Sei sulla pagina 1di 831

Oracle Corporation

Oracle Value Chain Planning Profile Options


Revised: 2012-04-27

For Oracle Internal and licensed customer use only. This report is compiled from the Profile Options Database created and maintained by the VCP Support Team and contains knowledge gathered from the Documentation, Notes, Bugs, and other internal sources. We do not guarantee this data to be without flaw and offer no warranty to its fitness for use. We will update and maintain this document when possible to present the best available information. (c) Oracle Corporation 2010

Table of Contents
Advanced Planning and Scheduling Profile Options....................................................................18 BOM: Hour UOM...................................................................................................................19 CRP:Spread discrete requirements......................................................................................20 CSD: Default Repair Order...................................................................................................21 CSD: Default Repair Organization........................................................................................22 CSD: Default Repair Type..................................................................................................... 3 2 CSD: Default Service Request Severity for Internal Repair Order........................................24 CSD: Default Service Request Type for Internal Repair Order.............................................25 CSD: Repair Mode for Depot Repair Orders......................................................................... 6 2 CSD: Repair Type Internal Repair Order..............................................................................27 CSP: Repair Supplier Organization's Defective Subinventory..............................................28 CSP: Repair Supplier Organization's Usable Subinventory..................................................29 INV:Capable to Promise........................................................................................................ 0 3 MO: Operating Unit...............................................................................................................31 MRP: 2-Cuttoff Date Offset Months......................................................................................32 MRP: Calculate MATO Demand...........................................................................................33 MRP: Calculate Plan Performance.......................................................................................34 MRP: Calculate Supply Demand........................................................................................... 5 3 MRP: Category Set for Backlog Form...................................................................................36 MRP: Compute Standard Mandatory Components for ATO Models....................................37 MRP: Cutoff History Days.....................................................................................................39 MRP: Disable Project Validation...........................................................................................40 MRP: Explode Demand Through Phantom Component.......................................................42 MRP: Firm Internal Req Transferred to OE........................................................................... 3 4 MRP: Hash Area Size (Bytes)...............................................................................................44 MRP: Ignore Alternate BOM/Routing....................................................................................45 MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting 46 MRP: Net All Purchase Orders Prior To Requisitions...........................................................47 MRP: Old Sales Orders Cutoff Days.....................................................................................48 MRP: Persist ATP Results....................................................................................................49 MRP: Plan Revenue Discount Percent.................................................................................50 MRP: Plan Revenue Price List..............................................................................................51 MRP: Planning Manager Run First Time..............................................................................52 MRP: RHX Check Profile......................................................................................................53 MRP: Round Source Entries.................................................................................................54 MRP: Sort Area Size (Bytes)................................................................................................. 5 5 MRP: Update Requested Completion Date when Releasing Reschedules..........................56 MRP: Use Alternate SQL for Daily Cleanup.......................................................................... 7 5 MRP: Use Progress Bar for Backlog Workbench.................................................................. 8 5 MRP: i2 Batch Client Timeout...............................................................................................59 MRP: i2 Calc Cumulative Yield.............................................................................................60 MRP: i2 Check if FP installed................................................................................................ 1 6 MRP: i2 Data Load Timeout..................................................................................................62

MRP: i2 Date Constant.........................................................................................................63 MRP: i2 Debug Mode............................................................................................................64 MRP: i2 Factory Planner Exec Dir Attr Number....................................................................65 MRP: i2 Factory Planner User Attribute Number..................................................................66 MRP: i2 Job Change Attribute Number.................................................................................67 MRP: i2 Log Directory...........................................................................................................68 MRP: i2 Net Change Dir........................................................................................................ 9 6 MRP: i2 RHYTHM Aggregate Resource Attribute Number...................................................70 MRP: i2 RHYTHM BC Delimiter............................................................................................71 MRP: i2 RHYTHM BOM Attribute Consumed attribute number............................................72 MRP: i2 RHYTHM BOM Attribute Produced attribute number..............................................73 MRP: i2 RHYTHM Batch Client Filter.................................................................................... 4 7 MRP: i2 RHYTHM Cooldown Time Attribute Number...........................................................75 MRP: i2 RHYTHM Delimiter..................................................................................................76 MRP: i2 RHYTHM Enable Attribute Base Planning..............................................................77 MRP: i2 RHYTHM Estimated Queue Time Attribute Number...............................................78 MRP: i2 RHYTHM Factory Planner Data Dir Attribute Number............................................79 MRP: i2 RHYTHM Factory Planner Host Attribute Number..................................................80 MRP: i2 RHYTHM Factory Planner Port Attribute Number...................................................81 MRP: i2 RHYTHM Inventory Attribute Alias Separator.........................................................82 MRP: i2 RHYTHM Minimum Queue Time Attribute Number................................................83 MRP: i2 RHYTHM OE Attribute Consumed attribute number...............................................84 MRP: i2 RHYTHM Offloadable To Attribute Number............................................................85 MRP: i2 RHYTHM Offloadable from Attribute Number.........................................................86 MRP: i2 RHYTHM PO Attribute Alias attribute number........................................................87 MRP: i2 RHYTHM Part Buffer Style Attribute Number.......................................................... 8 8 MRP: i2 RHYTHM Resource Type Attribute Number...........................................................89 MRP: i2 RHYTHM released as firm manufacturing order.....................................................90 MRP: i2 RhythmLink Data Directory.....................................................................................91 MRP: i2 RhythmLink Executable Directory...........................................................................92 MRP: i2 RhythmLink Host.....................................................................................................93 MRP: i2 RhythmLink Port Number........................................................................................94 MRP: i2 RhythmLink User.....................................................................................................95 MRP: i2 Start Factory Planner Client....................................................................................96 MRP: i2 Start RhythmLink Client........................................................................................... 7 9 MRP: i2 WIP Job Load Timeout............................................................................................98 MRP:ATP Assignment Set....................................................................................................99 MRP:ATP Database Link....................................................................................................100 MRP:Activate OLP..............................................................................................................101 MRP:Allow Safety Stock Pegging.......................................................................................102 MRP:Backlog Progress Timeout.........................................................................................103 MRP:Calculate Excess Exceptions on Time Fence............................................................104 MRP:Combine Sugg Rep Schedules..................................................................................105 MRP:Complete Supply Chain ATP.....................................................................................106 MRP:Compute Sales Order Changes.................................................................................107 MRP:Consume Fcst Set Summary.....................................................................................108 MRP:Consume Forecast.....................................................................................................109 MRP:Consume MDS...........................................................................................................110 MRP:Consume MPS...........................................................................................................111 MRP:Create Time fence...................................................................................................... 12 1

MRP:Cutoff Date Offset Months.......................................................................................... 13 1 MRP:Debug Mode............................................................................................................... 14 1 MRP:Default Criteria Set.....................................................................................................115 MRP:Default DRP Plan Name............................................................................................116 MRP:Default Forecast Date................................................................................................117 MRP:Default Forecast Name..............................................................................................118 MRP:Default Plan Name.....................................................................................................119 MRP:Default Schedule Name.............................................................................................120 MRP:Default Sourcing Assignment Set..............................................................................121 MRP:Demand Time Fence Days........................................................................................122 MRP:Derive PO supply date from need by date.................................................................123 MRP:Enhanced Exception..................................................................................................124 MRP:Environment variable to set path for MRP files..........................................................125 MRP:Firm Planned Order Time Fence................................................................................ 26 1 MRP:Include Schd Rcpts in Use-up....................................................................................127 MRP:Include Substitute Components.................................................................................128 MRP:Interface Table History Days......................................................................................129 MRP:MPS Relief Batch Size...............................................................................................130 MRP:MPS Relief Direction..................................................................................................131 MRP:Maintain Original Schedule Version...........................................................................132 MRP:Perform Planning Manager Functions in Loads.........................................................133 MRP:Planner Batch Size..................................................................................................... 34 1 MRP:Planner Workers........................................................................................................135 MRP:Planning Manager Batch Size....................................................................................136 MRP:Planning Manager Max Workers................................................................................137 MRP:Purchasing By Revision.............................................................................................138 MRP:Purge Batch Size.......................................................................................................139 MRP:Recommend action within PTF..................................................................................140 MRP:Repetitive Past Due Supply Days..............................................................................141 MRP:Requisition Load Group Option..................................................................................142 MRP:Retain Dates Within Calendar Boundary...................................................................144 MRP:Snapshot Pause for Lock (Minutes)...........................................................................145 MRP:Snapshot Substitute Parts.......................................................................................... 46 1 MRP:Snapshot Workers...................................................................................................... 47 1 MRP:Sourcing Rule Category Set....................................................................................... 48 1 MRP:Time Fence Warning..................................................................................................149 MRP:Trace Mode................................................................................................................150 MRP:Use Direct Load Option..............................................................................................151 MRP:Use Ship Arrived Flag................................................................................................152 MRP_NEW_PLANNER_BACK_COMPATIBILITY.............................................................. 53 1 MSC : Consider all supplies for VMI replenishment calculation..........................................155 MSC : Consume Highest Revision Forecast.......................................................................156 MSC : Publish Supply Commit based on pegging information............................................ 57 1 MSC : VMI Requisitions Need By Date at RTF end............................................................158 MSC: 64-bit Planner Platform.............................................................................................159 MSC: APCC - Enable Cumulative Measures in Archive.....................................................160 MSC: APCC Archive SCRM Measures...............................................................................162 MSC: APCC Calendar Code...............................................................................................164 MSC: APCC Category Set 1...............................................................................................165 MSC: APCC Category Set 2...............................................................................................166

MSC: APCC Category Set 3...............................................................................................167 MSC: APCC Category set for detailed pegging analysis....................................................168 MSC: APCC Currency Code...............................................................................................169 MSC: APCC Instance.......................................................................................................... 70 1 MSC: APCC Period Set name............................................................................................171 MSC: APCC SNO Item Simulation Set...............................................................................172 MSC: APCC WebLogic Console Password........................................................................174 MSC: APCC WebLogic Console Username.......................................................................175 MSC: APCC WebLogic Password......................................................................................176 MSC: APCC WebLogic Username...................................................................................... 77 1 MSC: APCC Webcenter Admin URL..................................................................................178 MSC: APCC Webcenter Enabled........................................................................................ 79 1 MSC: APCC Webcenter Group Space Template................................................................ 80 1 MSC: APCC Webcenter Spaces Member Role..................................................................181 MSC: APCC Webcenter Spaces Port.................................................................................182 MSC: APCC Webcenter Spaces Recipient Key Alias.........................................................183 MSC: APCC Webcenter Spaces Saml Issuer Name..........................................................184 MSC: APCC Webcenter URL.............................................................................................. 85 1 MSC: APCC to APS database link name............................................................................186 MSC: ATP Allocation Method.............................................................................................. 87 1 MSC: ATP Capacity Allocation............................................................................................ 88 1 MSC: ATP Debug Mode...................................................................................................... 89 1 MSC: ATP Enforces Lead Time for ATO Model.................................................................. 90 1 MSC: ATP Infinite Time Fence Pad....................................................................................191 MSC: ATP Synchronization Downtime (minutes)................................................................ 92 1 MSC: ATP Web Service Responsibility............................................................................... 93 1 MSC: ATP Web Service User.............................................................................................194 MSC: AVOID RE-SOURCING SALES ORDERS...............................................................195 MSC: Action Allowed on ATP 24x7 Plan While Running....................................................196 MSC: Aggregate Resource Name Flexfield Attribute..........................................................197 MSC: Align Component Demand Date with Pegging Date.................................................198 MSC: Allocated ATP Forward Consumption Method..........................................................199 MSC: Allocation Assignment Category Set.........................................................................200 MSC: Allow Release of Planned Orders from Demand Schedule Plan..............................201 MSC: Allow release of replenishments above suggested quantity.....................................202 MSC: Analytics Currency Code........................................................................................... 03 2 MSC: Anchor date for calculating operation yields.............................................................204 MSC: Anchor date for calculating remaining shelf life......................................................... 05 2 MSC: Apply Lot Modifiers in Weekly/Period Buckets..........................................................206 MSC: Apply Order Modifier To Start Quantity.....................................................................207 MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock..................208 MSC: Apply shortage and excess tolerance to planned orders..........................................209 MSC: Auto-Release Compression Days Tolerance............................................................210 MSC: Automatically Recalculate Operation Time...............................................................212 MSC: Avoid Re-Sourcing Sales Orders..............................................................................213 MSC: BPEL Demantra Password.......................................................................................214 MSC: BPEL Demantra Username....................................................................................... 15 2 MSC: BPEL Domain Name.................................................................................................216 MSC: BPEL End Point URI.................................................................................................217 MSC: BPEL Process Version..............................................................................................218

MSC: Batch Size for Self Service Loads.............................................................................219 MSC: Batchable Flag..........................................................................................................220 MSC: Batching Window......................................................................................................221 MSC: Buy Order Processing Lead Time Calendar.............................................................222 MSC: CP Debug Level........................................................................................................223 MSC: Calendar Reference for Bucketing............................................................................224 MSC: Cancel Oustanding Sales Order Quantities..............................................................225 MSC: Category Set for Jobs without an Item Reference....................................................226 MSC: Category Set for Liability Analysis............................................................................. 27 2 MSC: Category for Jobs without an Item Reference...........................................................228 MSC: Category set for CP Horizontal View......................................................................... 29 2 MSC: Category set for Strategic Planning..........................................................................230 MSC: Category set for serviceable items............................................................................231 MSC: Choice of item for which to create supplies in substitute relationship.......................232 MSC: Circular sourcing surplus days..................................................................................233 MSC: Class Hierarchy.........................................................................................................234 MSC: Closest Quantity Pegging.......................................................................................... 35 2 MSC: Collaborative Planning Default Calendar..................................................................236 MSC: Collect CMRO Work Order Demand for PS..............................................................237 MSC: Collect Item, Material and Resource Costs...............................................................238 MSC: Collect PS SNO Data................................................................................................239 MSC: Collection Time Window for Install Base under Contracts history............................. 40 2 MSC: Collection Window for Trading Partner Changes (Days)..........................................241 MSC: Collections Snapshot Threshold...............................................................................242 MSC: Compute Project Exception....................................................................................... 43 2 MSC: Configuration.............................................................................................................244 MSC: Consolidate Interplant Demands...............................................................................245 MSC: Consume Forecast Inside Demand Time Fence....................................................... 46 2 MSC: Consume forecast with no demand class.................................................................247 MSC: Consume forecasts using Internal Sales Orders....................................................... 48 2 MSC: Cost Type..................................................................................................................250 MSC: Cost of Using a BOM/ Routing Flexfield Attribute.....................................................251 MSC: Create Resource Requirements for all Operations...................................................252 MSC: Currency Conversion Type.......................................................................................253 MSC: Custom allocation...................................................................................................... 54 2 MSC: DPP Allow Quantity Reduction Only When Supply is Excess on Internal Requisition, Requisition and PO.............................................................................................................255 MSC: DPP Debug Level...................................................................................................... 56 2 MSC: DPP Demand Priority Details viewing buckets.......................................................... 57 2 MSC: DPP Discrete Job Cutoff Window (Days)..................................................................258 MSC: DPP Related Exception Additional Offset Days........................................................259 MSC: DRP Multitasking Group ID's per Process................................................................260 MSC: DRP Multitasking Max Concurrent Processes..........................................................261 MSC: Daily Allocation to Maintain Safety Stock Level........................................................262 MSC: Day UOM..................................................................................................................263 MSC: Days of Resource Availability before sysdate...........................................................264 MSC: Debug Level..............................................................................................................265 MSC: Debug Module...........................................................................................................266 MSC: Default Category Set for Rapid Planning..................................................................267 MSC: Default Project for Supplies Pegged to Excess......................................................... 68 2

MSC: Default Workbench Height........................................................................................269 MSC: Default Workbench Width.........................................................................................270 MSC: Degree of Parallelism for Index Creation..................................................................271 MSC: Demand Priority Flexfield Attribute............................................................................ 72 2 MSC: Demand Satisfied Percent Threshold for Pegging....................................................273 MSC: Display Order Rescheduling Supplies....................................................................... 74 2 MSC: Display Supplier Item in Collaborative Planning.......................................................275 MSC: Display Warning Message When Rescheduling Recommendation Not Suggested by the Plan...............................................................................................................................276 MSC: Distribution Planning Ship Date................................................................................277 MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies.................278 MSC: E1 APS FC URL........................................................................................................ 80 2 MSC: E1 APS ODI URL......................................................................................................281 MSC: E1 Concatenation Character.....................................................................................282 MSC: E1APS_BATCH_SIZE..............................................................................................283 MSC: E1APS_DEM_END_DATE_IN_MONTHS................................................................284 MSC: E1APS_DEM_START_DATE_IN_MONTHS............................................................285 MSC: E1APS_DEM_WF_TIME_OUT.................................................................................286 MSC: E1APS_NO_OF_WORKERS.................................................................................... 87 2 MSC: E1APS_TIME_OUT..................................................................................................288 MSC: E1APS_WS_TIME_OUT........................................................................................... 89 2 MSC: E1_DBLINK...............................................................................................................290 MSC: EBS source instance for OTM................................................................................... 91 2 MSC: ENFORCE CRITERIA REQUIREMENT BEFORE EXECUTING QUERY................ 92 2 MSC: Enable 64 bit snapshot.............................................................................................. 93 2 MSC: Enable ATP Summary Mode..................................................................................... 94 2 MSC: Enable ATP Workflow...............................................................................................295 MSC: Enable ATP for Phantom Components.....................................................................296 MSC: Enable Advanced Constraints...................................................................................297 MSC: Enable Allocated ATP...............................................................................................298 MSC: Enable DRP Multitasking..........................................................................................299 MSC: Enable Diagnostic ATP.............................................................................................300 MSC: Enable Enhanced Sourcing....................................................................................... 01 3 MSC: Enable Group Based Netting....................................................................................302 MSC: Enable Java Debug...................................................................................................303 MSC: Enable Model and End Item dimensions in APCC....................................................304 MSC: Enable Priority Pegging............................................................................................. 05 3 MSC: Enable Release of Defective Planned Transfers......................................................306 MSC: Enforce Hard Links.................................................................................................... 07 3 MSC: Enhanced Project Netting.........................................................................................308 MSC: Excess and Safety Stock by Demand Class.............................................................309 MSC: Fast Refresh of Region Site Map..............................................................................310 MSC: File Flush Limit..........................................................................................................311 MSC: Firm Internal Requisition Time Fence.......................................................................312 MSC: Firm Intransit and PO in Receiving Supplies............................................................. 13 3 MSC: Fixed Date for Install Base under Contracts History (DD-MON-YYYY)....................314 MSC: Flush All Items for Simulation.................................................................................... 15 3 MSC: Forecast Priority Flexfield Attribute...........................................................................316 MSC: Forecast Spreading Calendar...................................................................................317 MSC: Forecast Spreading Calendar...................................................................................318

MSC: Future Days for Currency Conversion....................................................................... 20 3 MSC: Gateway URL to External Application.......................................................................321 MSC: Generate Exceptions in CP.......................................................................................322 MSC: Generate Notifications for Transportation Updates...................................................323 MSC: HP Maximum Displayed Item Count.........................................................................324 MSC: High Volume Items....................................................................................................325 MSC: History Days for Currency Conversion......................................................................326 MSC: Horizon for APCC Collected data - Backward days..................................................327 MSC: Horizon for APCC Collected data - Forward days..................................................... 28 3 MSC: Horizontal Plan Demand Bucketing Preference........................................................329 MSC: Horizontal Plan Extension Program..........................................................................330 MSC: Hour UOM.................................................................................................................331 MSC: Hybrid Allocated ATP................................................................................................332 MSC: INTER PLANT DEM PRIORITY................................................................................333 MSC: IO UI Performance tuning.........................................................................................334 MSC: IO UI Period Set Name.............................................................................................335 MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP....................336 MSC: Ignore CMRO and EAM Workorders in ASCP..........................................................337 MSC: Ignore PTF during CTP.............................................................................................338 MSC: Ignore Routings Without Any Date Effective Operations..........................................339 MSC: Ignore Safety Stock Inside Lead Time......................................................................340 MSC: Include Firm Planned Orders In Firm Allocation Window.......................................... 41 3 MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations..........342 MSC: Include Safety Stocks in Priority Based Pegging......................................................343 MSC: Inflate WIP Resource Requirements.........................................................................344 MSC: Inventory Rebalancing Surplus Inventory Basis........................................................ 46 3 MSC: JInitiator Version.......................................................................................................347 MSC: Launch Analyze Plan Partition..................................................................................348 MSC: Launch System Sql Loader.......................................................................................349 MSC: Launch Workflow-Enabled Exception Message Notifications...................................350 MSC: Level for Calculating Liability..................................................................................... 51 3 MSC: Limit Gantt Chart Orders View Hierarchy..................................................................352 MSC: MPS Auto-Firm Planned Orders...............................................................................353 MSC: Map Server Host.......................................................................................................354 MSC: Map Server Port........................................................................................................355 MSC: Max display decimals for Currency...........................................................................356 MSC: Max display decimals for Quantity............................................................................357 MSC: Max display decimals for Quantity (aggregates).......................................................358 MSC: Max display decimals for Ratios/Percentages..........................................................359 MSC: Max display decimals for Time..................................................................................360 MSC: Max display decimals for Time (aggregates)............................................................361 MSC: Maximum Capacity.................................................................................................... 62 3 MSC: Maximum Percentage variation in safety stock values.............................................363 MSC: Maximum number of planned orders per demand....................................................364 MSC: Maximum number of planned orders per demand(1)................................................365 MSC: Minimize Project Cross Peg within Window..............................................................366 MSC: Minimize changes to chronological sequence of supplies while rescheduling..........367 MSC: Minimum Capacity..................................................................................................... 68 3 MSC: Minimum Percentage variation in safety stock values..............................................369 MSC: Minimum Supply/Demand Percent for Pegging........................................................370

MSC: Move Past Due To Sysdate......................................................................................371 MSC: Net Change Temp Dir...............................................................................................372 MSC: New Forecast Auto Plan...........................................................................................373 MSC: New Planner Backward Compatibility.......................................................................374 MSC: New Supply Commit Auto Plan.................................................................................376 MSC: Number of Workers for Self Service Loads...............................................................377 MSC: OTHER with zero allocation percent is valid demand class......................................378 MSC: OTM Punchout URI...................................................................................................379 MSC: OTM Responsibility...................................................................................................380 MSC: OTM User.................................................................................................................. 81 3 MSC: Operator Company Name.........................................................................................382 MSC: Oracle Rapid Planning URL......................................................................................383 MSC: Order Number-CA Mandatory for CVMI....................................................................384 MSC: Order Type for Consigned VMI.................................................................................385 MSC: Organization containing generic BOM for forecast explosion...................................386 MSC: Overwrite all Order Forecast records........................................................................387 MSC: Overwrite all supplier capacity records.....................................................................388 MSC: PS - Snapshot Base Package...................................................................................389 MSC: PS - Snapshot Beginning Inventory Package...........................................................390 MSC: PS - Snapshot Calendar Package............................................................................391 MSC: PS - Snapshot Customer Package...........................................................................392 MSC: PS - Snapshot Distribution Package.........................................................................393 MSC: PS - Snapshot Enterprise Forecast Package............................................................ 94 3 MSC: PS - Snapshot Inventory Safety Targets Package....................................................395 MSC: PS - Snapshot Manufacturing Package....................................................................396 MSC: PS - Snapshot Purchase Orders Package................................................................397 MSC: PS - Snapshot Reservation Package........................................................................398 MSC: PS - Snapshot Sales Orders Package......................................................................399 MSC: PS - Snapshot Supplier Package..............................................................................400 MSC: PS - Snapshot Transfer Orders Package.................................................................. 01 4 MSC: PS - Snapshot Work Orders Package....................................................................... 02 4 MSC: PS - Visit Display Format in PS UI............................................................................403 MSC: PS Adjust Post Horizon Demand Qty........................................................................ 04 4 MSC: PS Consistent Resource Assignment.......................................................................405 MSC: PS Currency Symbol.................................................................................................406 MSC: PS Enable CRO Scheduling.....................................................................................407 MSC: PS Enable RMO Scheduling.....................................................................................408 MSC: PS Filter Active Items................................................................................................409 MSC: PS Firm Past Due WO..............................................................................................410 MSC: PS Resource Constraint Horizon..............................................................................411 MSC: PS Run Application Script.........................................................................................412 MSC: PS Run Connector Script..........................................................................................413 MSC: PS/SNO API Version................................................................................................. 14 4 MSC: PS/SNO Alignment Date...........................................................................................415 MSC: PS/SNO App Server URL.........................................................................................416 MSC: PS/SNO Client Install Path........................................................................................ 17 4 MSC: PS/SNO Compress Xml Files...................................................................................418 MSC: PS/SNO Data Store Path..........................................................................................419 MSC: PS/SNO Debug Mode...............................................................................................420 MSC: PS/SNO Download XML Files................................................................................... 21 4

MSC: PS/SNO Include Negative Inventory Demands......................................................... 22 4 MSC: PS/SNO Past Due Supplies Window........................................................................424 MSC: PS/SNO Use DB for Integration Data.......................................................................425 MSC: Pass List Price to OM in DRP Release.....................................................................426 MSC: Peg Firm Supply First................................................................................................ 27 4 MSC: Peg Firm Work Orders Within Assigned Projects and Tasks....................................428 MSC: Peg to maximize supply usage.................................................................................429 MSC: Perform ATP check for Internal Sales Orders...........................................................430 MSC: Plan co-products.......................................................................................................431 MSC: Plan for order at risk calculation................................................................................432 MSC: Planning Currency..................................................................................................... 33 4 MSC: Pre-Flush................................................................................................................... 34 4 MSC: Prefer Consumption within Forecast Bucket.............................................................435 MSC: Priority for Substitute Items Flexfield Attribute..........................................................436 MSC: Priority of Alternate Resources for an Operation Flexfield Attribute.......................... 37 4 MSC: Production Plan for Transportation updates.............................................................. 38 4 MSC: Project Task Collection Window Days......................................................................439 MSC: Provide Warning For Dates Entered on Non-work Days........................................... 40 4 MSC: Provide Warning when Sales Order Quantity is Changed........................................441 MSC: Purchase Order Dock Date Calculation Preference.................................................. 42 4 MSC: Purge Exception Days............................................................................................... 43 4 MSC: Purge Staging and Entity Key Translation Tables..................................................... 44 4 MSC: Rapid Planning Group Planned Orders..................................................................... 45 4 MSC: Rapid Planning Safety Stock Lead Time Method...................................................... 46 4 MSC: Rapid Planning Scripts Home...................................................................................447 MSC: Rapid Planning UI Refresh Timeout.......................................................................... 48 4 MSC: Rapid Planning WebLogic Server Home................................................................... 49 4 MSC: Read Profiles From DB.............................................................................................450 MSC: Recalculate Demand Priorities after Spreading........................................................451 MSC: Refresh Site to Region Mappings Event...................................................................452 MSC: Refresh Snapshots Pending Timeout.......................................................................453 MSC: Region Instance........................................................................................................454 MSC: Release WIP Dtls if Order Date different then BOM Revision Date..........................455 MSC: Released Only By User.............................................................................................457 MSC: Resource Group for a Line Flexfield Attribute...........................................................458 MSC: Resource Type for an Operation Flexfield Attribute..................................................459 MSC: Respect Minimum Remaining Shelf Life Days..........................................................460 MSC: Retain Time for Non-ATPable Items.........................................................................461 MSC: Return Best Source in Global ATP............................................................................ 62 4 MSC: SCEM Engine Launch Events...................................................................................463 MSC: SNO - Snapshot Base Package................................................................................464 MSC: SNO - Snapshot Beginning Inventory Package........................................................465 MSC: SNO - Snapshot Calendar Package.........................................................................466 MSC: SNO - Snapshot Customer Package........................................................................467 MSC: SNO - Snapshot Demand Package..........................................................................468 MSC: SNO - Snapshot Distribution Package......................................................................469 MSC: SNO - Snapshot Enterprise Forecast Package......................................................... 70 4 MSC: SNO - Snapshot Fixed Production Package.............................................................471 MSC: SNO - Snapshot Inventory Safety Targets Package.................................................472 MSC: SNO - Snapshot Manufacturing Package.................................................................473

MSC: SNO - Snapshot Manufacturing Package(1).............................................................474 MSC: SNO - Snapshot Purchase Orders Package.............................................................475 MSC: SNO - Snapshot Sales Orders Package...................................................................476 MSC: SNO - Snapshot Supplier Package...........................................................................477 MSC: SNO - Snapshot Transfer Orders Package............................................................... 78 4 MSC: SNO - Snapshot Work Orders Package.................................................................... 79 4 MSC: SNO Connector Precision.........................................................................................480 MSC: SNO Currency Precision...........................................................................................481 MSC: SNO Decimal Precision............................................................................................. 82 4 MSC: SNO Optimization Type............................................................................................483 MSC: SNO Publish On Client.............................................................................................. 84 4 MSC: SNO Run Application Script......................................................................................485 MSC: SNO Run Connector Script.......................................................................................486 MSC: SNO Transportation Capacity By..............................................................................487 MSC: Safety Stock Project..................................................................................................488 MSC: Safety stock change interval (Days).......................................................................... 89 4 MSC: Sales Orders Offset Days.........................................................................................490 MSC: Scope of Analyze Plan Partition................................................................................491 MSC: Search Criteria Warning............................................................................................492 MSC: Selection order for Firm Supplies in backward allocation window............................493 MSC: Self Service Loads Delimiter.....................................................................................494 MSC: Service Level Category Set....................................................................................... 95 4 MSC: Service Planning Enabled.........................................................................................496 MSC: Service Planning Item Safety Stock Level Value......................................................497 MSC: Share Plan Partitions................................................................................................498 MSC: Shelf Life Override of Order Modifiers for Transfer Orders.......................................499 MSC: Simultaneous Resource Sequence Flexfield Attribute..............................................500 MSC: Smoothing method to calculate Safety stock within Change interval........................501 MSC: Source Instance ID.................................................................................................... 02 5 MSC: Source Setup Required.............................................................................................503 MSC: Sourcing History Start Date Offset(in months)..........................................................504 MSC: Sourcing Rule Category Set...................................................................................... 05 5 MSC: Sourcing Variance Tolerance....................................................................................506 MSC: Split Planned Order to perform safety stock pegging................................................ 07 5 MSC: Split Planned Orders for Scheduling Flexibility.........................................................508 MSC: Supplier Capacity Accumulation(multiplier)............................................................... 10 5 MSC: Supplier Capacity Consumption by Purchase Orders...............................................511 MSC: Suppress Exception for Selection of Alternates........................................................512 MSC: Temp Index Extent Size(Bytes)................................................................................. 13 5 MSC: Temp Table Extent Size(Bytes)................................................................................514 MSC: Unit of Measure.........................................................................................................515 MSC: Update Requested Completion Date when Releasing Reschedules........................516 MSC: Update Use Up Date.................................................................................................517 MSC: Use Enhanced Forward ATP....................................................................................518 MSC: Use FIFO Pegging....................................................................................................519 MSC: Use Optimization Phase Supply Due Dates for Pegging..........................................520 MSC: Use Shipping/Receiving Calendar............................................................................521 MSC: Use attribute based netting.......................................................................................522 MSC: VMI Default Query..................................................................................................... 23 5 MSC: Value of N for all top/bottom-N reports in Dashboards.............................................524

