................................119 MRP:Default Schedule Name.............................................................................................120 MRP:Default Sourcing Assignment Set..............................................................................121 MRP:Demand Time Fence Days........................................................................................122 MRP:Derive PO supply date from need by date.................................................................123 MRP:Enhanced Exception..................................................................................................124 MRP:Environment variable to set path for MRP files..........................................................125 MRP:Firm Planned Order Time Fence................................................................................ 26 1 MRP:Include Schd Rcpts in Use-up....................................................................................127 MRP:Include Substitute Components.................................................................................128 MRP:Interface Table History Days......................................................................................129 MRP:MPS Relief Batch Size...............................................................................................130 MRP:MPS Relief Direction..................................................................................................131 MRP:Maintain Original Schedule Version...........................................................................132 MRP:Perform Planning Manager Functions in Loads.........................................................133 MRP:Planner Batch Size..................................................................................................... 34 1 MRP:Planner Workers........................................................................................................135 MRP:Planning Manager Batch Size....................................................................................136 MRP:Planning Manager Max Workers................................................................................137 MRP:Purchasing By Revision.............................................................................................138 MRP:Purge Batch Size.......................................................................................................139 MRP:Recommend action within PTF..................................................................................140 MRP:Repetitive Past Due Supply Days..............................................................................141 MRP:Requisition Load Group Option..................................................................................142 MRP:Retain Dates Within Calendar Boundary...................................................................144 MRP:Snapshot Pause for Lock (Minutes)...........................................................................145 MRP:Snapshot Substitute Parts.......................................................................................... 46 1 MRP:Snapshot Workers...................................................................................................... 47 1 MRP:Sourcing Rule Category Set....................................................................................... 48 1 MRP:Time Fence Warning..................................................................................................149 MRP:Trace Mode................................................................................................................150 MRP:Use Direct Load Option..............................................................................................151 MRP:Use Ship Arrived Flag................................................................................................152 MRP_NEW_PLANNER_BACK_COMPATIBILITY.............................................................. 53 1 MSC : Consider all supplies for VMI replenishment calculation..........................................155 MSC : Consume Highest Revision Forecast.......................................................................156 MSC : Publish Supply Commit based on pegging information............................................ 57 1 MSC : VMI Requisitions Need By Date at RTF end............................................................158 MSC: 64-bit Planner Platform.............................................................................................159 MSC: APCC - Enable Cumulative Measures in Archive.....................................................160 MSC: APCC Archive SCRM Measures...............................................................................162 MSC: APCC Calendar Code...............................................................................................164 MSC: APCC Category Set 1...............................................................................................165 MSC: APCC Category Set 2...............................................................................................166
MSC: APCC Category Set 3...............................................................................................167 MSC: APCC Category set for detailed pegging analysis....................................................168 MSC: APCC Currency Code...............................................................................................169 MSC: APCC Instance.......................................................................................................... 70 1 MSC: APCC Period Set name............................................................................................171 MSC: APCC SNO Item Simulation Set...............................................................................172 MSC: APCC WebLogic Console Password........................................................................174 MSC: APCC WebLogic Console Username.......................................................................175 MSC: APCC WebLogic Password......................................................................................176 MSC: APCC WebLogic Username...................................................................................... 77 1 MSC: APCC Webcenter Admin URL..................................................................................178 MSC: APCC Webcenter Enabled........................................................................................ 79 1 MSC: APCC Webcenter Group Space Template................................................................ 80 1 MSC: APCC Webcenter Spaces Member Role..................................................................181 MSC: APCC Webcenter Spaces Port.................................................................................182 MSC: APCC Webcenter Spaces Recipient Key Alias.........................................................183 MSC: APCC Webcenter Spaces Saml Issuer Name..........................................................184 MSC: APCC Webcenter URL.............................................................................................. 85 1 MSC: APCC to APS database link name............................................................................186 MSC: ATP Allocation Method.............................................................................................. 87 1 MSC: ATP Capacity Allocation............................................................................................ 88 1 MSC: ATP Debug Mode...................................................................................................... 89 1 MSC: ATP Enforces Lead Time for ATO Model.................................................................. 90 1 MSC: ATP Infinite Time Fence Pad....................................................................................191 MSC: ATP Synchronization Downtime (minutes)................................................................ 92 1 MSC: ATP Web Service Responsibility............................................................................... 93 1 MSC: ATP Web Service User.............................................................................................194 MSC: AVOID RE-SOURCING SALES ORDERS...............................................................195 MSC: Action Allowed on ATP 24x7 Plan While Running....................................................196 MSC: Aggregate Resource Name Flexfield Attribute..........................................................197 MSC: Align Component Demand Date with Pegging Date.................................................198 MSC: Allocated ATP Forward Consumption Method..........................................................199 MSC: Allocation Assignment Category Set.........................................................................200 MSC: Allow Release of Planned Orders from Demand Schedule Plan..............................201 MSC: Allow release of replenishments above suggested quantity.....................................202 MSC: Analytics Currency Code........................................................................................... 03 2 MSC: Anchor date for calculating operation yields.............................................................204 MSC: Anchor date for calculating remaining shelf life......................................................... 05 2 MSC: Apply Lot Modifiers in Weekly/Period Buckets..........................................................206 MSC: Apply Order Modifier To Start Quantity.....................................................................207 MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock..................208 MSC: Apply shortage and excess tolerance to planned orders..........................................209 MSC: Auto-Release Compression Days Tolerance............................................................210 MSC: Automatically Recalculate Operation Time...............................................................212 MSC: Avoid Re-Sourcing Sales Orders..............................................................................213 MSC: BPEL Demantra Password.......................................................................................214 MSC: BPEL Demantra Username....................................................................................... 15 2 MSC: BPEL Domain Name.................................................................................................216 MSC: BPEL End Point URI.................................................................................................217 MSC: BPEL Process Version..............................................................................................218
MSC: Batch Size for Self Service Loads.............................................................................219 MSC: Batchable Flag..........................................................................................................220 MSC: Batching Window......................................................................................................221 MSC: Buy Order Processing Lead Time Calendar.............................................................222 MSC: CP Debug Level........................................................................................................223 MSC: Calendar Reference for Bucketing............................................................................224 MSC: Cancel Oustanding Sales Order Quantities..............................................................225 MSC: Category Set for Jobs without an Item Reference....................................................226 MSC: Category Set for Liability Analysis............................................................................. 27 2 MSC: Category for Jobs without an Item Reference...........................................................228 MSC: Category set for CP Horizontal View......................................................................... 29 2 MSC: Category set for Strategic Planning..........................................................................230 MSC: Category set for serviceable items............................................................................231 MSC: Choice of item for which to create supplies in substitute relationship.......................232 MSC: Circular sourcing surplus days..................................................................................233 MSC: Class Hierarchy.........................................................................................................234 MSC: Closest Quantity Pegging.......................................................................................... 35 2 MSC: Collaborative Planning Default Calendar..................................................................236 MSC: Collect CMRO Work Order Demand for PS..............................................................237 MSC: Collect Item, Material and Resource Costs...............................................................238 MSC: Collect PS SNO Data................................................................................................239 MSC: Collection Time Window for Install Base under Contracts history............................. 40 2 MSC: Collection Window for Trading Partner Changes (Days)..........................................241 MSC: Collections Snapshot Threshold...............................................................................242 MSC: Compute Project Exception....................................................................................... 43 2 MSC: Configuration.............................................................................................................244 MSC: Consolidate Interplant Demands...............................................................................245 MSC: Consume Forecast Inside Demand Time Fence....................................................... 46 2 MSC: Consume forecast with no demand class.................................................................247 MSC: Consume forecasts using Internal Sales Orders....................................................... 48 2 MSC: Cost Type..................................................................................................................250 MSC: Cost of Using a BOM/ Routing Flexfield Attribute.....................................................251 MSC: Create Resource Requirements for all Operations...................................................252 MSC: Currency Conversion Type.......................................................................................253 MSC: Custom allocation...................................................................................................... 54 2 MSC: DPP Allow Quantity Reduction Only When Supply is Excess on Internal Requisition, Requisition and PO.............................................................................................................255 MSC: DPP Debug Level...................................................................................................... 56 2 MSC: DPP Demand Priority Details viewing buckets.......................................................... 57 2 MSC: DPP Discrete Job Cutoff Window (Days)..................................................................258 MSC: DPP Related Exception Additional Offset Days........................................................259 MSC: DRP Multitasking Group ID's per Process................................................................260 MSC: DRP Multitasking Max Concurrent Processes..........................................................261 MSC: Daily Allocation to Maintain Safety Stock Level........................................................262 MSC: Day UOM..................................................................................................................263 MSC: Days of Resource Availability before sysdate...........................................................264 MSC: Debug Level..............................................................................................................265 MSC: Debug Module...........................................................................................................266 MSC: Default Category Set for Rapid Planning..................................................................267 MSC: Default Project for Supplies Pegged to Excess......................................................... 68 2
MSC: Default Workbench Height........................................................................................269 MSC: Default Workbench Width.........................................................................................270 MSC: Degree of Parallelism for Index Creation..................................................................271 MSC: Demand Priority Flexfield Attribute............................................................................ 72 2 MSC: Demand Satisfied Percent Threshold for Pegging....................................................273 MSC: Display Order Rescheduling Supplies....................................................................... 74 2 MSC: Display Supplier Item in Collaborative Planning.......................................................275 MSC: Display Warning Message When Rescheduling Recommendation Not Suggested by the Plan...............................................................................................................................276 MSC: Distribution Planning Ship Date................................................................................277 MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies.................278 MSC: E1 APS FC URL........................................................................................................ 80 2 MSC: E1 APS ODI URL......................................................................................................281 MSC: E1 Concatenation Character.....................................................................................282 MSC: E1APS_BATCH_SIZE..............................................................................................283 MSC: E1APS_DEM_END_DATE_IN_MONTHS................................................................284 MSC: E1APS_DEM_START_DATE_IN_MONTHS............................................................285 MSC: E1APS_DEM_WF_TIME_OUT.................................................................................286 MSC: E1APS_NO_OF_WORKERS.................................................................................... 87 2 MSC: E1APS_TIME_OUT..................................................................................................288 MSC: E1APS_WS_TIME_OUT........................................................................................... 89 2 MSC: E1_DBLINK...............................................................................................................290 MSC: EBS source instance for OTM................................................................................... 91 2 MSC: ENFORCE CRITERIA REQUIREMENT BEFORE EXECUTING QUERY................ 92 2 MSC: Enable 64 bit snapshot.............................................................................................. 93 2 MSC: Enable ATP Summary Mode..................................................................................... 94 2 MSC: Enable ATP Workflow...............................................................................................295 MSC: Enable ATP for Phantom Components.....................................................................296 MSC: Enable Advanced Constraints...................................................................................297 MSC: Enable Allocated ATP...............................................................................................298 MSC: Enable DRP Multitasking..........................................................................................299 MSC: Enable Diagnostic ATP.............................................................................................300 MSC: Enable Enhanced Sourcing....................................................................................... 01 3 MSC: Enable Group Based Netting....................................................................................302 MSC: Enable Java Debug...................................................................................................303 MSC: Enable Model and End Item dimensions in APCC....................................................304 MSC: Enable Priority Pegging............................................................................................. 05 3 MSC: Enable Release of Defective Planned Transfers......................................................306 MSC: Enforce Hard Links.................................................................................................... 07 3 MSC: Enhanced Project Netting.........................................................................................308 MSC: Excess and Safety Stock by Demand Class.............................................................309 MSC: Fast Refresh of Region Site Map..............................................................................310 MSC: File Flush Limit..........................................................................................................311 MSC: Firm Internal Requisition Time Fence.......................................................................312 MSC: Firm Intransit and PO in Receiving Supplies............................................................. 13 3 MSC: Fixed Date for Install Base under Contracts History (DD-MON-YYYY)....................314 MSC: Flush All Items for Simulation.................................................................................... 15 3 MSC: Forecast Priority Flexfield Attribute...........................................................................316 MSC: Forecast Spreading Calendar...................................................................................317 MSC: Forecast Spreading Calendar...................................................................................318
MSC: Future Days for Currency Conversion....................................................................... 20 3 MSC: Gateway URL to External Application.......................................................................321 MSC: Generate Exceptions in CP.......................................................................................322 MSC: Generate Notifications for Transportation Updates...................................................323 MSC: HP Maximum Displayed Item Count.........................................................................324 MSC: High Volume Items....................................................................................................325 MSC: History Days for Currency Conversion......................................................................326 MSC: Horizon for APCC Collected data - Backward days..................................................327 MSC: Horizon for APCC Collected data - Forward days..................................................... 28 3 MSC: Horizontal Plan Demand Bucketing Preference........................................................329 MSC: Horizontal Plan Extension Program..........................................................................330 MSC: Hour UOM.................................................................................................................331 MSC: Hybrid Allocated ATP................................................................................................332 MSC: INTER PLANT DEM PRIORITY................................................................................333 MSC: IO UI Performance tuning.........................................................................................334 MSC: IO UI Period Set Name.............................................................................................335 MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP....................336 MSC: Ignore CMRO and EAM Workorders in ASCP..........................................................337 MSC: Ignore PTF during CTP.............................................................................................338 MSC: Ignore Routings Without Any Date Effective Operations..........................................339 MSC: Ignore Safety Stock Inside Lead Time......................................................................340 MSC: Include Firm Planned Orders In Firm Allocation Window.......................................... 41 3 MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations..........342 MSC: Include Safety Stocks in Priority Based Pegging......................................................343 MSC: Inflate WIP Resource Requirements.........................................................................344 MSC: Inventory Rebalancing Surplus Inventory Basis........................................................ 46 3 MSC: JInitiator Version.......................................................................................................347 MSC: Launch Analyze Plan Partition..................................................................................348 MSC: Launch System Sql Loader.......................................................................................349 MSC: Launch Workflow-Enabled Exception Message Notifications...................................350 MSC: Level for Calculating Liability..................................................................................... 51 3 MSC: Limit Gantt Chart Orders View Hierarchy..................................................................352 MSC: MPS Auto-Firm Planned Orders...............................................................................353 MSC: Map Server Host.......................................................................................................354 MSC: Map Server Port........................................................................................................355 MSC: Max display decimals for Currency...........................................................................356 MSC: Max display decimals for Quantity............................................................................357 MSC: Max display decimals for Quantity (aggregates).......................................................358 MSC: Max display decimals for Ratios/Percentages..........................................................359 MSC: Max display decimals for Time..................................................................................360 MSC: Max display decimals for Time (aggregates)............................................................361 MSC: Maximum Capacity.................................................................................................... 62 3 MSC: Maximum Percentage variation in safety stock values.............................................363 MSC: Maximum number of planned orders per demand....................................................364 MSC: Maximum number of planned orders per demand(1)................................................365 MSC: Minimize Project Cross Peg within Window..............................................................366 MSC: Minimize changes to chronological sequence of supplies while rescheduling..........367 MSC: Minimum Capacity..................................................................................................... 68 3 MSC: Minimum Percentage variation in safety stock values..............................................369 MSC: Minimum Supply/Demand Percent for Pegging........................................................370
MSC: Move Past Due To Sysdate......................................................................................371 MSC: Net Change Temp Dir...............................................................................................372 MSC: New Forecast Auto Plan...........................................................................................373 MSC: New Planner Backward Compatibility.......................................................................374 MSC: New Supply Commit Auto Plan.................................................................................376 MSC: Number of Workers for Self Service Loads...............................................................377 MSC: OTHER with zero allocation percent is valid demand class......................................378 MSC: OTM Punchout URI...................................................................................................379 MSC: OTM Responsibility...................................................................................................380 MSC: OTM User.................................................................................................................. 81 3 MSC: Operator Company Name.........................................................................................382 MSC: Oracle Rapid Planning URL......................................................................................383 MSC: Order Number-CA Mandatory for CVMI....................................................................384 MSC: Order Type for Consigned VMI.................................................................................385 MSC: Organization containing generic BOM for forecast explosion...................................386 MSC: Overwrite all Order Forecast records........................................................................387 MSC: Overwrite all supplier capacity records.....................................................................388 MSC: PS - Snapshot Base Package...................................................................................389 MSC: PS - Snapshot Beginning Inventory Package...........................................................390 MSC: PS - Snapshot Calendar Package............................................................................391 MSC: PS - Snapshot Customer Package...........................................................................392 MSC: PS - Snapshot Distribution Package.........................................................................393 MSC: PS - Snapshot Enterprise Forecast Package............................................................ 94 3 MSC: PS - Snapshot Inventory Safety Targets Package....................................................395 MSC: PS - Snapshot Manufacturing Package....................................................................396 MSC: PS - Snapshot Purchase Orders Package................................................................397 MSC: PS - Snapshot Reservation Package........................................................................398 MSC: PS - Snapshot Sales Orders Package......................................................................399 MSC: PS - Snapshot Supplier Package..............................................................................400 MSC: PS - Snapshot Transfer Orders Package.................................................................. 01 4 MSC: PS - Snapshot Work Orders Package....................................................................... 02 4 MSC: PS - Visit Display Format in PS UI............................................................................403 MSC: PS Adjust Post Horizon Demand Qty........................................................................ 04 4 MSC: PS Consistent Resource Assignment.......................................................................405 MSC: PS Currency Symbol.................................................................................................406 MSC: PS Enable CRO Scheduling.....................................................................................407 MSC: PS Enable RMO Scheduling.....................................................................................408 MSC: PS Filter Active Items................................................................................................409 MSC: PS Firm Past Due WO..............................................................................................410 MSC: PS Resource Constraint Horizon..............................................................................411 MSC: PS Run Application Script.........................................................................................412 MSC: PS Run Connector Script..........................................................................................413 MSC: PS/SNO API Version................................................................................................. 14 4 MSC: PS/SNO Alignment Date...........................................................................................415 MSC: PS/SNO App Server URL.........................................................................................416 MSC: PS/SNO Client Install Path........................................................................................ 17 4 MSC: PS/SNO Compress Xml Files...................................................................................418 MSC: PS/SNO Data Store Path..........................................................................................419 MSC: PS/SNO Debug Mode...............................................................................................420 MSC: PS/SNO Download XML Files................................................................................... 21 4
MSC: PS/SNO Include Negative Inventory Demands......................................................... 22 4 MSC: PS/SNO Past Due Supplies Window........................................................................424 MSC: PS/SNO Use DB for Integration Data.......................................................................425 MSC: Pass List Price to OM in DRP Release.....................................................................426 MSC: Peg Firm Supply First................................................................................................ 27 4 MSC: Peg Firm Work Orders Within Assigned Projects and Tasks....................................428 MSC: Peg to maximize supply usage.................................................................................429 MSC: Perform ATP check for Internal Sales Orders...........................................................430 MSC: Plan co-products.......................................................................................................431 MSC: Plan for order at risk calculation................................................................................432 MSC: Planning Currency..................................................................................................... 33 4 MSC: Pre-Flush................................................................................................................... 34 4 MSC: Prefer Consumption within Forecast Bucket.............................................................435 MSC: Priority for Substitute Items Flexfield Attribute..........................................................436 MSC: Priority of Alternate Resources for an Operation Flexfield Attribute.......................... 37 4 MSC: Production Plan for Transportation updates.............................................................. 38 4 MSC: Project Task Collection Window Days......................................................................439 MSC: Provide Warning For Dates Entered on Non-work Days........................................... 40 4 MSC: Provide Warning when Sales Order Quantity is Changed........................................441 MSC: Purchase Order Dock Date Calculation Preference.................................................. 42 4 MSC: Purge Exception Days............................................................................................... 43 4 MSC: Purge Staging and Entity Key Translation Tables..................................................... 44 4 MSC: Rapid Planning Group Planned Orders..................................................................... 45 4 MSC: Rapid Planning Safety Stock Lead Time Method...................................................... 46 4 MSC: Rapid Planning Scripts Home...................................................................................447 MSC: Rapid Planning UI Refresh Timeout.......................................................................... 48 4 MSC: Rapid Planning WebLogic Server Home................................................................... 49 4 MSC: Read Profiles From DB.............................................................................................450 MSC: Recalculate Demand Priorities after Spreading........................................................451 MSC: Refresh Site to Region Mappings Event...................................................................452 MSC: Refresh Snapshots Pending Timeout.......................................................................453 MSC: Region Instance........................................................................................................454 MSC: Release WIP Dtls if Order Date different then BOM Revision Date..........................455 MSC: Released Only By User.............................................................................................457 MSC: Resource Group for a Line Flexfield Attribute...........................................................458 MSC: Resource Type for an Operation Flexfield Attribute..................................................459 MSC: Respect Minimum Remaining Shelf Life Days..........................................................460 MSC: Retain Time for Non-ATPable Items.........................................................................461 MSC: Return Best Source in Global ATP............................................................................ 62 4 MSC: SCEM Engine Launch Events...................................................................................463 MSC: SNO - Snapshot Base Package................................................................................464 MSC: SNO - Snapshot Beginning Inventory Package........................................................465 MSC: SNO - Snapshot Calendar Package.........................................................................466 MSC: SNO - Snapshot Customer Package........................................................................467 MSC: SNO - Snapshot Demand Package..........................................................................468 MSC: SNO - Snapshot Distribution Package......................................................................469 MSC: SNO - Snapshot Enterprise Forecast Package......................................................... 70 4 MSC: SNO - Snapshot Fixed Production Package.............................................................471 MSC: SNO - Snapshot Inventory Safety Targets Package.................................................472 MSC: SNO - Snapshot Manufacturing Package.................................................................473
MSC: SNO - Snapshot Manufacturing Package(1).............................................................474 MSC: SNO - Snapshot Purchase Orders Package.............................................................475 MSC: SNO - Snapshot Sales Orders Package...................................................................476 MSC: SNO - Snapshot Supplier Package...........................................................................477 MSC: SNO - Snapshot Transfer Orders Package............................................................... 78 4 MSC: SNO - Snapshot Work Orders Package.................................................................... 79 4 MSC: SNO Connector Precision.........................................................................................480 MSC: SNO Currency Precision...........................................................................................481 MSC: SNO Decimal Precision............................................................................................. 82 4 MSC: SNO Optimization Type............................................................................................483 MSC: SNO Publish On Client.............................................................................................. 84 4 MSC: SNO Run Application Script......................................................................................485 MSC: SNO Run Connector Script.......................................................................................486 MSC: SNO Transportation Capacity By..............................................................................487 MSC: Safety Stock Project..................................................................................................488 MSC: Safety stock change interval (Days).......................................................................... 89 4 MSC: Sales Orders Offset Days.........................................................................................490 MSC: Scope of Analyze Plan Partition................................................................................491 MSC: Search Criteria Warning............................................................................................492 MSC: Selection order for Firm Supplies in backward allocation window............................493 MSC: Self Service Loads Delimiter.....................................................................................494 MSC: Service Level Category Set....................................................................................... 95 4 MSC: Service Planning Enabled.........................................................................................496 MSC: Service Planning Item Safety Stock Level Value......................................................497 MSC: Share Plan Partitions................................................................................................498 MSC: Shelf Life Override of Order Modifiers for Transfer Orders.......................................499 MSC: Simultaneous Resource Sequence Flexfield Attribute..............................................500 MSC: Smoothing method to calculate Safety stock within Change interval........................501 MSC: Source Instance ID.................................................................................................... 02 5 MSC: Source Setup Required.............................................................................................503 MSC: Sourcing History Start Date Offset(in months)..........................................................504 MSC: Sourcing Rule Category Set...................................................................................... 05 5 MSC: Sourcing Variance Tolerance....................................................................................506 MSC: Split Planned Order to perform safety stock pegging................................................ 07 5 MSC: Split Planned Orders for Scheduling Flexibility.........................................................508 MSC: Supplier Capacity Accumulation(multiplier)............................................................... 10 5 MSC: Supplier Capacity Consumption by Purchase Orders...............................................511 MSC: Suppress Exception for Selection of Alternates........................................................512 MSC: Temp Index Extent Size(Bytes)................................................................................. 13 5 MSC: Temp Table Extent Size(Bytes)................................................................................514 MSC: Unit of Measure.........................................................................................................515 MSC: Update Requested Completion Date when Releasing Reschedules........................516 MSC: Update Use Up Date.................................................................................................517 MSC: Use Enhanced Forward ATP....................................................................................518 MSC: Use FIFO Pegging....................................................................................................519 MSC: Use Optimization Phase Supply Due Dates for Pegging..........................................520 MSC: Use Shipping/Receiving Calendar............................................................................521 MSC: Use attribute based netting.......................................................................................522 MSC: VMI Default Query..................................................................................................... 23 5 MSC: Value of N for all top/bottom-N reports in Dashboards.............................................524
MSC: Vertical view default query........................................................................................525 MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)..526 MSC: Write MBP Flat Files.................................................................................................527 MSC:ATP Assignment Set..................................................................................................528 MSC:Coll Error Debug Mode..............................................................................................529 MSC:Coll Performance Debug Mode..................................................................................531 MSC:Collect Completed Jobs.............................................................................................532 MSC:Collect Routing...........................................................................................................533 MSC:Compute IB Aggregation during Collection................................................................534 MSC:Criticality Category Set............................................................................................... 36 5 MSC:Prevent Loops when pegging Non-Standard Jobs..................................................... 37 5 MSC:Release only orders pegging fully to on hand............................................................538 MSC:Retain Released Data................................................................................................540 MSC:SRP PHASE2 ENABLED...........................................................................................541 MSC:Select Sourcing Rules In ATP Based On...................................................................542 MSC_USE_HASH_KEY...................................................................................................... 43 5 MSD: AW Tablespace.........................................................................................................544 MSD: Calculate Planning Percentages...............................................................................545 MSD: Category Set Name................................................................................................... 46 5 MSD: Client Debugging....................................................................................................... 47 5 MSD: Conversion Type.......................................................................................................548 MSD: Currency Code..........................................................................................................549 MSD: Customer Attribute....................................................................................................550 MSD: Default DP Scenario.................................................................................................. 51 5 MSD: Enabled Organization for Item Collections................................................................552 MSD: Excess and Obsolescence, Liability Category Set Name.........................................553 MSD: MAXVALUECOUNT for edges in XWDEVKIT..........................................................554 MSD: Master Org................................................................................................................555 MSD: OLAP Directory Alias................................................................................................556 MSD: OLAP Initial Page Pool.............................................................................................. 57 5 MSD: OLAP Maximum Page Pool......................................................................................558 MSD: OLAP Workflow Page Pool.......................................................................................559 MSD: One Step Collection..................................................................................................560 MSD: Two-Level Planning................................................................................................... 61 5 MSD: Use Classic Even Allocation.....................................................................................562 MSD: Use Classic Worksheet.............................................................................................563 MSD:View Scope measures are editable............................................................................ 64 5 MSD_DEM: Calculate Planning Percentage.......................................................................565 MSD_DEM: Category Set Name......................................................................................... 66 5 MSD_DEM: Conversion Type.............................................................................................567 MSD_DEM: Currency Code................................................................................................568 MSD_DEM: Customer Attribute..........................................................................................569 MSD_DEM: Data Profile for Price Lists............................................................................... 70 5 MSD_DEM: Debug Mode.................................................................................................... 71 5 MSD_DEM: Enable Supply Plan Download for work orders...............................................572 MSD_DEM: Explode Demand Method................................................................................ 73 5 MSD_DEM: Fiscal Calendar...............................................................................................574 MSD_DEM: Host URL......................................................................................................... 75 5 MSD_DEM: Include Dependent Demand...........................................................................576 MSD_DEM: Include organization in CMR Data Load.........................................................577