MSC: Vertical view default query........................................................................................525 MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)..526 MSC: Write MBP Flat Files.................................................................................................527 MSC:ATP Assignment Set..................................................................................................528 MSC:Coll Error Debug Mode..............................................................................................529 MSC:Coll Performance Debug Mode..................................................................................531 MSC:Collect Completed Jobs.............................................................................................532 MSC:Collect Routing...........................................................................................................533 MSC:Compute IB Aggregation during Collection................................................................534 MSC:Criticality Category Set............................................................................................... 36 5 MSC:Prevent Loops when pegging Non-Standard Jobs..................................................... 37 5 MSC:Release only orders pegging fully to on hand............................................................538 MSC:Retain Released Data................................................................................................540 MSC:SRP PHASE2 ENABLED...........................................................................................541 MSC:Select Sourcing Rules In ATP Based On...................................................................542 MSC_USE_HASH_KEY...................................................................................................... 43 5 MSD: AW Tablespace.........................................................................................................544 MSD: Calculate Planning Percentages...............................................................................545 MSD: Category Set Name................................................................................................... 46 5 MSD: Client Debugging....................................................................................................... 47 5 MSD: Conversion Type.......................................................................................................548 MSD: Currency Code..........................................................................................................549 MSD: Customer Attribute....................................................................................................550 MSD: Default DP Scenario.................................................................................................. 51 5 MSD: Enabled Organization for Item Collections................................................................552 MSD: Excess and Obsolescence, Liability Category Set Name.........................................553 MSD: MAXVALUECOUNT for edges in XWDEVKIT..........................................................554 MSD: Master Org................................................................................................................555 MSD: OLAP Directory Alias................................................................................................556 MSD: OLAP Initial Page Pool.............................................................................................. 57 5 MSD: OLAP Maximum Page Pool......................................................................................558 MSD: OLAP Workflow Page Pool.......................................................................................559 MSD: One Step Collection..................................................................................................560 MSD: Two-Level Planning................................................................................................... 61 5 MSD: Use Classic Even Allocation.....................................................................................562 MSD: Use Classic Worksheet.............................................................................................563 MSD:View Scope measures are editable............................................................................ 64 5 MSD_DEM: Calculate Planning Percentage.......................................................................565 MSD_DEM: Category Set Name......................................................................................... 66 5 MSD_DEM: Conversion Type.............................................................................................567 MSD_DEM: Currency Code................................................................................................568 MSD_DEM: Customer Attribute..........................................................................................569 MSD_DEM: Data Profile for Price Lists............................................................................... 70 5 MSD_DEM: Debug Mode.................................................................................................... 71 5 MSD_DEM: Enable Supply Plan Download for work orders...............................................572 MSD_DEM: Explode Demand Method................................................................................ 73 5 MSD_DEM: Fiscal Calendar...............................................................................................574 MSD_DEM: Host URL......................................................................................................... 75 5 MSD_DEM: Include Dependent Demand...........................................................................576 MSD_DEM: Include organization in CMR Data Load.........................................................577

MSD_DEM: Master Org......................................................................................................578 MSD_DEM: Maximum seeded units available for price lists...............................................579 MSD_DEM: Schema...........................................................................................................580 MSD_DEM: Simulation Set Name......................................................................................581 MSD_DEM: Source Instance for Global Forecast............................................................... 82 5 MSD_DEM: Truncate Staging Table...................................................................................583 MSD_DEM: Two-Level Planning......................................................................................... 84 5 MSD_DEM: UOM for fleet flight hours................................................................................585 MSD_DEM: Use new Site code format...............................................................................586 MSD_DEM: Version............................................................................................................587 MSD_SPF: History basis for Failure Rate computation......................................................588 MSD_SPF: Organization containing generic BOM for Service Parts Forecasting..............589 MSO: Activity Selection Window (in Days).......................................................................... 90 5 MSO: Additional Demand Slices for Shared Supply Rescheduling....................................591 MSO: Allow Partial Demand Completion............................................................................592 MSO: Allow Schedule Gaps for Shared Supplies...............................................................593 MSO: Allow Simultaneous Resource To End At Different Time.......................................... 95 5 MSO: Allow Simultaneous Resources to End at Different Times........................................ 96 5 MSO: Alternate Process Penalty......................................................................................... 97 5 MSO: Alternate Resource Penalty......................................................................................598 MSO: Alternate Resource Selection Method......................................................................599 MSO: Alternate Source Penalty..........................................................................................600 MSO: Apply Windows for Firm Scheduling.........................................................................601 MSO: Avoid non working days for Buy/Transfer order dates..............................................602 MSO: Barrier Optimizer Algorithm Choice..........................................................................603 MSO: Batching Precision....................................................................................................604 MSO: Big M Value for SCO................................................................................................. 05 6 MSO: CPLEX Crash Parameter..........................................................................................606 MSO: CPLEX Refactor Rate...............................................................................................607 MSO: CPLEX Scaling Factor..............................................................................................608 MSO: CPLEX messages to screen indicator......................................................................609 MSO: Calculate Constraint Exceptions...............................................................................610 MSO: Capacity Units Recalculation Threshold...................................................................611 MSO: Check Redundant Constraints..................................................................................612 MSO: Choice of supply for substitution...............................................................................613 MSO: Component offset logic for optimization....................................................................614 MSO: Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During Component Substitution......................................................................................................615 MSO: Continuous transfer across organizations................................................................. 17 6 MSO: Convergent Supplies Consumption Pattern..............................................................618 MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders ............................................................................................................................................619 MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders................ 20 6 MSO: Cost Roll-up incremental factor................................................................................. 22 6 MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence....623 MSO: DS Scheduling Window............................................................................................625 MSO: Default Forecast Priority...........................................................................................626 MSO: Default Idle Time Tolerance (Hours).........................................................................627 MSO: Default Resource Sequencing Window (in Days).....................................................628 MSO: Default Sales Order Priority......................................................................................629

MSO: Default Timestamp Safety Stocks.............................................................................630 MSO: Default Timestamp for Forecasts..............................................................................631 MSO: Default Timestamp for Sales Orders......................................................................... 32 6 MSO: Default Value for Maximum Acceptable Days Early.................................................633 MSO: Delay Fulfillment of Small Demands.........................................................................634 MSO: Demand Size Tolerance Before Splitting Planned Orders........................................635 MSO: Demand Type Priority...............................................................................................636 MSO: Demand Window Size............................................................................................... 37 6 MSO: Disable Inference of Item Substitution Relationship.................................................638 MSO: Divergent Supply Feeding Pattern............................................................................639 MSO: Divergent Supply Feeding Pattern for Inter-Org and Supplier Sourced orders......... 40 6 MSO: Divergent Supply Feeding Pattern for Intra-Org Sourced orders..............................641 MSO: Dual Simplex Parameter...........................................................................................642 MSO: EDD Demand Cutoff Priority.....................................................................................643 MSO: EDD Scheduling Window Control.............................................................................644 MSO: Enable Advanced Sequencing..................................................................................645 MSO: Enable Cost Rollup for Optimization.........................................................................646 MSO: Enable Decision Rules..............................................................................................647 MSO: Enable Hard Links Globally....................................................................................... 48 6 MSO: Enable Rounding of Fractional Supplies For Service Planning................................649 MSO: Enable sourcing split for end item substitution.......................................................... 50 6 MSO: Enforce Minimum Transfer Quantities......................................................................651 MSO: Enforce Resource Sequence Contiguity...................................................................652 MSO: Firm Purchase Orders Within Time Fence................................................................ 53 6 MSO: Firm Requisitions Within Time Fence.......................................................................654 MSO: Firm Supply Allocation Window (Backward days)..................................................... 55 6 MSO: Firm Supply Allocation Window (Forward days).......................................................656 MSO: Firm Work Orders/Operations Within Time Fence....................................................657 MSO: Floating Point Precision............................................................................................658 MSO: Floating Point Precision for Increments of Shift Start/End Times Within a Planning Bucket.................................................................................................................................659 MSO: Floating Point Precision for Order Q.........................................................................660 MSO: Floating Point Precision for Planning Bucket Efficiency............................................ 61 6 MSO: Floating Point Precision for Transportation Capacities (Volume).............................662 MSO: Floating Point Precision for Transportation Capacities (Weight)..............................663 MSO: Floating Point Precision for Usage in Routings......................................................... 64 6 MSO: Generate Compression Days Exception...................................................................665 MSO: Generate Compression/Firming Exceptions for Orders in Progress.........................666 MSO: Generate Reduced Model.........................................................................................667 MSO: Generate Shared Supply Exceptions........................................................................668 MSO: Global Batchable Flag............................................................................................... 69 6 MSO: Global Chargeable Flag............................................................................................670 MSO: Global Time Limit......................................................................................................671 MSO: HLS flat files path......................................................................................................672 MSO: Hard link scheduling window..................................................................................... 73 6 MSO: Hard link scheduling window expansion factor.........................................................674 MSO: Heuristic type............................................................................................................675 MSO: Incremental Planned Orders.....................................................................................676 MSO: Internal Demand Aggregation Within Optimization...................................................677 MSO: Inventory Carrying Costs Percentage.......................................................................678

MSO: JIT Selector Window Size.........................................................................................679 MSO: LP Constraint Batch Size..........................................................................................680 MSO: LP Markowitz Coefficient..........................................................................................681 MSO: LP Optimization Algorithm........................................................................................682 MSO: Late Demands Exceptions Tolerance Minutes.........................................................683 MSO: Lead Time Control....................................................................................................684 MSO: List Size for Pricing Candidates................................................................................686 MSO: Lookahead days to net co-product/by-product supplies before creating planned orders..................................................................................................................................687 MSO: Max Gap Tolerence on SDS.....................................................................................688 MSO: Maximium Number of Prepones...............................................................................689 MSO: Maximize Search of Availability Intervals..................................................................690 MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in Optimization...................................691 MSO: Maximum Activity Duration.......................................................................................692 MSO: Maximum Allowable Days Late.................................................................................693 MSO: Maximum Allowable Days Late before Forecast Expiration...................................... 94 6 MSO: Maximum Alternate Combinations............................................................................695 MSO: Maximum Demands Per Group for Advanced Sequencing......................................696 MSO: Maximum Demands per Group.................................................................................697 MSO: Maximum Demands per Slice...................................................................................698 MSO: Maximum Inventory Level % of Safety Stock............................................................ 99 6 MSO: Maximum Lead Time Factor.....................................................................................700 MSO: Maximum Number of Demands in a Hard Linked Demand Set................................701 MSO: Maximum Number of Pull for Operation.................................................................... 02 7 MSO: Maximum Number of Pushes for Operation.............................................................. 03 7 MSO: Maximum Operations Per Slice................................................................................704 MSO: Maximum Resource Over-capacity...........................................................................705 MSO: Maximum Simplex Iterations.....................................................................................706 MSO: Maximum number of pulls/push for hard linked operations......................................707 MSO: Minimize Supply Duration.........................................................................................708 MSO: Minimum Processing Lead Time Adjustment Factor................................................709 MSO: Multiplier To Derive Supply Allocation Window......................................................... 10 7 MSO: Net All Firm Supplies Before Creating Planned Order..............................................711 MSO: Network routing cycle time coefficient....................................................................... 13 7 MSO: Network routing fixed time window...........................................................................714 MSO: Nfl Backward Compression Pct................................................................................715 MSO: Nfl Forward Compression Pct...................................................................................716 MSO: Number of Backtracks Allowed.................................................................................717 MSO: Number of Decomposition Groups Per Process.......................................................718 MSO: Number of Demand Groups for Optimization............................................................ 19 7 MSO: Number of Iterations for Local Search......................................................................720 MSO: Number of LP Phases for Safety Stock Calculation.................................................. 21 7 MSO: Number of Processes to use in Decomposition........................................................722 MSO: Number of Threads for Optimization.........................................................................723 MSO: Number of processes for Inline Forecast..................................................................724 MSO: Optimization Advanced Start....................................................................................725 MSO: Optimization Daily Aggregation Buckets...................................................................726 MSO: Optimization Weekly Aggregation Buckets...............................................................727 MSO: Optimization debug level........................................................................................... 28 7 MSO: Order Modifier Max Searching Depth.......................................................................729

MSO: Overlap Activities by MTQ........................................................................................730 MSO: Peg By-product Supplies..........................................................................................731 MSO: Penalty Basis for Changeovers................................................................................. 32 7 MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute..........733 MSO: Penalty Cost Factor for Exceeding Material Capacity............................................... 34 7 MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute..................735 MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute...........736 MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute........737 MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute738 MSO: Penalty Cost Factor for Exceeding Resource Capacity............................................739 MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute...............740 MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute.......741 MSO: Penalty Cost Factor for Late Demands.....................................................................742 MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute........................................ 43 7 MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute................................744 MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute.................................745 MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute..................................746 MSO: Penalty Increase Tolerance Percentage in Local Search.........................................747 MSO: Penalty multiplier outside unconstrained..................................................................748 MSO: Percent Complete Before Resequencing.................................................................. 49 7 MSO: Postpone Use of Alternates to Latest Possible Time................................................750 MSO: Preemption Slack Ratio............................................................................................751 MSO: Preprocessing Aggregator Fill................................................................................... 52 7 MSO: Preprocessing Aggregator Limit................................................................................ 53 7 MSO: Preprocessing Flag for LP Matrix.............................................................................. 54 7 MSO: Preprocessor LP Compression.................................................................................755 MSO: Primal Simplex Parameter........................................................................................756 MSO: Primal/Dual Preprocessing Reduction......................................................................757 MSO: Pull push base..........................................................................................................758 MSO: Pull push offset.........................................................................................................759 MSO: Queue Time Factor...................................................................................................760 MSO: Re-computation percentage for sequence generation..............................................761 MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs...................................... 62 7 MSO: Reschedule Shared Supply to Influence Batching....................................................763 MSO: Resource Adjustment Factor For Improved Offloading to Alternates.......................764 MSO: Resource Batching Strategy.....................................................................................765 MSO: Resource Group for the Line Flexfield Attribute........................................................766 MSO: Respect Activity Contiguity Flag for Process Supplies.............................................767 MSO: Respect EDD Scheduling windows for Lead Times.................................................. 68 7 MSO: SCO Dual Variables Tolerance.................................................................................769 MSO: SCO Reduced Cost Tolerance.................................................................................770 MSO: SCO TRIANGULATION............................................................................................771 MSO: STL Buffer Size.........................................................................................................772 MSO: Schedule Across Breaks...........................................................................................773 MSO: Schedule All Firm Planned Orders First.................................................................... 74 7 MSO: Schedule Simultaneous Resources Across Breaks..................................................775 MSO: Schedule window width............................................................................................. 77 7 MSO: Scheduler Time Step................................................................................................778 MSO: Scheduling Activity Selection Window......................................................................779 MSO: Scheduling Window UOM.........................................................................................780

MSO: Setup Pattern Calculation Window...........................................................................781 MSO: Simplex Feasibility Tolerance...................................................................................782 MSO: Simplex Optimality Tolerance...................................................................................783 MSO: Simplex Perturbation Constant.................................................................................784 MSO: Simplex Perturbation Limit........................................................................................785 MSO: Simplex Perturbation Parameter...............................................................................786 MSO: Simplex Presolve Limit.............................................................................................. 87 7 MSO: Simplex Singularity Repair Limit...............................................................................788 MSO: Skip Firm SDS Activities During Justify....................................................................789 MSO: Slack Hours For Batch Resource.............................................................................. 90 7 MSO: Solve Dual Problem..................................................................................................791 MSO: Sourcing Allocation Window.....................................................................................792 MSO: Split Planned Orders for Assigned Units................................................................... 93 7 MSO: Split Supplies for SPP Release................................................................................. 94 7 MSO: Spread Resource Consumption Within Optimization................................................795 MSO: Substitute Item Penalty.............................................................................................796 MSO: Supplies used for satisfying transient safety stock...................................................797 MSO: Supply Reschedule Window Size for Safety Stock Pegging..................................... 98 7 MSO: Supply Window Size.................................................................................................799 MSO: Synchronize Chargeable Resources to Respect Hard Links....................................800 MSO: Target Inventory Level % of Safety Stock.................................................................801 MSO: Transfer Quantity Threshold for Enforceing Hard Links............................................ 02 8 MSO: UOM for converting Changeover Time to Penalty....................................................803 MSO: Upper Limit for Maximum Time Offset for Hard Links...............................................804 MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows..........................805 MSO: Use Collections Start Time.......................................................................................806 MSO: Use Customer Site in End Item Substitution Rule....................................................807 MSO: Use Decomposition in Optimization..........................................................................808 MSO: Use Discrete Job Resource Usage to Consume Resource Capacity.......................809 MSO: Use Effectivity Date to Infer End Item Substitution Priority.......................................810 MSO: Use Existing Supplies in Alternate BOM/Subs. Comp..............................................811 MSO: Use Item Shelf Life Days in Scheduling Buy/Transfer Orders..................................812 MSO: Use JIT dates from high level scheduling results...................................................... 13 8 MSO: Use Of Assigned Units In Scheduling.......................................................................814 MSO: Use Optimization and Decision Rules for Simulation................................................ 15 8 MSO: Use SCO Time Aggregation.....................................................................................816 MSO: Use Safety Lead Time..............................................................................................817 MSO: Use Sequencing Template........................................................................................ 18 8 MSO: Use Shift Definitions When Scheduling Lead Times................................................. 19 8 MSO: Use Up Existing Supply of Primary Components Before Substitute.........................820 MSO: Write Inline forecasting flat files................................................................................821 MSR: Budget Category Set.................................................................................................822 MSR: Budget Enditem Favor Factor...................................................................................823 MSR: Budget Heuristic........................................................................................................824 MSR: Postponement Factor................................................................................................825 MSR: Probability Distribution Type.....................................................................................826 MSR: Safety Stock Holding Strategy..................................................................................827 POR: Sync up Need by date on IR with OM.......................................................................828 WIP:Discrete Job Prefix......................................................................................................829 WSM: Create Job Level BOM and Routing Copies............................................................830

Advanced Planning and Scheduling Profile Options


BOM: Hour UOM
Profile Code Profile Option Name Description BOM BOM:HOUR_UOM_CODE Hour UOM used by leadtime calculations Usuallly set to HR for hours and then any conversions are entered as required in Inventory application.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes Yes No No No No No No No No No No No No No No

CRP:Spread discrete requirements


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising CRP CRP_SPREAD_LOAD Spread discrete requirements that span multiple days Not used for collections, but used in ASCP for resource horizontal plan

Yes No No Yes Yes No No No No No No No No No No No No No No

CSD: Default Repair Order


Profile Code Profile Option Name Description CSD CSD_DEFAULT_REPAIR_ORDER For SPP - Service Parts Planning Set on EBS Source in a distributed environment Default Repair Order Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSD: Default Repair Organization


Profile Code Profile Option Name Description CSD CSD_DEFAULT_REPAIR_ORG For SPP - Service Parts Planning Set on EBS Source in a distributed environment Default repair owning organization Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSD: Default Repair Type


Profile Code Profile Option Name Description CSD CSD_DEFAULT_REPAIR_TYPE For SPP - Service Parts Planning Set on EBS Source in a distributed environment Default repair type for new repair orders Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSD: Default Service Request Severity for Internal Repair Order


Profile Code Profile Option Name Description CSD CSD_IRO_DEFAULT_SR_SEVERITY For SPP - Service Parts Planning Set on EBS Source in a distributed environment Default service request severity for internal repair orders Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSD: Default Service Request Type for Internal Repair Order


Profile Code Profile Option Name Description CSD CSD_IRO_DEFAULT_SR_TYPE For SPP - Service Parts Planning Set on EBS Source in a distributed environment Default Service Request Type for internal repair orders Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSD: Repair Mode for Depot Repair Orders


Profile Code Profile Option Name Description CSD CSD_REPAIR_MODE For SPP - Service Parts Planning Set on EBS Source in a distributed environment Repair Mode for Depot Repair Processes - Site Level Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSD: Repair Type Internal Repair Order


Profile Code Profile Option Name Description CSD CSD_IRO_REPAIR_TYPE For SPP - Service Parts Planning Set on EBS Source in a distributed environment Repair Type for creation of internal repair orders Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSP: Repair Supplier Organization's Defective Subinventory


Profile Code Profile Option Name Description CSP CSP_REPAIR_SUP_ORG_DEFECT_SUBINV For SPP - Service Parts Planning Set on EBS Source in a distributed environment This profile value used in Repair PO Execution as Defective Subinventory Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

CSP: Repair Supplier Organization's Usable Subinventory


Profile Code Profile Option Name Description CSP CSP_REPAIR_SUP_ORG_USABLE_SUBINV For SPP - Service Parts Planning Set on EBS Source in a distributed environment This profile value used in Repair PO Execution as Usable Subinventory Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No No No No No No No

INV:Capable to Promise
Profile Code Profile Option Name Description INV INV_CTP Valid values are ATP based on collected data ATP/CTP based on planning output Other values may appear, but are not longer used by the code. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No Yes

MO: Operating Unit


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MO: ORG_ID Operating Unit the responsibility logs onto

No No No No No No No No No No No No No No No

MRP: 2-Cuttoff Date Offset Months


Profile Code Profile Option Name Description MRP MRP_CUTOFF_DATE_OFFSET_2 Do NOT Use custom profile for secondary offset - not used except in DEV supported test instances.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MRP: Calculate MATO Demand


Profile Code Profile Option Name Description MRP MRP_CALC_MATO_DEMAND This profile option is used by ASCP to support forecast consumption processes for Multi-level ATO models. Set to Yes if these processes are utilized. This was used only until 11.5.9. From 11.5.10 this profile is not used. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3125951 3125891 -1 -1 Yes No No No No No No No No No No No No No No

MRP: Calculate Plan Performance


Profile Code Profile Option Name Description MRP MRP_CALCULATE_PLAN_PERFORMANCE Not used in Oracle Advanced Planning This profile is used to decide upon whether the request Calculate Plan performance Indicators needs to be run at the end of MRP Launch or not. This was an optional program used to gather info from MRP and load into tables used by the old Business Intelligence programs. More information is available in Note: 783088.1 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Calculate Supply Demand


Profile Code Profile Option Name Description MRP MRP_ATP_CALC_SD Calculate Supply Demand details for ATP. When you drill to ATP Details on the ATP inquiry or Sales order Availability window (and other applications like iStore, Quoting, etc), the ATP Details and Pegging are displayed. In the pegging screen, you can right-click on lines showing Green or Red icon, then you will have access to other information like Supply/Demand, Horizontal Plan, etc. These details are only available when this profile is set to Yes. Otherwise you will get an error message to setup the profile. PERFORMANCE NOTE: This is used for ATP debugging and can effect performance, especially on large orders or ATO models. This should usually be setup at the User Level as required. Note Reference(s) 368229.1 565918.1 436771.1 Bug Reference(s) Document References(s)

Oracle Global Order Promising Implementation and User's Guide -1 -1 -1 -1 -1 Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP: Category Set for Backlog Form


Profile Code Profile Option Name Description MRP MRP_BALWB_CATEGORY_SET Category Set for Order Backlog Workbench Form accessed from the Order Management Responsibility / Scheduling Suggest that this would be the same as used for preferences when viewing data in the Collections Workbench (View Collected Data) Use this profile option to indicate which items belonging to this category set appear in the Backlog Scheduling Workbench tree navigator. If no value is entered, no items appear in the Backlog Scheduling Workbench tree navigator. You can update this profile at the site level. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

MRP: Compute Standard Mandatory Components for ATO Models


Profile Code Profile Option Name Description MRP MRP_EXPLODE_ATO Determines whether to call the CTO API to calculate the dependent demand for ATO items during the Refresh Snapshots process. This will cause performance to be slower when Yes. Setting this to Yes would be normal if ATO Models are present in the system. Collections code will default this profile to Yes if it is NULL. Set this profile in the EBS Source instance when you have distributed installation. Note: Refresh Collection Snapshots will finish with warning when: CTO BOM not found for the item CTO_API was exploding the BOM and returns a warning from the CTO code.

We print the following for CTO BOM not found - this is a setup violation since the requirement for CTO is to configure and create the [STAR] item using CTO Auto-Create or by progressing the sales order. Warning: Item_ID = 781553, ORG_ID=5002 ; No BOM found for configured item in ship-from org. You may safely disregard this warning if the configured item is transferred across orgs, and the warning points to an org in which no assembly of the configured item takes place. If you are using ODS based ATP, please check that you have the BOM in shipping org. If you are using PDS based ATP, please check that item attribute ""Create Configured Item, BOM"" equals ""Based on Model"" and BOM exists in ship-from org. DOCUMENTATION BUG: The documentation has this profile backwards. Default Value - No Note Reference(s) 179522.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No

Global Order Promising

No

MRP: Cutoff History Days


Profile Code Profile Option Name Description MRP MRP_CUTOFF_HISTORY_DAYS Not used by Advanced Supply Chain Planning Note 303809.1 has more information about this Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Disable Project Validation


Profile Code Profile Option Name Description MRP MRP_DISABLE_PROJECT_VALIDATION

Special profile for Seiban project numbers. Used for release of planned orders from the ASCP workbench. Profile set in EBS Source in distributed installation. Valid values are:
Yes - project validation won't be executed. No - the project validation will be executed.

Default Value - No when NULL 11.5.10 Patch 6903209 One off patch released by DEV. Also included in 1st APS Source Side UI patch 7427625 and all Source Side rollups since October 2008 Bug 6903209 One off patch released for 11.5.10 12.0.6 bypass code included in $MRP_TOP/patch/115/MRPRLWFB.pls 120.1.12000000.6 BUT - the profile is not created, and must be created manually - see below 12.1.1 and above bypass code included in $MRP_TOP/patch/115/MRPRLWFB.pls 120.1.12010000.2 and above BUT - the profile is not created, and must be created manually - see below Maunual Profile Creation details Application - Master Scheduling/MRP Hierarchy Type - Security Hierarchy Type Access Level Visible and Updatable at the following levels

Site, Application, Responsibility, User SQL validation: SQL="select lookup_code, meaning \"MRP:DisableProjectValidation\" into :profile_option_value, :visible_option_value from fnd_lookups where lookup_type = 'YES_NO'" Column="\"MRP:DisableProjectValidation\"(*)"

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6865274 -1 Yes No No Yes Yes No No No Yes No No No No No No No No No No

MRP: Explode Demand Through Phantom Component


Profile Code Profile Option Name Description MRP MRP_EXPL_DEM_THROUGH_PHANTOM Not used in Oracle Advanced Planning. This is used by MRP to decide whether demand needs to be exploded through Phantom components or not. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Firm Internal Req Transferred to OE


Profile Code Profile Option Name Description MRP MRP_FIRM_OE_XFERRED_INTERNAL_REQ Valid values are: Yes - all internal requisitions transferred to Oracle Order Management are treated as firm supplies by Oracle Advanced Supply Chain Planning No - Oracle Advanced Supply Chain Planning may generate reschedule recommendations for these internal requisitions.

Rescheduled recommendations cannot be released to purchasing for internal requisitions. To reschedule recommendations, cancel the internal requisition in the source instance and create a new requisition with the new date. Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No Yes No No Yes No No No No No No No No Yes No No No

MRP: Hash Area Size (Bytes)


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_HASH_AREA_SIZE Used in 11.5.9 and below for Data Collections.

Yes No No No No No No No No No No No No No No

MRP: Ignore Alternate BOM/Routing


Profile Code Profile Option Name Description MRP MRP_IGNORE_ALTERNATES Not Used in Oracle Advanced Planning, only for Oracle MRP. Ref Bug 3824520 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting
Profile Code Profile Option Name Description MRP MRP_IGNORE_ZERO_QTY_DEMANDS Not used in Oracle Advanced Planning. This is for standard MRP Forecasting functionality - program INCFIF Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Net All Purchase Orders Prior To Requisitions


Profile Code Profile Option Name Description MRP MRP_FIRM_REQS_WITHIN_TF Use this profile to specify whether or not the planning engine should net all existing supplies prior to netting purchase requisitions. Yes - Net purchase orders, then net purchase requisitions. This may result in purchase requisitions with schedule dates earlier than purchase orders being canceled or rescheduled out. No - Net purchase orders and purchase requisitions together. Note: If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option.

Default - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MRP: Old Sales Orders Cutoff Days


Profile Code Profile Option Name Description MRP MRP_OLD_SO_CUTOFF_DAYS Only For MRP, it controls the number of days from sysdate backwards that the Planning Manager goes to pick up sales orders. For example the value 365 will let the Planning Manager see sales orders up to 365 days old. Choose a value that will capture all open sales orders. The Planning Manager will pick up closed sales orders as well, these are used for forecast consumption in MRP functionality. A NULL value will pick up ALL sales orders. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Persist ATP Results


Profile Code Profile Option Name Description MRP MRP_ATP_PERSIST Profile added in 11.5.9. This is to fulfill customer specific requirement for reporting on the MRP_ATP_SCHEDULE_TEMP and MRP_ATP_DETAILS_TEMP tables data. Default is NO and should be left as NO Bug details: Commit ATP results data (mrp_atp_details_temp and mrp_atp_schedule_temp) into database instead of removing data as is done in types of ATP requests. Customer is using these tables to generate a report. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5102683 -1 Yes No No No No No No No No No No No No No Yes

MRP: Plan Revenue Discount Percent


Profile Code Profile Option Name Description MRP MRP_BIS_AV_DISCOUNT Specifies the average discount percent applied to all items in a plan. This value is a key performance indicator used to calculate performance in a plan for Business Intelligence reports. Valid values are: Integers between 0 and 100.