MSD_DEM: Master Org......................................................................................................578 MSD_DEM: Maximum seeded units available for price lists...............................................579 MSD_DEM: Schema...........................................................................................................580 MSD_DEM: Simulation Set Name......................................................................................581 MSD_DEM: Source Instance for Global Forecast............................................................... 82 5 MSD_DEM: Truncate Staging Table...................................................................................583 MSD_DEM: Two-Level Planning......................................................................................... 84 5 MSD_DEM: UOM for fleet flight hours................................................................................585 MSD_DEM: Use new Site code format...............................................................................586 MSD_DEM: Version............................................................................................................587 MSD_SPF: History basis for Failure Rate computation......................................................588 MSD_SPF: Organization containing generic BOM for Service Parts Forecasting..............589 MSO: Activity Selection Window (in Days).......................................................................... 90 5 MSO: Additional Demand Slices for Shared Supply Rescheduling....................................591 MSO: Allow Partial Demand Completion............................................................................592 MSO: Allow Schedule Gaps for Shared Supplies...............................................................593 MSO: Allow Simultaneous Resource To End At Different Time.......................................... 95 5 MSO: Allow Simultaneous Resources to End at Different Times........................................ 96 5 MSO: Alternate Process Penalty......................................................................................... 97 5 MSO: Alternate Resource Penalty......................................................................................598 MSO: Alternate Resource Selection Method......................................................................599 MSO: Alternate Source Penalty..........................................................................................600 MSO: Apply Windows for Firm Scheduling.........................................................................601 MSO: Avoid non working days for Buy/Transfer order dates..............................................602 MSO: Barrier Optimizer Algorithm Choice..........................................................................603 MSO: Batching Precision....................................................................................................604 MSO: Big M Value for SCO................................................................................................. 05 6 MSO: CPLEX Crash Parameter..........................................................................................606 MSO: CPLEX Refactor Rate...............................................................................................607 MSO: CPLEX Scaling Factor..............................................................................................608 MSO: CPLEX messages to screen indicator......................................................................609 MSO: Calculate Constraint Exceptions...............................................................................610 MSO: Capacity Units Recalculation Threshold...................................................................611 MSO: Check Redundant Constraints..................................................................................612 MSO: Choice of supply for substitution...............................................................................613 MSO: Component offset logic for optimization....................................................................614 MSO: Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During Component Substitution......................................................................................................615 MSO: Continuous transfer across organizations................................................................. 17 6 MSO: Convergent Supplies Consumption Pattern..............................................................618 MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders ............................................................................................................................................619 MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders................ 20 6 MSO: Cost Roll-up incremental factor................................................................................. 22 6 MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence....623 MSO: DS Scheduling Window............................................................................................625 MSO: Default Forecast Priority...........................................................................................626 MSO: Default Idle Time Tolerance (Hours).........................................................................627 MSO: Default Resource Sequencing Window (in Days).....................................................628 MSO: Default Sales Order Priority......................................................................................629
MSO: Default Timestamp Safety Stocks.............................................................................630 MSO: Default Timestamp for Forecasts..............................................................................631 MSO: Default Timestamp for Sales Orders......................................................................... 32 6 MSO: Default Value for Maximum Acceptable Days Early.................................................633 MSO: Delay Fulfillment of Small Demands.........................................................................634 MSO: Demand Size Tolerance Before Splitting Planned Orders........................................635 MSO: Demand Type Priority...............................................................................................636 MSO: Demand Window Size............................................................................................... 37 6 MSO: Disable Inference of Item Substitution Relationship.................................................638 MSO: Divergent Supply Feeding Pattern............................................................................639 MSO: Divergent Supply Feeding Pattern for Inter-Org and Supplier Sourced orders......... 40 6 MSO: Divergent Supply Feeding Pattern for Intra-Org Sourced orders..............................641 MSO: Dual Simplex Parameter...........................................................................................642 MSO: EDD Demand Cutoff Priority.....................................................................................643 MSO: EDD Scheduling Window Control.............................................................................644 MSO: Enable Advanced Sequencing..................................................................................645 MSO: Enable Cost Rollup for Optimization.........................................................................646 MSO: Enable Decision Rules..............................................................................................647 MSO: Enable Hard Links Globally....................................................................................... 48 6 MSO: Enable Rounding of Fractional Supplies For Service Planning................................649 MSO: Enable sourcing split for end item substitution.......................................................... 50 6 MSO: Enforce Minimum Transfer Quantities......................................................................651 MSO: Enforce Resource Sequence Contiguity...................................................................652 MSO: Firm Purchase Orders Within Time Fence................................................................ 53 6 MSO: Firm Requisitions Within Time Fence.......................................................................654 MSO: Firm Supply Allocation Window (Backward days)..................................................... 55 6 MSO: Firm Supply Allocation Window (Forward days).......................................................656 MSO: Firm Work Orders/Operations Within Time Fence....................................................657 MSO: Floating Point Precision............................................................................................658 MSO: Floating Point Precision for Increments of Shift Start/End Times Within a Planning Bucket.................................................................................................................................659 MSO: Floating Point Precision for Order Q.........................................................................660 MSO: Floating Point Precision for Planning Bucket Efficiency............................................ 61 6 MSO: Floating Point Precision for Transportation Capacities (Volume).............................662 MSO: Floating Point Precision for Transportation Capacities (Weight)..............................663 MSO: Floating Point Precision for Usage in Routings......................................................... 64 6 MSO: Generate Compression Days Exception...................................................................665 MSO: Generate Compression/Firming Exceptions for Orders in Progress.........................666 MSO: Generate Reduced Model.........................................................................................667 MSO: Generate Shared Supply Exceptions........................................................................668 MSO: Global Batchable Flag............................................................................................... 69 6 MSO: Global Chargeable Flag............................................................................................670 MSO: Global Time Limit......................................................................................................671 MSO: HLS flat files path......................................................................................................672 MSO: Hard link scheduling window..................................................................................... 73 6 MSO: Hard link scheduling window expansion factor.........................................................674 MSO: Heuristic type............................................................................................................675 MSO: Incremental Planned Orders.....................................................................................676 MSO: Internal Demand Aggregation Within Optimization...................................................677 MSO: Inventory Carrying Costs Percentage.......................................................................678
MSO: JIT Selector Window Size.........................................................................................679 MSO: LP Constraint Batch Size..........................................................................................680 MSO: LP Markowitz Coefficient..........................................................................................681 MSO: LP Optimization Algorithm........................................................................................682 MSO: Late Demands Exceptions Tolerance Minutes.........................................................683 MSO: Lead Time Control....................................................................................................684 MSO: List Size for Pricing Candidates................................................................................686 MSO: Lookahead days to net co-product/by-product supplies before creating planned orders..................................................................................................................................687 MSO: Max Gap Tolerence on SDS.....................................................................................688 MSO: Maximium Number of Prepones...............................................................................689 MSO: Maximize Search of Availability Intervals..................................................................690 MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in Optimization...................................691 MSO: Maximum Activity Duration.......................................................................................692 MSO: Maximum Allowable Days Late.................................................................................693 MSO: Maximum Allowable Days Late before Forecast Expiration...................................... 94 6 MSO: Maximum Alternate Combinations............................................................................695 MSO: Maximum Demands Per Group for Advanced Sequencing......................................696 MSO: Maximum Demands per Group.................................................................................697 MSO: Maximum Demands per Slice...................................................................................698 MSO: Maximum Inventory Level % of Safety Stock............................................................ 99 6 MSO: Maximum Lead Time Factor.....................................................................................700 MSO: Maximum Number of Demands in a Hard Linked Demand Set................................701 MSO: Maximum Number of Pull for Operation.................................................................... 02 7 MSO: Maximum Number of Pushes for Operation.............................................................. 03 7 MSO: Maximum Operations Per Slice................................................................................704 MSO: Maximum Resource Over-capacity...........................................................................705 MSO: Maximum Simplex Iterations.....................................................................................706 MSO: Maximum number of pulls/push for hard linked operations......................................707 MSO: Minimize Supply Duration.........................................................................................708 MSO: Minimum Processing Lead Time Adjustment Factor................................................709 MSO: Multiplier To Derive Supply Allocation Window......................................................... 10 7 MSO: Net All Firm Supplies Before Creating Planned Order..............................................711 MSO: Network routing cycle time coefficient....................................................................... 13 7 MSO: Network routing fixed time window...........................................................................714 MSO: Nfl Backward Compression Pct................................................................................715 MSO: Nfl Forward Compression Pct...................................................................................716 MSO: Number of Backtracks Allowed.................................................................................717 MSO: Number of Decomposition Groups Per Process.......................................................718 MSO: Number of Demand Groups for Optimization............................................................ 19 7 MSO: Number of Iterations for Local Search......................................................................720 MSO: Number of LP Phases for Safety Stock Calculation.................................................. 21 7 MSO: Number of Processes to use in Decomposition........................................................722 MSO: Number of Threads for Optimization.........................................................................723 MSO: Number of processes for Inline Forecast..................................................................724 MSO: Optimization Advanced Start....................................................................................725 MSO: Optimization Daily Aggregation Buckets...................................................................726 MSO: Optimization Weekly Aggregation Buckets...............................................................727 MSO: Optimization debug level........................................................................................... 28 7 MSO: Order Modifier Max Searching Depth.......................................................................729
MSO: Overlap Activities by MTQ........................................................................................730 MSO: Peg By-product Supplies..........................................................................................731 MSO: Penalty Basis for Changeovers................................................................................. 32 7 MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute..........733 MSO: Penalty Cost Factor for Exceeding Material Capacity............................................... 34 7 MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute..................735 MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute...........736 MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute........737 MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute738 MSO: Penalty Cost Factor for Exceeding Resource Capacity............................................739 MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute...............740 MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute.......741 MSO: Penalty Cost Factor for Late Demands.....................................................................742 MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute........................................ 43 7 MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute................................744 MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute.................................745 MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute..................................746 MSO: Penalty Increase Tolerance Percentage in Local Search.........................................747 MSO: Penalty multiplier outside unconstrained..................................................................748 MSO: Percent Complete Before Resequencing.................................................................. 49 7 MSO: Postpone Use of Alternates to Latest Possible Time................................................750 MSO: Preemption Slack Ratio............................................................................................751 MSO: Preprocessing Aggregator Fill................................................................................... 52 7 MSO: Preprocessing Aggregator Limit................................................................................ 53 7 MSO: Preprocessing Flag for LP Matrix.............................................................................. 54 7 MSO: Preprocessor LP Compression.................................................................................755 MSO: Primal Simplex Parameter........................................................................................756 MSO: Primal/Dual Preprocessing Reduction......................................................................757 MSO: Pull push base..........................................................................................................758 MSO: Pull push offset.........................................................................................................759 MSO: Queue Time Factor...................................................................................................760 MSO: Re-computation percentage for sequence generation..............................................761 MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs...................................... 62 7 MSO: Reschedule Shared Supply to Influence Batching....................................................763 MSO: Resource Adjustment Factor For Improved Offloading to Alternates.......................764 MSO: Resource Batching Strategy.....................................................................................765 MSO: Resource Group for the Line Flexfield Attribute........................................................766 MSO: Respect Activity Contiguity Flag for Process Supplies.............................................767 MSO: Respect EDD Scheduling windows for Lead Times.................................................. 68 7 MSO: SCO Dual Variables Tolerance.................................................................................769 MSO: SCO Reduced Cost Tolerance.................................................................................770 MSO: SCO TRIANGULATION............................................................................................771 MSO: STL Buffer Size.........................................................................................................772 MSO: Schedule Across Breaks...........................................................................................773 MSO: Schedule All Firm Planned Orders First.................................................................... 74 7 MSO: Schedule Simultaneous Resources Across Breaks..................................................775 MSO: Schedule window width............................................................................................. 77 7 MSO: Scheduler Time Step................................................................................................778 MSO: Scheduling Activity Selection Window......................................................................779 MSO: Scheduling Window UOM.........................................................................................780
MSO: Setup Pattern Calculation Window...........................................................................781 MSO: Simplex Feasibility Tolerance...................................................................................782 MSO: Simplex Optimality Tolerance...................................................................................783 MSO: Simplex Perturbation Constant.................................................................................784 MSO: Simplex Perturbation Limit........................................................................................785 MSO: Simplex Perturbation Parameter...............................................................................786 MSO: Simplex Presolve Limit.............................................................................................. 87 7 MSO: Simplex Singularity Repair Limit...............................................................................788 MSO: Skip Firm SDS Activities During Justify....................................................................789 MSO: Slack Hours For Batch Resource.............................................................................. 90 7 MSO: Solve Dual Problem..................................................................................................791 MSO: Sourcing Allocation Window.....................................................................................792 MSO: Split Planned Orders for Assigned Units................................................................... 93 7 MSO: Split Supplies for SPP Release................................................................................. 94 7 MSO: Spread Resource Consumption Within Optimization................................................795 MSO: Substitute Item Penalty.............................................................................................796 MSO: Supplies used for satisfying transient safety stock...................................................797 MSO: Supply Reschedule Window Size for Safety Stock Pegging..................................... 98 7 MSO: Supply Window Size.................................................................................................799 MSO: Synchronize Chargeable Resources to Respect Hard Links....................................800 MSO: Target Inventory Level % of Safety Stock.................................................................801 MSO: Transfer Quantity Threshold for Enforceing Hard Links............................................ 02 8 MSO: UOM for converting Changeover Time to Penalty....................................................803 MSO: Upper Limit for Maximum Time Offset for Hard Links...............................................804 MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows..........................805 MSO: Use Collections Start Time.......................................................................................806 MSO: Use Customer Site in End Item Substitution Rule....................................................807 MSO: Use Decomposition in Optimization..........................................................................808 MSO: Use Discrete Job Resource Usage to Consume Resource Capacity.......................809 MSO: Use Effectivity Date to Infer End Item Substitution Priority.......................................810 MSO: Use Existing Supplies in Alternate BOM/Subs. Comp..............................................811 MSO: Use Item Shelf Life Days in Scheduling Buy/Transfer Orders..................................812 MSO: Use JIT dates from high level scheduling results...................................................... 13 8 MSO: Use Of Assigned Units In Scheduling.......................................................................814 MSO: Use Optimization and Decision Rules for Simulation................................................ 15 8 MSO: Use SCO Time Aggregation.....................................................................................816 MSO: Use Safety Lead Time..............................................................................................817 MSO: Use Sequencing Template........................................................................................ 18 8 MSO: Use Shift Definitions When Scheduling Lead Times................................................. 19 8 MSO: Use Up Existing Supply of Primary Components Before Substitute.........................820 MSO: Write Inline forecasting flat files................................................................................821 MSR: Budget Category Set.................................................................................................822 MSR: Budget Enditem Favor Factor...................................................................................823 MSR: Budget Heuristic........................................................................................................824 MSR: Postponement Factor................................................................................................825 MSR: Probability Distribution Type.....................................................................................826 MSR: Safety Stock Holding Strategy..................................................................................827 POR: Sync up Need by date on IR with OM.......................................................................828 WIP:Discrete Job Prefix......................................................................................................829 WSM: Create Job Level BOM and Routing Copies............................................................830
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No Yes No No No No No No No No No No No No
INV:Capable to Promise
Profile Code Profile Option Name Description INV INV_CTP Valid values are ATP based on collected data ATP/CTP based on planning output Other values may appear, but are not longer used by the code. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No Yes
No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Oracle Global Order Promising Implementation and User's Guide -1 -1 -1 -1 -1 Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
We print the following for CTO BOM not found - this is a setup violation since the requirement for CTO is to configure and create the [STAR] item using CTO Auto-Create or by progressing the sales order. Warning: Item_ID = 781553, ORG_ID=5002 ; No BOM found for configured item in ship-from org. You may safely disregard this warning if the configured item is transferred across orgs, and the warning points to an org in which no assembly of the configured item takes place. If you are using ODS based ATP, please check that you have the BOM in shipping org. If you are using PDS based ATP, please check that item attribute ""Create Configured Item, BOM"" equals ""Based on Model"" and BOM exists in ship-from org. DOCUMENTATION BUG: The documentation has this profile backwards. Default Value - No Note Reference(s) 179522.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No
No
Yes No No No No No No No No No No No No No No
Special profile for Seiban project numbers. Used for release of planned orders from the ASCP workbench. Profile set in EBS Source in distributed installation. Valid values are:
Yes - project validation won't be executed. No - the project validation will be executed.
Default Value - No when NULL 11.5.10 Patch 6903209 One off patch released by DEV. Also included in 1st APS Source Side UI patch 7427625 and all Source Side rollups since October 2008 Bug 6903209 One off patch released for 11.5.10 12.0.6 bypass code included in $MRP_TOP/patch/115/MRPRLWFB.pls 120.1.12000000.6 BUT - the profile is not created, and must be created manually - see below 12.1.1 and above bypass code included in $MRP_TOP/patch/115/MRPRLWFB.pls 120.1.12010000.2 and above BUT - the profile is not created, and must be created manually - see below Maunual Profile Creation details Application - Master Scheduling/MRP Hierarchy Type - Security Hierarchy Type Access Level Visible and Updatable at the following levels
Site, Application, Responsibility, User SQL validation: SQL="select lookup_code, meaning \"MRP:DisableProjectValidation\" into :profile_option_value, :visible_option_value from fnd_lookups where lookup_type = 'YES_NO'" Column="\"MRP:DisableProjectValidation\"(*)"
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6865274 -1 Yes No No Yes Yes No No No Yes No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Rescheduled recommendations cannot be released to purchasing for internal requisitions. To reschedule recommendations, cancel the internal requisition in the source instance and create a new requisition with the new date. Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No Yes No No Yes No No No No No No No No Yes No No No
Yes No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting
Profile Code Profile Option Name Description MRP MRP_IGNORE_ZERO_QTY_DEMANDS Not used in Oracle Advanced Planning. This is for standard MRP Forecasting functionality - program INCFIF Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Default - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Optional - Average Discount to be applied when calculating Revenue of a plan as part of Plan Performance Indicators Set on EBS Source and APS Destination in a distributed installation. Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
This value is a key performance indicator used to calculate performance in a plan for Business Intelligence reports. Set in EBS Source in a distributed installation. Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 Yes No No No No No No No No No No No No No Yes
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
4567833 -1 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MRP:Activate OLP
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP-OLP Not used by Oracle Advanced Planning
Yes No No No No No No No No No No No No No No
5924044 -1 Yes No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Valid values: yes/no Default value: yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
MRP:Consume Forecast
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_FORECAST_CONSUMPTION Not used in Oracle Advanced Planning.
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
MRP:Consume MDS
Profile Code Profile Option Name Description MRP MRP_MDS_CONSUMPTION If set to yes, planning manager needs to be running when loading MDS in the ASCP plan 790125.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MRP:Consume MPS
Profile Code Profile Option Name Description Note Reference(s) MRP MRP_MPS_CONSUMPTION If set to yes, planning manager needs to be running on the source to collect WIP/PO supplies. 790125.1
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
The planning engine honors the item attribute Planning Time Fence regardless of the value of this profile option. Note Reference(s)
399888.1 422361.1
-1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MRP:Debug Mode
Profile Code Profile Option Name Description MRP MRP_DEBUG Enable debug messages. Note: Has high impact across many applications. This profile should only be set at USER Level unless otherwise instructed by support. Setting at the Site Level can have impact on WIP, BOM, OM, MRP, ASCP applications.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
7362528 Oracle Global Order Promising Implementation and User's Guide -1 -1 Oracle Master Scheduling/MRP and Oracle Supply Chain Planning User's Guide -1 No No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Not used in ASCP Used in Inventory Supply Demand form - Ref Bug 7260101 Check the value of the profile MRP:Derive PO supply date from need by date If this set to No, set it to Yes. Then, we derive the PO due date as need by date + post processing lead time. This calculation is done during the supply/demand inquiry. If this is not set, then the date displayed in the supply/demand inquiry is the expected_delivery_date in mtl_supply.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7260101 -1 No No No No No No No No No No No No No No No
MRP:Enhanced Exception
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_ENHANCED_EXCEPTION Not used by Oracle Advanced Planning
Yes No No No No No No No No No No No No No No
If the overwrite option in the plan is set to overwrite all, then all firm planned orders are deleted Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
3162334 1555350 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
MRP:Planner Workers
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_PLANNER_WORKERS Not used by Oracle Advanced Planning. This profile is used by the MRP Planning Manager.
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
MRP:Purchasing By Revision
Profile Code Profile Option Name Description MRP MRP_PURCHASING_BY_REVISION When releasing planned orders, we check if profile is set. IF NULL, then we check if item has Revision Control checked and if Yes, then we set revision control Yes When profile Yes (or NULL and item revision control - Yes), then we update revision of item based on effectivity date of revisions defined for the item Set on EBS Source in a distributed environment Note Reference(s) 238838.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3939138 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
This profile is used when the Auto-Release Planned Orders process is run as part of an Plan run. The Auto-Release Planned Orders will launch when the Production Flag is checked on the Plan Names form. Additional Item setups are required for orders to be eligible for release during this process. Set in APS Destination instance. The profile is NOT used when releasing planned orders from the workbench. Instead, the Planner workbench /Tools/Preferences - the Plan Preferences - Other tab - Req Group By This has a lookup to choose the options for how you group lines being released to PO application to create requisitions. Indicates group by option used when loading requisitions Valid values are DB Value [number] - Application Displayed Value - Description 1 - All on One - (creates one purchase requisition for all recommended orders) 2 - Item (creates one purchase requisition for each item; within each requisition, creates one line for each planned order), 3 - Buyer - (creates one purchase requisition for each buyer; within each requisition, creates one line for each planned order), 4 - Planner - (creates one purchase requisition for each planner; within each requisition, creates one
line for each planned order), 5 - Vendor - (creates one purchase requisition for each vendor; within each requisition, creates one line for each planned order), 6 - Category - (creates one purchase requisition for each item category; within each requisition, creates one line for each planned order,
7 - One each (creates a purchase requisition for each planned order).
8 - Location - PO Req Import process chooses deliver to location to group the lines.
Note Reference(s) 779922.1
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No Yes No No Yes Yes No No No No Yes No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
6436732 -1 No No No Yes No No No No No No No No No No No No No No No
MRP:Snapshot Workers
Profile Code Profile Option Name Description MRP MRP_SNAPSHOT_WORKERS Determines number of workers launched by the snapshot monitor. When set to 0, the Snapshot runs as a single- threaded process. Snapshot workers collect data on bills of material, work in process, on- hand quantities, purchasing, firm planned orders, routings, and work-in-process job resource requirements. 111955.1 824317.1 130995.1
Note Reference(s)
-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
MRP:Trace Mode
Profile Code Profile Option Name Description MRP MRP_TRACE Enable trace option for MRP, ASCP, other processes. This should only be used with suggestion of support since this reaches to many different applications. Should only be set at User Level to avoid tracing many application processes. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No Yes Yes No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
MRP_NEW_PLANNER_BACK_COMPATIBILITY
Profile Code Profile Option Name Description MRP MRP_NEW_PLANNER_BACK_COMPATIBILITY
Per bug 9848641: There have been changes back and forth with this profile in combination with MSC: New Planner Backward Compatibility. 1. MRP profile will remain the same. It will decided whether an item should be treated as phantom or not. 2. MSC on the other hand will now decide whether the new algorithm would be used or the old one. Yes would mean old and No would mean new. Yes - Phantoms will be treated as regular items and planned orders will be created. No - Phantoms will be exploded, and not appear in the plan. Default - Null - which is No
Note Reference(s)
9848641 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes Yes Yes Yes No No No Yes Yes Yes Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized
Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes Yes No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5949512 -1 Yes No No No No Yes No No No No No No No No No
-1 No No No Yes No No No No No No No No No No No No No No No
Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No Yes No No No No No No No No No
6836990 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
When a plan is published from ASCP to APCC, all fact tables are loaded irrespective of customer needs. The profile provides user the ability to load data of selected facts/measures where possible. It has Yes/No values, and defaults to Yes. To disable cumulative measures, user needs to explicitly set it to No. When the profile "MSC: APCC - Enable Cumulative Measures in Archive" is set to No the following tables are not populated during archive: - MSC_DEMANDS_CUM_F - MSC_RESOURCES_CUM_F
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning
Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No Yes No No
This is about performance problems in msc_phub_cost_pkg due to source_count section. It has to process msc_item_sourcing, and has to densify by multiplying weeks in horizon. This makes data volume large, and results in performance problems. But source_count measures are mostly used for SNO plans, while performance problem in this bug happened on ASCP plans. Confirmed with PM, we should allow user to turn it off by setting a profile option. We introduced new profile option "MSC: APCC Archive SCRM Measures" (MSC_APCC_ENABLE_SCRM, Yes(default)|No), when set to No, source_count is skipped. Following presentation columns are not populated: "- Excess, Obselescence And Risk Management"."Count of Sources" "- Excess, Obselescence And Risk Management"."Count of Sources in IO Plan" "- Sourcing Effectiveness"."Count of Items Single Sourced" Values: with profile options "MSC: APCC Archive SCRM Measures" set to "Yes'and "No" and also with blank. Blank and yes will have same result as the default value is blank. When profile set to "Yes" the count of sources and Count of Items single sourced are populated and when "No" the Count of Sources and Count of Items single sourced are not populated. Hence
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 -1 Yes No No No No No No No No No No No Yes No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No No No No No No No No No No Yes No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No No No No No No No No No No Yes No No
Description
Bug 9274349: APCC SUPPORT SNO ITEM SIMULATION SET FOR EXCESS AND OBSOLESCENCE FACTS.
temporary solution for simulation sets for sno in apcc Note Reference(s)
It'll wort like this:- user sets the profile option before publishing SNO
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
1081051.1
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No No No No No No No No Yes No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1081051.1
-1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1081051.1
-1 No No No No No No No No No No No No Yes No No
No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
MSC MSC_APCC_BACK_TO_SELF_DBLINK new profile option "MSC: APCC to APS database link name" (MSC_APCC_BACK_T
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
-1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Note Reference(s)
-1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Global Order Promising Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note: Once in 11.5.10 and using MSC: Use Shipping/Receiving Calendars, this profile should be obsolete for functional purposes. 227406.1
Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
First introduced in 11.5.9 - Bug 5903195 Forward ported to 11.5.10 and included in ASCP Engine/UI RUP #33 Forward ported to R12 in Bug 6266579 and present in CU3 patch 6731645 and included in 12.0.6 Fixed in base release of 12.1.1 Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
3128505 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
The planning engine uses lead-time percent to calculate the operation start date; it assumes that the lead-time percent of an operation that is effective in the future is the same as the lead-time percent of the operation it replaces. If an operation's effectivity ends within a time bucket, the planning engine assumes that its effectivity ends on the first day of the time bucket. Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No Yes No No No No No No No No No No No No No No No
Default Value - NULL (Yes) Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No
Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No Yes No No No No No No No No
MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock
Profile Code Profile Option Name Description MSC MSC_SS_SMOOTH_NON_MRP Use this profile option to specify the safety stock to which the smoothing within time interval applies: Valid values are: Yes - Smoothing applies to all types of safety stock No - Smoothing applies only to MRP planned safety stock
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Introduced in ASCP Engine/UI rollup #33. 11-May-2010 - Not front ported to any R12.x release. Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7461501 -1 Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No Yes Yes No No No No No
Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No Yes No Yes No No
-1 No No No No No No No No No No Yes No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No Yes No No
-1 No No No No No No No No No No No No Yes No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No No No No No No No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No
This profile was introduced to offer backward compatibility to the way processing Lead-time was calculated in 11.5.9. The equivalent of the 11.5.9 functionalty is to use Org Manufacturing calendar. Notes: Ref Note 566206.1 for more information.ATP does not currently use this profile. an ASL must be assigned to the item with the Supplier Capacity Calendar same as the Org calendar to get ATP to offer the same functionality as ASCP planning Default Value - Supplier Capacity Calendar Note Reference(s) 566206.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No Yes No No No No No No No No No
Calendar used for bucketing KPI's. If the profile option MSC:Calendar Reference for Bucketing is null, then the plan owning organization calendar is used for the plan bucketing. If this profile points at a valid calendar, then the plan will use that calendar for bucketing Also known to cause plan failures, Signal 11 errors when this not setup. No formal documentation on the profile
Note Reference(s)
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No Yes No Yes No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note that the only order modifier that is considered when determining partial allocations to sales orders is the Round Order Quantities item attribute for the shipping organization. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No Yes No No No No No No No No No No
No No No Yes No No No No No No No Yes No No No No No No No No No No No No
5481643 -1 No No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No Yes No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2422506 -1 Yes No No No No Yes No No No No No No No No No
-1 Yes No No Yes No No No No No No No No No No No No No No No
-1 No No No No No No No Yes Yes No No No No No No No No No No No
6528915 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4446794 -1 Yes No No No No Yes No No No No No No No No No
-1 No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No Yes No Yes Yes Yes No No No No Yes Yes No Yes No No No
Yes No No No No No No No No No No No No No No
MSC: Collection Time Window for Install Base under Contracts history
Profile Code Profile Option Name Description MSC MSC_COLL_TIME_WINDOW_IBUC_HISTORY Profile for Collection Time Window for Install Base under Contracts history This profile option specifies the time window for which IB under Contract history is to be collected. 1225993.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No Yes Yes No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
MSC: Configuration
Profile Code Profile Option Name Description MSC MSC_X_CONFIGURATION Ensure that the value of the profile option MSC: Configuration is set to APS & CP. This enables collaboration between Oracle Advanced Supply Chain Planning and Oracle Collaborative Planning used to enable ASCP - CP interaction
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No Yes No No No No No No No No No
Default Value - By End Pegged Demand Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7457980 -1 Yes No No No Yes No No No No No No No No No No
If you are using forecast spreading: For a periodic forecast entry that falls in weekly planning buckets within the demand time fence, the forecast spreading process spreads the entries into daily entries. If the daily entry is within the demand time fence, the process ignores the value that you set and uses the value Yes in processing. If the daily entry is outside the demand time fence, the process ignores this profile option and consumes against the entry.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
565926.1
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
6434413 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization
Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No Yes
Yes No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 No No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC: DPP Allow Quantity Reduction Only When Supply is Excess on Internal Requisition, Requisition and PO
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC MSC_DRP_FIRM_REQS_QTY Per Bug 9546158The profile option "MSC: DPP Allow Quantity Reduction Only
No No No No No No No No No No No No No No No
0 - No Debug 1 - Informational Message 2 - Logic and Data Debug 3 - Logic Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9262606 -1 No No No No Yes No No No No No No No No No No
Yes No No No Yes No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No Yes No No No No No No No No No No
The profile is used to specify the number of days to extend the lead time window calculation for related exceptions in the source organization. Therefore, the calculation is "Start date - max LT - profile option days" This profile option is added to account for the fact that UI does not consider shipping / receiving / manufacturing / intransit calendars in its window calculation.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No Yes No No No No No No No No No No
8523019 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 No No No No Yes No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
8523019 -1 -1 -1 No No No No Yes No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No Yes No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5217328 -1 Yes No No Yes No No No No No No No No No No No No No No No
-1 Yes No No Yes No No No No No No No No No No No No No No No
-1 Yes No No Yes No No No No No No No No No No No No No No No
Controls the use of parallel workers in data collections. Specifies how many parallel workers to use when creating indexes. If the profile is set to null, then the DOP (degree of parallelism) is being calculated by the database based on the number of cpu and the initialization parameter PARALLEL_THREADS_PER_CPU. If you set the profile to 1 then it will not use any parallel slaves, as such performance will be slower in collections
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
4460213 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
After the profile change, allow 60-90 seconds for the profile change to take place. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3969852 -1 Yes No No No No Yes No No No No No No No No No
MSC: Display Warning Message When Rescheduling Recommendation Not Suggested by the Plan
Profile Code Profile Option Name Description MSC MSC_REL_SHOW_WARN This profile option specifies whether or not the Planner Workbench should display a warning message when you release rescheduled orders that the planning engine has not recommended. Valid values are: Yes - Use this value if you want the Planner Workbench to prompt you for confirmation when you release rescheduled orders that the planning engine does not recommend. No - Use this value if you do not want the Planner Workbench to display the message prompting to prompt you for confirmation when you release the rescheduled orders that the planning engine does not recommend.