Optional - Average Discount to be applied when calculating Revenue of a plan as part of Plan Performance Indicators Set on EBS Source and APS Destination in a distributed installation. Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MRP: Plan Revenue Price List


Profile Code Profile Option Name Description MRP MRP_BIS_PRICE_LIST Lookup for Price List in Order Management Optional - Price List used to calculate revenue of a plan as part of Plan Performance Indicators- from SO_PRICE_LISTS. Valid values are: Numeric

This value is a key performance indicator used to calculate performance in a plan for Business Intelligence reports. Set in EBS Source in a distributed installation. Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MRP: Planning Manager Run First Time


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_PLNG_MGR_FIRST_TIME Not used by Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP: RHX Check Profile


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_RHX_CHECK_PROFILE_FP Not used by Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP: Round Source Entries


Profile Code Profile Option Name Description MRP MRP_ROUND_SOURCE_ENTRIES Not used in Oracle Advanced Planning. Used by MRP to decide whether to round forecast or sales order quantities when loading the forecast or MDS. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Sort Area Size (Bytes)


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_SORT_AREA_SIZE Used for Data Collections in 11.5.9 and below.

Yes No No No No No No No No No No No No No No

MRP: Update Requested Completion Date when Releasing Reschedules


Profile Code Profile Option Name Description MRP MRP_UPD_REQ_DATE_REL Not used in Oracle Advanced Supply Planning. Exists in release code for MRP Planning in MRP_REL_PLAN_PUB File $MRP_TOP/patch/115/sql/MRPPRELB.pls See profile for Advanced Supply Chain Planning - MSC: Update Requested Completion Date when Releasing Reschedules Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP: Use Alternate SQL for Daily Cleanup


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_ALTERNATE_SQL Not used for Advanced Planning. This is for the planning manager Once-ADay Task Worker operations. Ref Bug 3958467

Yes No No No No No No No No No No No No No No

MRP: Use Progress Bar for Backlog Workbench


Profile Code Profile Option Name Description MRP MRP_ATP_PROGRESS_BAR MRP: Use Progress Bar for Backlog Workbench This is the display bar which is present when you schedule orders in the Order Backlog Workbench. PERFORMANCE ALERT: This should be set to No if you are processing many orders OR IF you find that the Backlog Workbench appears to hang while scheduling orders. 742648.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Note Reference(s)

-1 -1 Yes No No No No No No No No No No No No No Yes

MRP: i2 Batch Client Timeout


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_BC_TIMEOUT Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Calc Cumulative Yield


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_ENABLE_CUMUL_YIELD Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Check if FP installed


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_CHECK_FOR_FP Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Data Load Timeout


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_DATA_LOAD_TIMEOUT Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Date Constant


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_DATE_CONSTANT Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Debug Mode


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_DEBUG Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Factory Planner Exec Dir Attr Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_FP_EDIR_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Factory Planner User Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_FP_USER_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Job Change Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_JC_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Log Directory


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_LOG_DIR Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Net Change Dir


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_FP_NET_DIR Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Aggregate Resource Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_AGG_RES_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM BC Delimiter


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_BC_DELIMITER Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM BOM Attribute Consumed attribute number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_BOM_AC_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM BOM Attribute Produced attribute number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_BOM_AP_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Batch Client Filter


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_BCL_FILTER Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Cooldown Time Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RES_CDT_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Delimiter


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_DELIMITER Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Enable Attribute Base Planning


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_ENABLE_ABP Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Estimated Queue Time Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RES_EQT_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Factory Planner Data Dir Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_FP_DD_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Factory Planner Host Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_FP_HOST_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Factory Planner Port Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_FP_PORT_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Inventory Attribute Alias Separator


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_INV_AA_SEP Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Minimum Queue Time Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RES_MQT_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM OE Attribute Consumed attribute number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_OE_AC_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Offloadable To Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RES_OFFTO_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Offloadable from Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RES_OFFFROM_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM PO Attribute Alias attribute number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_PO_AA_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Part Buffer Style Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_BUF_STYLE_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM Resource Type Attribute Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RES_TYP_ATTR_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RHYTHM released as firm manufacturing order


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RELEASED_AS_FIRM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RhythmLink Data Directory


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RL_DATA_DIR Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RhythmLink Executable Directory


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RL_EXEC_DIR Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RhythmLink Host


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RL_HOST Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RhythmLink Port Number


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RL_PORT_NUM Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 RhythmLink User


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_RL_USER Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Start Factory Planner Client


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_START_FP_CLIENT Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 Start RhythmLink Client


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_START_RL_CLIENT Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP: i2 WIP Job Load Timeout


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_I2_P_JOB_LOAD_TIMEOUT Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:ATP Assignment Set


Profile Code Profile Option Name Description MRP MRP_ATP_ASSIGN_SET ATP Assignment Set to be used when scheduling Orders for ATP based on Collected Data. Required for ATP Based on Collected data to have sourcing information and provide correct results. This assignment set will default into the ATP Inquiry when accessed form the Order Management application. In a distributed installation, this would be setup on the EBS Source instance (not required on the APS Destination instance - see MSC: ATP Assignment Set) Note Reference(s) 147243.1

Bug Reference(s) Document References(s)

4567833 -1 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:ATP Database Link


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3049003 -1 No No No No No No No No No No No No No No Yes MRP MRP_ATP_DATABASE_LINK Determines whether distributed Order Promising is used. This profile is obsolete in 11.5.10 and later releases.

MRP:Activate OLP
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP-OLP Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Allow Safety Stock Pegging


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_ALLOW_SS_PEGGING This is a MRP Profile. Not used in advanced Supply Chain Planning

5924044 -1 Yes No No No No No No No No No No No No No No

MRP:Backlog Progress Timeout


Profile Code Profile Option Name Description MRP MRP_BALWB_TIMEOUT Used to help the performance of the Order Backlog workbench. Timeout in minutes. Should be set to 10 Change to other values only at the direction of Development for debugging an issue with the back log workbench

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Calculate Excess Exceptions on Time Fence


Profile Code Profile Option Name Description MRP MRP_CALC_EXCESS_EXCEPT Indicates whether excess exceptions are calculated at the time fence or up to the time fence Yes: The planning engine issuesexceptions only at the time fence date. No: The planning engine issues individual exception.

Valid values: yes/no Default value: yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes Yes No No No No No No No No No No No No No No

MRP:Combine Sugg Rep Schedules


Profile Code Profile Option Name Description MRP MRP_COMBINE_REP_SCHEDULE Combines repetitive schedules, if scheduled back-to-back for the same quantity. Used only by unconstrained plans Valid values: yes/no Default value: yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No Yes No No No No No No No No No No No No No

MRP:Complete Supply Chain ATP


Profile Code Profile Option Name Description Note Reference(s) MRP MRP_COMPLETE_SCATP Not used by Advanced Supply Chain Planning.

Bug Reference(s) Document References(s)

2655891 2941520 -1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Compute Sales Order Changes


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_COMPUTE_SO_CHANGES Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Consume Fcst Set Summary


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_CONSUME_FC_SET_SUMMARY Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Consume Forecast
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_FORECAST_CONSUMPTION Not used in Oracle Advanced Planning.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MRP:Consume MDS
Profile Code Profile Option Name Description MRP MRP_MDS_CONSUMPTION If set to yes, planning manager needs to be running when loading MDS in the ASCP plan 790125.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes Yes No No No No No No No No No No No No No No

MRP:Consume MPS
Profile Code Profile Option Name Description Note Reference(s) MRP MRP_MPS_CONSUMPTION If set to yes, planning manager needs to be running on the source to collect WIP/PO supplies. 790125.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4890962 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MRP:Create Time fence


Profile Code Profile Option Name Description MRP MRP_FIRM_ORDER_TF Instructs the planning engine to create a natural time fence on firm work orders, purchase orders, flow schedules and shipments. Valid values are: Yes - create a natural time fence based on firm work orders, purchase orders, flow schedules, and shipments No - the planning engine does not create a time fence

The planning engine honors the item attribute Planning Time Fence regardless of the value of this profile option. Note Reference(s)

399888.1 422361.1

Bug Reference(s) Document References(s)

-1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Cutoff Date Offset Months


Profile Code Profile Option Name Description MRP MRP_CUTOFF_DATE_OFFSET Determines how many months of resource availability should be computed for resources and simulation sets. No resource availability is calculated beyond this horizon. For constrained plans beyond this horizon, resource capacity is viewed as infinite. Set this value to your plan horizon Valid values: Integer >= 0 Default value: 6 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4736046 -1 Yes No No Yes No No No No No No No No No No No No No No No

MRP:Debug Mode
Profile Code Profile Option Name Description MRP MRP_DEBUG Enable debug messages. Note: Has high impact across many applications. This profile should only be set at USER Level unless otherwise instructed by support. Setting at the Site Level can have impact on WIP, BOM, OM, MRP, ASCP applications.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No Yes Yes No No No No Yes No Yes Yes No No No No No No Yes No No No No Yes

MRP:Default Criteria Set


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEFAULT_CRITERIA_SET Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Default DRP Plan Name


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEFAULT_DRP_NAME Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Default Forecast Date


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEFAULT_FORECAST_DATE Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Default Forecast Name


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEFAULT_FORECAST Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Default Plan Name


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEFAULT_PLAN Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Default Schedule Name


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEFAULT_SCHEDULE Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Default Sourcing Assignment Set


Profile Code Profile Option Name Description MRP MRP_DEFAULT_ASSIGNMENT_SET Not used by Oracle Advanced Planning. Used in Oracle Purchasing to determine the sourcing assignment set to assign sources to requisitions. Note Reference(s) 209633.1 763822.1

Bug Reference(s) Document References(s)

7362528 Oracle Global Order Promising Implementation and User's Guide -1 -1 Oracle Master Scheduling/MRP and Oracle Supply Chain Planning User's Guide -1 No No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Demand Time Fence Days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_DEMAND_TF Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Derive PO supply date from need by date


Profile Code Profile Option Name Description MRP MRP_CALC_SUPDT_FROM_NBDT

Not used in ASCP Used in Inventory Supply Demand form - Ref Bug 7260101 Check the value of the profile MRP:Derive PO supply date from need by date If this set to No, set it to Yes. Then, we derive the PO due date as need by date + post processing lead time. This calculation is done during the supply/demand inquiry. If this is not set, then the date displayed in the supply/demand inquiry is the expected_delivery_date in mtl_supply.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7260101 -1 No No No No No No No No No No No No No No No

MRP:Enhanced Exception
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_ENHANCED_EXCEPTION Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Environment variable to set path for MRP files


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_FILES_PATH_ENV_VAR Specifies appropriate path for the MRP files. If this profile option is not used, files are written to the $APPLOUT directory.

Yes No No Yes Yes No No No No No No No No No No No No No No

MRP:Firm Planned Order Time Fence


Profile Code Profile Option Name Description MRP MRP_FIRM_PO_TF Instructs the planning engine to create a natural time fence for an item at the completion date of the latest firm planned order. Valid values are: Yes - firm planned orders create a natural time fence. No - planning engine does not create a time fence at a firm planned order

If the overwrite option in the plan is set to overwrite all, then all firm planned orders are deleted Note Reference(s)

Bug Reference(s) Document References(s)

3642086 2553205 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Include Schd Rcpts in Use-up


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5087357 -1 Yes No No Yes Yes No No No No No No No No No No No No No No MRP MRP_SCH_RCP_USEUP If this profile option is set to Yes, it includes scheduled receipts when computing the engineering change order use-up date.

MRP:Include Substitute Components


Profile Code Profile Option Name Description MRP MRP_ATP_SUB_COMP Indicates whether to include substitute components in the Oracle Global Order Promising calculation. Users can update at the site level. This setting is only applicable when ATP is based on Planning output.

Note Reference(s)

Bug Reference(s) Document References(s)

3162334 1555350 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Interface Table History Days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_INTERFACE_HISTORY_DAYS Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:MPS Relief Batch Size


Profile Code Profile Option Name Description MRP MRP_MPS_RELIEF_BATCH Not used in Oracle Advanced Planning. This is for standard MRP processing of MPS Relief. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP:MPS Relief Direction


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_MPS_RELIEF_DIRECTION_CONTROL Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Maintain Original Schedule Version


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_ORIGINAL_SCHEDULE_VERSION Not used in Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Perform Planning Manager Functions in Loads


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_PLANNING_MANAGER_IN_LOADS Not used by Oracle Advanced Planning

Yes No No No No No No No No No No No No No No

MRP:Planner Batch Size


Profile Code Profile Option Name Description MRP MRP_PLANNER_BATCH_SIZE Not used by Oracle Advanced Planning. This profile is used by the MRP planning manager. This impacts ASCP only in the sense that it affects how the planning manager runs.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP:Planner Workers
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_PLANNER_WORKERS Not used by Oracle Advanced Planning. This profile is used by the MRP Planning Manager.

Yes No No No No No No No No No No No No No No

MRP:Planning Manager Batch Size


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_SCHED_MGR_BATCH_SIZE Not used by Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP:Planning Manager Max Workers


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_SCHED_MGR_MAX_WORKERS Not used by Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP:Purchasing By Revision
Profile Code Profile Option Name Description MRP MRP_PURCHASING_BY_REVISION When releasing planned orders, we check if profile is set. IF NULL, then we check if item has Revision Control checked and if Yes, then we set revision control Yes When profile Yes (or NULL and item revision control - Yes), then we update revision of item based on effectivity date of revisions defined for the item Set on EBS Source in a distributed environment Note Reference(s) 238838.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3939138 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MRP:Purge Batch Size


Profile Code Profile Option Name Description Note Reference(s) MRP MRP_PURGE_BATCH_SIZE Used by Oracle Advanced Supply Chain Planning collections and Snapshot .111955.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4590579 -1 -1 Yes No No Yes No No No No Yes No Yes Yes No No No No No No No No Yes No No No

MRP:Recommend action within PTF


Profile Code Profile Option Name Description MRP MRP_REC_ACTION_IN_PTF Affects exceptions and recommendations. It instructs the planning engine, in unconstrained plans, to generate recommendations for scheduled receipts earlier than Planning Time Fence Date. This profile is not used for MSO (constrained planning), looks at planning time fence control. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2980511 -1 -1 Yes No No Yes No Yes No No No No No No No No No No No No No

MRP:Repetitive Past Due Supply Days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_REP_PAST_DUE_SUPPLY Not used by Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP:Requisition Load Group Option


Profile Code Profile Option Name Description MRP MRP_LOAD_REQ_GROUP_BY

This profile is used when the Auto-Release Planned Orders process is run as part of an Plan run. The Auto-Release Planned Orders will launch when the Production Flag is checked on the Plan Names form. Additional Item setups are required for orders to be eligible for release during this process. Set in APS Destination instance. The profile is NOT used when releasing planned orders from the workbench. Instead, the Planner workbench /Tools/Preferences - the Plan Preferences - Other tab - Req Group By This has a lookup to choose the options for how you group lines being released to PO application to create requisitions. Indicates group by option used when loading requisitions Valid values are DB Value [number] - Application Displayed Value - Description 1 - All on One - (creates one purchase requisition for all recommended orders) 2 - Item (creates one purchase requisition for each item; within each requisition, creates one line for each planned order), 3 - Buyer - (creates one purchase requisition for each buyer; within each requisition, creates one line for each planned order), 4 - Planner - (creates one purchase requisition for each planner; within each requisition, creates one

line for each planned order), 5 - Vendor - (creates one purchase requisition for each vendor; within each requisition, creates one line for each planned order), 6 - Category - (creates one purchase requisition for each item category; within each requisition, creates one line for each planned order,
7 - One each (creates a purchase requisition for each planned order).

8 - Location - PO Req Import process chooses deliver to location to group the lines.
Note Reference(s) 779922.1

Bug Reference(s) Document References(s)

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No Yes No No Yes Yes No No No No Yes No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Retain Dates Within Calendar Boundary


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4874810 -1 Yes No No Yes Yes No No No No No No No No No No No No No No MRP MRP_RETAIN_DATES_WTIN_CAL_BOUNDARY Determines whether to pull dates outside the calendar boundary into calendar horizon.

MRP:Snapshot Pause for Lock (Minutes)


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_SNAPSHOT_PAUSE_FOR_LOCK Not used by Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP:Snapshot Substitute Parts


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_SNAP_SUBSTITUTES Not used in Oracle Advanced Planning.

6436732 -1 No No No Yes No No No No No No No No No No No No No No No

MRP:Snapshot Workers
Profile Code Profile Option Name Description MRP MRP_SNAPSHOT_WORKERS Determines number of workers launched by the snapshot monitor. When set to 0, the Snapshot runs as a single- threaded process. Snapshot workers collect data on bills of material, work in process, on- hand quantities, purchasing, firm planned orders, routings, and work-in-process job resource requirements. 111955.1 824317.1 130995.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MRP:Sourcing Rule Category Set


Profile Code Profile Option Name Description MRP MRP_SRA_CATEGORY_SET Not used in Advanced Supply Chain Planning Indicates the category set used when Oracle Supply Chain Planning or Oracle Purchasing creates sourcing assignments at category-org or category level. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MRP:Time Fence Warning


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MRP MRP_MPS_TIME_FENCE_WARNING Not used in Oracle Advanced Planning.

Yes No No No No No No No No No No No No No No

MRP:Trace Mode
Profile Code Profile Option Name Description MRP MRP_TRACE Enable trace option for MRP, ASCP, other processes. This should only be used with suggestion of support since this reaches to many different applications. Should only be set at User Level to avoid tracing many application processes. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes Yes No No No Yes Yes Yes No No No No No No No Yes

MRP:Use Direct Load Option


Profile Code Profile Option Name Description MRP MRP_DIRECT_LOAD Valid values are: Yes - SQL Loader is called directly to load rows into the database during planning. No

Note Reference(s)

Default Value - No 307443.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No Yes Yes No No No No No No No No No No No No

MRP:Use Ship Arrived Flag


Profile Code Profile Option Name Description MRP MRP_SHIP_ARRIVE_FLAG Determines whether sales orders are automatically viewed as arrived at a customer site after transit lead-time has expired. Used when a customer is modeled as an organization

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MRP_NEW_PLANNER_BACK_COMPATIBILITY
Profile Code Profile Option Name Description MRP MRP_NEW_PLANNER_BACK_COMPATIBILITY

Per bug 9848641: There have been changes back and forth with this profile in combination with MSC: New Planner Backward Compatibility. 1. MRP profile will remain the same. It will decided whether an item should be treated as phantom or not. 2. MSC on the other hand will now decide whether the new algorithm would be used or the old one. Yes would mean old and No would mean new. Yes - Phantoms will be treated as regular items and planned orders will be created. No - Phantoms will be exploded, and not appear in the plan. Default - Null - which is No

Note Reference(s)

Bug Reference(s) Document References(s)

9848641 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes Yes Yes Yes No No No Yes Yes Yes Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized

Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes Yes No No No No No No No

MSC : Consider all supplies for VMI replenishment calculation


Profile Code Profile Option Name Description MSC MSC_VMI_ALL_SUPPLY When profile is set as yes the VMI engine considers all manually created PO/PR/ASN/Shipments as supply and account them in replenishment calculation

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5949512 -1 Yes No No No No Yes No No No No No No No No No

MSC : Consume Highest Revision Forecast


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_CONSUME_HIGHEST_REV_FCST Lower revision SOs consume against forecast of only the Highest revision

-1 No No No Yes No No No No No No No No No No No No No No No

MSC : Publish Supply Commit based on pegging information


Profile Code Profile Option Name Description MSC MSC_PUBLISH_SUPPLY_COMMIT Enables or disables detailed publish of supply commits as a single supply commit record or multiple supply commit records if there are multiple supplies to meet the demand. Valid values are: Yes No

Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No Yes No No No No No No No No No

MSC : VMI Requisitions Need By Date at RTF end


Profile Code Profile Option Name Description MSC MSC_VMI_REQUISTION_AT_RTF_END When set to yes, this profile option ignores the release time fence. This enhancement impacts only the need-by date on the requisition that is created, when a replenishment is released from VMI Added the code to ignore RTF if the profile "VMI Requisitions Need By Date at RTF end" is set to No. The default value of this profile is "Yes". Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6001195 -1 Yes No No No No Yes No No No No No No No No No

MSC: 64-bit Planner Platform


Profile Code Profile Option Name Description MSC MSC_PLANNER_PLATFORM Set to the supported 64-bit platforms. Valid values are: Note Reference(s) 254810.1 Sun 64-bit - 1 HP 64-bit - 2 AIX 64-bit - 3 Linux 64-bit - 4 HP Itanium 64-bit - 5

Bug Reference(s) Document References(s)

6836990 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: APCC - Enable Cumulative Measures in Archive


Profile Code Profile Option Name Description MSC MSC_APCC_ENABLE_CUM

When a plan is published from ASCP to APCC, all fact tables are loaded irrespective of customer needs. The profile provides user the ability to load data of selected facts/measures where possible. It has Yes/No values, and defaults to Yes. To disable cumulative measures, user needs to explicitly set it to No. When the profile "MSC: APCC - Enable Cumulative Measures in Archive" is set to No the following tables are not populated during archive: - MSC_DEMANDS_CUM_F - MSC_RESOURCES_CUM_F

Note Reference(s)

Bug Reference(s)

Document References(s)

10252796 12612608 12617301 -1 -1 -1 No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning

Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No Yes No No

MSC: APCC Archive SCRM Measures


Profile Code Profile Option Name Description MSC MSC_APCC_ENABLE_SCRM

This is about performance problems in msc_phub_cost_pkg due to source_count section. It has to process msc_item_sourcing, and has to densify by multiplying weeks in horizon. This makes data volume large, and results in performance problems. But source_count measures are mostly used for SNO plans, while performance problem in this bug happened on ASCP plans. Confirmed with PM, we should allow user to turn it off by setting a profile option. We introduced new profile option "MSC: APCC Archive SCRM Measures" (MSC_APCC_ENABLE_SCRM, Yes(default)|No), when set to No, source_count is skipped. Following presentation columns are not populated: "- Excess, Obselescence And Risk Management"."Count of Sources" "- Excess, Obselescence And Risk Management"."Count of Sources in IO Plan" "- Sourcing Effectiveness"."Count of Items Single Sourced" Values: with profile options "MSC: APCC Archive SCRM Measures" set to "Yes'and "No" and also with blank. Blank and yes will have same result as the default value is blank. When profile set to "Yes" the count of sources and Count of Items single sourced are populated and when "No" the Count of Sources and Count of Items single sourced are not populated. Hence

performance could be improved by switching off the profile.


Note Reference(s)

Bug Reference(s)

Document References(s)

12820986 12845928 12820986 10252796 13638350 -1 -1 -1 -1 -1 No No No Yes No No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: APCC Calendar Code


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_HUB_CAL_CODE Used in the dashboard to code manufacturing calendar.

Yes No No Yes No No No No No No No No No No No No No No No

MSC: APCC Category Set 1


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_HUB_CAT_SET_ID_1 Used to filter the category set name. Only 3 category sets are supported, and dashboards will use this profile in the dashboards. 844667.1

-1 Yes No No Yes No No No No No No No No No No No No Yes No No

MSC: APCC Category Set 2


Profile Code Profile Option Name Description MSC MSC_HUB_CAT_SET_ID_2 This profile works in conjunction with MSC: APCC Category Set 1 and MSC: APCC Category Set 3. These profiles govern which category set the analytical layer when displaying the item-category hierarchy uses. It precomputes the data for all three hierarchies, but displays the data using only the MSC: APCC Category Set 1 value. Therefore, if the user wants to view using the value in MSC: APCC Category Set 2, the values in these two profiles must be switched. The user can then see the results using the new category set, which is now in the MSC: APCC Category Set 1 profile. There is no need to rerun the plan or republish it to APCC, however, if user decides to use a completely new category set, which is not currently in these three profiles, then the profile values must be updated, and the plans must be rerun, or republished, to APCC for the change to take effect. This is a site level profile 759571.1

Note Reference(s)

844667.1 Bug Reference(s) Document References(s) 6836737 -1 -1 -1 -1 -1 Yes No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: APCC Category Set 3


Profile Code Profile Option Name Description MSC MSC_HUB_CAT_SET_ID_3 This profile works in conjunction with MSC: APCC Category Set 1 and MSC: APCC Category Set 2. These profiles govern which category set the analytical layer when displaying the item-category hierarchy uses. It precomputes the data for all three hierarchies, but displays the data using only the MSC: APCC Category Set 1 value. Therefore, if the user wants to view using the value in MSC: APCC Category Set 3, the values in these two profiles must be switched. The user can then see the results using the new category set, which is now in the MSC: APCC Category Set 1 profile. There is no need to rerun the plan or republish it to APCC, however, if user decides to use a completely new category set, which is not currently in these three profiles, then the profile values must be updated, and the plans must be rerun, or republished, to APCC for the change to take effect. This is a site level profile. Note Reference(s) 844667.1 Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: APCC Category set for detailed pegging analysis


Profile Code Profile Option Name Description Note Reference(s) 1225973.1 MSC MSC_APCC_PEGGING_CAT_SET Category set for detailed pegging analysis. APCC archives pegging information for ASCP items of this catetory set.

Bug Reference(s) Document References(s)

10013480 12746734 -1 -1 -1 -1 No No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: APCC Currency Code


Profile Code Profile Option Name Description MSC MSC_HUB_CUR_CODE_RPT The analytical layer to convert the values in functional currency to a common reporting currency uses this. This profile is used as the reporting currency for APCC. Please note that if this profile is changed the plan must be republished to APCC repository to see the data in the new currency. This is a site level profile. 759571.1 844667.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No No No No No No No No No No Yes No No

MSC: APCC Instance


Profile Code Profile Option Name Description MSC MSC_APCC_TARGET_DBLINK Name of the database link in the 11.5.10 server to the 12.1 APCC instance. It is used by the archive plan summary to push the plan summary for 11.5.10 Planning Server to the APCC Server. This profile options is set up on the APS 11.5.10 instance only. 844667.1

Note Reference(s)

Bug Reference(s) Document References(s)

8665145 8597162 -1 -1 -1 Yes No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: APCC Period Set name


Profile Code Profile Option Name Description MSC MSC_HUB_PERIOD_SET_NAME The analytical layer and the dashboards that display time in the hierarchy of days, fiscal periods, quarters, and year use this. This is a site level profile. 759571.1 844667.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No No No No No No No No No No Yes No No

MSC: APCC SNO Item Simulation Set


Profile Code Profile Option Name MSC MSC_APCC_SNO_ITEM_SIMULATION_SET

Description

Bug 9274349: APCC SUPPORT SNO ITEM SIMULATION SET FOR EXCESS AND OBSOLESCENCE FACTS.
temporary solution for simulation sets for sno in apcc Note Reference(s)

It'll wort like this:- user sets the profile option before publishing SNO

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

9274349 9612415 -1 -1 No No No No No No No No No No No Yes Yes No No

MSC: APCC WebLogic Console Password


Profile Code Profile Option Name Description MSC MSC_WC_WEBLOGIC_PASSWORD MSC: APCC WebLogic Console Password Webcenter

Note Reference(s)

1081051.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No No No No No No Yes No No

MSC: APCC WebLogic Console Username


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_WC_WEBLOGIC_USERNAME Set it to WebLogic admin user. For example, weblogic. This user should be the admin user for WebLogic. 1081051.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No No No No No No Yes No No

MSC: APCC WebLogic Password


Profile Code Profile Option Name Description MSC MSC_WS_WEBLOGIC_PASSWORD MSC: APCC WebLogic Password Soa server

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

1081051.1

-1 No No No No No No No No No No No No Yes No No

MSC: APCC WebLogic Username


Profile Code Profile Option Name Description MSC MSC_WS_WEBLOGIC_USERNAME MSC: APCC WebLogic Username Soa server

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

1081051.1

-1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Admin URL


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_WC_ADMIN_URL

No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Enabled


Profile Code Profile Option Name Description MSC MSC_WC_ENABLED 7 MSC_WC_URL MSC: APCC Webcenter URL Webcenter URL For example, http://rws60018rems.us.oracle.com/webcenter/wcAuthentication/?login=true &success_url=/spaces Replace your host and keep the other things same. Then, you skip the Webcenter welcome/login screen when navigating from e-Business Suite to Webcenter. 1226033.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Group Space Template


Profile Code Profile Option Name Description MSC MSC_WC_SPACES_TEMPLATE 3 MSC_WC_SPACES_TEMPLATE MSC: APCC Webcenter Group Space Template Webcenter Group Space Template Name For example, 1226033.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Spaces Member Role


Profile Code Profile Option Name Description MSC MSC_WC_SPACES_MEMBERROLE 2 MSC_WC_SPACES_MEMBERROLE MSC: APCC Webcenter Spaces Member Role Viewer Or Participant Members added to the webcenter group space can be either viewers or participants. 1226033.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Spaces Port


Profile Code Profile Option Name Description MSC MSC_WC_SPACES_PORT 6 MSC_WC_SPACES_PORT MSC: APCC Webcenter Spaces Port Webcenter Spaces managed server Port For example, 8877 1226033.1 1081051.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Spaces Recipient Key Alias


Profile Code Profile Option Name Description MSC MSC_WC_SPACES_RECIPIENTKEYALIAS 4 MSC_WC_SPACES_RECIPIENTKEYALIAS MSC: APCC Webcenter Spaces Recipient Key Alias Recipient Key Alias For example, 1226033.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter Spaces Saml Issuer Name


Profile Code Profile Option Name Description MSC MSC_WC_SPACES_SAMLISSUERNAME 5 MSC_WC_SPACES_SAMLISSUERNAME MSC: APCC Webcenter Spaces Saml Issuer Name Saml issuer name of Webcenter For example, www.oracle.com 1226033.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: APCC Webcenter URL


Profile Code Profile Option Name Description MSC MSC_WC_URL 7 MSC_WC_URL MSC: APCC Webcenter URL Webcenter URL For example, http://rws60018rems.us.oracle.com/webcenter/wcAuthentication/?login=true &success_url=/spaces Replace your host and keep the other things same. Then, you skip the Webcenter welcome/login screen when navigating from e-Business Suite 1226033.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: APCC to APS database link name


Profile Code Profile Option Name Description Note Reference(s)

MSC MSC_APCC_BACK_TO_SELF_DBLINK new profile option "MSC: APCC to APS database link name" (MSC_APCC_BACK_T

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

8856448 8665145 -1 -1 No No No No No No No No No No No No Yes No No

MSC: ATP Allocation Method


Profile Code Profile Option Name Description MSC MSC_ALLOCATION_METHOD For ATP based on Planning Output only This site-level profile determines the allocation method used by ATP. This is a site level profile. Values are: User-Defined Allocation Percentage Demand Priority 334286.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: ATP Capacity Allocation


Profile Code Profile Option Name Description MSC MSC_CAP_ALLOCATION Set it to No. You should only set it to Yes with specific instruction from Oracle Applications development

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: ATP Debug Mode


Profile Code Profile Option Name Description MSC MSC_ATP_DEBUG Used to create debug files for ATP. Files are named session-[number] -- [number] is assigned by a sequence. In a distributed installation, files are created on both the EBS Source instance and APS Destination instance. Both files are required for Support and DEV to investigate an ATP issue. Note 122372.1 is key guide to producing and providing these files to support. Values are: + Debug Only: ATP generates a log file for an ATP request. + Debug and Database Trace: ATP generates a log file and a database trace file. + Database Trace Only: ATP generates a database trace file. + None: ATP does not generate a log file or a database trace file. (Default) 954333.1 122372.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: ATP Enforces Lead Time for ATO Model


Profile Code Profile Option Name Description MSC MSC_ENFORCE_MODEL_LT Used for ATP based on Collected Data Indicates whether ATP enforces lead time for ATO models or not. + Yes - Enforces lead time for ATO models. + No - Does not enforce lead time for ATO models. Note Reference(s)

Bug Reference(s) Document References(s)

Oracle Global Order Promising Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: ATP Infinite Time Fence Pad


Profile Code Profile Option Name Description MSC MSC_ATP_INFINITE_TF_PAD Add Offset Days to Infinite Supply Fence Per Note 227406.1 for 11.5.9 Results displayed by Oracle Advanced Supply Chain Planning and ATP mismatch when considering the Infinite Supply Fence Date to satisfy demands. Oracle Advanced Supply Chain Planning considers Delivery Calendar, but ATP does not. A new profile option MSC: ATP Infinite Time Fence Pad has been created to offset the Supply Fence Date with the number of days set by user. ATP adds this number to the Infinite Supply Fence Date. Thus, the Oracle Advanced Supply Chain Planning matches the ATP output.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Note: Once in 11.5.10 and using MSC: Use Shipping/Receiving Calendars, this profile should be obsolete for functional purposes. 227406.1

-1 Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: ATP Synchronization Downtime (minutes)


Profile Code Profile Option Name Description MSC MSC_ATP_SYNC_DOWNTIME Used for ATP 24x7 plan run. Determines the approximate ATP downtime (in minutes) to cover the time required to synchronize and to switch over to the refreshed plan during the plan synchronization process. Oracle Global Order Promising internally translates this value into the number of orders to process. You should set the value for this profile based on the sales order volume during the ATP 24x7 plan run. This profile option also determines the duration of the extended synchronization process. This process is executed for the duration of the ATP downtime or 10 minutes (default), whichever is larger. Note: ATP Post Plan Processing is where this is executed and it reports in the log file how much downtime was used. Actual downtime is usually very small and default value of 10 mins should not require any changes. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: ATP Web Service Responsibility


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6625571 -1 No No No No No No No No No No No No Yes No Yes MSC MSC_WS_ATP_FNDRESP Responsibility used when ATP web service is invoked. Not used yet

MSC: ATP Web Service User


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6625571 -1 No No No No No No No No No No No No Yes No Yes MSC MSC_WS_ATP_FNDUSER User used when ATP web service is invoked Not Used yet.