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
3016969 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 -1 -1 Yes No No No Yes No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies
Profile Code Profile Option Name Description MSC MSC_DRP_USE_FIRM_SUPPLIES DPP uses for netting the firm supplies from entire horizon (not only within current allocation bucket) First released in 12.0.4/12.0.6 ASCP Engine/UI CU8 patch. Forward ported in 12.1.3.1 Description from DRP FAQ Note 761820.1:
Why do sometimes I don't see my future firm supplies netted with current demand and I see a new planned order created by DRP?
In DRP, we do netting of supply and demand within an allocation bucket. So if allocation bucket is say weekly then supplies of 2nd week onwards won't be used to meet the demand of 1st week. This is current functionality. To make this functionality more flexible, in R12 CU8 we have provided one profile where based on the business requirement, user can select whether to net supplies of next buckets to meet demands of current buckets. The profile name is "MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies". If profile value is Yes the Unconstrained Netting phase will use first all firm supplies within
entire horizon. Only if there is no more firm supply than new unconstrained supply will get generated and dependent demand gets pushed down to sourcing.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9176212 -1 No No No No Yes No No No No No No No No No No
No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
MSC: E1APS_BATCH_SIZE
Profile Code Profile Option Name Description MSC MSC_E1APS_BATCH_SIZE Transaction batch size used in Legacy Collections Default: 1000 Format: Integer Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1APS_DEM_END_DATE_IN_MONTHS
Profile Code Profile Option Name Description MSC MSC_E1APS_DEM_END_DATE_IN_MONTHS End date offset in months from the current date used for Demantra Price List collections Format: Integer Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1APS_DEM_START_DATE_IN_MONTHS
Profile Code Profile Option Name Description MSC MSC_E1APS_DEM_START_DATE_IN_MONTHS Start date offset in months from the current date used for Demantra Price List collections Format: Integer Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1APS_DEM_WF_TIME_OUT
Profile Code Profile Option Name Description MSC MSC_E1APS_DEM_WF_TIME_OUT Timeout value for Demantra Workflow in seconds Format: Integer Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1APS_NO_OF_WORKERS
Profile Code Profile Option Name Description MSC MSC_E1APS_NO_OF_WORKERS Number of workers for Legacy Collections concurrent program Default: 3 Format: Integer Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1APS_TIME_OUT
Profile Code Profile Option Name Description MSC MSC_E1APS_TIME_OUT Timeout value in minutes for Legacy collections preprocessor and ODS Load programs Default: 180 Format: Integer Where Used: JDE-VCP Collections Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1APS_WS_TIME_OUT
Profile Code Profile Option Name Description MSC MSC_E1APS_WS_TIME_OUT Timeout value in seconds for ODI webservice Format: Integer Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: E1_DBLINK
Profile Code Profile Option Name Description MSC MSC_E1_DBLINK Database link to ODI Work repository from the apps schema Format: String Where Used: JDE-VCP Collections
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
-1 No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
867822.1
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
You may only set this profile to Yes when Oracle Global Order Promising is on the same instance as other ERP application (i.e. You have a centralized instance setup) ATP will use the detailed information in several cases even if you have this set to Yes ATP in the Order Backlog Workbench is based on the detail supply demand tables, regardless of the profile setting for MSC: Enable ATP Summary Mode. ATP for ATO models is always based on detailed information. 457840.1 563617.1 Bug Reference(s) Document References(s)
Note Reference(s)
-1 Oracle Global Order Promising Implementation and User's Guide -1 Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 -1 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
8523019 -1 -1 -1 No No No No Yes No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
6001023 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Rank 2 buy sources are considered if supplier capacity is exhausted for rank 1 sources. This profile option duplicates the functionality of the decision rule Use Alternate Sources parameter for buy items but not for transfers from other organizations. When the decision rules are enabled, the planning engine does not consider this profile option. Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle recommends that you set the value to Yes and use the latest netting features. This profile option is for backward compatibility. In R12 this profile has to be set to Yes. 421097.1
-1 Yes No No Yes No No No No No No No No No No No No No No No
No No No No No No No No No No No No Yes No No
Yes No No Yes No No No No No No No No No No No No No No No
7453287 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
10417975 -1 -1 No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No No No No No No No No No No
These recommendations are informational only and cannot be released from the Planner Workbench. This is a user level profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4593891 -1 Yes No No Yes No No No No No No No No No No No No No No No
MSC: Fixed Date for Install Base under Contracts History (DD-MON-YYYY)
Profile Code Profile Option Name Description MSC MSC_FIXED_DATE_IBUC_HISTORY Profile for defining the date for the Fixed date instances This is only applicable for testing instances where fixed date is being used in the system for testing stability.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9979825 -1 No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No
MSC: Forecast Spreading Calendar will use the calendar for spreading the forecast based on either: Org Manufacturing Calendar Org Shipping Calendar It should be noted that the bucketing of the forecast is always based on the shipping calendar. This is the design, since you cannot ship when the org is closed for shipping, then forecast will be bucketed so that it will be ready to ship. For instance, using the example below - if you enter a sales order with day 6 as requested ship date, and we cannot ship on Day 6, then we will back up the ship date to Day 5 So the sales order demand would fall on Day 5, so we plan the forecast in the same manner, so you can produce when the demand from sales order will fall on the calendar. Example: Mfg calendar 7 days on shipping calendar 5 on / 2 off Forecast qty per week = 700 Spread Forecast qty / Forecast Bucketing Day 1 100 100 Day 2 100 100 Day 3 100 100 Day 4 100 100 Day 5 100 300 Day 6 100 Day 7 100 Note: Introduced in 11.5.10 in Rollup #34
Note Reference(s)
7420122 -1 -1 Yes
12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No Yes Yes Yes Yes Yes No No Yes Yes Yes Yes Yes Yes Yes No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No Yes No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No No No No No No No No No No No
No No No No No No No No No No No No Yes No No
No No No No No No No No No No No No Yes No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Global Order Promising Implementation and User's Guide Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
-1 Yes No No No No No Yes No No No No No No No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP
Profile Code Profile Option Name Description MSC MSC_IGNORE_ATP_CHECK Valid values are: Yes - and using "ATP Based on collected Data" then when there is a configuration existing for the Sales order, we treat the model as non atpable. No - no alterations on existing demand will be done Default Value - No Only available in 11.5.10 at this time (Jun 2011) Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
- If profile is set to Yes, depending on net_wip setting in the plan option Continue with old behavior - If profile is set to No and net_wip is No - Only Eam/cmro orders are dealt with. - If profile is set to No and net_wip to Yes, code deals with all except eam/cmro orders. New code deals with eam/cmro orders alone.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12686233 -1 No No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
When the profile is set to yes then make of safety stock quantity to zero inside time fence.
1264886.1 1323113.1
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6623090 -1 Yes No No Yes Yes No No No No No No No No No No No No No No
MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations
Profile Code Profile Option Name Description MSC MSC_INCLUDE_MFG_CAL This profile was obsoleted in 11.5.10. The functionality of MSC: Use Shipping/Receiving Calendars replaces this in 11.5.10 and above. For 11.5.9 and lower, this determines whether ATP uses 24x7 calendar instead of Org Manufacturing calendar for shipping dates (No for 24x7, Yes for Org Calendar) 555016.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No No No No No No
Note Reference(s)
4011546 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note that this profile option is used in conjunction with shop floor scheduling products such as Oracle Manufacturing Scheduling. It is assumed that the discrete jobs are not released from the planning engine. If the jobs are rescheduled and released by the planning engine, the resource requirements are deflated. This could result in data inconsistency as the resource requirements are deflated on release whereas Oracle Manufacturing and Scheduling might have calculated resource requirements based on the inflated values. The planning engine always sends the original resource requirements upon release. If the resource requirements are already inflated in the source from Oracle Manufacturing Scheduling, set this profile option to No to avoid double inflation of the resource requirements. Otherwise, set it to Yes so that the planning engine inflates the resource requirements. Default Value - No Set on APS Destination in a distributed environment Note Reference(s) 373892.1 858515.1
2490553 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization
Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
This profile option is specifically used when MRP_DIRECT_LOAD is set to Yes. Note Reference(s) 555016.1 307443.1 Bug Reference(s) Document References(s) 5722157 -1 -1 -1 Yes No No Yes Yes No No No Yes No Yes Yes No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
5481643 -1 No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3621869 -1 Yes No No Yes No No No No No No No No No No No No No No No
If an MPS is a demand schedule for another plan, this has no impact as planned orders from the MPS are always treated as firm.
This profile option applies only to master production schedule plans. You can set it at the site and user levels. 259322.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
4573393 -1 No No No No No No No No No No No No No No No
4573393 -1 No No No No No No No No No No No No No No No
This profile is to control the decimal places for Currency units. The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level.
1276896.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No Yes No No No No No No
This profile is to control the decimal places for Quantity units (order quantity, exception quantity, etc.). The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level.
1276896.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No Yes No No No No No No
This profile is to control the decimal places for aggregate Quantity units. The default value for this profile is 0. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level. Applies to quantities in the Material Plan and all Hours measures shown in the Resource Plan.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1276896.1
-1 No No No No No No No No Yes No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No Yes No No No No No No
This profile is to control the decimal places for Time (hours, days, etc.). The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level. This is useful when the lead time calculation is not in the integer value in terms of days and Hours.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1276896.1
-1 No No No No No No No No Yes No No No No No No
Used to control the decimal places displayed for time (hours, days, etc.) Applies to the Hours measures shown in the Resource Plan
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 10193934 -1 No No No No No No No No Yes No No No No No No
4573393 -1 No No No No No No No No No No No No No No No
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
417736.1
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
4573393 -1 No No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
When the Arrival date is given and we offset it with the Lead times if the dates go behind Sysdate that is Past Due then we move it to the Sysdate
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5618929 -1 Yes No No Yes No No No No No No No No No No No No No No Yes
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
Based on latest information available in Bug 9848641 And Per bug 12352866, this needs to be set to YES in 12.1.3 to avoid a performance issue in constrained plans.
Yes - uses the new algorithm for planning phantom items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = Yes, then Phantoms will be planned as regular items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = No or NULL, then Phantoms will NOT be planned as regular items. No - Uses the old algorithm for planning phantom items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = Yes, then Phantoms will be planned as regular items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = No or NULL, then Phantoms will NOT be planned as regular items.
Most all customers should use Yes. If case of certain plan errors when working with byproducts and profile = Yes, then you need to set profile = No The failure will occur when by-product is also a component of the BOM as shown below Ex: Assembly A / \ Phantom B Phantom C -> By-product C | comp C This setup will result in a A->C->A loop. This was seen in bug where plan failed with the following message: ### Error: found loop between FROM operation : with sequence number 10
supply id 1018430492 item id 1181059 TO operation : with sequence number 1 supply id 1018430492 item id 1181059 org Id = 86 This could occur in two conditions : A. There is a loop in network routing - if so, please check the set-up and fix the routing B. There are by/co-products of assembly which are also a component of an item forming this assembly If so, try to change the profile option MSO: Peg By-product Supplies to FALSE APP-MRP-22064: An internal error has occurred (hls_failure, 1)
Note Reference(s) 433492.1
9848641 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes Yes Yes Yes No No No Yes Yes Yes Yes Yes Yes No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Set the profile option MSC: SCEM Engine Launch Events to All to automatically start Supply Chain Event Manager (SCEM) when a supplier loads an order forecast or when you publish an order forecast from the planning server. If you set the profile option to Publish, Supply Chain Event Manager starts only when plans are published from Oracle Advanced Supply Chain Planning. If you set the profile option to Load, Supply Chain Event Manager starts only when data is loaded using flat files. Ensure that the value of the profile option MSC: Configuration is set to APS & CP. Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
6156478 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No Yes Yes No No No No No No No No No No No No No No
-1 No No No Yes No No No No No No No No No No No No No No No
-1 No No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2297044 -1 Yes No No No No Yes No No No No No No No No No
Rapid Planning External Server URL The port number provided in the profile value should be same as the port number for the UI Domain that is defined in Creating the UI Domain from the Oracle Rapid Planning Installation Guide, Release 12.1.3.3
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1276882.1
-1 No No No No No No No No Yes No No No No No No
Valid values: Yes/No Default = No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3103879 -1 Yes No No No No Yes No No No No No No No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No No No No No No No
Valid value are: Yes - Customer Package is used for creating a model in Production Scheduling. No - Customer Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Valid value are: Yes - Distribution Package is used for creating a model in Production Scheduling. No - Distribution Package is not used for creating a model in Production Scheduling. Default Value - Yes At this time this package is not used by the PS model creation process.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Valid value are: Yes - Enterprise Forecast Package is used for creating a model in Production Scheduling. No - Enterprise Forecast Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Valid value are: Yes - Safety Stock Targets Package is used for creating a model in Production Scheduling. No - Safety Stock Targets Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Valid value are: Yes - Manufacturing Package is used for creating a model in Production Scheduling. No - Manufacturing Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Valid value are: Yes - Purchase Orders Package is used for creating a model in Production Scheduling. No - Purchase Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
MSC: PS - Snapshot Reservation Package This profile brings in reservations for PS plans (similar to how you enable all the other data packages). Only meaningful for 12.1.3.6+ (which is not released yet)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1386168.1
-1 No No No Yes No No No No No No No No No No No No No No No
Valid value are: Yes - Sales Orders Package is used for creating a model in Production Scheduling. No - Sales Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Valid value are: Yes - Supplier Package is used for creating a model in Production Scheduling. No - Supplier Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Valid value are: Yes - Transfer Orders Package is used for creating a model in Production Scheduling. No - Transfer Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Valid value are: Yes - Work Orders Package is used for creating a model in Production Scheduling. No - Work Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Allows the user to specify the display for CMRO Visits in the Production Scheduling client. Allowable vaues are: "Name" or "Code" or "Name:Code" Applicable to 12.1.3+
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
MSC: PS Adjust Post Horizon Demand Qty This profile allows PS solver to "net-out" demands that are not fulfilled until after the end of the scheduling horizon. When profile "MSC: PS Adjust Post Horizon Demand Qty" to yes, then PS uses the Work Orders that are on end of horizon to meet demand.
Note Reference(s) 1386168.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12939774 -1 -1 No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
If CRO option is licensed along with Production Scheduling application, the profile option "MSC: PS Enable CRO Scheduling" must be set to "Yes". RMO and CRO are synonymous. Made obsolete in R12.1.3
Note Reference(s) 973027.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7037527 -1 -1 No No No No No No No No No No No No No No No
-1 No No No No No No No No No No No No No No No
Introduced in Patch 9921057 This profile option will filter out any items which do not have any active demand within the PS horizon. This can be dependent or independent. This works with or without an ASCP plan reference. If an ASCP plan is referenced, the active demand from planned orders is also studied. Not applicable after 12.1.3.7.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7489790 -1 Yes No No No No No No No No No No No No No No
Specifies the name of the batch script that starts Production Scheduling. Default Value - runPS.bat Obsolete in PS V2 integration (11.5.10/R12.1)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5136451 -1 Yes No No No No No No No No No No No No No No
Specifies the batch script that starts the Production Scheduling Connector. Default Value - runPSConnector.bat Obsolete in v2 integration (11.5.10/R12.1)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No No No No No No No No No Yes No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No Yes No No No
This flag indicates whether the extracted files/model files are stored in compressed format or not. Typically this should be set to Yes to mazimize data download speed to the client. If integration extensions are being developed then you may not want to store these in compressed format. Valid values are: Yes No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No No No No No No No No No Yes No No No
This flag determines the level of logging appearing in the integration log files. This flag is typically only set upon request from Oracle support when investigating issues. Setting this flag to Yes will have peformance implications. Valid values are:
Yes No
Note Reference(s)
-1 -1 -1 Yes No No No No No No No No No No Yes No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Setting this flag causes the intermediate integration data files to be downloaded to the client. This causes significantly more data to be transfered and is typically done for debugging model construction issues. When set to No, only the final model file will be downloaded to the client Valid values are:
Yes - if users want to download the xml files to the client machine for debugging purpose. No
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC: PS/SNO Include Negative Inventory Demands This profile has been introduced to extract negative beginning inventory. If there is negative on-hand inventory then an artificial demand will be created for this negative quantity so that the projected inventory balances are accurate. For example, if Item A has -10 on hand a demand of 10 will be created. This profile option controls the creation of these artificial demands. The profile controls the extraction of negative demand. Values: The default value is Yes. If this set to "No" then negative demands will not be extracted.
Note Reference(s)
1386168.1
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center
No No
This value specifies the amount of time in the past to look for supply. Not applicable after 12.1.3.7 so will be removed from the ldt file, however, customers who have this profile in their DB would continue to see them but can safely ignore. From bug 9909547 which introduced this profile A new profile option "MSC: Past Due Supplies Window" has been added. The past due supplies will be extracted based on the user's input. If the value in this profile option is 10 then integration will bring the supplies 10 days before the horizon start. Older past due supplies will be ignored.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9909547 -1 No No No No No No No No No No No Yes No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No No No Yes No No No
Yes No No No No No No No No No No No No No No
MSC: Peg Firm Work Orders Within Assigned Projects and Tasks
Profile Code Profile Option Name Description MSC MSC_FIRM_JOB_RESV_TASK When set to yes, reservation level for firm work orders will be set at Task level This is designed to work with MSC: Enable Attribute Netting = No Note that in 12.1 we recommend that customers use MSC: Enable Attribute Netting = Yes to use the new netting engine, unless they have specific business requirement for using old netting engine (No) Per Enhancement 8482143 When pegging firm work orders for hard pegged items, in old attribute netting, peg the firm work orders to demands having same project/task as itself. Otherwise peg it to excess. This is independent of the reservation level. Introduced in ASCP Engine/UI RUP #37 for 11.5.10 - Per bug 9087339, further fix was made. - Ported to 12.1.3.1 and 12.0.6 ASCP Engine/UI CU10 patch Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
-1 -1 No No No No No No No No No No No No No No Yes
Can be defined at the site level. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is Yes. 305575.1
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
Indicates a plan that Oracle Collaborative Planning uses to derive the pegging information for each order that you upload. See also Note.276003.1 for the description of Enhanced Flagging of Potentially Late Orders.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No No Yes No No No No No No No No No
MSC: Pre-Flush
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_PRE_FLUSH Not used per bug 4573393
4573393 -1 Yes No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes Yes No No No No No No No No No No No No No No
Default = Yes Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4479258 -1 No No No No Yes No No No No No No No No No No
This is a site level profile option. Use the same setting of this profile option for running both collections and plans. Default Value - Promise Date Note Reference(s) 413816.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
4717843 -1 -1 -1 Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC MSC_RP_GROUP_PLANNED_ORDERS Determines if planned orders of the same type are grouped. Purchase and t
10130815 -1 No No No No No No No No Yes No No No No No No
Safety Stock Lead Time Method Values This profile provides the following options:
Do not compute Safety Stock (currently exists) Use Safety Stock Percent (currently exists) Use Safety Stock Quantity (this is the enhancement)
In 12.1.3.6, this profile is not used. A new profile has been introduced MSC: Safety Stock Planning Method which has valuesa. Do not plan Safety Stock b. Use Safety Stock Quantities c. Use Safety Stock Lead Time from Safety Stock Percent To calculate safety stock using quantity, this plan options must be set to Use Safety Stock Quantity. Use Safety Stock Lead Time from Safety Stock Percent (this option replaces Use Safety Stock Percent option that was in RP 12.1.3.3.)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 1276896.1
-1 No No No No No No No No Yes No No No No No No
This profile should point to the directory where all the WLST_scripts will be kept.
1276882.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No Yes No No No No No No
-1 No No No No No No No No Yes No No No No No No
-1 No No No No No No No No Yes No No No No No No
Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9406133 -1 Yes No No Yes Yes No No No Yes No Yes Yes Yes No No No No No No No No No No No
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
With the alternate value selected, the collected data might not reflect the exact region site mapping based if the standalone Refresh Collection Snapshots is run. Default Value - Yes 427338.1
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
5717270 -1 -1 Yes No No No No No No No No No No No No No No
Default Value - 10 Note Reference(s) 468903.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No No
This profile needs to be set when data is being collected from multiple sources. APCC only reports from the instance which is defined in this profile. The profile is depreciated after patch 10309327:R12.MSC.B - APCC TO SUPPORT REGIONS FROM MULTIPLE INSTANCES
Note Reference(s) 844667.1 Bug Reference(s) Document References(s) 6899253 6850493 -1 -1 -1 Yes No No No No No No No No No No No Yes No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSC: Release WIP Dtls if Order Date different then BOM Revision Date
Profile Code Profile Option Name Description MSC MSC_RELEASE_DTLS_REVDATE Oracle Work in Process uses the details effective on the job start date. Valid values are: Yes - then planning engine releases the WIP details even if the Suggested Start Date is different than BOM Revision Date. No - the planning engine does not release the WIP details if the new WIP Start Date is different than BOM Revision Date.
Set on APS Destination in a distributed environment If all conditions are met to release the WIP details when releasing a planned orders (Ref Note 1346745.1) Then we evaluate the order as per the following example: Check the fixed and variable LT of the item and offset the start date: Answer: Planned order with Suggested due Date of Day 60 and offset makes start date Day 50 If the planed order has been compressed, or the planning engine has used an alternate routing (also possible that Alternate BOM is used) Then is it possible that the start date in workbench is not Day 50 but [different day] If [different day], then check the profile, If Yes, then release the details, IF No, then do not release the details and just release the header row to WIP and let WIP Mass Load compute the components and resources and dates for these based on the BOM and Routing for the item. then we will not release details unless the profile is set to Yes. Note Reference(s) 958034.1 1346745.1 Bug Reference(s) Document References(s) 2682123 -1 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center
No No
Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8326980 -1 Yes No No Yes Yes No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
2954572 -1 -1 No No No No No No No No No No No No No No No
Details added to recent ASCP Guide - E13358-08 (page A-53) This profile option enables ASCP to plan supplies with respect to the shelf life enhancements described in this design including the minimum remaining shelf life days. Valid values are: Yes - ASCP plans supplies with respect to minimum remaining shelf life days. This is the recommended setting. No - ASCP plans supplies without enforcing minimum remaining shelf life days - This is the default value.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
7424037 -1 -1 No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Valid value are: Yes - Base Package is used for creating a SNO model. No - Base Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Valid value are: Yes - Calendar Package is used for creating a SNO model. No - Calendar Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Valid value are: Yes - Customer Package is used for creating a SNO model. No - Customer Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Valid value are: Yes - Demand Package is used for creating a SNO model. No - Demand Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Valid value are: Yes - Distribution Package is used for creating a SNO model. No - Distribution Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Valid value are: Yes - Forecast Package is used for creating a SNO model. No - Forecast Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Valid value are: Yes - Fixed Production Package is used for creating a SNO model. No - Fixed Production Package is not used for creating a SNO model. Default Value - Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No No No No No No No Yes No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 No No No No No No No No No No No Yes No No No
Default Value - Yes Note: We have two profiles: MSC: SNO - Snapshot Manufacturing Package MSC: SNO - Snapshot Manufacturing Package (1) Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Change only on advise from Oracle Development. Default Value - 8 Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
5157640 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No Yes No No No
The precision used when displaying currency values in SNO. For the most accurate calculations, a precision of 9 is recommended. Valid values are: Numeric
Default Value - 2
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Within SNO, the number of decimal places is called the display precision. Changing the display precision does not change the actual data values saved in a model. The display precision can affect results when you match data. For example, if the display precision is 2, a Machine node Utilization field with a value of 133.333333 displays 133.33. If you try to match Machine nodes with a Utilization field value of 133.33, the Machine node in this example is not matched because its actual value is 133.333333. Default Value - 2 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Default Value - Cost Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
This flag causes released results to be stored on the client side for diagnostic purposes. It slows down the whole release process so it is recommended to be used under the guidance of Oracle support. Valid values are:
Yes No - prevents the local save of the files in CSV for debugging, This can save space and improve performance on large models.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7233633 -1 Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Specifies the batch script that starts the SNO Connector. Do not change without advise from Oracle Development. Default Value - runSNOConnector.bat Obsolete in v2 integration (11.5.10/R12.1)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Can be defined at the site level. A Null value means all closed sales orders are collected. Does not apply to complex maintenance repair and overhaul where the material scheduled for a visit or task is collected as a sales order in Oracle Advanced Supply Chain Planning. Default Value - null Note Reference(s) 277863.1 217116.1 780735.1 365770.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Normally, we recommend the default setting for this profile, unless you run several plans each cycle and the profile MSC: Launch Analyze Plan Partition is set to No. Then you should set All Partitions and launch this request after running all ASCP plans in your planning cycle. Using this strategy can have positive performance impact if all plans are run together and then users start working in the plans. Default Value - Plan Partition Only Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No Yes No Yes Yes No No No No No No No No No No No No
No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - ~ Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No Yes No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 No No No No No No No Yes No No No No No No No No No No No No
Item - SPP will consider the safety stock level for each item (for which safety stock is prescribed) Prime (Default) - the safety stock for the entire prime will be considered as the safety stock level and the existing supply for the various members of the prime will be considered while trying to maintain the safety stock level.