MSC: AVOID RE-SOURCING SALES ORDERS


Profile Code Profile Option Name Description MSC MSC: AVOID RE-SOURCING SALES ORDERS Ignore this profile, it is duplicate and needs to be removed. See instead - MSC: Avoid Re-Sourcing Sales Orders MSC_AVOID_RESOURCING_SALES_ORDERS 352277.1

Note Reference(s)

Bug Reference(s) Document References(s)

6134419 12846307 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Action Allowed on ATP 24x7 Plan While Running


Profile Code Profile Option Name Description MSC MSC_ALLOWED_ACTION_24X7 Profile to control whether 24X7ATP plan can be viewed and updated while the plan is running. Determines whether manual updates are allowed to the original plan when the plan copy is running. Values are: Yes: The ATP plan appears in the Workbench window while it is running. You can make changes to the plan. However, the changes will not appear in the refreshed plan. No: The ATP plan appears only in the View Plan window. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes Yes No No No No No No Yes Yes No No No No No No No No No No Yes

MSC: Aggregate Resource Name Flexfield Attribute


Profile Code Profile Option Name Description MSC MSC_AGGREG_RES_NAME This profile option stores the name of the flexfield column that contains the value in the corresponding table. See 'Flexfield Attributes, page A-1 for more information. Set in EBS Source in a distributed installation.

Created by Create Planning Flexfields concurrent request. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: Align Component Demand Date with Pegging Date


Profile Code Profile Option Name Description MSC MSC_ALIGN_COMP_DMD_WITH_PEG Per Bug 6512739The work orders are scheduled out further than planned order--"cross scheduling", because the assembly level, the pegging window is very large, causing some early component supplies are pegged (via multihop) to late high priority demand. The scheduler's right justification pushes the work orders out. . Introduce a profile MSC: Align Component Demand Date with Pegging Date. Yes - the component demand will be pushed out in the first place, so it has less chance to grab the work orders

First introduced in 11.5.9 - Bug 5903195 Forward ported to 11.5.10 and included in ASCP Engine/UI RUP #33 Forward ported to R12 in Bug 6266579 and present in CU3 patch 6731645 and included in 12.0.6 Fixed in base release of 12.1.1 Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6512739 6266579 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Allocated ATP Forward Consumption Method


Profile Code Profile Option Name Description MSC MSC_ATP_FORWARD_CONSUME_METHOD Determines the type of forward consumption that Oracle Global Order Promising can perform to accommodate the shortage faced by a demand class. Values are: + Reduce future supply from lowest priority: Use the available supply from the lowest priority demand to account for the shortage of a demand class. If every demand class is at same priority, reduce the future supply to cover the shortage for a demand class. + Reduce available supply from any priority: A promised demand is the most important demand that you need to meet. Oracle Global Order Promising starts the adjustments from the higher priority demand class. That is, Oracle Global Order Promising reduces the availability of a lower priority demand class before a higher priority demand class to account for shortages from a previous period. Thus, it reduces the available supply to account for the shortage from lower priority demand classes. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: Allocation Assignment Category Set


Profile Code Profile Option Name Description MSC MSC_ALLOC_CATEGORY_SET The Assign Allocation Rule form and the Sourcing assignment form both use the MSC: Sourcing Category Set to determine the valid category set. Use this profile option if you want the allocation rule category set to be different from the sourcing assignments category set.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3128505 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No No

MSC: Allow Release of Planned Orders from Demand Schedule Plan


Profile Code Profile Option Name Description MSC MSC_DRP_RELEASE_FROM_MRP This profile option provides increased flexibility for releasing planned orders and applies only to manual release. It is not considered for auto-release. MPS and MPP planned orders cannot be auto-released from the MRP. The planning engine assumes that if the item is marked so that auto-release is allowed then auto-release has already occurred from the MPS or the MPP. Valid values are: Yes - You can release demand schedule MPP or MPP planned orders from the lower level plan No - You cannot release demand schedule MPP or MPP planned orders from the lower level plan

Set on APS Destination in a distributed environment Note Reference(s) 795033.1

Bug Reference(s) Document References(s)

5852065 -1 -1 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Allow release of replenishments above suggested quantity


Profile Code Profile Option Name Description MSC MSC_VMI_RELEASE_ABOVE_MAX When set to yes, this will allow users to replenish more than the suggested quantity. Used in Collaborative Planning for release of VMI Orders Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3389269 -1 Yes No No No No Yes No No No No No No No No No

MSC: Analytics Currency Code


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_ANALYTICS_CURRENCY_CODE No Documentation available for this profile.

No No No Yes No No No No No No No No No No No No No No No

MSC: Anchor date for calculating operation yields


Profile Code Profile Option Name Description MSC MSC_OPERATION_YIELD_TYPE Use this profile option to instruct the planning engine on which effectivity date to use when it generates resource requirements of operations with yields. This profile option applies to discrete jobs and Oracle ShopFloor Management (OSFM) routings with primary network scheduling method. Order start date: Use the order start date to check for operation effectivity and select yield value. Operation start date: Use the operation start date to check for operation effectivity and select yield value.

The planning engine uses lead-time percent to calculate the operation start date; it assumes that the lead-time percent of an operation that is effective in the future is the same as the lead-time percent of the operation it replaces. If an operation's effectivity ends within a time bucket, the planning engine assumes that its effectivity ends on the first day of the time bucket. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3161454 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Anchor date for calculating remaining shelf life


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_USE_SHIP_DAYS_FOR_MRSL Specifies arrival date or ship date as the anchor date to use when calculating the remaining shelf life 760046.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSC: Apply Lot Modifiers in Weekly/Period Buckets


Profile Code Profile Option Name Description MSC MSC_APPLY_LOT_MODIFIER Determines whether order modifiers are considered when creating planned orders for weekly or period time buckets. Valid values are: Yes - considers order modifiers in these calculations No - does not consider order modifiers in these calculations

Default Value - NULL (Yes) Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No

MSC: Apply Order Modifier To Start Quantity


Profile Code Profile Option Name Description MSC MSC_APPLY_OM_TO_START_QTY Use this profile option to specify whether order modifiers are applied to start quantities for discrete or lot based jobs. This behavior only applies to routings that have operation yield. In this case the start quantity may be different from the expected supply quantity. Valid values are: Yes - The planning engine inflates the order start quantity by the routing operation yield and then applies order modifiers. No - The planning engine applies the order modifiers to the end quantity

Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No Yes No No No No No No No No

MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock
Profile Code Profile Option Name Description MSC MSC_SS_SMOOTH_NON_MRP Use this profile option to specify the safety stock to which the smoothing within time interval applies: Valid values are: Yes - Smoothing applies to all types of safety stock No - Smoothing applies only to MRP planned safety stock

Note Reference(s) 276707.1 759329.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Apply shortage and excess tolerance to planned orders


Profile Code Profile Option Name Description MSC MSC_APPLY_TOL_PLAN_ORD Introduced in ASCP Egnine/UI rollup #33 Valid values are: Yes - The shortage tolerance and excess percentages are applied to all supplies including planned orders. This is the default value. No - The shortage tolerance and excess percentages are applied only to firm existing supplies (such as Onhand, WIP).

Introduced in ASCP Engine/UI rollup #33. 11-May-2010 - Not front ported to any R12.x release. Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7461501 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Auto-Release Compression Days Tolerance


Profile Code Profile Option Name Description MSC MSC_AUTO_REL_COMP_TOLERANCE Allows orders to be auto-released provided their compression is not more than the value specified Set on APS Destination in a distributed environment In the Planner workbench you can use /Folder/Show Field to show Compression field to see how much compression - if any - is calculated for a planned order. Remember that Auto-Release will release orders based on the Suggested Order Date for the planned order (NOT the Suggested Due Date) - this field is also available via /folder/Show field Suggested Due Date - date order to be available in inventory Suggested Dock Date - Due Date - Post processing Lead Time Suggested Start Date - Dock Date - Processing LT Suggested Order Date - Start Date - Pre-processing LT Example: Assume the profile = NULL Item/Org setup has Release time fence days User define - 15, Leadtime is 10 days (working days). New planned order created due on working day 1 though 9 will not be released since the lead time is being compressed. The Sugg Order Date will show the anchor date of the plan and Compression Days field will be greater than 0. But any planned order that with Compression Days 0 and Sugg Order Date = to the anchor date of the plan run out to working day 15 will be released Set the profile to 10. Now in the above example, the planned order will be released on working day 1 through 9 since you're allowed up to 10 compression days for Autorelease to release the planned order. The Production Flag must be checked in the Plan Names form for Autorelease to run during the plan run. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No Yes Yes No No No No No

Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No

MSC: Automatically Recalculate Operation Time


Profile Code Profile Option Name Description MSC MSC_RECALCULATE_OP_TIME Enables automatic re-calculation of "New Date" (due date) of make orders when order is firmed and the "New Start Date" is updated by the user. This takes into account Fixed and Variable Lead Times and working days. This is done only in the case of unconstrained plans and has certain limitations.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6142627 9359714 -1 -1 Yes No No Yes No Yes No No No No No No No No No No No No No

MSC: Avoid Re-Sourcing Sales Orders


Profile Code Profile Option Name Description MSC MSC_AVOID_RESOURCING_SALES_ORDERS Possible values: Yes or No - Default = Yes (If null, then Yes) Yes - To maintain backward compatibility. Planning logic will avoid sourcing sales orders. This will disable the following functionalities: plan by arrival date, change ship methods, and change source org for sales order lines. No - With this setting, you can plan by arrival date, change ship methods, and change source org provided you have set up the correct sourcing rules. Introduced because ASCP planning was resourcing FIRM sales orders and changing the ship method that was chosen on the sales order. This is not forward ported to 12.1 or 12.2 Fixed in 11.5.10 and 12.0.6 Note Reference(s) 352277.1

Bug Reference(s) Document References(s)

6134419 12846307 -1 -1 -1 Yes No No Yes Yes No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: BPEL Demantra Password


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SCN_DEMANTRA_PASSWORD Required for launching Demantra nodes in BPEL, default value is soa. 759571.1

-1 No No No No No No No No No No Yes No Yes No No

MSC: BPEL Demantra Username


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SCN_DEMANTRA_USERNAME Required for launching Demantra nodes in BPEL, default value is soa. 759571.1

-1 No No No No No No No No No No Yes No Yes No No

MSC: BPEL Domain Name


Profile Code Profile Option Name Description MSC MSC_SCN_BPEL_DOMAIN Required for launching BPEL. To deploy custom BPEL processes, you must deploy the processes to the domain that is specified in the profile option MSC:BPEL 759571.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: BPEL End Point URI


Profile Code Profile Option Name Description MSC MSC_SCN_SERVICE_ENDPOINT Required for launching BPEL, typically: http://[m/c name]:port 759571.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No Yes No No

MSC: BPEL Process Version


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SCN_BPEL_VERSION Deployed BPEL process flows version number. 759571.1

-1 No No No No No No No No No No No No Yes No No

MSC: Batch Size for Self Service Loads


Profile Code Profile Option Name Description MSC MSC_SELF_SERVICE_LOADS_BATCH_SIZE For large data loads using Legacy Self Service Loads, set to a higher value in combination with profile MSC: Number of Workers for Self Service Loads to achieve best fit for performance and data size being loaded. Valid values are: Integer

Note Reference(s)

Default Value - 1000 352277.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No No No No No No No No No No No No No

MSC: Batchable Flag


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_BATCHABLE_FLAG No longer used in ASCP

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Batching Window


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_BATCHING_WINDOW Not used in Oracle Advanced Planning.

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Buy Order Processing Lead Time Calendar


Profile Code Profile Option Name Description MSC MSC_BUY_ORDER_PROCESSING_LEAD_TIME_CALENDAR Use this profile option to instruct the planning engine what calendar to use when it offsets processing lead-time for buy orders. Valid values are: Supplier Capacity Calendar - The planning engine offsets processing lead-time for buy orders using the Approved Supplier List Supplier Capacity Calendar. The Approved Supplier List Supplier Capacity Calendar is the successor to the Approved Supplier List supplier delivery calendar. Org Manufacturing Calendar - The planning engine offsets processing lead-time for buy orders using the organization manufacturing calendar.

This profile was introduced to offer backward compatibility to the way processing Lead-time was calculated in 11.5.9. The equivalent of the 11.5.9 functionalty is to use Org Manufacturing calendar. Notes: Ref Note 566206.1 for more information.ATP does not currently use this profile. an ASL must be assigned to the item with the Supplier Capacity Calendar same as the Org calendar to get ATP to offer the same functionality as ASCP planning Default Value - Supplier Capacity Calendar Note Reference(s) 566206.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No Yes No No Yes No No No No No No No No No No Yes No

MSC: CP Debug Level


Profile Code Profile Option Name Description MSC MSC_CP_DEBUG Controls the level of detail in the concurrent program log messages for Oracle Collaborative Planning. Valid values are: Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 295564.1 Off - No debug messages generated On - Short debug messages generated High - Detailed debug messages generated.

-1 Yes No No No No Yes No No No No No No No No No

MSC: Calendar Reference for Bucketing


Profile Code Profile Option Name Description MSC MSC_BKT_REFERENCE_CALENDAR

Calendar used for bucketing KPI's. If the profile option MSC:Calendar Reference for Bucketing is null, then the plan owning organization calendar is used for the plan bucketing. If this profile points at a valid calendar, then the plan will use that calendar for bucketing Also known to cause plan failures, Signal 11 errors when this not setup. No formal documentation on the profile

Note Reference(s)

452630.1 372199.1 603981.1

Bug Reference(s) Document References(s)

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No Yes No Yes No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Cancel Oustanding Sales Order Quantities


Profile Code Profile Option Name Description MSC MSC_FILL_OR_KILL_ENABLED Valid values are: No - then the DRP engine behavior is not affected and does not exhibit 'Fill or Kill'. Yes - then for any sales orders with open quantities after the Latest Acceptable Date, the quantities are canceled and the demands are not carried forward. The cancellation is effective as of the Latest Acceptable Date (which is considered by DRP as the end of the allocation bucket).

Note that the only order modifier that is considered when determining partial allocations to sales orders is the Round Order Quantities item attribute for the shipping organization. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No Yes No No No No No No No No No No

MSC: Category Set for Jobs without an Item Reference


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_NO_ACTIVITY_ITEM_CATEGORY_SET No information available for this profile in user guides.

No No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSC: Category Set for Liability Analysis


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_CATEGORY_SET_NAME Not used in Oracle Advanced Planning.

5481643 -1 No No No Yes No No No No No No No No No No No No No No No

MSC: Category for Jobs without an Item Reference


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_NO_ACTIVITY_ITEM_CATEGORY No Information available in user guides.

No No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSC: Category set for CP Horizontal View


Profile Code Profile Option Name Description MSC MSCX_CP_HZ_CATEGORY_SET Indicates a category set that you want to query in the Oracle Collaborative Planning horizontal view. Using this profile option, you can restrict queries to specific categories based on your requirement.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2422506 -1 Yes No No No No Yes No No No No No No No No No

MSC: Category set for Strategic Planning


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_STRATEGIC_PLANNING_CATEGORY_SET Information about this profile is not available in user guides. 365112.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Category set for serviceable items


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SERVICE_ITEMS_CATSET Category set to hold the serviceable Items. This profile is used to designate the category set to which all Serviceable (FRU) items have been assigned. 1225993.1

-1 No No No No No No No Yes Yes No No No No No No No No No No No

MSC: Choice of item for which to create supplies in substitute relationship


Profile Code Profile Option Name Description MSC MSC_ITEM_CHOICE_FOR_SUBSTITUTE Determines the item for which Oracle Global Order Promising and Oracle Advanced Supply Chain Planning creates planned supplies when item substitution relationships are specified. Choices are: Demanded Item (default), (701) Highest Level Item, (702) Follow Item Attributes (703) When set to Follow Item Attribute and the item attribute Create Supply for all the substitute items in the substitution chain is No, no supplies are created. When you have a substitution chain A --> B --> C, and this profile option is set to Highest Level Item, it is expected that Oracle Advanced Planning creates supply for item C. Item C must be enabled in the organization where you are trying to create supply. If item C is not enabled in the organization, Oracle Advanced Planning creates supply for item B (the next highest level item in the substitution chain) and does not create supply for item C. Oracle Global Order Promising currently supports only the No Substitution or Full Substitution options. It does not support partial substitution. Therefore, a request is not fulfilled by using a partial quantity from the requested item and a partial quantity from a substituted item. Note Reference(s) 382638.1

Bug Reference(s) Document References(s)

6528915 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Circular sourcing surplus days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_CIRC_SRC_DAYS This profile is no longer used.

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Class Hierarchy


Profile Code Profile Option Name Description MSC MSC_CLASS_HIERARCHY This profile determines the type of hierarchy that will be used. This profile has two values: + Demand Class: single level. + Customer Class: three levels; customer class, customer, and site

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

MSC: Closest Quantity Pegging


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_CLOSEST_QTY_PEGGING This profile was removed in 11.5.9

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Collaborative Planning Default Calendar


Profile Code Profile Option Name Description MSC MSC_X_DEFAULT_CALENDAR When multiple customer sites display together, Oracle Collaborative Planning uses the default system calendar (profile option MSC: Collaborative Planning Default Calendar).

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4446794 -1 Yes No No No No Yes No No No No No No No No No

MSC: Collect CMRO Work Order Demand for PS


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_CMRO_WO_DEMAND_PS Collect CMRO Work Order demands into msc_demands for PS Set profile to Yes if using the CMRO integration 1157809.1

-1 No No No No No No No No No No No No No No No

MSC: Collect Item, Material and Resource Costs


Profile Code Profile Option Name Description MSC MSC_COLLECT_COSTS_FOR_ITEM This profile option indicates whether data collection should include cost information. Specifying No may improve data collections performance. Only required if using Cost Based Optmization type plan where Optimization flag is checked in the plan options.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No Yes No Yes Yes Yes No No No No Yes Yes No Yes No No No

MSC: Collect PS SNO Data


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_COLLECT_PS_SNO_DATA

Yes No No No No No No No No No No No No No No

MSC: Collection Time Window for Install Base under Contracts history
Profile Code Profile Option Name Description MSC MSC_COLL_TIME_WINDOW_IBUC_HISTORY Profile for Collection Time Window for Install Base under Contracts history This profile option specifies the time window for which IB under Contract history is to be collected. 1225993.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No Yes Yes No No No No No No No No No No No

MSC: Collection Window for Trading Partner Changes (Days)


Profile Code Profile Option Name Description MSC MSC_COLLECTION_WINDOW_FOR_TP_CHANGES Used by Oracle Advanced Supply Chain Planning collections. Specifies the number of days backwards that changes in customer names, customer sites, vendors, and vendor sites are collected. If null, then all changes are collected. Used when collections for the trading partners entity is run in complete mode. 405295

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No No No No No No No No No No No No No

MSC: Collections Snapshot Threshold


Profile Code Profile Option Name Description MSC MSC_SNAPSHOT_THRESHOLD In Refresh Snapshots request, we checks the number of rows in table and number of rows in the MLOG If ratio exceeds the threshold, then we will launch Complete Refresh of the SnapshotWe do not recommend setting this profile unless directed by DEV We will perform a complete refresh when a large number of rows exist in the MLOG, since this would be faster than referencing the MLOG table for a fast refresh This profile would usually be triggered when a large data load was performed to load data into setup tables. Valid values: Integer 0 - 100 NULL is default - seen as 40 179522.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No No No No

MSC: Compute Project Exception


Profile Code Profile Option Name Description MSC MSC_PROJECT_TASK_EXCEPTION This profile option determines whether to generate project specific exceptions when running a project based plan. Valid values are: Yes: Enable the generation of project specific exceptions. No: Disable the generation of project specific exceptions.

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Configuration
Profile Code Profile Option Name Description MSC MSC_X_CONFIGURATION Ensure that the value of the profile option MSC: Configuration is set to APS & CP. This enables collaboration between Oracle Advanced Supply Chain Planning and Oracle Collaborative Planning used to enable ASCP - CP interaction

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No Yes No No No No No No No No No

MSC: Consolidate Interplant Demands


Profile Code Profile Option Name Description MSC MSC_CONSOL_INTERPLANT_DEM This profile option is not documented in the User Guide. (see Note 555016.1 ) Consolidates inter-plant demand into a single inter-plant supply, thus reducing the number of inter-plant orders. Valid values are: By End Pegged Demand - Retain current behavior of creating a demand for each end pegged demand. By Demand Schedule Supply -On a given day aggregate the dependent demands from one supply

Default Value - By End Pegged Demand Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7457980 -1 Yes No No No Yes No No No No No No No No No No

MSC: Consume Forecast Inside Demand Time Fence


Profile Code Profile Option Name Description MSC MSC_CONSUME_FORECAST_DTF Valid values are: No - demand time fence control is implemented prior to forecast consumption. Forecast entries in the demand time fence are dropped as demand statements and not used for consumption. Yes - forecast consumption occurs prior to enforcing demand time fence control. The forecast entries within the demand time fence are used for consumption but not as demand. After consumption, demand quantity for all the forecast entries within the demand time fence is zero.

If you are using forecast spreading: For a periodic forecast entry that falls in weekly planning buckets within the demand time fence, the forecast spreading process spreads the entries into daily entries. If the daily entry is within the demand time fence, the process ignores the value that you set and uses the value Yes in processing. If the daily entry is outside the demand time fence, the process ignores this profile option and consumes against the entry.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

565926.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Consume forecast with no demand class


Profile Code Profile Option Name Description MSC MSC_CONSUME_NULL_DC This profile option instructs the forecast consumption process in about the order it should use to consume forecast entries when some of them have a demand class and others do not have a demand class. Valid values are: Within Each Bucket - The forecast consumption process starts by consuming forecast entries for the day on the sales order; it consumes entries with matching demand class first, then entries with no demand class. Then, it consumes forecast entries within the backward and forward consumption days; for each day, it uses matching demand class first, then no demand class. Within Each Bucket - After Consuming Demand Class Specific Forecast: The forecast consumption process starts by consuming forecast entries for the day on the sales order with matching demand class only. Then, it consumes forecast entries within the backward and forward consumption days with matching demand class only. If there is a remaining sales order quantity, it repeats the process against forecast entries with no demand class, first on the day on the sales order, then within the backward and forward consumption days.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Consume forecasts using Internal Sales Orders


Profile Code Profile Option Name Description MSC MSC_CONSUME_INT_SALES_ORDERS Only used when INV: Inventory Capable to Promise - ATP/CTP based on Planning Data Valid values are: * Yes - Perform ATP check on Internal Sales Orders (1 - default) * No - Do Not perform ATP check on Internal Sales Orders (2) * Only If Destination Organization on ISO is not part of Plan -(3) From Note 558908.1 1. The profile was added in bug 5440895. This profile works in tandem with the profile option MSC: Perform ATP Check for Internal Sales Orders. see the table in the note to understand the profile values and how they are used. 2. If you have a centralized instance, set the profile value as required. If you are a decentralized/distributed installation with both APS Destination and EBS Source, set this on the APS destination and EBS source. Notes: 1. Bug 6434413 Some Orgs do use an Internal sales order and need consumptions, but other orgs do NOT want consumption, so fixes had to be made so that profile value can be set for different orgs at different settings (by Responsibility) and have the value honored. Set in EBS source 2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See Note 252108.1 for list of patches. Patch 6434413 should not be applied instead of a rollup patch. 3. In R12.0.4, this fix is included ATP CU4, and also in base release of 12.0.6 558908.1

Note Reference(s)

Bug Reference(s) Document References(s)

6434413 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization

Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No Yes

MSC: Cost Type


Profile Code Profile Option Name Description MSC MSC_COST_TYPE Use this profile option on the source instance (execution system) to specify the cost type that collections should use when collecting the item costs. You should perform a cost rollup for the specified cost type before collecting data. If this profile option is null, collections uses the: Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising Frozen cost type for standard costed organizations Average cost type specified for average costed organizations

Yes No No No No No No No No No No No No No No

MSC: Cost of Using a BOM/ Routing Flexfield Attribute


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_ALT_BOM_COST Not used by Oracle Advanced Planning.

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: Create Resource Requirements for all Operations


Profile Code Profile Option Name Description MSC MSC_CREATE_DUMMY_RES_REQS If an operation has no resources with Schedule = Yes, when this profile option is set to: Yes - The planning engine creates a dummy resource requirement for the operation No - The planning engine does not create a dummy resource requirement for the operation; the operation does not have any resource requirements

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Currency Conversion Type


Profile Code Profile Option Name Description MSC MSC_CURRENCY_CONVERSION_TYPE Use this profile option on the destination instance to specify currency conversion type. If you change the value, the next time you run collections, the collections process purges the data with the previous currency conversion type and replaces it with data with the new currency conversion type.

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 No No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Custom allocation


Profile Code Profile Option Name Description MSC MSC_USE_CUSTOM_ALLOCATION To improve performance for customer allocated ATP used only in following cases. Only end item allocation. no component allocation. that is, the item cannot be a component of other bom. No ctp (so we don't deal with planned order demand allocation and CTP suggested supply/demand allocation). Note Reference(s) 555016.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6456520 -1 -1 Yes No No No No No No No No No No No No No Yes

MSC: DPP Allow Quantity Reduction Only When Supply is Excess on Internal Requisition, Requisition and PO
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC MSC_DRP_FIRM_REQS_QTY Per Bug 9546158The profile option "MSC: DPP Allow Quantity Reduction Only

No No No No No No No No No No No No No No No

MSC: DPP Debug Level


Profile Code Profile Option Name Description MSC MSC_DRP_DEBUG_LEVEL Debug Level for Distribution Planning Was renamed from MSC: Distribution Planning Debug Level" to "MSC: DPP Debug Level" in 12.0 Engine CU10 patch and in EBS 12.1.3 Should be set only with guidance of Support or Development.

0 - No Debug 1 - Informational Message 2 - Logic and Data Debug 3 - Logic Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9262606 -1 No No No No Yes No No No No No No No No No No

MSC: DPP Demand Priority Details viewing buckets


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_DRP_DMD_PRIORITY_BK No documentation found on this profile.

Yes No No No Yes No No No No No No No No No No

MSC: DPP Discrete Job Cutoff Window (Days)


Profile Code Profile Option Name Description MSC MSC_DRP_DISCRETE_JOB_CUTOFF_WINDOW Use this profile option to control the number of days from plan start date that discrete jobs are considered. Valid values are: Null: -All discrete jobs are considered by the distribution plan. 0 - No discrete jobs are considered by the distribution plan. Integer >=0 - All discrete jobs with completion dates from plan launch date + {integer value} are considered by the distribution plan. New planned orders for discrete jobs can be created both inside and outside the job cutoff window.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No Yes No No No No No No No No No No

MSC: DPP Related Exception Additional Offset Days


Profile Code Profile Option Name Description MSC MSC_DRP_REL_EXP_OFFSET_DAYS

The profile is used to specify the number of days to extend the lead time window calculation for related exceptions in the source organization. Therefore, the calculation is "Start date - max LT - profile option days" This profile option is added to account for the fact that UI does not consider shipping / receiving / manufacturing / intransit calendars in its window calculation.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No No Yes No No No No No No No No No No

MSC: DRP Multitasking Group ID's per Process


Profile Code Profile Option Name Description MSC MSC_DRP_GROUPIDS_PER_PROCESS Use this profile option to specify how many Group IDs an unconstrained demand and supply netting and allocation child process should process. In this phase, a child process loads data based on internal group IDs and will load all the org-items belonging to those group ID's. This option specifies the length of the list of group ID's. This profile option does not control the Load Consolidation processes. This profile option does not apply with operating system Microsoft Windows. Note Reference(s)

Bug Reference(s) Document References(s)

8523019 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 No No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: DRP Multitasking Max Concurrent Processes


Profile Code Profile Option Name Description MSC MSC_DRP_MAX_CONCURRENT_PROCESSES Use this profile option to specify the maximum number of DPP processes that are allowed to run in parallel. For example, if your machine has 4 CPU's,you might choose to run a maximum of one concurrent process on each CPU; in this case, set the value to 4. This profile option does not apply with operating system Microsoft Windows. Note Reference(s)

Bug Reference(s) Document References(s)

8523019 -1 -1 -1 No No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Daily Allocation to Maintain Safety Stock Level


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_DAILY_ALLOCATION_SS Indicates whether or not the safety stock level that you specify needs to be maintained.