Example: Consider this supersession session chain: A3 -] A4 [-] A5 [-] A6 -] A7 [-] A8 Assume safety stock for each item = 100 units for a give period. If the profile option = 'Item', then consider the safety stock level for each item to be 100 units and use only native supply to maintain this level. There will be no substitution recommended by planning and safety stock violation exceptions will be raised for each item. If the profile = 'Prime', then planning determines that A3, A6 and A8 are the primes in this supersession chain then planning will use the following levels: SS target for A3=100 units, and planning will only use supply of A3 to maintain this level. SS target for A6=300 units, and planning will use supplies of A4, A5 and A6 to maintain this level. SS target for A8=200 units, and planning will use supplies of A7 and A8 to maintain this level. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No Yes No Yes Yes No No No No No Yes No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
5370377 4520265 -1 -1 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No Yes No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
2937850 -1 Yes No No No No No No No No No No No No No No
-1 -1 -1 -1 -1 Yes No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) 298806.1 787982.1 562872.1 787458.1 947399.1 958872.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center
No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
-1 No No No Yes No No No No No No No No No No No No No No No
-1 No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
3938565 8603036 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
730061.1 436771.1 Bug Reference(s) Document References(s) 845365.1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Global Order Promising Implementation and User's Guide -1 -1 Yes No No Yes No No No No Yes No No No Yes No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) 420752.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No No No Yes No No No No No No No No No
MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)
Profile Code Profile Option Name Description MSC MSC_LOCK_WAIT_TIME Time (in seconds) the Snapshot Delete Worker waits to obtain a lock on a table/partition before aborting. Releasing plan recommendations through Workbench and running Purge Plan can cause locks on the table/partition preventing the Snapshot Delete Worker from obtaining a lock. If the timer expires, the program prints the following message in the log file: Unable to obtain a lock on table. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 -1 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Added in R12.x for debug messages for Data Collections - Planning Data Pull and ODS Load and other collections processes. MRP: Debug mode is still debug profile used for Refresh Collections Snapshots, but all other processes now use this profile to set debug level. Level settings may vary by release: On (Minimal) Medium -- CAUTION - levels below may cause performance issues. Should usually be set only with DEV recommendation. High High (Verbose) Dev List of values available as in 12.1.3.4: OFF LOW (Default) MEDIUM HIGH DEV
Note Reference(s)
5514401 5578510 -1 -1 -1 -1 No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning
Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No
CAUTION: Should not be used with MSC:Coll Error Debug Mode set to Medium or higher unless directed by DEV. Best to set this profile and have MSC: Coll Error Debug Mode = OFF when working a pure performance issue Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
6722040 5514401 -1 -1 No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
MSC:Collect Routing
Profile Code Profile Option Name Description MSC MSC_COLLECT_ROUTING Use this profile to instruct the targeted collections process how to collect bill of material and routing data. Valid values are: Yes - Collect bill of material and routing data No: Collect bill of material data but do not collect routing data
This profile option is overridden by profile option INV: Capable To Promise is ATP/CTP based on Planning Output. Do NOT set no if running any Plans in VCP Applications. Useful when ATP based collected data is being used and having very large BOM Routing tables and it can help performance. Currently only available in 11.5.10 starting in Data Collections Rollup #25. Bugs to Front port to R12 and R12.1 are pending
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
6658721 -1 -1 Yes No No No No No No No No No No No No No No
MSC:Compute IB Aggregation during Collection Initiallly the Aggregate Information Collection was made part of Refresh Collection Process. We have made it a standalone program which can be run independently of the Refresh Collection Snapshot process based on value of the profile option MSC:Compute IB Aggregation during Collection. By default ,the Install base aggregation will be computed during Collection process, and if the profile option is set to No, then the Installbase Aggregation can be computed by running the concurrent program "Compute Installbase Aggregate Under Contracts". To imrove performance we have paralleilized the computation by introducing concurrent programs "Installbase Worker" , however this program can only be invoked by the parent program "Compute Installbase Aggregate Under Contracts". If this profile option is set to No, then the concurrent program "Compute Aggre Installbase under Contract" will not be called during collections. So, when the data pull parameter "Install Base Under Contracts" is set to Yes, we will collect over the install base under contracts information already computed at that time. The user can run the concurrent program "Compute Aggre Installbase under Contract",
before the collection run so that the collection run timings are reduced.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Enhancement Bug 4417550 was logged to help further control how orders can be released. This is first released in 11.5.10 in ASCP Engine/UI Rollup # 8 - Ref Note 252108.1 for more information on the rollup patches for APS Suite The implementation is described as follows: 1. Implement the functionality at the Responsibility Level. -- This is enabled at Site, Application and Responsibility level only -- This is NOT available to set at the User level 2. The check is ONLY for first level of pegging for Buy From or Transfer From type pegging lines. Warning:This will not check the pegging of any Sub-Assemblies that are in the pegging tree to see if they components of the Subassembly are pegging to on hand. 3. The message is a Warning and can be ignored by the user and order may still be released Set on APS Destination in a distributed environment
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections
560587.1
-1 Yes No
Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
When set to Yes, then the data that is inserted into the MSC%Interface tables during release from the workbench (Or when Auto-Release Planned Orders is run) is retained in these tables. ( Also can effect release from PS application) Default = No Primarily used for debugging purposes. Tables effected: MSC_SO_RELEASE_INTERFACE MSC_PO_RESCHEDULE_INTERFACE MSC_WIP_JOB_SCHEDULE_INTERFACE MSC_WIP_JOB_DTLS_INTERFACE MSC_PURCHASE_ORDER_INTERFACE MSC_SALES_ORDER_INTERFACE MSC_PO_REQUISITIONS_INTERFACE This profile is used for release process in E1-VCP integration
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12592939 -1 No No No Yes Yes No No No Yes No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
1 - Sysdate - current default functionality Sourcing rule effectivity date is based on system date 2 - Request Date - this will check for sourcing effectivity based on the Request Date or Planning Time Fence Date (whichever is greater) Example: Item has 5 days leadtime and ZERO on hand Item sourced from supplier A on right now Item sourcing will change on Day 10 to Supplier B So sourcing rule is setup with supplier A sourcing disabled on Day 9 Sourcing shows supplier B with sourcing starts on Day 10 So Customer A calls today and requests item to ship on Day 20, SO -- best solution is to use profile with setting Request Date, since you would need to order the product on Day 14 to arrive on Day 19, then ship on Day 20. Supplier B would be chosen for this order. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8423266 -1 Yes No No Yes No No No No No No No No No No No No No No Yes
MSC_USE_HASH_KEY
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3575822 -1 Yes No No Yes No No No No No No No No No No No No No No No MSC MSC_USE_HASH_KEY This is an internal profile. Should be set to Yes always
MSD: AW Tablespace
Profile Code Profile Option Name Description MSD MSD_TABLESPACE This profile controls where analytic workspaces are created and stored. New plans are created in the specified tablespace; existing plans remain in the tablespace specified at the time of their creation. Changing the tablespace profile has no effect on existing data.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3900222 -1 No No No No No No No No No Yes No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No No No No No No No Yes No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No Yes No No No No No
-1 Yes No No No No No No No No Yes No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2710122 -1 Yes No No No No No No No No Yes No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4157588 -1 Yes No No No No No No No No Yes No No No No No
5202797 -1 No No No No No No No No No Yes No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2779954 -1 Yes No No No No No No No No Yes No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No Yes No No No No No
-1 No No No No No No No No No No Yes No No No No
-1 -1 -1 Yes No No No No No No No No Yes No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3009964 -1 Yes No No No No No No No No Yes No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6137940 -1 Yes No No No No No No No No Yes No No No No No
Default Value - Y Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6367799 -1 No No No No No No No No No Yes No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No Yes No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No No Yes No No No No
No No No No No No No No No Yes Yes No No No No
No No No No No No No No No No Yes No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No Yes No No No No
No No No No No No No No No Yes Yes No No No No
Yes No No No No No No No No No Yes No No No No
MSD_DEM: Schema
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8361879 -1 Yes No No No No No No No No No Yes No No No No MSD MSD_DEM_SCHEMA Set this profile value to the database schema name where the Oracle Demantra schema has been installed. Destination side profile
-1 No No No No No No No No No No Yes No No No No
No No No No No No No No No No Yes No No No No
Yes No No No No No No No No No Yes No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No No No No Yes No No No No
MSD_DEM: Version
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_DEM_VERSION Created documentation bug 12685733 . 1061331.1
-1 No No No No No No No No No No Yes No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No No No No No Yes Yes No No No No No No No No No No No
Controls the maximum number of slices to which supply can be rescheduled. Supply is not rescheduled after this maximum even when demand will be delayed. Possible values include: -1 - Reschedule to last slice 0 - Does not reschedule.
For example, if a supply pegs to demand in slice 2, 3, 4, 5, and 6, and the parameter value is 2, supply will reschedule if needed in slice 3 and 4 (rescheduled 2 times, in slice 3 and 4) and will not reschedule in slice 5 and 6. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - 0 739561.1 952924.1 726610.1 747739.1
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
This functionality can be enabled for all independent demands or only for Sales Orders. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is All End Demands. Default Value - None 458693.1
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No
Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No
Yes/No - Default = No When scheduling simulateous resources, value of Yes can allow these resources to finish at different times. This can cause different resource consumption. Yes may be required when resources are available with different shift times in order to get reasonable plan results. No documentation on this profile.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
837834.1
This is an internal value. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
This profile option does not govern the placement of order dates. If profile option MSO: Use Shift definitions when scheduling lead-times is Yes, the planning engine assumes accurate shift timing. Note Reference(s) 853822.1 1331154.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
3511063 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
3964120 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7424573 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes No No No Yes No No No No No No No No No No No
The planning engine schedules supplies in two phases: Backward schedule - From demand due date to see if demand can be met on time. Forward schedule: If the backward schedule results in a late demand, the forward schedule from the plan start date meet demands with minimum lateness.
At the end of the forward schedule phase, the planning engine adjusts the schedule to remove gaps between supplies (right justification). It may move a supply to occur at a time where there are more resource units available that there were in its previously scheduled time. If this profile option is 1, the planning engine considers assigning more resource units to the supply. For example, this profile option is 0.5. The planning engine considers changing the number of resource units if the current capacity units value is less than 0.5 * Max assigned units on the routing for the item. If this profile option is 0, the planning engine does not consider assigning more resource units. This is a user level profile option. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - 0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8745009 -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
B31553-02 Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5018283 -1 Yes No No Yes No No Yes Yes No No No Yes Yes No Yes No Yes No No No No No No No
MSO: Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During Component Substitution
Profile Code Profile Option Name Description MSO MSO_SCHEDULE_PO_IN_FIFO
Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During Component Substitution Introduced on top of EBS 12.1.2 in one-off patch 9238752 (included in VCP 12.1.2.1) In base release of EBS 12.1.3 Bug 8238752 notes the following: For enabling the Consume PO supplies in FIFO sequence feature the following profiles needs to be set. 1.MSO: Component offset logic for optimization = 2 2.MSO: Schedule PO in FIFO = Yes 3.MSC: Use Optimization Phase Supply Due Dates for Pegging - Yes 4.MSO: Additional Demand Slices for Shared Supply Rescheduling -1 5.MSO: Net All Firm Supplies Before Creating Planned Order - All Supply Types This enhancement was done for a particular customer. They also used some customization scripts for this solution to work. Default Value=No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning 9238752 -1 No No No Yes No No Yes Yes No
Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No
This feature can also be set at the item/organization level using the Continuous Inter-Org Transfers item attribute. The value specified for the item attribute overrides the profile option setting. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7436622 -1 Yes No No Yes No No No No No No No No No No No No No No No
Default Value - Parallel Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders
Profile Code Profile Option Name Description MSO MSO_INTER_ORG_DEMAND_SPLIT Allows you to fulfill a demand in series or in parallel from multiple supplies from suppliers and/or other organizations. Valid Values are: Series - Demand is satisfied in series from multiple supplies. Parallel - This is the default value.Demand is satisfied in parallel from multiple supplies.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value: Parallel For supplier sourced orders, use profile option MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced Orders. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. 726610.1
If a component is fed by orders from multiple organizations, the value of profile option MSO:Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders overrides the value of this profile option. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Defaut value: Parallel
Note Reference(s) 726610.1
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center
No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence
Profile Code Profile Option Name Description MSO MSO_AGG_SUP_FOR_DMD_IN_PTF
Introduced in ASCP Engine/UI rollup #33 for 11.5.10 Front ported to R12 in CU5 patch 7270650 Fixed in VCP Cum patch 12.1.3.1 and above The Memory Based Planner (MBP) used to create supplies for unsatisfied demands inside PTF on respective dates after considering the FDS. Later on those supplies were moved to PTF date, resulting in more than one supply on PTF date. This would be wrong for some set up. So, we made the code changes to create single supply for unsatisfied demands in PTF. This is now controlled by this profile.
Yes, then one supply is created for unsatisfied demands on the PTF date if all of the following conditions are satisfied: Plan is not constrained with Decision Rules Plan is not optimized.
No, more than one supply may be created for unsatisfied demands on the PTF date.
Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No
Note Reference(s)
-1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No Yes No No No No No No No Yes No No No No No No No No No No No No
Default Value - 10000. Note Reference(s) 296941.1 147220.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - Beginning of Day Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No
1331154.1 Bug Reference(s) 6273866 3198606 7460229 3573179 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 -1 Yes No No Yes Yes No No No No No No No No Yes No No No No No
Document References(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
The sales order demand due timestamp does not affect forecast consumption because forecast consumption is done in daily buckets. This profile option does not apply to forecasts. Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
4120214 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - NULL 739561.1 1068297.1
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Bug Reference(s)
Document References(s)
8264328 2764894 8264323 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
4573393 -1 Yes No No No No No No No No No No No No No No
MSO: Divergent Supply Feeding Pattern for InterOrg and Supplier Sourced orders
Profile Code Profile Option Name Description MSO MSO_INTER_ORG_SUPPLY_SPLIT Allows you to fulfill multiple downstream demands in parallel or in series by a supply from another internal organization. Values are: Series With MTQ Only - This is the default value. A supply always feeds multiple demands in series when a corresponding MTQ has been specified. Series - Supply feeds multiple demands in series.
If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value: Series With MTQ Only
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4572101 -1 Yes No No Yes No No No Yes No No No No No No No No No No No
The actual window is defined by the dates: Latest Possible completion time (LPCT) - Determined by the start time of downstream activities that have already been scheduled. Earliest Allowable Completion Time (EACT) - Calculated by the planning engine which accounts for the unscheduled upstream activities and how much time those activities need.
If this profile option is the default value, the planning engine uses the calculated EACT. If this profile option is lower than the default value, the planning engine uses an earlier EACT than the calculated EACT which gives the activity a larger scheduling window. If this profile option is higher than the default value, the planning engine uses a later EACT than the calculated EACT which gives the activity a smaller scheduling window. This is a user level profile option. Default Value - 0.5 Note Reference(s) 259322.1
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Valid values: Yes/No Default value: No The planning modes Constrained (Without Detailed Scheduling) and Constrained (With Detailed Scheduling) are available when the value of this profile option is set to Yes
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5233140 -1 No No No Yes No No Yes Yes No No No No No No No No No No No
Default value = NULL (No) Will be used if the Optimization Flag is checked in Plan Options. When Yes, it is possible that internal cost rollup may take some time and impact performance.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No
The Plan Options tab, Decision Rules, is disabled. If you select No, you can duplicate the functionality of the decision rule Use Alternate Sources parameter for buy items but not for transfers from other organizations; set profile option MSC: Enable Enhanced Sourcing to Yes. Default Value - No Note Reference(s)
214041.1 225876.1
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5067925
No No No No No No No No No No No No No No No
Enables rounding of fractional supplies and demands and allocated qty after 1-to-1 splitting based on pegging for SPP Valid values are: Y - By rounding the orders we are going to update the data from the pegging, supplies and demands table. Rounding is process that round up to the nearest integer the fractional order quantities. N - If the profile is not specified the order quantities are NOT rounded up (default behavior)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6834025 -1 No No No No No No No Yes No No No No No No No No No No No No
When using End Item Substitution, for Rank 1 sourcing rules with split sourcing %, this profile must be set to enforce the sourcing split. Valid values: Yes/No Default value: No Not supported on Rank 2 of the sourcing rule.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
6430766 9486069 -1 -1 Yes No No Yes No No Yes Yes No No No Yes Yes Yes Yes No Yes No No No No No No No
Valid values : Yes/No Default value = Yes If set to Yes : The downstream process starts after a minimum quantity from the upstream process has been completed. The material transfer is continuous after the Minimum Transfer Quantity is completed. No documentation on this profile. However, you can find information about "Minimum Transfer Quantity" (MTQ) in ASCP guide (Page 6-79) This is linked to MTQ setups for resources and routings. This should be No, unless you have specific MTQ setups that must be enforced.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - No Note Reference(s) 562872.1 259322.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
370386.1 365112.1
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
The planning engine does not reschedule or cancel recommendations even if there are conditions for reschedules and cancellations. The planning engine uses the start date of the receiving organization as the reference for internal requisitions. Default : No 555016.1 1079681.1 1068297.1 365112.1
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
4688250 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
There is a documentation bug : The documentation says that this profile is replaced by profile MSO: Floating Point Precision for Order Quantities - but this does not exist. This (Floating Point Precision) is the correct profile name - Refer to the documentation for MSO: Floating Point Precision for Order Quantities and use this profile instead. Number > 0 Default = 100 Internal multiplier for order quantities. Can change the value depending on precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled by the machine.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No
MSO: Floating Point Precision for Increments of Shift Start/End Times Within a Planning Bucket
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_HLS_SHIFT_INC_PRECISION Could not find in the User guide.
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
The planning engine issues exception message Orders with insufficient leadtime when it schedules orders for less time than their assembly's lead-time. If the reason for that scheduling is that the planning engine would schedule the order in the past, it also issues exception message Orders with compression days. To avoid seeing both these exceptions for the same order, select No for this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
The planning engine assumes that these orders are in progress and on time: Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
B31553-02 Yes No No No No No No No No No No No No No No
Material flows and resource loads are not influenced by charge quantities. Valid values: yes/no Default value: no Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes Yes No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
This profile option specifies the time window within which ASCP tries to schedule a set of operations linked together through hard links.If scheduling is unsuccessful,overloads are created. This is a hidden profile option used by development. This defines the scheduling window within which the system schedules the hard-linked operation set. Increasing the window gives room to schedule operations with hard links without overloading. Based on the number of operations per hard linked operation set,increasing this value can have a performance impact. Valid Values : Integer Default value 30
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
Bug 9587814 shows that cusotmer had plan using 12gb of memory and by setting this profile = Yes, the plan only used 5gb of memory
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
9587814 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No Yes Yes Yes No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
6863019 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Default Value:0 If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Violate Minimum Processing Times to Meet Demand Due Date: The planning engine meets the demand due date even if it compresses operations and supplies beyond their minimum durations (from item lead-times and routing usages). -- This setting can violate the Planning Time Fence settings for an item. -- It can also violate a Natural Time Fence created by using profile MR: Create Time Fence = Yes Do Not Violate Minimum Processing Times: The planning engine respects the minimum durations of operations and supplies (from item lead-times and routing usages) even if it satisfies demands late. Default Value: Violate minimum Processing Times to Meet Demand Due Date This, sometimes, used with plan option - Enforce Purchasing Lead-times Constraint and can change planning engine behaviour. In 11.5.10, this profile is only for EDD - Enforce Demand Due Dates plan In 12.0.4 and above, this profile works for BOTH EDD and ECC - Enforce Capacity Constraints plans.
Note Reference(s)
-1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning
All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
MSO: Lookahead days to net co-product/by-product supplies before creating planned orders
Profile Code Profile Option Name Description MSO MSO_CO_LOOKAHEAD_WINDOW Profile no longer used in the application. Will be removed from UI in a future release. Was originally available in 11.5.8 and removed in 11.5.10. accidentally included in R12 Note Reference(s) 111.1
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
**Begin PM Update This profile was introduced in R1 for DS. Not used anymore **End PM Update Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Can be defined at the site level. This profile is automatically calculated,this means that the Planning Engine determines the default value of this profile option. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - 10 If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
If you need to change the default value of this profile in your installation, it is recommended that you consult with Oracle Development before doing so. You can set this option if you receive the Requirement causes resource overload exceptions in the Planner Workbench in Enforce Capacity Constraints Plans. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. 841308.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) 567317.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4006732 -1 -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Can be defined at the site level. Note: Set this to a number as large as the typical planning horizon to avoid unusual results. Default Value - 300 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - Null Note Reference(s) 859179.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8801111 -1 -1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No
No No No No No No No No No No No No No No No
Default Value - 1 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
2829066 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Default Value - 100 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 MSO: Target Inventory Level % of Safety Stock Yes No No Yes No No No No Yes No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No No No No No No No No No No No No No
Can be defined at the site level. This profile is automatically calculated, this means that the Planning Engine determines the default value of this profile option. Default Value - 8 If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Can be defined at the site level. This is automatic Calculated profile. When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. Default Value - 5 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Valid Value: Number >= 0. Default Value: Null. Note Reference(s) 1068297.1 Bug Reference(s) Document References(s)
-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
3 - Only for Purchase and Transfer Supplies: Net all firm purchased and transfer supplies before creating planned orders. 4 - All Supply Types Including by-product/co-product supplies: Nets all firm supplies (including by-product and coproduct supplies) before creating planned orders. The planning engine does not reschedule by-product and coproduct supplies, they follow the scheduling of the supply that generates them. This choice allows these supplies to be netted for earlier demands. This may cause late demands, but may reduce overall inventory.
Note Reference(s)
Default: No 370386.1
749448.1
-1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes Yes Yes Yes Yes No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning
Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No No No No No No No No
Defined at the site level. Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Default Value:0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Defined at the site level. Default Value - 0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Default Value - 100% Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Can be defined at the site level. Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Default Value - 100% Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12409853 -1 No No No No Yes No No Yes No No No No No No No No No No No No
However, multi-threading increases the CPU usage and memory consumption. You can control the load on CPU by specifying the number of threads that you want to run in parallel. Valid value: Integer >0 Default value: null Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 -1 Yes No No Yes No No No No No No No No No No No No No No No
No No No No No No No No No No No No No No No
Oracle suggests that: The solution quality improves with higher numbers while the processing time worsens with higher numbers. For each integer increase in the profile option, processing time worsens at a much higher rate than solution quality improves. You consider the tradeoffs and tend towards lower rather than higher numbers. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6890145 -1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No
Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No Yes No No No Yes No No No No No No No No No No No
MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ITEM_CAP_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 of ASCP user guide for more information. Valid Values: Interger>=0 Default Value: Null 763878.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_SUP_CAP_PENALTY Attribute Number Automatically generated to denote flexfield segment holding the penalty factor. This profile option stores the item flexfield segment that holds the penalty cost factor for exceeding material capacity. The collections process Generate Planning Flexfield concurrent program captures the segment when it first runs during installation. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_ITEM_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are: Interger >= 0
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_RES_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are: Interger >= 0
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_TRSP_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are: Interger >= 0
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_RES_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. Valid values are: Interger >=0
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_TRSP_PENALTY Penalty Cost for Exceeding Transportation Capacity (Optimized Plan)
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No Yes No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
4139766 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Default Value - NULL Note Reference(s) 176030.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ITEM_DMD_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. Valid Values: Integer>=0 Default Value: Null
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_DMD_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 for more information. Valid values are: Interger >= 0
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_SO_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 in the ASCP User Guide for more information. Valid values: integer >= 0 Default value: 0 153919.1
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
2149275 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
Default Value - Automatic Calulations When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. These profile options are included in this appendix for information purposes only. If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
This profile option does not apply to other order types, for example, purchase orders and purchase requisitions. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7280156 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
The factor that the planning engine uses to reduce the resource availability when making the sourcing decision. For example, if the factor is set to 0.8, the resource availability is reduced by 20% and the planning engine uses more of the alternate processes. Then, at the time of scheduling, planning has more flexibility. Valid values: A number between and including 0 and 1 Default value: Null (internally defaulted as a value of 1)
Note Reference(s)
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) 244748.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Valid values: Yes/No Default value: Yes Available in 12.1.1 and upwards as well Note Reference(s) 365112.1 Bug Reference(s) Document References(s) 4413913 4432428 -1 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No
Yes No No No No No No No No No No No No No No
2953151 -1 No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Details added to recent ASCP Guide - E13358-08 (page A-125) Valid Values: Yes/No Default Value: Yes (can schedule across break) Specifies whether the simultaneous resource activity is allowed to go across calendar breaks or not. This profile option behaves the same as profile option MSO: Schedule Across Breaks. However, it only applies to simultaneous resources. MSO: Schedule Across Breaks: Determines whether the scheduling engine starts an activity before a break and ends it after the break. If set to No, verify that every activity has enough resource in one shift (otherwise the activities are moved to the end of the horizon). The setting would depend on whether or not the requirements on the simultaneous resource(s) are "breakable". It would be best for this to be in sync with the principal, but there may be cases where we really can't allow a simultaneous requirement to span a break even though the principal may be able to. Generally, we expect the principal resource to be the one dictating the behavior, but this allows for the simultaneous resource to actually be somewhat more restrictive. If we set "MSO: Schedule Simultaneous Resources Across Breaks" to "No", but "MSO: Schedule Across Breaks" to "Yes", then the user should be prepared to see requirements being pushed out by the simultaneous if necessary. When your requirement for the simultaneous is non-breakable and too long to fit in shift time. 1. MSO: Schedule across break is set to No/
should be Yes 2. MSO: Schedule Simultaneous Resources Across Breaks should also be yes. We have this profile precisely to avoid that the simultaneous would be longer because of breaks. i.e. the labor finishing his job after the machine has finished during the night.
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - 8 days Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
-1 Yes No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
4007906 -1 No No No Yes No No No No No No No No No No No No No No No
The relative mix of various setup types that fall into this window is calculated and then applied to each resource sequencing window. When MSO: Use Sequencing Template is set to Yes, ASCP uses this calculated mix of setup types to determine the desired spots. Default Value - 1 Note Reference(s)
4113649 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 No No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
5090041 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s)
Document References(s)
4164443 4416504 5090041 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
8538729 -1 No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note that the maximum number of resource units at the routing level will always be respected. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Yes No No Yes No No No No No No No No No No No No No No No
Default value: Null (interpreted as No) Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9020829 -1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
You can use this profile option to specify the number of days a specific supply can satisfy safety stock demand. Default Value - Null Note Reference(s)
3500953 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
No No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 MSO: Maximum Inventory Level % of Safety Stock Yes No No Yes No No No No Yes No No No No No No No No No No
Default Value: 0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8730427 -1 No No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
MSO: Upper Limit for Maximum Time Offset for Hard Links
Profile Code Profile Option Name Description MSO MSO_HARD_LINK_MAX_OFFSET_UPPERBOUND
Use this profile option to set an upper limit for the maximum time offset. If a maximum time offset is higher than this number, the planning engine uses this number instead of what you set. Valid values are: Valid Values: Integer (including 0),null: Use 10,000,000 Default value: Null
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
760046.1
-1 No No No Yes No No No No No No No No No No No No No No No
Valid values are: Yes - the planning engine does not set any of these dates during a break even if the calculation places it there. No - the planning engine does set any of these dates during a break if the calculation places it there.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5048642 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No Yes
No No No No Yes No No Yes No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s)
NOTE: This profile, when used with the profile "MSO: Postpone Use of Alternates to Latest Possible Time" may give you different results. From Note 365112.1 - also see Note 567667.1 for clarification on the use of this profile in an Enforce Due Date (EDD) plan. 365112.1
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
-1 No No No Yes No No No No No No No No No No No No No No No
No No No Yes No No No No No No No No No No No No No No No
Note: The assumption that the activity duration is less when more units are chosen is only valid for the basis type of Item specified in the Operation > Resources form. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - No (Do not run Optimization / Decision Rules during Online Planning) 365112.1
-1 Yes No No Yes No No No No No No No No No No No No No No No
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Default Value - No Note Reference(s) 872475.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Default value: No Note Reference(s) 415276.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9500377 -1 -1 No No No Yes No No Yes Yes No No No No No No No No No No No
If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. (Default) Note Reference(s) 950994.1 978623.1 1301132.1 Bug Reference(s) Document References(s)
Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No
Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
If this profile is set to "Yes" then Inline forecasting calculation details are written in the flat files. This should only be set if you would like to debug the inline forecasting results.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7621495 -1 No No No No No No No Yes No No No No No No No No No No No No
Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No
5182644 -1 No No No No No No Yes No No No No No No No No
-1 Yes No No No No No Yes No No No No No No No No
Default Value - 10 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No
Default Value - Probabilities Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No
Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising
2260006 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No
Yes No No Yes No No No No No No No No No No No No No No No