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Day UOM


Profile Code Profile Option Name Description MSC MSC:DAY_UOM_CODE Supports the unit of measure conversion required for Oracle Advanced Supply Chain Planning resource batching calculations. Batching Window is considered in days, but users can specify the batching window in a unit of measure other than days. The profile option establishes a standard for the Day unit of measure. Users must specify a unit of measure that represents the value Day using this profile option. Users must also set up a unit of measure conversion between the unit of measure used for resources and the Day unit of measure specified here.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Days of Resource Availability before sysdate


Profile Code Profile Option Name Description MSC MSC_RES_AVAIL_BEFORE_SYSDAT Calculate Resource Availability for X days before sysdate. If a high number, then resource availability calculation during ODS Load could take a longer time. This can be used to collect resource availability in the past. Then this can be used in Planning to calculate completion time of operations in progress. You should collect resource availability in the past that will cover the earliest operation start date currently running in the system. Valid values are: Integer / NULL = 1

This profile is not supported in 12.1.1 and above Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5044955 5043399 -1 -1 No No No Yes No No No No No No No No No No No No No No No

MSC: Debug Level


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_DEBUG_LEVEL

Yes No No No No No No No No No No No No No No

MSC: Debug Module


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_DEBUG_MODULE

Yes No No No No No No No No No No No No No No

MSC: Default Category Set for Rapid Planning


Profile Code Profile Option Name Description MSC MSC_RP_DEFAULT_CAT_SET This is category set that is used in the UI when no more specific set is available. It is used in particular for plan input. For plans, category set is a parameters in the plan options 1276896.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No Yes No No No No No No

MSC: Default Project for Supplies Pegged to Excess


Profile Code Profile Option Name Description MSC MSC_DEF_PROJ_SUP_EXCESS This is a profile to support pegging of excess supplies to a default project. This was however modified to be supported only for buy items and items with no components.Refer bug# 5217328 mentioned below' Default Value: blank. Valid Values: Restricted to those setup in Oracle Projects (see Oracle Projects User Guide).

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5217328 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Default Workbench Height


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_DEFAULT_WORKBENCH_HEIGHT Specify the default workbench height. Can be defined at the site level.

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Default Workbench Width


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_DEFAULT_WORKBENCH_WIDTH Specify the default workbench width. Can be defined at the site level.

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Degree of Parallelism for Index Creation


Profile Code Profile Option Name Description MSC MSC_INDEX_PARALLEL_THREADS

Controls the use of parallel workers in data collections. Specifies how many parallel workers to use when creating indexes. If the profile is set to null, then the DOP (degree of parallelism) is being calculated by the database based on the number of cpu and the initialization parameter PARALLEL_THREADS_PER_CPU. If you set the profile to 1 then it will not use any parallel slaves, as such performance will be slower in collections

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4460213 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Demand Priority Flexfield Attribute


Profile Code Profile Option Name Description MSC MRP_DMD_PRIORITY_FLEX_NUM Stores the value of the attribute column that controls the demand priority. See 'Flexfield Attributes, page A-1 for more information. Set in EBS Source in a Distrubuted installation.

Note Reference(s)

Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Demand Satisfied Percent Threshold for Pegging


Profile Code Profile Option Name Description MSC MSC_DEMAND_SA_PER_THRESHHOLD Set this profile option to instruct the planning engine to stop pegging supplies to a demand which is over satisfaction percentage. Oracle recommends setting the value greater than 99.9. Even if you set this profile option below 100.0, the planning engine still satisfies 100% of the demand. Note Reference(s) 739561.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Display Order Rescheduling Supplies


Profile Code Profile Option Name Description MSC MSC_DISP_RESCH_SUPPLIES Yes: Planner Workbench displays Order Rescheduling Supply and Order Rescheduling Demand inserted by available to promise when it unschedules a sales order for a configured item Values are: + Yes: Displays the rescheduling supplies details in the Planner Workbench. + No: he rescheduling supplies details are hidden from the Planner Workbench This profile is provided for debugging and analysis only. Therefore, you should set this profile to No in a production environment. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

MSC: Display Supplier Item in Collaborative Planning


Profile Code Profile Option Name Description MSC MSC_DIS_SUP_ITEM_CP_HZ This setting is to display the Supplier Item value in the Horizontal Plan in Collaborative Planning. Valid values are: Yes - display the Supplier Item value in the Horizontal Plan in Collaborative Planning No - do not display the Supplier Item value in the Horizontal Plan in Collaborative Planning

After the profile change, allow 60-90 seconds for the profile change to take place. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3969852 -1 Yes No No No No Yes No No No No No No No No No

MSC: Display Warning Message When Rescheduling Recommendation Not Suggested by the Plan
Profile Code Profile Option Name Description MSC MSC_REL_SHOW_WARN This profile option specifies whether or not the Planner Workbench should display a warning message when you release rescheduled orders that the planning engine has not recommended. Valid values are: Yes - Use this value if you want the Planner Workbench to prompt you for confirmation when you release rescheduled orders that the planning engine does not recommend. No - Use this value if you do not want the Planner Workbench to display the message prompting to prompt you for confirmation when you release the rescheduled orders that the planning engine does not recommend.

Set on APS Destination in a distributed environment Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3016969 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Distribution Planning Ship Date


Profile Code Profile Option Name Description MSC MSC_DIST_PLAN_SHIP_DATE Use this profile option to schedule a trip for departure based on the earliest and latest possible ship dates of the trip. Valid values are: Ship full trips early or ship latest(Target) - Utilized trips ship on the earliest possible ship date or in time to prevent inventory levels from dropping below target. Ship full trips early or ship latest (SS) -Utilized trips ship on the earliest possible ship date or in time to prevent inventory levels from dropping below safety stock. Latest possible ship date (Target) -Trips ship just in time to prevent inventory levels from dropping below target. Latest possible ship date (SS) - : Trips ship just in time to prevent inventory levels from dropping below safety stock

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 -1 -1 Yes No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies
Profile Code Profile Option Name Description MSC MSC_DRP_USE_FIRM_SUPPLIES DPP uses for netting the firm supplies from entire horizon (not only within current allocation bucket) First released in 12.0.4/12.0.6 ASCP Engine/UI CU8 patch. Forward ported in 12.1.3.1 Description from DRP FAQ Note 761820.1:

Why do sometimes I don't see my future firm supplies netted with current demand and I see a new planned order created by DRP?
In DRP, we do netting of supply and demand within an allocation bucket. So if allocation bucket is say weekly then supplies of 2nd week onwards won't be used to meet the demand of 1st week. This is current functionality. To make this functionality more flexible, in R12 CU8 we have provided one profile where based on the business requirement, user can select whether to net supplies of next buckets to meet demands of current buckets. The profile name is "MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies". If profile value is Yes the Unconstrained Netting phase will use first all firm supplies within

entire horizon. Only if there is no more firm supply than new unconstrained supply will get generated and dependent demand gets pushed down to sourcing.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9176212 -1 No No No No Yes No No No No No No No No No No

MSC: E1 APS FC URL


Profile Code Profile Option Name Description MSC MSC_E1APS_FCURL URL for the webservice used to Launch ODI scenarios from collections program Format: String Where Used: JDE-VCP Collections Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1 APS ODI URL


Profile Code Profile Option Name Description MSC MSC_E1APS_ODIURL URL for the webservice used to Launch ODI scenarios from collections program Format: String Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1 Concatenation Character


Profile Code Profile Option Name Description MSC MSC_E1_CONCAT_CHAR Delimiter character in the generated flat files from JDE Default: + Format: Character Where Used: JDE-VCP Collections. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_BATCH_SIZE
Profile Code Profile Option Name Description MSC MSC_E1APS_BATCH_SIZE Transaction batch size used in Legacy Collections Default: 1000 Format: Integer Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_DEM_END_DATE_IN_MONTHS
Profile Code Profile Option Name Description MSC MSC_E1APS_DEM_END_DATE_IN_MONTHS End date offset in months from the current date used for Demantra Price List collections Format: Integer Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_DEM_START_DATE_IN_MONTHS
Profile Code Profile Option Name Description MSC MSC_E1APS_DEM_START_DATE_IN_MONTHS Start date offset in months from the current date used for Demantra Price List collections Format: Integer Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_DEM_WF_TIME_OUT
Profile Code Profile Option Name Description MSC MSC_E1APS_DEM_WF_TIME_OUT Timeout value for Demantra Workflow in seconds Format: Integer Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_NO_OF_WORKERS
Profile Code Profile Option Name Description MSC MSC_E1APS_NO_OF_WORKERS Number of workers for Legacy Collections concurrent program Default: 3 Format: Integer Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_TIME_OUT
Profile Code Profile Option Name Description MSC MSC_E1APS_TIME_OUT Timeout value in minutes for Legacy collections preprocessor and ODS Load programs Default: 180 Format: Integer Where Used: JDE-VCP Collections Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1APS_WS_TIME_OUT
Profile Code Profile Option Name Description MSC MSC_E1APS_WS_TIME_OUT Timeout value in seconds for ODI webservice Format: Integer Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: E1_DBLINK
Profile Code Profile Option Name Description MSC MSC_E1_DBLINK Database link to ODI Work repository from the apps schema Format: String Where Used: JDE-VCP Collections

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: EBS source instance for OTM


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_EBS_INSTANCE_FOR_OTM A string such as TST. Default to same instance as APS self instance. Now APS-OTM integration only support single EBS source instance.

-1 No No No Yes No No No No No No No No No No No No No No No

MSC: ENFORCE CRITERIA REQUIREMENT BEFORE EXECUTING QUERY


Profile Code Profile Option Name Description MSC MSC_PQUERY_EXEC_WITH_CRITERIA Use this profile option to specify if a query requestor needs to specify criteria before executing a query. Valid values are: Yes - This ensures that the query performs more efficiently. No

Note Reference(s)

867822.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSC: Enable 64 bit snapshot


Profile Code Profile Option Name Description MSC MSC_ENABLE_64BIT_SNAPSHOT When using 64 bit planning, you can also run the Memory Base Snapshot in 64 bit mode. This does not make the plan run faster. This is for extremely large data models the exceed the requirements of 32 bit snapshot. Most customers using 64 bit planning will not need 64 bit snapshot. Valid vaules are: Enabled - 1 Disabled - 0

Note Reference(s)

Default Value - Disabled 254810.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes Yes No No No Yes No Yes Yes Yes No No No No Yes No No No No No No

MSC: Enable ATP Summary Mode


Profile Code Profile Option Name Description MSC MSC_ENABLE_ATP_SUMMARY This profile determines whether we launch program - Load ATP Summary Based on Collected Data - MSCCLCNC This will summarize data for sales orders and supply / demand data and can improve ATP scheduling performance. This is a site level profile. Valid values are: Yes - Enable ATP Summary Mode No - Disable ATP Summary Mode.

You may only set this profile to Yes when Oracle Global Order Promising is on the same instance as other ERP application (i.e. You have a centralized instance setup) ATP will use the detailed information in several cases even if you have this set to Yes ATP in the Order Backlog Workbench is based on the detail supply demand tables, regardless of the profile setting for MSC: Enable ATP Summary Mode. ATP for ATO models is always based on detailed information. 457840.1 563617.1 Bug Reference(s) Document References(s)

Note Reference(s)

-1 Oracle Global Order Promising Implementation and User's Guide -1 Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Enable ATP Workflow


Profile Code Profile Option Name Description MSC MSC_ALLOCATED_ATP_WORKFLOW The profile MSC: Enable ATP Workflow is a site level profile option and it cannot be set at the responsibility level. Controls the notification sent to planner if we cannot meet the request, or stealing is involved when allocated ATP is used or when override happens under ATP based on planning output. If end item substitution is used, then we send notification to customer contacts and sales representative. Also used for ATP Override functionality. 419271.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: Enable ATP for Phantom Components


Profile Code Profile Option Name Description MSC MSC_ENABLE_PHANT_COMP Enable ATP for Phantom Components Yes / No When set to No, it skips the Phantom components and ignores Phantom lead times and moves directly to the next level in the BOM. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 11797513 -1 Yes No No No No No No No No No No No No No Yes

MSC: Enable Advanced Constraints


Profile Code Profile Option Name Description MSC MSC_ENABLE_NEW_CONSTRAINTS Use this profile option to control the values that display for plan option Constraints Mode (on the Constraints tab). Valid values are: Yes: All values for plan option Constraints Mode display No: All values for plan option Constraints Mode display except Constrained (Without Detailed Scheduling)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Enable Allocated ATP


Profile Code Profile Option Name Description MSC MSC_ALLOCATED_ATP Enable Allocated ATP is only available for ATP based on Planning Output Update at the Site level only. This should be set to NO for ATP based on Collected Data -- there have been issues in the past where this profile was Yes and ATP based on Collected Data has issues Yes / No (default) 212788.1 218010.1 339599.1 154293.1 333936.1 251920.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 -1 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Enable DRP Multitasking


Profile Code Profile Option Name Description MSC MSC_DRP_MULTITASKING Use this profile option to specify whether the planning engine should use high volume distribution planning. You can set at the user and site levels. Valid values are: Yes - All DPP plans run by this user or at this site are run in high volume mode. This value does not apply with operating system Microsoft Windows. No - DPP plans run by this user or at this site are not run in high volume mode

Note Reference(s)

Bug Reference(s) Document References(s)

8523019 -1 -1 -1 No No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Enable Diagnostic ATP


Profile Code Profile Option Name Description MSC MSC_DIAGNOSTIC_ATP Use this profile to enable diagnostics within the ATP Inquiry form. Open the ATP inquiry screen and then go to /Tools and check on Enable Diagnostic ATP Then when you perform ATP inquiry for the item, additional information on the constraints causing lateness will be available. Example on the GOP Users Guide provides more information. 303067.1

Note Reference(s)

Bug Reference(s) Document References(s)

6001023 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Enable Enhanced Sourcing


Profile Code Profile Option Name Description MSC MSC_ENHANCE_SOURCING Enables enhanced sourcing logic that considers historical allocations and allows the splitting of planned orders to achieve target sourcing percentages.

Rank 2 buy sources are considered if supplier capacity is exhausted for rank 1 sources. This profile option duplicates the functionality of the decision rule Use Alternate Sources parameter for buy items but not for transfers from other organizations. When the decision rules are enabled, the planning engine does not consider this profile option. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Enable Group Based Netting


Profile Code Profile Option Name Description MSC MSC_ENABLE_GROUP_BASED_NETTING Use this profile option to control whether the planning engine uses group based netting features. Valid values are: Yes - provides the most recent netting logic

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle recommends that you set the value to Yes and use the latest netting features. This profile option is for backward compatibility. In R12 this profile has to be set to Yes. 421097.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Enable Java Debug


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_JAVA_DEBUG When setting this profile to Yes, debug messages are written to the java console. 396037.1

-1 No No No Yes No No No No No No No No No No No No Yes Yes No

MSC: Enable Model and End Item dimensions in APCC


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_APCC_END_ITEM_ENABLED Enabled flag, indicating whether APCC will archive pegging information at End Item granularity.

No No No No No No No No No No No No Yes No No

MSC: Enable Priority Pegging


Profile Code Profile Option Name Description MSC MSC_ENABLE_PRIORITY_PEGGING This is not a visible profile. This is actually a parameter on the options form for the plan options. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Enable Release of Defective Planned Transfers


Profile Code Profile Option Name Description MSC MSC_ENABLE_REL_DFCT_PLAN_TRNSFRS To Control Release of Defective Planned Transfers May be customer specific and change in 12.2 - Per bug 9187165 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9187165 -1 No No No No No No No Yes Yes No No No No No No No No No No No

MSC: Enforce Hard Links


Profile Code Profile Option Name Description MSC MSO_ENFORCE_HARD_LINKS This profile option specifies whether time offsets are hard constraints or soft constraints. Valid values are: Yes - the planning engine can violate resource and material capacities to satisfy minimum and maximum time offsets. If capacity is exceeded, exception messages start the cause as "Hard Link Constraint". No - the planning engine cannot violate resource and material capacities to satisfy the minimum and maximum time offsets. In this case, the planning engine can violate hard links and generate a "Hard Link Violation" exception message.

Default Value - Yes Note Reference(s)

Bug Reference(s) Document References(s)

7453287 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Enhanced Project Netting


Profile Code Profile Option Name Description MSC MSC_ENHANCED_PROJECT_NETTING The new schedule date on on-hand and expired-lots is calculated incorrectly, when flushing to MSLD_SUPPLIES.dat. The new shcedule date now is calculated using date from call to get_curr_date() instead of arguments>curr_date as done previously

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Excess and Safety Stock by Demand Class


Profile Code Profile Option Name Description MSC MSC_EXCESS_SUPPLY_BY_DC Controls the allocation of supply or demand that pegs to excess or safety stock in the case of allocated ATP using the demand-priority based method. Values are: + Yes: If such supply or demand has a demand class, and if the demand class exists on the allocation rule, then allocate the supply or demand to the demand class. If the supply or demand does not have a demand class or if the demand class does not exist on the allocation rule, then allocate the supply or demand to OTHER. + No: Allocate such supply or demand to OTHER. 250289.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: Fast Refresh of Region Site Map


Profile Code Profile Option Name Description MSC MSC_FAST_REGION_SITE_MAP This effects Region to site mapping of suppliers which is launched during the Refresh Collections snapshots. No - default - standard functionality Yes - will launch and cursor to specifically select only newly changed records for region to site mapping of supplies. Introduced in VCP 12.1.3.4 Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

10417975 -1 -1 No No No No No No No No No No No No No No No

MSC: File Flush Limit


Profile Code Profile Option Name Description MSC MSC_FILE_FLUSH_LIMIT Use this profile option to control Planner concurrent process write to database, if the number of records exceed this value, the process uses SQL*Loader or array insert. 725858.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No Yes Yes Yes Yes No No No No No Yes Yes No Yes No No No

MSC: Firm Internal Requisition Time Fence


Profile Code Profile Option Name Description MSC MSC_FIRM_PURCH_REQ_TF This profile option creates a natural time fence for an item if a firm internal requisition exists. The natural time fence is the date of the latest firm internal requisition. Valid values are: Yes: Use this to create a natural time fence for a firm internal requisition. No: Use this if you do not want to create a natural time fence for a firm internal requisition.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No Yes No No No No No No No No No No

MSC: Firm Intransit and PO in Receiving Supplies


Profile Code Profile Option Name Description MSC MSC_FIRM_INTRANSIT_PO_IN_RECEIVING This profile option applies to unconstrained plans only and instructs the planning engine whether it should consider intransit and purchase order in receiving supplies as firm or it should issue reschedule recommendations for them. Valid values are: Yes - the planning engine considers intransit and purchase order in receiving supplies as firm. No - the planning engine generates reschedule recommendations for these types of supplies. Use this setting if you expedite shipments that are en route from a supplier to a receiving organization or if you want to expedite the movement of materials in receiving to the shop floor. For example, you might offload a package from a ship at a port and then fly the package to the receiving organization.

These recommendations are informational only and cannot be released from the Planner Workbench. This is a user level profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4593891 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Fixed Date for Install Base under Contracts History (DD-MON-YYYY)
Profile Code Profile Option Name Description MSC MSC_FIXED_DATE_IBUC_HISTORY Profile for defining the date for the Fixed date instances This is only applicable for testing instances where fixed date is being used in the system for testing stability.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9979825 -1 No No No No No No No No No No No No No No No

MSC: Flush All Items for Simulation


Profile Code Profile Option Name Description MSC MSC_FLUSH_ALL_ITEMS_ONLINE Profile option used to identify items to calculate safety stock as part of the batch replan. Valid values are: Yes - flush the item data during simulation/batch replan to calculate the safety stocks and not miss any data. No - only the items changed for simulation or batch replan are taken into account and recalculated

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5920518 9361980 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Forecast Priority Flexfield Attribute


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_FCST_PRIORITY_FLEX_NUM Stores the value of the attribute column that will control the forecast priority. See 'Flexfield Attributes, page A-1 for more information. 794086.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Forecast Spreading Calendar


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_FCST_SPREADING_CALENDAR Obsolete

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Forecast Spreading Calendar


Profile Code Profile Option Name Description MSC MSC_FORECAST_SPREAD_CAL

MSC: Forecast Spreading Calendar will use the calendar for spreading the forecast based on either: Org Manufacturing Calendar Org Shipping Calendar It should be noted that the bucketing of the forecast is always based on the shipping calendar. This is the design, since you cannot ship when the org is closed for shipping, then forecast will be bucketed so that it will be ready to ship. For instance, using the example below - if you enter a sales order with day 6 as requested ship date, and we cannot ship on Day 6, then we will back up the ship date to Day 5 So the sales order demand would fall on Day 5, so we plan the forecast in the same manner, so you can produce when the demand from sales order will fall on the calendar. Example: Mfg calendar 7 days on shipping calendar 5 on / 2 off Forecast qty per week = 700 Spread Forecast qty / Forecast Bucketing Day 1 100 100 Day 2 100 100 Day 3 100 100 Day 4 100 100 Day 5 100 300 Day 6 100 Day 7 100 Note: Introduced in 11.5.10 in Rollup #34

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile

7420122 -1 -1 Yes

12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No Yes Yes Yes Yes Yes No No Yes Yes Yes Yes Yes Yes Yes No No No No No No No

MSC: Future Days for Currency Conversion


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_FUTURE_DAYS_FOR_CURR_CONV Use this profile option to instruct the collections process how many future days of currency conversion rates to collect, starting from today.

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No No No No No No No No No

MSC: Gateway URL to External Application


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2937850 -1 Yes No No Yes No No No No No No No No No No No No No No No MSC MSC_GATEWAY_URL_EXTERNAL This profile is obsolete and needs to be removed from the applications. This is documented in bug 2937850

MSC: Generate Exceptions in CP


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_WS_OTM_GEN_EXC_CP Control whether the order later or earlier exceptions will be generated in Collaborate Planning. 733189.1 761773.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No Yes No No No No No No No No No

MSC: Generate Notifications for Transportation Updates


Profile Code Profile Option Name Description MSC MSC_GEN_NOTIFICATION_FOR_OTM Use this profile option to specify whether the process that passes estimated arrival time updates from Oracle Transportation Management should create workflow notifications. Valid values are: Yes - Create workflow notifications No - Do not create workflow notifications

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No No No No No No No No No No

MSC: HP Maximum Displayed Item Count


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_HP_ITEM_LIMIT Controls the number of items that can be viewed in the Horizontal Plan. 734926.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: High Volume Items


Profile Code Profile Option Name Description MSC MSC_HIGH_VOL_ITEMS This snapshot profile controls plan weed out logic. Since snapshot on 64-bit machines could run out of memory if the number of planned items is high. Valid values: Yes: Snapshot bypasses the weed out logic and directly inserts items from operational data store to planning data store. If item planning type is All Planned Items, the snapshot inserts all items into the planing data store. If the items have demand schedules only, snapshot only inserts the items in demands schedules into the planning data store. No: The snapshot uses weed out logic. 749602.1 404046.1 387368.1

Note Reference(s)

Bug Reference(s) Document References(s)

7696320 5203445 -1 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: History Days for Currency Conversion


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_HISTORY_DAYS_FOR_CURR_CONV Use this profile option to instruct the collections process how many past days of currency conversion rates to collect, starting from today.

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No No No No No No No No No

MSC: Horizon for APCC Collected data - Backward days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_APCC_COLL_HORIZON_DAYS_BACK no info

No No No No No No No No No No No No Yes No No

MSC: Horizon for APCC Collected data - Forward days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_APCC_COLL_HORIZON_DAYS cant find much of anything on this.

No No No No No No No No No No No No Yes No No

MSC: Horizontal Plan Demand Bucketing Preference


Profile Code Profile Option Name Description MSC MSC_HP_DMD_BKT_PRF This profile controls how Oracle Global Order Promising treats demand due date when calculating availability. Valid values are: Plan Recommended Date - Oracle Global Order Promising treats the demand due as the date recommended by Oracle Advanced Supply Chain Planning. (Material Available Date of the Sales Order demand in Supply/Demand view of the ASCP Plan) Demand Due Date, Oracle Global Order Promising treats the demand due as the Schedule Ship Date. (Suggested Due Date in Supply/Demand view of ASCP plan.) So using Demand Due Date will have ATP Hiorizontal Plan and ASCP Horizontal Plan show demand in the same buckets. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Global Order Promising Implementation and User's Guide Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

MSC: Horizontal Plan Extension Program


Profile Code Profile Option Name Description MSC MSC_HP_EXTENSION_PROGRAM Use this profile option when you are using a custom row in the Planner Workbench Horizontal Plan. Specify the name of the PL/SQL program unit with no parameters that specifies that information to display in the custom row. 743420.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Hour UOM


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC:HOUR_UOM_CODE Specifies unit of measure. Can be defined at the site level.

Yes No No Yes Yes No No No No No Yes Yes Yes No No No No No No No No No No No

MSC: Hybrid Allocated ATP


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_HYBRID_ALLOC_ATP This is the profile option to support Hybrid Allocated ATP

No No No No No No No No No No No No No No No

MSC: INTER PLANT DEM PRIORITY


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_INTERPLANT_DEM_PRI Hidden. Used for coding.

7457980 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: IO UI Performance tuning


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_IO_UI_PERF_TUNE Not available in user guide and no information on this profile.

-1 Yes No No No No No Yes No No No No No No No No

MSC: IO UI Period Set Name


Profile Code Profile Option Name Description MSC MSC_IO_UI_PERSETNAME Introduced in Patch 9724753 for 12.1.1 CU4 Included in VCP 12.1.3.1 and above. The period_set_name used in financial calendar is different than the one being supported. Currently only 'Accounting' is supported and defaulted by the code. This profile will allow setting of a different calendar, otherwise Accounting calendar will be defaulted. 1133108.1

Note Reference(s)

Bug Reference(s) Document References(s)

9724753 9892129 -1 -1 -1 No No No No No No Yes No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP
Profile Code Profile Option Name Description MSC MSC_IGNORE_ATP_CHECK Valid values are: Yes - and using "ATP Based on collected Data" then when there is a configuration existing for the Sales order, we treat the model as non atpable. No - no alterations on existing demand will be done Default Value - No Only available in 11.5.10 at this time (Jun 2011) Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6355057 6475340 -1 -1 Yes No No No No No No No No No No No No No Yes

MSC: Ignore CMRO and EAM Workorders in ASCP


Profile Code Profile Option Name Description MSC MSC_ASCP_IGNORE_CMRO_EAM_WO This profile exists in 12.1.3.6 and later if profile: "MSC: Ignore CMRO and EAM Workorders in ASCP" is set as Yes,

- If profile is set to Yes, depending on net_wip setting in the plan option Continue with old behavior - If profile is set to No and net_wip is No - Only Eam/cmro orders are dealt with. - If profile is set to No and net_wip to Yes, code deals with all except eam/cmro orders. New code deals with eam/cmro orders alone.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12686233 -1 No No No Yes Yes No No No No No No No No No No No No No No

MSC: Ignore PTF during CTP


Profile Code Profile Option Name Description MSC MSC_CTP_IGNORE_PTF Valid values are: * Yes - set the Planning Time Fence to sysdate. So Planning Time Fence is not considered while doing ATP. * No Default Value - No Introduced to help customers who are running UNconstrained plan and using ATP based on Planning output. For GOP, for make order, the start date will respect Planning Time Fence . For transfer order, the ship date will respect Planning Time Fence. For buy order, the dock date will respect Planning Time Fence. This it is consistent with the constrained plan, and it is by design. However, for an unconstrained plan, due date will respect Planning Time Fence. So if GOP is done on a unconstrained plan, this could lead to confusion. Only available in 11.5.10 - front port to R12.x has not occurred yet. 464095.1

Note Reference(s)

Bug Reference(s)

Document References(s)

6113215 6241549 624154 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Ignore Routings Without Any Date Effective Operations


Profile Code Profile Option Name Description MSC MSC_IGNORE_RTG_WITHOUT_DT_EFF_OPER Ignore Routings Without Any Date Effective Operations Introduced in bug 9387109 released in ASCP Engine/UI Rollup #41 - 9550751 A new profile MSC: Ignore Routings Without Any Date Effective Operations is introduced and a code change was made to ignore the operations with routings with effectivity date in the past. Bug notes: Set the Profile "MSC: Ignore Routings Without Any Date Effective Operations" to 'NO'. Create an item with primary bom, primary routing, and an alternate routing. Alternate routing is with all operations disabled. -- This will be treated as item with no operations. 1312424.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

9387109 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSC: Ignore Safety Stock Inside Lead Time


Profile Code Profile Option Name Description MSC MSC_IGNORE_SS_IN_LEAD_TIME

When the profile is set to yes then make of safety stock quantity to zero inside time fence.
1264886.1 1323113.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No Yes Yes No No No No No No No No No No No No No No

MSC: Include Firm Planned Orders In Firm Allocation Window


Profile Code Profile Option Name Description MSC MSC_INCLUDE_FPO_IN_FAW For priority pegging, controls the point at which demands peg to firm planned orders. Valid values are: Yes - Firm planned orders are included in the firm allocation window (along with scheduled receipts). They are eligible for pegging during the first phase of priority pegging. No - Firm planned orders are not included in the firm allocation window (along with scheduled receipts). They are eligible for pegging during the second phase priority pegging.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6623090 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations
Profile Code Profile Option Name Description MSC MSC_INCLUDE_MFG_CAL This profile was obsoleted in 11.5.10. The functionality of MSC: Use Shipping/Receiving Calendars replaces this in 11.5.10 and above. For 11.5.9 and lower, this determines whether ATP uses 24x7 calendar instead of Org Manufacturing calendar for shipping dates (No for 24x7, Yes for Org Calendar) 555016.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No No No No No No

MSC: Include Safety Stocks in Priority Based Pegging


Profile Code Profile Option Name Description MSC MSC_INCLUDE_SS_IN_PRIORITY Controls whether to exclude non-transient safety stock levels from the priority-based pegging logic. Valid values are: Yes - The planning engine does not give preference to nontransient safety stock levels in priority-based pegging. It pegs the demands and the safety stock levels, at the same time, to the supplies. No - The planning engine gives preference to non-transient safety stock levels in priority-based pegging. It first pegs them to non-firm planned orders. Then, it pegs the demands to the other supplies.

Note Reference(s)

Bug Reference(s) Document References(s)

4011546 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Inflate WIP Resource Requirements


Profile Code Profile Option Name Description MSC MSC_INFLATE_WIP Determines whether or not the planning engine should inflate the Work in Process resource requirements based on resource efficiency and utilization during collections from Oracle Work in Process. Valid values are: Yes - Planning engine inflates the resource requirements for the firm, unfirm, and non-standard discrete jobs considering the resource efficiency and utilization. No - The planning engine does not consider resource efficiency and utilization to inflate the resource requirements for the collected discrete jobs.

Note that this profile option is used in conjunction with shop floor scheduling products such as Oracle Manufacturing Scheduling. It is assumed that the discrete jobs are not released from the planning engine. If the jobs are rescheduled and released by the planning engine, the resource requirements are deflated. This could result in data inconsistency as the resource requirements are deflated on release whereas Oracle Manufacturing and Scheduling might have calculated resource requirements based on the inflated values. The planning engine always sends the original resource requirements upon release. If the resource requirements are already inflated in the source from Oracle Manufacturing Scheduling, set this profile option to No to avoid double inflation of the resource requirements. Otherwise, set it to Yes so that the planning engine inflates the resource requirements. Default Value - No Set on APS Destination in a distributed environment Note Reference(s) 373892.1 858515.1

Bug Reference(s) Document References(s)

2490553 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization

Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No

MSC: Inventory Rebalancing Surplus Inventory Basis


Profile Code Profile Option Name Description MSC MSC_CIRC_SRC_SURP_INV_BASIS This profile can be set at the Site, Responsibility, or User. This profile relates to Distribution Planning. Use this option to specify whether inventory rebalancing considers target or safety stock inventory levels. Valid values are: Target - Surplus inventory is defined as the quantity of projected available balance greater than target inventory level. Target inventory demands are considered by inventory rebalancing. Safety Stock - Surplus inventory is defined as the quantity of projected available balance greater than safety stock inventory level. Target inventory level demands are ignored by inventory rebalancing. 397199.1

Note Reference(s)

Bug Reference(s) Document References(s)

7366907 7426019 -1 -1 -1 -1 Yes No No No No No No No No Yes No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: JInitiator Version


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_JINI_VERSION No documentation or bugs found for this profile.

No No No Yes No No No No No No No No No No No No No No No

MSC: Launch Analyze Plan Partition


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_LAUNCH_ANALYZE_PART Launches the concurrent request Analyze Plan Partition. 250161.1 298355.1

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes Yes No No No Yes No Yes Yes No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Launch System Sql Loader


Profile Code Profile Option Name Description MSC MSC_LAUNCH_SYSTEM_SQLLDR Valid values are: Yes - will launch sqlldr by system call. No - will call fdpldr() function as earlier.

This profile option is specifically used when MRP_DIRECT_LOAD is set to Yes. Note Reference(s) 555016.1 307443.1 Bug Reference(s) Document References(s) 5722157 -1 -1 -1 Yes No No Yes Yes No No No Yes No Yes Yes No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Launch Workflow-Enabled Exception Message Notifications


Profile Code Profile Option Name Description Note Reference(s) 564868.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2474996 -1 -1 Yes No No No No Yes No No No No No No No No No MSC MSC_LAUNCH_EXCEPTION_NOTIFICATION Determines if Oracle Collaborative Planning sends notification messages when it generates exceptions

MSC: Level for Calculating Liability


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_LIABILITY_CALC_LEVEL This profile is not used.

5481643 -1 No No No No No No No No No No No No No No No

MSC: Limit Gantt Chart Orders View Hierarchy


Profile Code Profile Option Name Description MSC MSC_GANTT_ORDER_HIERARCHY When you enter the ordersview of the ASCP Ganttchart from the context of a supply, you should (optionally) see in the left hand pane tree only the supply and those supplies that end peg to that supply. You should not see any of the supplies between the context supply and the end pegged demand.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3621869 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: MPS Auto-Firm Planned Orders


Profile Code Profile Option Name Description MSC MSC_MPS_AUTO_FIRM_PO This profile option specifies how the planning engine deals with master production schedule firm planned orders. You can use this profile option to specify whether or not the planning engine should treat all planned orders in the master production schedule as firm: Valid values are: Yes - When running batch replan using an MPS plan, all planned orders are treated as firm without regard to planning time fence No - When running batch replan, only planned orders inside the PTF are firm.

If an MPS is a demand schedule for another plan, this has no impact as planned orders from the MPS are always treated as firm.
This profile option applies only to master production schedule plans. You can set it at the site and user levels. 259322.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Map Server Host


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_MAPSERVER_HOST Not Used.

4573393 -1 No No No No No No No No No No No No No No No

MSC: Map Server Port


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_MAPSERVER_PORT Not Used.

4573393 -1 No No No No No No No No No No No No No No No

MSC: Max display decimals for Currency


Profile Code Profile Option Name Description MSC MSC_RP_DEC_CURR

This profile is to control the decimal places for Currency units. The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level.
1276896.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No Yes No No No No No No

MSC: Max display decimals for Quantity


Profile Code Profile Option Name Description MSC MSC_RP_DEC_QTY

This profile is to control the decimal places for Quantity units (order quantity, exception quantity, etc.). The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level.
1276896.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No Yes No No No No No No

MSC: Max display decimals for Quantity (aggregates)


Profile Code Profile Option Name Description MSC MSC_RP_DEC_QTY_AGG

This profile is to control the decimal places for aggregate Quantity units. The default value for this profile is 0. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level. Applies to quantities in the Material Plan and all Hours measures shown in the Resource Plan.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

1276896.1

-1 No No No No No No No No Yes No No No No No No

MSC: Max display decimals for Ratios/Percentages


Profile Code Profile Option Name Description MSC MSC_RP_DEC_RATIO This profile is to control the decimal places for ratio measures (utilization %, fill rate %, load ratio, etc.) in the resource plan. The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level. 1276896.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No Yes No No No No No No

MSC: Max display decimals for Time


Profile Code Profile Option Name Description MSC MSC_RP_DEC_TIME

This profile is to control the decimal places for Time (hours, days, etc.). The default value for this profile is 2. This profile can be enabled only at the site and responsibility level. Users will not be able to set them at user level. This is useful when the lead time calculation is not in the integer value in terms of days and Hours.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

1276896.1

-1 No No No No No No No No Yes No No No No No No

MSC: Max display decimals for Time (aggregates)


Profile Code Profile Option Name Description MSC MSC_RP_DEC_TIME_AGG

Used to control the decimal places displayed for time (hours, days, etc.) Applies to the Hours measures shown in the Resource Plan

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 10193934 -1 No No No No No No No No Yes No No No No No No

MSC: Maximum Capacity


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_MAX_CAPACITY Not Used

4573393 -1 No No No No No No No No No No No No No No No

MSC: Maximum Percentage variation in safety stock values


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_SS_MAX_VARIATION The safety stock is not allowed to deviate by more than this value between two adjacent time intervals. Null allows any deviation. 759329.1 376451.1 276707.1 559867.1 Bug Reference(s) Document References(s)

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Maximum number of planned orders per demand


Profile Code Profile Option Name Description Note Reference(s) MSC MSC: MAXIMUM NUMBER OF PLANNED ORDERS PER DEMAND The maximum number of planned orders that the planning engine can create to satisfy one demand. 399364.1 434809.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Maximum number of planned orders per demand(1)


Profile Code Profile Option Name Description MSC MSC_MAX_PLANNED_ORDERS_PER_DEMAND This profile is obsolete. This profile was introduced in basically to plug abnormal demand supply situation in plans. Suppose there is a demand line of 1000 and by mistake some one has setup an order modifier (FOQ/MOQ) of 1 then 1 demand would generate 1000 work orders. In actual business the order sizes may be 50 or 100, so 1000 work order/demand is really not an ideal profile of supply /demand. To check these kind of data maintenance issues this profile was introduced where one has a rough idea on the maximum number of work orders one demand might generate and can set this as an internal checkpoint. I believe this profile has been removed later as in some business/Semiconductors work orders can really run into very huge number/demand and it is difficult to guess the value for this. Plans at our end were tripping on this profile. I do not see this profile any more in planners log 11.5.10-Rollup 4 onwards. This is correct, just to add this logic is not applicable to DRP Plans and will get invoked only for Fixed Order Quantity order modifiers. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MSC: Minimize Project Cross Peg within Window


Profile Code Profile Option Name Description MSC MSC_MINIMIZE_CROSS_PEG Values: Yes/No Default: Yes Used in conjunction with profile option MSC: Use attribute based netting in priority pegging. Valid values are: Yes - The planning engine tries to minimize cross pegging within the Supply/Demand window. No - The planning engine does not attend to the amount of cross pegging

Default Value - Yes Note Reference(s)

417736.1

Bug Reference(s) Document References(s)

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Minimize changes to chronological sequence of supplies while rescheduling


Profile Code Profile Option Name Description MSC MSC_MINIMIZE_WORKORDER_CROSSOVER Valid values are: Yes - to minimize the rescheduling of work orders in progress during rescheduling operations during Memory Based Planner. No

Default Value - No Available in 12.1.1 and upwards as well 376038.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Minimum Capacity


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_MIN_CAPACITY Not Used.

4573393 -1 No No No No No No No No No No No No No No No

MSC: Minimum Percentage variation in safety stock values


Profile Code Profile Option Name Description MSC MSC_SS_MIN_VARIATION The safety stock is held constant across time intervals if the deviation is within this percentage. Zero ignores all deviations. 376451.1 276707.1 759329.1 559867.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Minimum Supply/Demand Percent for Pegging


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_MIN_SUP_DEM_PER_PEG

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Move Past Due To Sysdate


Profile Code Profile Option Name Description MSC MSC_MOVE_PAST_DUE_TO_SYSDATE

When the Arrival date is given and we offset it with the Lead times if the dates go behind Sysdate that is Past Due then we move it to the Sysdate

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5618929 -1 Yes No No Yes No No No No No No No No No No No No No No Yes

MSC: Net Change Temp Dir


Profile Code Profile Option Name Description MSC MSC_OA_TEMP_DIR Stores the location of image cache used in the Plan Comparison Report. Indicate the location in the following format: [directory]@[subdir] where [directory] This must match the absolute path of the OA_MEDIA environment variable and [subdir] is the name of a subdirectory under the OA_MEDIA directory. The subdirectory must have write permissions for all. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: New Forecast Auto Plan


Profile Code Profile Option Name Description MSC MSC_DEFAULT_UNCONST_PLAN The plan launched in Oracle Advanced Supply Chain Planning when Oracle Collaborative Planning receives a supplier's forecast. Oracle recommends that this plan be an unconstrained plan. Set the profile to an unconstrained supply chain plan. When the demand plan scenario mentioned in the profile option MSD: Default DP Scenario is published, the unconstrained supply chain plan specified in the profile option MSC: New Forecast Auto Plan starts running. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No Yes No No No Yes No No No No No

MSC: New Planner Backward Compatibility


Profile Code Profile Option Name Description MSC MSC_NEW_PLANNER_BACK_COMPATIBILITY

Based on latest information available in Bug 9848641 And Per bug 12352866, this needs to be set to YES in 12.1.3 to avoid a performance issue in constrained plans.
Yes - uses the new algorithm for planning phantom items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = Yes, then Phantoms will be planned as regular items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = No or NULL, then Phantoms will NOT be planned as regular items. No - Uses the old algorithm for planning phantom items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = Yes, then Phantoms will be planned as regular items. When you also set MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY = No or NULL, then Phantoms will NOT be planned as regular items.

Most all customers should use Yes. If case of certain plan errors when working with byproducts and profile = Yes, then you need to set profile = No The failure will occur when by-product is also a component of the BOM as shown below Ex: Assembly A / \ Phantom B Phantom C -> By-product C | comp C This setup will result in a A->C->A loop. This was seen in bug where plan failed with the following message: ### Error: found loop between FROM operation : with sequence number 10

supply id 1018430492 item id 1181059 TO operation : with sequence number 1 supply id 1018430492 item id 1181059 org Id = 86 This could occur in two conditions : A. There is a loop in network routing - if so, please check the set-up and fix the routing B. There are by/co-products of assembly which are also a component of an item forming this assembly If so, try to change the profile option MSO: Peg By-product Supplies to FALSE APP-MRP-22064: An internal error has occurred (hls_failure, 1)
Note Reference(s) 433492.1

Bug Reference(s) Document References(s)

9848641 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes Yes Yes Yes No No No Yes Yes Yes Yes Yes Yes No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: New Supply Commit Auto Plan


Profile Code Profile Option Name Description MSC MSC_DEFAULT_CONST_PLAN The profile controls the plan that is launched in Oracle Advanced Supply Chain Planning when Oracle Collaborative Planning receives a supplier's supply commits. Oracle recommends that this plan be a constrained plan. Valid values are: Specify the name of the plan that you want to launch automatically in the profile option MSC: New Supply Commit Auto Plan. It is recommended that you specify a constrained plan.

Set the profile option MSC: SCEM Engine Launch Events to All to automatically start Supply Chain Event Manager (SCEM) when a supplier loads an order forecast or when you publish an order forecast from the planning server. If you set the profile option to Publish, Supply Chain Event Manager starts only when plans are published from Oracle Advanced Supply Chain Planning. If you set the profile option to Load, Supply Chain Event Manager starts only when data is loaded using flat files. Ensure that the value of the profile option MSC: Configuration is set to APS & CP. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No Yes No No No No No No No No No

MSC: Number of Workers for Self Service Loads


Profile Code Profile Option Name Description MSC MSC_SELF_SERVICE_LOADS_WORKERS_NUM Used in conjunction with profile MSC Batch Size for Self Service Loads to help size loading for large data loads using Self Service Collections. Oracle does not suggest using a value larger than 10. You may need to increase Standard Manager workshifts (processes) to accommodate a larger number. Valid values: Integer Default value = 3 352277.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No No No No No No No No No No No No No

MSC: OTHER with zero allocation percent is valid demand class


Profile Code Profile Option Name Description MSC MSC_ZERO_ALLOC_PERC Set this profile, if you want to consider others with zero allocation percent as valid demand class When set to Yes, demand classes with 0% allocation are considered as valid demand classes for allocated ATP calculations. When set to No, demand classes with 0% allocations are not considered as valid demand classes for allocated ATP calculations Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6156478 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No No No No No No No No No No No No Yes

MSC: OTM Punchout URI


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_OTM_PUNCHOUT_URI Used by punchout. URL to OTM such as: http://otm-it1-55-oas.us.oracle.com/ 733189.1 761773.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No Yes Yes No No No No No No No No No No No No No No

MSC: OTM Responsibility


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_WS_OTM_RESPID Responsibility like supply chain planner 761773.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSC: OTM User


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_WS_OTM_USERID Userid, like MFG, this profile and next one will be used for notification workflow 761773.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSC: Operator Company Name


Profile Code Profile Option Name Description MSC MSC_X_COMPANY_NAME Used by Oracle Collaborative planning. This profile option will be defaulted with value of "My Company". User can update the company name. This company name will get reflected in next collection run

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2297044 -1 Yes No No No No Yes No No No No No No No No No

MSC: Oracle Rapid Planning URL


Profile Code Profile Option Name Description MSC MSC_RP_HOST_URL

Rapid Planning External Server URL The port number provided in the profile value should be same as the port number for the UI Domain that is defined in Creating the UI Domain from the Oracle Rapid Planning Installation Guide, Release 12.1.3.3

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

1276882.1

-1 No No No No No No No No Yes No No No No No No

MSC: Order Number-CA Mandatory for CVMI


Profile Code Profile Option Name Description MSC MSC_X_CVMI_CA_MAND Determines whether the order number is mandatory for a consumption advice, while the customer enters the consumption advice record. If the profile option is set to Yes, the user must enter order number for the consumption advice. If set to No, the key date for sales orders and ASN is considered as part of deletion key.

Valid values: Yes/No Default = No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Collaborative Planning Implementation and User's Guide Yes No No No No Yes No No No No No No No No No

MSC: Order Type for Consigned VMI


Profile Code Profile Option Name Description MSC MSC_X_VMI_OM_ORDER_TYPE This indicates the order type that Oracle Collaborative Planning uses when creating a sales order for consigned VMI. This order type should encompass billing and inventory reduction functions without any shipping being performed Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6518881 -1 Yes No No No No Yes No No No No No No No No No

MSC: Organization containing generic BOM for forecast explosion


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_ORG_FOR_BOM_EXPLOSION Used by collections to identify and populate the bill of material validation organization.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Overwrite all Order Forecast records


Profile Code Profile Option Name Description MSC MSC_X_OVERWRITE_OF If the profile "MSC: Overwrite order forecast" is Yes, we delete all the Order forecast for that item,cust/cust_site, supp/supp_site , order type combination; and then load the new Order forecast. 461898.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3754801 -1 -1 Yes No No No No Yes No No No No No No No No No

MSC: Overwrite all supplier capacity records


Profile Code Profile Option Name Description MSC MSC_X_OVERWRITE_SC Indicates whether or not the previous records regarding supplier capacity need to be maintained. You can set this profile option to replace all previous supplier capacity values with the latest supplier capacity to which the supplier commits.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3103879 -1 Yes No No No No Yes No No No No No No No No No

MSC: PS - Snapshot Base Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_BASE_PKG Valid value are: Yes - Base Package is used for creating a model in Production Scheduling. No - Base Package is not used for creating a model in Production Scheduling.

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Beginning Inventory Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_BGN_INVNTRY_PKG Valid value are: Yes - Beginning Inventory Package is used for creating a model in Production Scheduling. No - Beginning Inventory Package is not used for creating a model in Production Scheduling.

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Calendar Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_CALENDAR_PKG Valid values are: Yes - Calendar Package is used for creating a model in Production Scheduling. No - Calendar Package is not used for creating a model in Production Scheduling.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - Yes 415381.1

-1 Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Customer Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_CUSTOMER_PKG

Valid value are: Yes - Customer Package is used for creating a model in Production Scheduling. No - Customer Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Distribution Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_DSTRBTN_PKG

Valid value are: Yes - Distribution Package is used for creating a model in Production Scheduling. No - Distribution Package is not used for creating a model in Production Scheduling. Default Value - Yes At this time this package is not used by the PS model creation process.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Enterprise Forecast Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_FORECAST_PKG

Valid value are: Yes - Enterprise Forecast Package is used for creating a model in Production Scheduling. No - Enterprise Forecast Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Inventory Safety Targets Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_IST_PKG

Valid value are: Yes - Safety Stock Targets Package is used for creating a model in Production Scheduling. No - Safety Stock Targets Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Planning Command Center User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Manufacturing Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_MFG_PKG

Valid value are: Yes - Manufacturing Package is used for creating a model in Production Scheduling. No - Manufacturing Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Planning Command Center User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Purchase Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_PO_PKG

Valid value are: Yes - Purchase Orders Package is used for creating a model in Production Scheduling. No - Purchase Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Reservation Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_RESERVATION_PKG

MSC: PS - Snapshot Reservation Package This profile brings in reservations for PS plans (similar to how you enable all the other data packages). Only meaningful for 12.1.3.6+ (which is not released yet)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

1386168.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSC: PS - Snapshot Sales Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_SO_PKG

Valid value are: Yes - Sales Orders Package is used for creating a model in Production Scheduling. No - Sales Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Supplier Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_SUPPLIER_PKG

Valid value are: Yes - Supplier Package is used for creating a model in Production Scheduling. No - Supplier Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Transfer Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_TO_PKG

Valid value are: Yes - Transfer Orders Package is used for creating a model in Production Scheduling. No - Transfer Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Snapshot Work Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_PS_WO_PKG

Valid value are: Yes - Work Orders Package is used for creating a model in Production Scheduling. No - Work Orders Package is not used for creating a model in Production Scheduling. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS - Visit Display Format in PS UI


Profile Code Profile Option Name Description MSC MSC_SCP_PS_VISIT_DISP_FORMAT

Allows the user to specify the display for CMRO Visits in the Production Scheduling client. Allowable vaues are: "Name" or "Code" or "Name:Code" Applicable to 12.1.3+

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: PS Adjust Post Horizon Demand Qty


Profile Code Profile Option Name Description MSC MSC_SCP_PS_ADJUST_POST_HORIZON_DEM_QTY

MSC: PS Adjust Post Horizon Demand Qty This profile allows PS solver to "net-out" demands that are not fulfilled until after the end of the scheduling horizon. When profile "MSC: PS Adjust Post Horizon Demand Qty" to yes, then PS uses the Work Orders that are on end of horizon to meet demand.

Note Reference(s) 1386168.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12939774 -1 -1 No No No Yes No No No No No No No No No No No No No No No

MSC: PS Consistent Resource Assignment


Profile Code Profile Option Name Description MSC MSC_SCP_PS_CONSISTENT_RESOURCE_ASSIGNMENT Whether the Production Scheduling functionality 'Consistent Resource Assignment' should be used. If activated, where a routing has alternates on multiple operation steps with the same resources, then the solver will try to use the same resource across the routing. There are three available options: + No - This functionality is not activated + Yes - The functionality is activated for all routings 883676.1

Note Reference(s)

Bug Reference(s) Document References(s)

5332948 7316625 -1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: PS Currency Symbol


Profile Code Profile Option Name Description MSC MSC_SCP_CURRENCY_SYMBOL The currency symbol used by PS for measurement of costs and calculation of key performance indicators. Set this in the APS destination for a distributed installation Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: PS Enable CRO Scheduling


Profile Code Profile Option Name Description MSC MSC_SCP_PS_ENABLE_CRO

If CRO option is licensed along with Production Scheduling application, the profile option "MSC: PS Enable CRO Scheduling" must be set to "Yes". RMO and CRO are synonymous. Made obsolete in R12.1.3

Note Reference(s) 973027.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7037527 -1 -1 No No No No No No No No No No No No No No No

MSC: PS Enable RMO Scheduling


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SCP_PS_ENABLE_RMO

Obsolete with v2 integration (11.5.10/12.1)


454651.1

-1 No No No No No No No No No No No No No No No

MSC: PS Filter Active Items


Profile Code Profile Option Name Description MSC MSC_SCP_FILTER_ACTIVE_ITEMS

Introduced in Patch 9921057 This profile option will filter out any items which do not have any active demand within the PS horizon. This can be dependent or independent. This works with or without an ASCP plan reference. If an ASCP plan is referenced, the active demand from planned orders is also studied. Not applicable after 12.1.3.7.

Note Reference(s)

Bug Reference(s)

Document References(s)

9609494 9921057 9444710 -1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: PS Firm Past Due WO


Profile Code Profile Option Name Description MSC MSC_SCP_PS_FIRM_PAST_DUE_WO This option if enabled will firm all work order operations which commence prior to the beginning of the schedule horizon. This also considers the schedule start date offset. This is based on the operation start dates.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7489790 -1 Yes No No No No No No No No No No No No No No

MSC: PS Resource Constraint Horizon


Profile Code Profile Option Name Description MSC MSC_SCP_PS_RESOURCE_CONSTRAINT_HORIZON Introduced in bug 10160770 This flag (set in number of days) is used to set the capacity constraint Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 10160770 -1 No No No No No No No No No No No No No No No

MSC: PS Run Application Script


Profile Code Profile Option Name Description MSC MSC_SCP_PS_APP_SCRIPT

Specifies the name of the batch script that starts Production Scheduling. Default Value - runPS.bat Obsolete in PS V2 integration (11.5.10/R12.1)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5136451 -1 Yes No No No No No No No No No No No No No No

MSC: PS Run Connector Script


Profile Code Profile Option Name Description MSC MSC_SCP_PS_CONNECTOR_SCRIPT

Specifies the batch script that starts the Production Scheduling Connector. Default Value - runPSConnector.bat Obsolete in v2 integration (11.5.10/R12.1)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No No No No No

MSC: PS/SNO API Version


Profile Code Profile Option Name Description MSC MSC_SCP_API_VERSION The API version used when generating the XML packages for Strategic Network Optimization and/or Production Scheduling. This must be configured as specified for the current version of the software being used. Typically, this value should not be changed unless the guidance of Oracle Support. 552381.1 973027.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No No No No No No No No No Yes No No No

MSC: PS/SNO Alignment Date


Profile Code Profile Option Name Description MSC MSC_SCP_ALIGNMENT_DATE The date/time that determines the start of the period start date within Strategic Network Optimization. For example, if set to a Monday all full SNO periods will commence on a Monday. If the plan start date does not align with this, the first period may be a partial period. If your plan start date falls on a Wednesdy while the alignment date is a Monday will result in the first period being Wednesday - Sunday (5 days).

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6012870 5646419 -1 -1 Yes No No No No No No No No No No Yes No No No

MSC: PS/SNO App Server URL


Profile Code Profile Option Name Description MSC MSC_SCP_APP_SERVER_URL The fully qualified URL (including port number) for the application server. This is required for the Production Scheduling and Strategic Network Optimization client release process 760103.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7037527 -1 -1 No No No No No No No No No No No Yes No No No

Note Reference(s)

MSC: PS/SNO Client Install Path


Profile Code Profile Option Name Description MSC MSC_SCP_CLIENT_PATH This is the install path on the client. The system installs the software in a 'scp' directory under this path. PS and SNO are installed automatically the first time they are accessed by the E-Business Suite.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No Yes No No No

MSC: PS/SNO Compress Xml Files


Profile Code Profile Option Name Description MSC MSC_SCP_ZIP_PACKAGES

This flag indicates whether the extracted files/model files are stored in compressed format or not. Typically this should be set to Yes to mazimize data download speed to the client. If integration extensions are being developed then you may not want to store these in compressed format. Valid values are: Yes No

Default Value - Yes


Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 415381.1

-1 Yes No No Yes No No No No No No No No No No No Yes No No No

MSC: PS/SNO Data Store Path


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_SCP_DATA_STORE_PATH Where model/publish and temporary files are stored on the server. 602712.1 868904.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No No No No No No No No No Yes No No No

MSC: PS/SNO Debug Mode


Profile Code Profile Option Name Description MSC MSC_SCP_DEBUG_MODE

This flag determines the level of logging appearing in the integration log files. This flag is typically only set upon request from Oracle support when investigating issues. Setting this flag to Yes will have peformance implications. Valid values are:
Yes No

Note Reference(s)

Default Value - No 868904.1 809199.1 405083.1

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No No No No No No No No No Yes No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: PS/SNO Download XML Files


Profile Code Profile Option Name Description MSC MSC_SCP_DOWNLOAD_XML_FILES

Setting this flag causes the intermediate integration data files to be downloaded to the client. This causes significantly more data to be transfered and is typically done for debugging model construction issues. When set to No, only the final model file will be downloaded to the client Valid values are:
Yes - if users want to download the xml files to the client machine for debugging purpose. No

Default Value - No. Note Reference(s) 733189.1

Bug Reference(s)

Document References(s)

7293823 8762862 8945618 -1 -1 -1 -1 Yes No No No No No No No No No No Yes No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: PS/SNO Include Negative Inventory Demands


Profile Code Profile Option Name Description MSC MSC_SCP_INCLUDE_NEGATIVE_INVENTORY_DEMANDS

MSC: PS/SNO Include Negative Inventory Demands This profile has been introduced to extract negative beginning inventory. If there is negative on-hand inventory then an artificial demand will be created for this negative quantity so that the projected inventory balances are accurate. For example, if Item A has -10 on hand a demand of 10 will be created. This profile option controls the creation of these artificial demands. The profile controls the extraction of negative demand. Values: The default value is Yes. If this set to "No" then negative demands will not be extracted.

Note Reference(s)

1386168.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center

12848085 -1 -1 No No No Yes No No No No No No No No No No No Yes No

Manufacturing Operations Center Global Order Promising

No No

MSC: PS/SNO Past Due Supplies Window


Profile Code Profile Option Name Description MSC MSC_SCP_PAST_DUE_SUPPLIES_WINDOW

This value specifies the amount of time in the past to look for supply. Not applicable after 12.1.3.7 so will be removed from the ldt file, however, customers who have this profile in their DB would continue to see them but can safely ignore. From bug 9909547 which introduced this profile A new profile option "MSC: Past Due Supplies Window" has been added. The past due supplies will be extracted based on the user's input. If the value in this profile option is 10 then integration will bring the supplies 10 days before the horizon start. Older past due supplies will be ignored.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9909547 -1 No No No No No No No No No No No Yes No No No

MSC: PS/SNO Use DB for Integration Data


Profile Code Profile Option Name Description MSC MSC_SCP_USE_DB_FOR_DATA In an distribution env, the application server and concurrent program server may run on different machine. In this case the application server may not have access to the file system which concurrent program server could access. In this case you will need to use the database option to access the data across servers. 454651.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No No No No No No No No No Yes No No No

MSC: Pass List Price to OM in DRP Release


Profile Code Profile Option Name Description MSC MSC_DRP_PASS_LIST_PRICE_OM This is discussed in Bug 7284253 MSC CREATES ISO WITH STATUS OF 'ENTERED' INSTEAD OF 'BOOKED': If profile MSC: Pass List Price to OM in DRP Release is set to Y, DRP release will create the internal sales order in 'Booked' state. Only in 11.5.10, not reported in any R12.x release. Note Reference(s) 943244.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7497020 -1 -1 Yes No No No Yes No No No No No No No No No No

MSC: Peg Firm Supply First


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_PEG_FIRM_SUPPLY_FIRST Does not appear in the documentation.

Yes No No No No No No No No No No No No No No

MSC: Peg Firm Work Orders Within Assigned Projects and Tasks
Profile Code Profile Option Name Description MSC MSC_FIRM_JOB_RESV_TASK When set to yes, reservation level for firm work orders will be set at Task level This is designed to work with MSC: Enable Attribute Netting = No Note that in 12.1 we recommend that customers use MSC: Enable Attribute Netting = Yes to use the new netting engine, unless they have specific business requirement for using old netting engine (No) Per Enhancement 8482143 When pegging firm work orders for hard pegged items, in old attribute netting, peg the firm work orders to demands having same project/task as itself. Otherwise peg it to excess. This is independent of the reservation level. Introduced in ASCP Engine/UI RUP #37 for 11.5.10 - Per bug 9087339, further fix was made. - Ported to 12.1.3.1 and 12.0.6 ASCP Engine/UI CU10 patch Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

8482143 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSC: Peg to maximize supply usage


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_PEG_TO_MAX_SUPPLY_USAGE Does not appear to exist in the documentation

No No No No No No No No No No No No No No No

MSC: Perform ATP check for Internal Sales Orders


Profile Code Profile Option Name Description MSC MSC_ATP_CHECK_INT_SALES_ORDERS Only used when INV: Inventory Capable to Promise - ATP/CTP based on Planning Data From Note 558908.1 1. The profile was added in bug 5440895. This profile works in tandem with the profile option MSC: Consume forecasts using Internal Sales Orders. So, If profile MSC: Perform ATP Check for Internal Sales Orders is set with a value, it is used. Otherwise, the value of the previous profile is used. 2. If you have a centralized instance, set the profile value as required. If you are a decentralized/distributed installation with both APS Destination and ERP Source, set this on the APS destination and ERP source. 3. Profile option values and meanings: * Yes - Perform ATP check on Internal Sales Orders * No - Do Not perform ATP check on Internal Sales Orders Notes: 1. Bug 6434413 Service Orgs do NOT use an External sales order, so fixes had to be made so that scheduling would be correct for service orgs that generate Internal Reqs directly 2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See Note 252108.1 for list of patches. Patch 6434413 should not be applied instead of a rollup patch. 3. In R12.0.4, this fix for bug 6434413 is not yet released - 16-APR-2008 Note Reference(s) 558908.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No No No No No No No No Yes

MSC: Plan co-products


Profile Code Profile Option Name Description MSC MSC_PLAN_COPRODUCTS Indicate whether co-products are planned and whether supplies are created for the co-products. Valid values are: Yes No

Can be defined at the site level. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is Yes. 305575.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Plan for order at risk calculation


Profile Code Profile Option Name Description MSC MSC_PLAN_FOR_ORDER_AT_RISK

Indicates a plan that Oracle Collaborative Planning uses to derive the pegging information for each order that you upload. See also Note.276003.1 for the description of Enhanced Flagging of Potentially Late Orders.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No No Yes No No No No No No No No No

MSC: Planning Currency


Profile Code Profile Option Name Description MSC MSC_PLANNING_CURRENCY In 11.5.10, this profile option is used to specify the planning currency. This profile option can be defined at the site level. In 12.1.x, this profile is not used. Default Value - US Dollar Note Reference(s) 147221.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4573393 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Pre-Flush
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_PRE_FLUSH Not used per bug 4573393

4573393 -1 Yes No No No No No No No No No No No No No No

MSC: Prefer Consumption within Forecast Bucket


Profile Code Profile Option Name Description MSC MSC_PREF_FOR_BUCKET Valid values are: Yes - this profile will take effect when the plan options are "Spread Forecast" and "Consumption by bucket" is unchecked. In that case, we would consume the forecasts in the following fashion: Spread the forecasts first. First round of consumption begins by walking backwards for the number of backward days mentioned from the date of the sales order, considering any forecast entry as eligible only if the sales order falls in the same bucket as the forecast. Once we find no more entries backwards we walk forwards for the forward number of days mentioned checking for eligible forecasts as mentioned above. Now, if we still need forecast entries, we start walking backwards this time trying to consume all the forecast entries within the backward time fence. After this we go forward in the same fashion if required. No - old behavior

Note Reference(s)

Default Value - No 395804.1 804214.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Priority for Substitute Items Flexfield Attribute


Profile Code Profile Option Name Description MSC MSC_BOM_SUBST_PRIORITY This profile option stores the name of the flexfield column that contains the value in the corresponding table. Set this profile option at the site level only See 'Flexfield Attributes, page A-1 for more information. Set in EBS Source in a distributed installation. Created by Create Planning Flexfields process. Note Reference(s)

Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Priority of Alternate Resources for an Operation Flexfield Attribute


Profile Code Profile Option Name Description MSC MSC_ALT_RES_PRIORITY This profile option stores the name of the flexfield column that contains the value in the corresponding table. See 'Flexfield Attributes, page A-1 for more information. Set in EBS Source in a distributed installation. Note Reference(s) Created by Create Planning Flexfields concurrent program

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: Production Plan for Transportation updates


Profile Code Profile Option Name Description MSC MSC_PROD_PLAN_ID_FOR_OTM_UPDATES Use this profile option to indicate the production plans that receive estimated arrival time updates from Oracle Transportation Management. Valid values are: Null: Do not pass updates to any plan All Production Plans: Pass updates to all plans with Production flag selected [specific plan name]: Pass updates only to the plan that is specified

Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes Yes No No No No No No No No No No No No No No

MSC: Project Task Collection Window Days


Profile Code Profile Option Name Description MSC MSC_COLLECTION_WINDOW_FOR_PROJ_TASKS Controls which projects/tasks are collected after the collection engine deletes all of the previously collected records for the instance. Valid values are: + Null: Collects all of the records from the source. + Integer: Collects all of the records from the source from projects whose end date is within the number of days in the past specified in the profile option value. The collections process never collects tasks whose projects are completed. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No Yes No Yes Yes Yes No No No No Yes Yes No No No No No

MSC: Provide Warning For Dates Entered on Nonwork Days


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_VALIDATE_NON_WORK_DATE Warning is displayed in the workbench if a non-working day is entered

4639108 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Provide Warning when Sales Order Quantity is Changed


Profile Code Profile Option Name Description MSC MSC_SO_QTY_CHANGED_WARN The New Quantity field on a sales order is user editable. The user can raise or lower the sales order quantity by firming the sales order. Valid values are: Yes - As the user tabs out of the New Quantity field, if the quantity is changed then a warning is given as " Sales orders with changed quantities cannot be released. The user must update the sales order directly in the source instance." In addition, the action for the sales order is set to None when the quantity is changed. No - supresses the warning

Default = Yes Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4479258 -1 No No No No Yes No No No No No No No No No No

MSC: Purchase Order Dock Date Calculation Preference


Profile Code Profile Option Name Description MSC MSC_PO_DOCK_DATE_CALC_PREF This profile option specifies the purchase order line date that the planning engine uses as the material arrival (dock) date. Valid values are: Promise Date: If the Promise Date is not available, the planning engine uses Need by Date so that unacknowledged purchase orders consume supplier capacity. (1) Need By Date: Existing purchase orders do not consume supplier capacity. (2)

This is a site level profile option. Use the same setting of this profile option for running both collections and plans. Default Value - Promise Date Note Reference(s) 413816.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Purge Exception Days


Profile Code Profile Option Name Description MSC MSC_PURGE_EXCEPTION_DAYS Information about this profile is not available in user guide. All exceptions generated/updated by the number of days before (set by this profile value) will be deleted. 555016.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Purge Staging and Entity Key Translation Tables


Profile Code Profile Option Name Description MSC MSC_PURGE_ST_CONTROL Controls both truncation of the staging table during data collection process and deletion of the link ID tables. Valid values are: Yes - conserve disk space when running data collections for single instances, or as separate processes for multiple instances. Set this profile to Yes when you have only 1 source instance connected to the planning server. This allows the MSC_ST_ tables to be truncated rather than deleted from. This helps conserve space and improve performance No - When running data collections for multiple instances simultaneously, set to avoid data loss. It should be set to No if you have multiple source instances connected to the planning server to avoid data loss as a truncation would get rid of all the data in the table.

Note Reference(s) 405295.1

Bug Reference(s) Document References(s)

4717843 -1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Rapid Planning Group Planned Orders


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC MSC_RP_GROUP_PLANNED_ORDERS Determines if planned orders of the same type are grouped. Purchase and t

10130815 -1 No No No No No No No No Yes No No No No No No

MSC: Rapid Planning Safety Stock Lead Time Method


Profile Code Profile Option Name Description MSC MSC_RP_SAFETY_STOCK_METHOD

Safety Stock Lead Time Method Values This profile provides the following options:
Do not compute Safety Stock (currently exists) Use Safety Stock Percent (currently exists) Use Safety Stock Quantity (this is the enhancement)

In 12.1.3.6, this profile is not used. A new profile has been introduced MSC: Safety Stock Planning Method which has valuesa. Do not plan Safety Stock b. Use Safety Stock Quantities c. Use Safety Stock Lead Time from Safety Stock Percent To calculate safety stock using quantity, this plan options must be set to Use Safety Stock Quantity. Use Safety Stock Lead Time from Safety Stock Percent (this option replaces Use Safety Stock Percent option that was in RP 12.1.3.3.)
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 1276896.1

-1 No No No No No No No No Yes No No No No No No

MSC: Rapid Planning Scripts Home


Profile Code Profile Option Name Description MSC MSC_RP_SCRIPTS_HOME

This profile should point to the directory where all the WLST_scripts will be kept.
1276882.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No Yes No No No No No No

MSC: Rapid Planning UI Refresh Timeout


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_RP_UI_TIMEOUT Timeout value is in millisecond. Example value 5000 1276882.1

-1 No No No No No No No No Yes No No No No No No

MSC: Rapid Planning WebLogic Server Home


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_RP_WLS_HOME

Installation path to the WLS Home directory


1276882.1

-1 No No No No No No No No Yes No No No No No No

MSC: Read Profiles From DB


Profile Code Profile Option Name Description MSC MSC_READ_PROFILES_FROM_DB No During planning flat files are created that hold profile values. At times, it is better to have profiles read from the database instead of the flat files. This can espeically true for on-line or batch replan when profiles are changed. Valid values are: Yes No

Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9406133 -1 Yes No No Yes Yes No No No Yes No Yes Yes Yes No No No No No No No No No No No

MSC: Recalculate Demand Priorities after Spreading


Profile Code Profile Option Name Description MSC MSC_RECALC_DMD_PRI_SPREADING MSC: Recalculate Demand Priorities after Spreading Default = No When plan option Spread Forecast is checked and profile = Yes, then after we spread the forecast, we recalculate the demand priority of sales orders and forecasts. First released in ASCP Engine/UI Rollup #35 for 11.5.10 Not ported to R12.x Ported to 12.1 and released in 12.1.2.1 and above. Note Reference(s)

Bug Reference(s)

Document References(s)

8301504 8839391 8311261 -1 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Refresh Site to Region Mappings Event


Profile Code Profile Option Name Description MSC MSC_REFRESH_REGION_SITE Valid values are: Yes - Collection of Sourcing Rules / Existing behavior mapping during collection if sourcing rules parameter is set to Yes No - Running of Refresh Collection Snapshots Request / Mapping will be performed only during standalone refresh snapshot and not during a complete refresh of data collections.

With the alternate value selected, the collected data might not reflect the exact region site mapping based if the standalone Refresh Collection Snapshots is run. Default Value - Yes 427338.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5717270 -1 -1 Yes No No No No No No No No No No No No No No

MSC: Refresh Snapshots Pending Timeout


Profile Code Profile Option Name Description MSC MSC_REF_SNAP_PENDING_TIMEOUT Sets the time that the Planning Data Pull concurrent process waits for concurrent process Refresh Snapshots on the source before it times out. This time out only applies if concurrent process Refresh Snapshots is at status Pending/Inactive which occurs if another version of concurrent process Refresh Snapshots is running. Valid values are: Integer in minutes

Default Value - 10 Note Reference(s) 468903.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No No No No No

MSC: Region Instance


Profile Code Profile Option Name Description MSC MSC_HUB_REGION_INSTANCE

This profile needs to be set when data is being collected from multiple sources. APCC only reports from the instance which is defined in this profile. The profile is depreciated after patch 10309327:R12.MSC.B - APCC TO SUPPORT REGIONS FROM MULTIPLE INSTANCES

Note Reference(s) 844667.1 Bug Reference(s) Document References(s) 6899253 6850493 -1 -1 -1 Yes No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Release WIP Dtls if Order Date different then BOM Revision Date
Profile Code Profile Option Name Description MSC MSC_RELEASE_DTLS_REVDATE Oracle Work in Process uses the details effective on the job start date. Valid values are: Yes - then planning engine releases the WIP details even if the Suggested Start Date is different than BOM Revision Date. No - the planning engine does not release the WIP details if the new WIP Start Date is different than BOM Revision Date.

Set on APS Destination in a distributed environment If all conditions are met to release the WIP details when releasing a planned orders (Ref Note 1346745.1) Then we evaluate the order as per the following example: Check the fixed and variable LT of the item and offset the start date: Answer: Planned order with Suggested due Date of Day 60 and offset makes start date Day 50 If the planed order has been compressed, or the planning engine has used an alternate routing (also possible that Alternate BOM is used) Then is it possible that the start date in workbench is not Day 50 but [different day] If [different day], then check the profile, If Yes, then release the details, IF No, then do not release the details and just release the header row to WIP and let WIP Mass Load compute the components and resources and dates for these based on the BOM and Routing for the item. then we will not release details unless the profile is set to Yes. Note Reference(s) 958034.1 1346745.1 Bug Reference(s) Document References(s) 2682123 -1 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center

Manufacturing Operations Center Global Order Promising

No No

MSC: Released Only By User


Profile Code Profile Option Name Description MSC MSC_RELEASED_BY_USER_ONLY Use this profile option to specify whether to restrict implementation of planned orders and recommendations to the current user. Valid values are: Yes - Only implement planned orders and recommendations that this user marked No - Implement planned orders and recommendations that any user marked

Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8326980 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Resource Group for a Line Flexfield Attribute


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_LINE_RES_GROUP This profile option stores the name of the flexfield column that contains the value in the corresponding table. 147242.1 763878.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Resource Type for an Operation Flexfield Attribute


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_RESOURCE_TYPE This profile is no longer being used. 147242.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2954572 -1 -1 No No No No No No No No No No No No No No No

MSC: Respect Minimum Remaining Shelf Life Days


Profile Code Profile Option Name Description MSC MSC_RESPECT_SHELF_LIFE_DAYS

Details added to recent ASCP Guide - E13358-08 (page A-53) This profile option enables ASCP to plan supplies with respect to the shelf life enhancements described in this design including the minimum remaining shelf life days. Valid values are: Yes - ASCP plans supplies with respect to minimum remaining shelf life days. This is the recommended setting. No - ASCP plans supplies without enforcing minimum remaining shelf life days - This is the default value.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

7424037 -1 -1 No No No Yes No No No No No No No No No No No No No No No

MSC: Retain Time for Non-ATPable Items


Profile Code Profile Option Name Description MSC MSC_RETAIN_TIME_NON_ATP_ITEM Valid values are: Yes - ATP returns same time stamp as passed to ATP from the Request Date and Time, for all single lines for nonatpable items or for all sets containing only non-atpable items. If a set contains mix of atpaple and non atpable items, then ATP continues to return 23:59:00 as the new timestamp. No 259601.1 9237457 551293.1 9237457 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No Yes

Note Reference(s)

Bug Reference(s) Document References(s)

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Return Best Source in Global ATP


Profile Code Profile Option Name Description MSC MSC_BEST_SOURCE_GLOBAL_ATP No Information available in User guides (115.5.10 or R12.1.1) This profile in only available in 11.5.10 Not ported to R12 or 12.1 Basic Functionality: This Feature will result in ATP taking more time to find the Best Source. - Original Behaviour: ---------------------------Suppose the Rank1 source gives you a Date within the 'Latest Acceptable Date'. ATP will stop there and won't go through all the sources. - New Behaviour with profile option set to YES: -------------------------------------------------------------If this profile is set to YES, ATP will go through all the Sources until it finds the best Available Date. So this feature is strictly monitored by the above profile option. So, if the profile MSC: Return best source in Global ATP is set as Yes, the Best possible source from all the global Sources defined for the item will be used. If the profile is set to NO or NULL, the original Behavior is retained. Default value of this profile is NO. NOTE: This feature is not supported for Ship set and Arrival Set. If the profile is set to yes the original behavior is retained for ship sets and arrival sets. 960369.1 734925.1

Note Reference(s)

Bug Reference(s) Document References(s)

5982134 -1 -1 -1 Yes No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: SCEM Engine Launch Events


Profile Code Profile Option Name Description MSC MSC_X_AUTO_SCEM_MODE Launch the Supply Chain Event Manager when data is loaded,published, or both. Set the profile option MSC: SCEM Engine Launch Events to All to automatically start Supply Chain Event Manager (SCEM) when a supplier loads an order forecast or when you publish an order forecast from the planning server. If you set the profile option to Publish, Supply Chain Event Manager starts only when plans are published from Oracle Advanced Supply Chain Planning. If you set the profile option to Load, Supply Chain Event Manager starts only when data is loaded using flat files. Note Reference(s) 295564.1 Bug Reference(s) Document References(s) 2949437 2546115 -1 -1 -1 Yes No No No No Yes No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: SNO - Snapshot Base Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_BASE_PKG

Valid value are: Yes - Base Package is used for creating a SNO model. No - Base Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Beginning Inventory Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_BGN_INVNTRY_PKG Specifies whether the Beginning Inventory Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Calendar Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_CALENDAR_PKG

Valid value are: Yes - Calendar Package is used for creating a SNO model. No - Calendar Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Customer Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_CUSTOMER_PKG

Valid value are: Yes - Customer Package is used for creating a SNO model. No - Customer Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Demand Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_DEMAND_PKG

Valid value are: Yes - Demand Package is used for creating a SNO model. No - Demand Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Distribution Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_DSTRBTN_PKG

Valid value are: Yes - Distribution Package is used for creating a SNO model. No - Distribution Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Enterprise Forecast Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_FORECAST_PKG

Valid value are: Yes - Forecast Package is used for creating a SNO model. No - Forecast Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Fixed Production Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_FP_PKG

Valid value are: Yes - Fixed Production Package is used for creating a SNO model. No - Fixed Production Package is not used for creating a SNO model. Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Inventory Safety Targets Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_IST_PKG Specifies whether the Inventory Safety Targets Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Manufacturing Package


Profile Code Profile Option Name Description MSC MSC_SNO_SCP_MFG_PKG Specifies whether the Manufacturing Package is used for creating a model in Strategic Network Optimization. Note: We have two profiles: MSC: SNO - Snapshot Manufacturing Package MSC: SNO - Snapshot Manufacturing Package (1) Valid values: Yes/No Default value: Yes Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 No No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Manufacturing Package(1)


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_MFG_PKG Specifies whether the Manufacturing Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - Yes Note: We have two profiles: MSC: SNO - Snapshot Manufacturing Package MSC: SNO - Snapshot Manufacturing Package (1) Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSC: SNO - Snapshot Purchase Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_PO_PKG Specifies whether the Purchase Orders Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Sales Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_SO_PKG Specifies whether the Sales Order Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Supplier Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_SUPPLIER_PKG Specifies whether the Supplier Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Transfer Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_TO_PKG Specifies whether the Transfer Orders Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO - Snapshot Work Orders Package


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_WO_PKG Specifies whether the Work Orders Package is used for creating a model in Strategic Network Optimization. Valid values are: Yes No

Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO Connector Precision


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_CONNECTOR_PRECISION 8 Specifies the precision value of the SNO connector. Valid values are: Integer

Change only on advise from Oracle Development. Default Value - 8 Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5157640 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No No No No No No No No No Yes No No No

MSC: SNO Currency Precision


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_CURRENCY_PRECISION

The precision used when displaying currency values in SNO. For the most accurate calculations, a precision of 9 is recommended. Valid values are: Numeric

Default Value - 2
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO Decimal Precision


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_PRECISION Specifies the number of decimal places shown for data in properties windows. Valid values are: Integer

Within SNO, the number of decimal places is called the display precision. Changing the display precision does not change the actual data values saved in a model. The display precision can affect results when you match data. For example, if the display precision is 2, a Machine node Utilization field with a value of 133.333333 displays 133.33. If you try to match Machine nodes with a Utilization field value of 133.33, the Machine node in this example is not matched because its actual value is 133.333333. Default Value - 2 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO Optimization Type


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_OPTIMIZATION_TYPE Whether the model is a Cost or Profit based model. In cost based models, the Selling Price is not part of the optimization. Valid values are: Cost: The item list price is not considered. Profit: The item list price is considered.

Default Value - Cost Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO Publish On Client


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_PUBLISH_ON_CLIENT

This flag causes released results to be stored on the client side for diagnostic purposes. It slows down the whole release process so it is recommended to be used under the guidance of Oracle support. Valid values are:
Yes No - prevents the local save of the files in CSV for debugging, This can save space and improve performance on large models.

Default Value - Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7233633 -1 Yes No No No No No No No No No No No No No No

MSC: SNO Run Application Script


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_APP_SCRIPT Specifies the name of the batch script that starts SNO. Default Value - runSNO.bat OBSOLETE -- in R12.1.2 Note Reference(s) 961419.1

Bug Reference(s) Document References(s)

7037527 6010199 -1 -1 -1 Yes No No No No No No No No No No Yes No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: SNO Run Connector Script


Profile Code Profile Option Name Description MSC MSC_SCP_SNO_CONNECTOR_SCRIPT

Specifies the batch script that starts the SNO Connector. Do not change without advise from Oracle Development. Default Value - runSNOConnector.bat Obsolete in v2 integration (11.5.10/R12.1)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: SNO Transportation Capacity By


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SCP_SNO_TRANSPORT_CAPACITY Needs to be Weight as capacity constraints are not stored by volume in EBS. Default Value - Weight

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No Yes No No No

MSC: Safety Stock Project


Profile Code Profile Option Name Description MSC MSC_SAFETY_STOCK_PROJECT Specifies the default project charged for all safety stock demands. Oracle Advanced Supply Chain Planning assigns the project specified for all safety stock demands which originate from non-MRP planned safety stock. When safety stock requirements are specified in Oracle Inventory for specific projects, the profile option value is not honored. The list of values for this profile option is restricted to projects specified in Oracle Projects. This profile option is enabled at project/seiban level, not at the task level. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSC: Safety stock change interval (Days)


Profile Code Profile Option Name Description MSC MSC_SS_INTERVAL_DAYS Use this profile option to specify the time interval used for smoothing within the time interval functionality. You can instruct the planing engine to keep safety stock levels relatively constant within a time interval. You specify: The number of days in the time interval: Set profile option MSC: Safety stock change interval (Days) The method that the planning engine should use to calculate the constant value: Set profile option MSC: Smoothing method to calculate Safety stock within Change interval 276707.1 559867.1 376451.1

Note Reference(s)

759329.1 Bug Reference(s) Document References(s)

-1 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Sales Orders Offset Days


Profile Code Profile Option Name Description MSC MSC_SO_OFFSET_DAYS Completed sales orders are collected within the offset duration. For example, if Sales Orders Offset Days is set to 90, all the sales orders completed in the past 90 days are also collected. Valid values are: Integer > 0

Can be defined at the site level. A Null value means all closed sales orders are collected. Does not apply to complex maintenance repair and overhaul where the material scheduled for a visit or task is collected as a sales order in Oracle Advanced Supply Chain Planning. Default Value - null Note Reference(s) 277863.1 217116.1 780735.1 365770.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Scope of Analyze Plan Partition


Profile Code Profile Option Name Description MSC MSC_ANALYZE_PARTITION_SCOPE This profile option specifies the partitions that concurrent process Analyze Plan Partitions should analyze. Valid values are: All Partitions Plan Partition Only

Normally, we recommend the default setting for this profile, unless you run several plans each cycle and the profile MSC: Launch Analyze Plan Partition is set to No. Then you should set All Partitions and launch this request after running all ASCP plans in your planning cycle. Using this strategy can have positive performance impact if all plans are run together and then users start working in the plans. Default Value - Plan Partition Only Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No Yes No Yes Yes No No No No No No No No No No No No

MSC: Search Criteria Warning


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_ALLOW_SEARCH_CRITERIA_WARNING No information currently available on this profile.

No No No No No No No No No No No No No No No

MSC: Selection order for Firm Supplies in backward allocation window


Profile Code Profile Option Name Description MSC MSC_SUPPLY_SELECTION_ORDER_BACKWARD_WINDOW Closest Supply (1), Earliest Supply (2) Site level default: Closest Supply (1) If profile is set to Earliest Supply, then we would walk forward instead of the existing backward way. If this profile is set to Closest Supply, then we will peg it to the closest firm supply. This would mean that the loop for backward phase present in mslflp.ppc, should be able to move in both the directions based on profile option. 391548.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5525679 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Self Service Loads Delimiter


Profile Code Profile Option Name Description MSC MSC_SELF_SERVICE_LOADS_DELIMITER ~/, (tilde or Comma) - default = ~ (tilde) Delimiter used to parse the data files loaded using self service loads, for example, the loading of spreadsheet forecast data to Oracle Demand Planning. Valid values are: ~ ,

Default Value - ~ Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No Yes No No No No No No No No No No

MSC: Service Level Category Set


Profile Code Profile Option Name Description MSC MSC_SERVICE_LEVEL_CATEGORY_SET Not much information is available about this profile in user guides. As per IO user guide: As part of the setup it is necessary to specify the value of the profile option MSC: Service Level Category Set. Only categories from this category set are available when assigning target service levels and fulfillment lead times at a category level during the setup of specific item or category level service levels and fulfillment lead times. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No Yes Yes No No No No No No No No No No No No

MSC: Service Planning Enabled


Profile Code Profile Option Name Description MSC MSC_SRP_ENABLED If using Service Parts Planning, then set to Yes to collect data for SPP (aka SRP). Valid values are: Yes No

Note Reference(s)

Default Value - No 760095.1 566096.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 No No No No No No No Yes No No No No No No No No No No No No

MSC: Service Planning Item Safety Stock Level Value


Profile Code Profile Option Name Description MSC MSO_SS_PLAN_LEVEL This profile determines how safety stock targets for different revisions in a supersession chain are considered in SPP. Valid Values.

Item - SPP will consider the safety stock level for each item (for which safety stock is prescribed) Prime (Default) - the safety stock for the entire prime will be considered as the safety stock level and the existing supply for the various members of the prime will be considered while trying to maintain the safety stock level.

Example: Consider this supersession session chain: A3 -] A4 [-] A5 [-] A6 -] A7 [-] A8 Assume safety stock for each item = 100 units for a give period. If the profile option = 'Item', then consider the safety stock level for each item to be 100 units and use only native supply to maintain this level. There will be no substitution recommended by planning and safety stock violation exceptions will be raised for each item. If the profile = 'Prime', then planning determines that A3, A6 and A8 are the primes in this supersession chain then planning will use the following levels: SS target for A3=100 units, and planning will only use supply of A3 to maintain this level. SS target for A6=300 units, and planning will use supplies of A4, A5 and A6 to maintain this level. SS target for A8=200 units, and planning will use supplies of A7 and A8 to maintain this level. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No No No No No No

MSC: Share Plan Partitions


Profile Code Profile Option Name Description MSC MSC_SHARE_PARTITIONS Yes: The number of plan partitions parameter to the concurrent program mentioned becomes irrelevant; only one partition is created for a plan (you can enter 1)

Note Reference(s) 137293.1 Bug Reference(s) Document References(s)

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No Yes No Yes Yes No No No No No Yes No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Shelf Life Override of Order Modifiers for Transfer Orders


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_OVERRIDE_OM_FOR_TRANSFER Instructs Oracle Advanced Supply Chain Planning whether to maximize the number of demands satisfied with respect to minimum remaining shelf life. 760046.1

-1 No No No Yes Yes No No No No No No No No No No No No No No

MSC: Simultaneous Resource Sequence Flexfield Attribute


Profile Code Profile Option Name Description MSC MSC_SIMUL_RES_SEQ This profile option stores the name of the flexfield column that contains the value in the corresponding table. This setup is only performed during application install. 153919.1 136734.1 130995.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Smoothing method to calculate Safety stock within Change interval


Profile Code Profile Option Name Description MSC MSC_SS_SMOOTHING_METHOD Specifies the mathematical construct used to calculate safety stock for a time interval using values within the time interval. Available values include: Minimum Average (Default) Note Reference(s) 376451.1 276707.1 Maximum

Bug Reference(s) Document References(s)

5370377 4520265 -1 -1 -1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Source Instance ID


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_SR_INSTANCE_ID This profile option is no longer used as of August 2003.

2937850 -1 Yes No No No No No No No No No No No No No No

MSC: Source Setup Required


Profile Code Profile Option Name Description MSC MSC_SOURCE_SETUP Internal profile used by the software during collections configuration. Do not manually update. When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support. Valid values are: 11i 12+ Note Reference(s) apsinfo_us 837670.1 211121.1 860349.1 580205.1 Yes No Y - for Yes N - for No

Bug Reference(s) Document References(s)

-1 -1 -1 -1 -1 Yes No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Sourcing History Start Date Offset(in months)


Profile Code Profile Option Name Description MSC MSC_START_SOURCING_HISTORY Offsets the starting date of sourcing history calculations and is used with collections parameters Purge Sourcing History = Yes and Recalculate Sourcing History = Yes. 399468.1 305327.1 780883.1 Bug Reference(s) Document References(s) 6959481 -1 -1 -1 -1 Yes No No Yes No No No No Yes No Yes Yes No No No No No No No No No No No No

Note Reference(s)

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Sourcing Rule Category Set


Profile Code Profile Option Name Description MSC MSC_SRA_CATEGORY_SET Determines the category set used in Oracle Advanced Supply Chain Planning in the assignment set form. If this is not set, the user cannot assign sourcing rules and bills of distribution at the Category- Instance-Organization and Category-Instance level. 205167.1 783204.1 306913.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Sourcing Variance Tolerance


Profile Code Profile Option Name Description MSC MSC_SOURCING_TOLERANCE Used when Enforce Sourcing Constraints is enabled for a plan. This percentage value establishes a threshold for triggering exception messages if sourcing allocations are violated. Exceptions are generated if the difference between the user-specified sourcing allocation percentages and the plan-derived allocation percentages is greater than the Sourcing Variance Tolerance. The profile option is entered as a number and converted to a percentage. If the user enters 0.5 it becomes 50%. Valid values are: Integer between 0 and 1

Default Value - 0.05 (5%) Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSC: Split Planned Order to perform safety stock pegging


Profile Code Profile Option Name Description MSC MSC_VIOLATE_ORDER_MODIFIER_SS Use this profile option to instruct the planning engine how to split a planned order that pegs to customer demand when pulling it in to meet transient safety stock. Values: 1 - No 2 - Yes but do not violate order modifier 3 - Yes 276707.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3829477 -1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Split Planned Orders for Scheduling Flexibility


Profile Code Profile Option Name Description MSC MSC_SPLIT_SUPPLY For constrained plan with decision rules and optimized plans, it determines whether the planning engine consolidates planned orders that were split during optimization processing prior to scheduling them. For unconstrained plans, set it to No. Valid values are: Yes - Do not consolidate planned orders prior to scheduling. The planning engine splits them into multiple planned orders whose quantities generally satisfy one planning time bucket's worth of capacity against the resources or suppliers used in the planned order. During scheduling, the planning engine has more flexibility to place smaller quantities into available time slots. You cannot specify the size of the durations and the planning engine does not guarantee that each planned order in the final plan output spans exactly one planning bucket. No - Consolidate orders when possible prior to scheduling. Use this value if you tend to have long production runs per routing that cross multiple planning buckets. The planning engine creates a single planned order. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is No.

Note Reference(s) 298806.1 787982.1 562872.1 787458.1 947399.1 958872.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center

Manufacturing Operations Center Global Order Promising

No No

MSC: Supplier Capacity Accumulation(multiplier)


Profile Code Profile Option Name Description MSC MSC_SUPP_CAP_ACCUM_MLTPLR This profile option is a multiplier to ASL lead-time. The planning engine uses it to derive the date when capacity accumulation begins for a supplier. If profile option MSC: Purchase Order Dock Date Calculation Preference is Promise Date, Oracle suggests that you set this profile option to 0 so that suppliers accumulates capacity withintheir lead-time. This is a site level profile option. It specifies the date that the planning engine begins supplier capacity accumulation. You enter it as a multiplier of the Approved Supplier List Processing Lead-time. To begin accumulation at the Approved Supplier List Processing Lead-time, enter 1 (the default). To begin accumulation at the plan start date, enter 0. To begin accumulation at a multiple of the Approved Supplier List Processing Lead-time, enter another whole number. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

8344302 8847552 -1 -1 Yes No No No No No No No No No No No No No No

MSC: Supplier Capacity Consumption by Purchase Orders


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSO_ALWAYS_CONSUME_CAPACITY_FOR_PO MSC: Supplier Capacity Consumption by Purchase Orders

No No No No No No No No No No No No No No No

MSC: Suppress Exception for Selection of Alternates


Profile Code Profile Option Name Description MSC MSC_SUPPRESS_ALT_EXCEPTION Controls whether the planning engine generates exceptions related to alternate bills of material and routings. If the profile option is No, it does not generate those exceptions. Valid values: Yes/No Default value: No

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSC: Temp Index Extent Size(Bytes)


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_TEMP_IND_NXTEXT Not Used 343996.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSC: Temp Table Extent Size(Bytes)


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_TEMP_TAB_NXTEXT Not used 343996.1

-1 No No No No No No No No No No No No No No No

MSC: Unit of Measure


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_UNIT_OF_MEASURE Not Used

No No No Yes No No No No No No No No No No No No No No No

MSC: Update Requested Completion Date when Releasing Reschedules


Profile Code Profile Option Name Description MSC MSC_UPD_REQ_DATE_REL Marked as N/A in the Users Guide for all information. Exists in the code for releasing from Planner Workbench in the Source side code MRP_AP_REL_PLAN_PUB and defaults to No The file is $MRP_TOP/patch/115/sql/MRPRELPB.pls Code review points to this not being used anywhere, even though the value is determined during the release process. Introduced in 11.5.9 and exists in 11.5.10 Bug 8603036 logged to get this ported into R12 Note Reference(s)

Bug Reference(s) Document References(s)

3938565 8603036 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Update Use Up Date


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_UPDATE_USE_UP_DATE This is an internal profile 747628.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC: Use Enhanced Forward ATP


Profile Code Profile Option Name Description MSC MSC_ENHANCED_FORWARD_ATP Use Enhanced Forward ATP -which can combine sources in Supply Chain ATP. This works only for ATP based on Planning Data and is not available for ATP based on Collected Data 12.1.3 Documentation updated with example of this functionality: See Oracle Global Order Promising Implementation and User's Guide Release 12.1 Part No. E13378-07 May 2010 pg 4-14 - Enhanced Forward ATP This example applies to 11.5.10 with latest GOP Rollup patch R12.0.6 with ATP CU patch 6 12.1.3 CAUTION: This can have significant performance impact as we do multiple iterations to arrive at an answer for ATP. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8443590 -1 Yes No No No No No No No No No No No No No Yes

MSC: Use FIFO Pegging


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_USE_FIFO_PEGGING If this profile option is Yes, the planning engine uses FIFO pegging. Not used in constrained plans without detailed scheduling 368676.1

-1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Use Optimization Phase Supply Due Dates for Pegging


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6009093 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No MSC MSC_USE_SCO_DATE When set to yes, Pegging uses the optimization recommended supply date for planned orders and scheduled receipts

MSC: Use Shipping/Receiving Calendar


Profile Code Profile Option Name Description MSC MSC_USE_SHIP_REC_CAL Enables the collection and use of shipping, receiving and transit calendars in ASCP, GOP, Rapid Planning Works for both ATP based on Collected Data and ATP based on Planning Data Determines whether shipping/receiving/carrier calendars are used for order promising. Values are: + Yes: Uses the shipping, receiving, and carrier calendars to schedule ship and arrival dates. + No: Uses only the organization's manufacturing calendar to schedule ship dates at each level. - EXCEPT for Processing Lead Time for Buy Items which will use 24x7 calendar 845365.1 390531

Note Reference(s)

730061.1 436771.1 Bug Reference(s) Document References(s) 845365.1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Global Order Promising Implementation and User's Guide -1 -1 Yes No No Yes No No No No Yes No No No Yes No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Use attribute based netting


Profile Code Profile Option Name Description MSC MSC_USE_ATTR_BASED_NETTING Use this profile option to control netting in a project manufacturing environment. Yes: Planning nets at the reservation level. It respects pegging level and creates planned orders based on hard pegging level. It does not respect order modifiers if the reservation level and hard pegging level are not the same. With this approach, you can enable priority pegging can be enabled. No: The planning engine uses customary netting in a project manufacturing environment.

Note Reference(s) 420752.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: VMI Default Query


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSCX_SCE_DEFAULT_QUERY Displays default results in the Oracle Collaborative Planning Horizontal View

5058121 -1 Yes No No No No Yes No No No No No No No No No

MSC: Value of N for all top/bottom-N reports in Dashboards


Profile Code Profile Option Name Description Note Reference(s) MSC MSC_HUB_TOP_BOTTOM_N_VALUE It holds the value of N for all top/bottom-N reports in Dashboards. 759571.1 844667.1

Bug Reference(s) Document References(s)

6755107 -1 -1 -1 Yes No No No No No No No No No No No Yes No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC: Vertical view default query


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSCX_VERTICAL_VIEW_DEFAULT_QUERY Used by Oracle Collaborative Planning to determine whether default results are displayed for the vertical view

Yes No No No No Yes No No No No No No No No No

MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)
Profile Code Profile Option Name Description MSC MSC_LOCK_WAIT_TIME Time (in seconds) the Snapshot Delete Worker waits to obtain a lock on a table/partition before aborting. Releasing plan recommendations through Workbench and running Purge Plan can cause locks on the table/partition preventing the Snapshot Delete Worker from obtaining a lock. If the timer expires, the program prints the following message in the log file: Unable to obtain a lock on table. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSC: Write MBP Flat Files


Profile Code Profile Option Name Description MSC MSC_WRITE_TO_FLAT_FILES Profile provide controls whether to flush the Planner concurrent process data files and setup data files during the plan run. If Yes, the process writes all the files to the $APPLCSF/out/data directory. Note Reference(s) 336724.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes Yes No No No Yes No Yes Yes Yes No No No No Yes No No No No No No

MSC:ATP Assignment Set


Profile Code Profile Option Name Description MSC MSC_ATP_ASSIGN_SET ATP Assignment Set used for ATP Based on Planning Output This should be the same assignment set assigned to the ASCP - ATP enabled plan to provide consistent results. This will default into the ATP Inquiry form when accessed from Advanced Supply Chain Planner responsibility. 812964.1 760117.1 290251.1 1059017.1 986625.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 -1 -1 -1 Oracle Global Order Promising Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC:Coll Error Debug Mode


Profile Code Profile Option Name Description MSC MSC_COLL_ERR_DEBUG

Added in R12.x for debug messages for Data Collections - Planning Data Pull and ODS Load and other collections processes. MRP: Debug mode is still debug profile used for Refresh Collections Snapshots, but all other processes now use this profile to set debug level. Level settings may vary by release: On (Minimal) Medium -- CAUTION - levels below may cause performance issues. Should usually be set only with DEV recommendation. High High (Verbose) Dev List of values available as in 12.1.3.4: OFF LOW (Default) MEDIUM HIGH DEV

Note Reference(s)

Bug Reference(s) Document References(s)

5514401 5578510 -1 -1 -1 -1 No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning

Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No

MSC:Coll Performance Debug Mode


Profile Code Profile Option Name Description MSC MSC_COLL_PERF_DEBUG Introduced in R12. Helps by adding messaging about performance in the log files. Valid values are: Off Medium High (Verbose)

CAUTION: Should not be used with MSC:Coll Error Debug Mode set to Medium or higher unless directed by DEV. Best to set this profile and have MSC: Coll Error Debug Mode = OFF when working a pure performance issue Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6722040 5514401 -1 -1 No No No No No No No No No No No No No No No

MSC:Collect Completed Jobs


Profile Code Profile Option Name Description MSC MSC_COLLECT_COMPLETED_JOBS This profile is used to prevent the collection of remaining requirements for jobs that are completed when set to No. Jobs may still have requirements for components that were not issued to the job. This profile was Introduced in 11.5.10 Collections Rollup #13 and is only used for Complete or Targeted Refresh of Data Collections 404975.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSC:Collect Routing
Profile Code Profile Option Name Description MSC MSC_COLLECT_ROUTING Use this profile to instruct the targeted collections process how to collect bill of material and routing data. Valid values are: Yes - Collect bill of material and routing data No: Collect bill of material data but do not collect routing data

This profile option is overridden by profile option INV: Capable To Promise is ATP/CTP based on Planning Output. Do NOT set no if running any Plans in VCP Applications. Useful when ATP based collected data is being used and having very large BOM Routing tables and it can help performance. Currently only available in 11.5.10 starting in Data Collections Rollup #25. Bugs to Front port to R12 and R12.1 are pending
Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6658721 -1 -1 Yes No No No No No No No No No No No No No No

MSC:Compute IB Aggregation during Collection


Profile Code Profile Option Name Description MSC MSC_COMPUTE_IB_AGGREGATE

MSC:Compute IB Aggregation during Collection Initiallly the Aggregate Information Collection was made part of Refresh Collection Process. We have made it a standalone program which can be run independently of the Refresh Collection Snapshot process based on value of the profile option MSC:Compute IB Aggregation during Collection. By default ,the Install base aggregation will be computed during Collection process, and if the profile option is set to No, then the Installbase Aggregation can be computed by running the concurrent program "Compute Installbase Aggregate Under Contracts". To imrove performance we have paralleilized the computation by introducing concurrent programs "Installbase Worker" , however this program can only be invoked by the parent program "Compute Installbase Aggregate Under Contracts". If this profile option is set to No, then the concurrent program "Compute Aggre Installbase under Contract" will not be called during collections. So, when the data pull parameter "Install Base Under Contracts" is set to Yes, we will collect over the install base under contracts information already computed at that time. The user can run the concurrent program "Compute Aggre Installbase under Contract",

before the collection run so that the collection run timings are reduced.
Note Reference(s)

Bug Reference(s)

Document References(s)

12648806 11792946 11932063 11727030 11930028 -1 -1 -1 -1 -1 No No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSC:Criticality Category Set


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSC MSC_CRIT_CATEGORY_SET Category Set To Define Criticality

No No No Yes No No No No No No No No No No No No No No No

MSC:Prevent Loops when pegging Non-Standard Jobs


Profile Code Profile Option Name Description MSC MSC_PREVENT_NSJOB_LOOP Discrete job demands remain unpegged in case of job demands generated due to Loops in BOM. Valid values are: Yes - If there exists a non standard job demand for a top level item in the supply chain bill and the non-standard job also exists as a valid supply in the plan, ASCP will make the pessimistic assumption that this could cause a fatal loop in the pegging and essentially ignore this demand for pegging purposes. This default setting is recommended strongly to prevent plan failures due to pegging loops. No - In the above case, ASCP makes the optimistic assumption that loops will not exist after pegging and proceeds to peg supply of the top level item to the nonstandard job demand. This setting should not to be used unless the user is completely certain that loops will not be caused based on their pegging related plan and profile option settings

Note Reference(s)

Default Value - Yes Available 12.1.1 and upwards 365112.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4575602 -1 -1 Yes No No Yes Yes No No No Yes No No No No No No No No No No

MSC:Release only orders pegging fully to on hand


Profile Code Profile Option Name Description MSC MSC_REL_ONLY_ONHAND_SUPPLY

Enhancement Bug 4417550 was logged to help further control how orders can be released. This is first released in 11.5.10 in ASCP Engine/UI Rollup # 8 - Ref Note 252108.1 for more information on the rollup patches for APS Suite The implementation is described as follows: 1. Implement the functionality at the Responsibility Level. -- This is enabled at Site, Application and Responsibility level only -- This is NOT available to set at the User level 2. The check is ONLY for first level of pegging for Buy From or Transfer From type pegging lines. Warning:This will not check the pegging of any Sub-Assemblies that are in the pegging tree to see if they components of the Subassembly are pegging to on hand. 3. The message is a Warning and can be ignored by the user and order may still be released Set on APS Destination in a distributed environment

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections

560587.1

-1 Yes No

Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No Yes Yes No No No Yes No No No No No No No No No No

MSC:Retain Released Data


Profile Code Profile Option Name Description MSC MSC_RETAIN_RELEASED_DATA

When set to Yes, then the data that is inserted into the MSC%Interface tables during release from the workbench (Or when Auto-Release Planned Orders is run) is retained in these tables. ( Also can effect release from PS application) Default = No Primarily used for debugging purposes. Tables effected: MSC_SO_RELEASE_INTERFACE MSC_PO_RESCHEDULE_INTERFACE MSC_WIP_JOB_SCHEDULE_INTERFACE MSC_WIP_JOB_DTLS_INTERFACE MSC_PURCHASE_ORDER_INTERFACE MSC_SALES_ORDER_INTERFACE MSC_PO_REQUISITIONS_INTERFACE This profile is used for release process in E1-VCP integration

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12592939 -1 No No No Yes Yes No No No Yes No No No No No No No No No No

MSC:SRP PHASE2 ENABLED


Profile Code Profile Option Name Description MSC MSC_SRP_PH2_ENABLED Profile for SRP phase2 enable Special profile to Service Parts Planning and Install Base Under Contracts integration. In case of using new Install Base functionality in 12.1.3.3 in Data Collections, this profile should be set to Yes. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

9791058 11785629 -1 -1 No No No No No No No Yes No No No No No No No No No No No No

MSC:Select Sourcing Rules In ATP Based On


Profile Code Profile Option Name Description MSC MSC_SOURCING_DATE From Documentation bug 8423266 logged to get this added to the documentation. Available in the latest Users Guide

1 - Sysdate - current default functionality Sourcing rule effectivity date is based on system date 2 - Request Date - this will check for sourcing effectivity based on the Request Date or Planning Time Fence Date (whichever is greater) Example: Item has 5 days leadtime and ZERO on hand Item sourced from supplier A on right now Item sourcing will change on Day 10 to Supplier B So sourcing rule is setup with supplier A sourcing disabled on Day 9 Sourcing shows supplier B with sourcing starts on Day 10 So Customer A calls today and requests item to ship on Day 20, SO -- best solution is to use profile with setting Request Date, since you would need to order the product on Day 14 to arrive on Day 19, then ship on Day 20. Supplier B would be chosen for this order. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8423266 -1 Yes No No Yes No No No No No No No No No No No No No No Yes

MSC_USE_HASH_KEY
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3575822 -1 Yes No No Yes No No No No No No No No No No No No No No No MSC MSC_USE_HASH_KEY This is an internal profile. Should be set to Yes always

MSD: AW Tablespace
Profile Code Profile Option Name Description MSD MSD_TABLESPACE This profile controls where analytic workspaces are created and stored. New plans are created in the specified tablespace; existing plans remain in the tablespace specified at the time of their creation. Changing the tablespace profile has no effect on existing data.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3900222 -1 No No No No No No No No No Yes No No No No No

MSD: Calculate Planning Percentages


Profile Code Profile Option Name Description MSD MSD_PLANNING_PERCENTAGE This profile option controls the behavior of the planning percentage calculations. For example, it controls whether the planning percentages can be calculated from the sales history of options. This profile can prevent expensive calculations when the user does not want to calculate planning percentages and just wants to use the existing planning percentages specified in the enterprise resource planning source to explode the forecast. 556091.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2930793 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Category Set Name


Profile Code Profile Option Name Description MSD MSD_CATEGORY_SET_NAME This profile option is used to select one category set during the data collection process. If the user value is left blank, then all categories will be selected for data collection. Valid values are limited to valid category set names. 344626.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4058454 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Client Debugging


Profile Code Profile Option Name Description Note Reference(s) MSD MSD_CLIENT_DEBUGGING Used for debugging ODP 789091.1 301936.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Conversion Type


Profile Code Profile Option Name Description Note Reference(s) MSD MSD_CONVERSION_TYPE This profile option determines what conversion rates are collected from the General Ledger rates table 419412.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

7530857 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Currency Code


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_CURRENCY_CODE This profile option designates the base currency used in Oracle Demand Planning. All revenues are calculated and displayed in this base currency 577726.1

-1 Yes No No No No No No No No Yes No No No No No

MSD: Customer Attribute


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_CUSTOMER_ATTRIBUTE This is a source profile option used to selectively bring the customer names into Oracle Demand Planning to improve the system performance 217042.1

-1 Yes No No No No No No No No Yes No No No No No

MSD: Default DP Scenario


Profile Code Profile Option Name Description MSD MSD_DEFAULT_DP_SCENARIO This profile option specifies a demand scenario, which appears as a demand schedule in the Plan Options window. When you publish the demand scenario specified in this option, the planning engine launches the unconstrained plan specified in the profile option MSC: New Forecast Auto Plan

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2710122 -1 Yes No No No No No No No No Yes No No No No No

MSD: Enabled Organization for Item Collections


Profile Code Profile Option Name Description MSD MSD_ITEM_ORG This profile option allows users to collect relationships for Items in Master Organization only or All Organizations. This profile option specifies how Oracle Demand Planning collects Product Family and Product Category relationships

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4157588 -1 Yes No No No No No No No No Yes No No No No No

MSD: Excess and Obsolescence, Liability Category Set Name


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_EOL_CATEGORY_SET_NAME This profile is not used.

5202797 -1 No No No No No No No No No Yes No No No No No

MSD: MAXVALUECOUNT for edges in XWDEVKIT


Profile Code Profile Option Name Description Note Reference(s) MSD MSD_EDGEMAXVALCOUNT Used for setting the maximum number of values allowed on an edge for XWDEVKIT. Used in the ODP Worksheet 359953.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4725583 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Master Org


Profile Code Profile Option Name Description MSD MSD_MASTER_ORG This profile option is used to select a master organization, if there are multiple master organizations. The item attributes pertaining to the selected master organization are used by Oracle Demand Planning

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 2779954 -1 Yes No No No No No No No No Yes No No No No No

MSD: OLAP Directory Alias


Profile Code Profile Option Name Description Note Reference(s) MSD MSD_DIR_ALIAS Use this profile to specify the database directory alias used to store the log files created during the demand plan build process. 470483.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3826884 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: OLAP Initial Page Pool


Profile Code Profile Option Name Description MSD MSD_USER_INIT_PAGEPOOL This profile specifies an initial minimum memory for planning and manager sessions and can be optimized for individual users. A value of 4 to 6MB is generally adequate. The default value is olap_page_pool_size. 363491.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No No No No No No No Yes No No No No No

MSD: OLAP Maximum Page Pool


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_USER_MAX_PAGEPOOL Not used - obsolete Note.416107.1

-1 No No No No No No No No No No Yes No No No No

MSD: OLAP Workflow Page Pool


Profile Code Profile Option Name Description Note Reference(s) MSD MAX_WF_MAX_PAGEPOOL This profile specifies the memory footprint for workflow initiated Oracle Demand Planning sessions. The default value is 64MB. 363491.1 285489.1 286729.1

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No No No No No No No Yes No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSD: One Step Collection


Profile Code Profile Option Name Description Note Reference(s) MSD MSD_ONE_STEP_COLLECTION This profile option controls the number of steps in the data collection process 332545.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2930793 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Two-Level Planning


Profile Code Profile Option Name Description MSD MSD_TWO_LEVEL_PLANNING This profile allows you to forecast demand at product family level on the basis of sales histories of member items. You can collect all the product family members and their sales histories regardless of the forecast control as long as the product family forecast control is 'Consume' or 'Consume & Derive' and the planning method for product family as well as members is not set to 'Not Planned'. This is achieved by setting the profile value to: Collect all family members and their sales histories. The default profile value, Exclude family members with forecast control 'None' enforces the existing behavior that is, only 'Consume' or 'Consume & Derive' product family members are collected.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 3009964 -1 Yes No No No No No No No No Yes No No No No No

MSD: Use Classic Even Allocation


Profile Code Profile Option Name Description MSD MSD_USE_EVEN_ALLOC This profile allows you to determine the allocation method used when an allocation basis does not exist. You can allocate evenly down the time dimension and use "first" allocation for other dimensions when an allocation basis is not available. Demand Planning uses the First Child allocation method by default, unless you enable the MSD: Use Classic Even Allocation profile. 436673.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4577092 -1 -1 Yes No No No No No No No No Yes No No No No No

MSD: Use Classic Worksheet


Profile Code Profile Option Name Description MSD MSD_USE_CLASSIC_WORKSHEET To force recalculations between worksheet edits, enable the MSD: Classic Worksheet profile option. This option enforces consistency across hierarchy levels, but may decrease performance. in 11.5.10 default is classic, in R12 default is simple. Not applicable to planning percentages worksheet

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6137940 -1 Yes No No No No No No No No Yes No No No No No

MSD:View Scope measures are editable


Profile Code Profile Option Name Description MSD VIEW_SCOPE_MEAS_EDITABLE The measures not included in the Assignment scope, but included in the View scope, can be viewed but not edited. Valid values are: Y - Yes, the default behaviour N - No

Default Value - Y Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6367799 -1 No No No No No No No No No Yes No No No No No

MSD_DEM: Calculate Planning Percentage


Profile Code Profile Option Name Description MSD MSD_DEM_PLANNING_PERCENTAGE Controls the planning percentage calculation for options and option classes. Use this profile option to specify upon what entities to calculate planning percentages. This occurs when system parameter CTO_PLANNING_PERCENTAGE_CHOICE instructs Oracle Demantra to calculate planning percentages. Do not change the setting of this profile option after the initial download or invalid combinations may result: + The typical reason for changing this value is to correct a setup error. + In that case, delete the invalid combinations and re-download. See Implementation Considerations. The default is Null. Valid vales are: + Yes for Consume & Derive Options and Option Classes: Include the sales history of options and option classes + Yes for Consume & Derive Options only: Include the sales history of options to model and removes option classes. Use it for assemble to order situations. + Yes for all the Options and Option Classes: Include the sales history of options and option classes including optional components of forecastable product families that have Forecast Control None. Note: It is recommended to set this parameter to Yes, for All Options and Option Classes before running shipping and booking history for Configure to Order 975066.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No Yes No No No No

MSD_DEM: Category Set Name


Profile Code Profile Option Name Description Note Reference(s) MSD MSD_DEM_CATEGORY_SET_NAME This profile defines the Item to Category rollups in each instance. 549565.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

8235032 -1 -1 Yes No No No No No No No No No Yes No No No No

MSD_DEM: Conversion Type


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5969081 -1 Yes No No No No No No No No No Yes No No No No MSD MSD_DEM_CONVERSION_TYPE This profile determines which currency conversion rates are collected from the General Ledger tables Source side profile

MSD_DEM: Currency Code


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5959651 -1 Yes No No No No No No No No No Yes No No No No MSD MSD_DEM_CURRENCY_CODE This profile designates the Demand Management base currency. Destination side profile

MSD_DEM: Customer Attribute


Profile Code Profile Option Name Description MSD MSD_DEM_CUSTOMER_ATTRIBUTE This is a source profile option used to selectively bring the customer names into Demand Management to improve system performance. Source side profile 726444.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6926188 -1 -1 Yes No No No No No No No No No Yes No No No No

MSD_DEM: Data Profile for Price Lists


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6450646 -1 Yes No No No No No No No No No Yes No No No No MSD MSD_DEM_PRICE_LIST_PROFILE Set this profile to import integration data profile for price lists. Destination side profile

MSD_DEM: Debug Mode


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_DEM_DEBUG_MODE When set to 'Yes', this profile is used to print debug information to the output file of the concurrent request. Destination side profile 741464.1

-1 Yes No No No No No No No No No Yes No No No No

MSD_DEM: Enable Supply Plan Download for work orders


Profile Code Profile Option Name Description MSD MSD_DEM_ENABLE_SUPPLY_PLAN_WO As of 1/15/12 - This is a new profile options added in 12.1.3.6 for Integration of CMRO and EAM with Demantra. Important - This feature is under CA and is meant for a specific customer only. For all other customers, they should not use these profiles till the feature is made GA. Profile to determine whether supply plan download will bring in data by work order attributes or not The profile will be used as a switch between the existing SOP integration design and the new design to bring in data striped by work order attributes. Possible Values a. No - Existing SOP Integration b. Yes - New SOP Integration with support for work orders Default Value - No. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No Yes Yes No No No No

MSD_DEM: Explode Demand Method


Profile Code Profile Option Name Description MSD MSD_DEM_EXPLODE_DEMAND_METHOD This profile option applies to Demantra integration with Service Parts Planning. This profile option specifies which historical data is used to determine the failure rate. The options are Field Service or Depot Repair & Field Service. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No Yes No No No No

MSD_DEM: Fiscal Calendar


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6278515 -1 No No No No No No No No No No Yes No No No No MSD MSD_DEM_FISCAL_CALENDAR All the fiscal calendars chosen in the calendar setup list will be available in the List Of Values for this profile.

MSD_DEM: Host URL


Profile Code Profile Option Name Description MSD MSD_DEM_HOST_URL Set this profile to the Oracle Demantra Application Server Host Name, Port Number and Application Name. This profile is used to invoke Oracle Demantra URLs from the E-Business Suite applications. Destination profile 431301.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6497910 -1 -1 Yes No No No No No No No No No Yes No No No No

MSD_DEM: Include Dependent Demand


Profile Code Profile Option Name Description MSD MSD_DEM_INCLUDE_DEPENDENT_DEMAND Use this profile option to specify whether the collections process should include configure to order structures, demand, and history. Valid values are: + Yes: Include configure to order structures, demand, and history + No: Do not include configure to order structures, demand, and history. This is the default 975066.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No Yes No No No No

MSD_DEM: Include organization in CMR Data Load


Profile Code Profile Option Name Description MSD MSD_DEM_INCLUDE_ORG_CMRO_DATA This is a new profile options added in 12.1.3.6 for Integration of CMRO and EAM with Demantra. As of 1/15/12 - Important - This feature is under CA and is meant for a specific customer only. For all other customers, they should not use these profiles till the feature is made GA. In 12.2 as well as 12.1.3.6, even though the code is available, it is hidden/disabled in UI out of the box. A new planning side profile to specify whether organization should be a dimension for the data loaded to SPF GL or not. Possible Values a. No b. Yes Default Value - No. Profile to determine whether to include organization in cMRO data load or not. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No Yes Yes No No No No

MSD_DEM: Master Org


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_DEM_MASTER_ORG This profile defines the Product Family to which an Item rolls up. Source side profile

Yes No No No No No No No No No Yes No No No No

MSD_DEM: Maximum seeded units available for price lists


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5879252 -1 Yes No No No No No No No No No Yes No No No No MSD MSD_DEM_MAX_PRL This profile determines the number of slots available for price lists in Oracle Demantra. Destination side profile

MSD_DEM: Schema
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8361879 -1 Yes No No No No No No No No No Yes No No No No MSD MSD_DEM_SCHEMA Set this profile value to the database schema name where the Oracle Demantra schema has been installed. Destination side profile

MSD_DEM: Simulation Set Name


Profile Code Profile Option Name Description MSD MSD_DEM_SIMULATION_SET_NAME This is a new profile options added in 12.1.3.6 for Integration of CMRO and EAM with Demantra. Important This feature is under CA and is meant for a specific customer only. For all other customers, they should not use these profiles till the feature is made GA. In 12.2 as well as 12.1.3.6, even though the code is available, it is hidden/disabled in UI out of the box. A new planning side profile to specify the simulation set from which repair cost of items will be collected into Demantra. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes No No No No No No Yes Yes No No No No

MSD_DEM: Source Instance for Global Forecast


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_DEM_SR_INSTANCE_FOR_GLOBAL_FCST 'MSD_DEM: Source Instance for Global Forecast' was created to allow user to specify the instance where global forecast will be uploaded into ASCP. 850484.1

-1 No No No No No No No No No No Yes No No No No

MSD_DEM: Truncate Staging Table


Profile Code Profile Option Name Description MSD MSD_DEM_TRUNCATE_STG_TABLE The profile should be set to No, if both Demantra and SRP are used together. No additional information available - logged documentation bug 12685689 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No Yes No No No No

MSD_DEM: Two-Level Planning


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_DEM_TWO_LEVEL_PLANNING This profile enables demand forecasts at the Product Family level on the basis of sales histories of member items. Destination side profile.

Yes No No No No No No No No No Yes No No No No

MSD_DEM: UOM for fleet flight hours


Profile Code Profile Option Name Description MSD MSD_DEM_FLEET_FLIGHT_HOURS_UOM This is a new profile options added in 12.1.3.6 for Integration of CMRO and EAM with Demantra. Important This feature is under CA and is meant for a specific customer only. For all other customers, they should not use these profiles till the feature is made GA. In 12.2 as well as 12.1.3.6, even though the code is available, it is hidden/disabled in UI out of the box. A new source side profile to specify the UOM/counter that will be used to identify the entry for fleet flight hours in the AHL_FLEET_UTILITZATION (Product CMRO, Entity - Fleet Utilization Data) table. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No Yes Yes No No No No No Yes Yes No No No No

MSD_DEM: Use new Site code format


Profile Code Profile Option Name Description MSD MSD_DEM_SITE_CODE_FORMAT Determines whether new Site code format is used or not. Created Doc bug 12685703 1312493.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No No No No Yes No No No No

MSD_DEM: Version
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_DEM_VERSION Created documentation bug 12685733 . 1061331.1

-1 No No No No No No No No No No Yes No No No No

MSD_SPF: History basis for Failure Rate computation


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSD MSD_SPF_FAILURE_RATE_HIST_BASIS This profile is used to specify the history data that should be used for failure rate computation 1225993.1

-1 No No No No No No No Yes Yes No No No No No No Yes No No No No

MSD_SPF: Organization containing generic BOM for Service Parts Forecasting


Profile Code Profile Option Name Description MSD MSD_SPF_MASTER_ORG This profile is used to specify the master organization for service organizations which will have the generic BOM definition This is for Service Parts Planning forecasting and explosion. Similar to profile used for ASCP planning - MSC: Organization containing generic BOM for forecast explosion - which is used for ASCP planning. 1225993.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No No No No No Yes Yes No No No No No No No No No No No

MSO: Activity Selection Window (in Days)


Profile Code Profile Option Name Description MSO MSO_SDS_SELECTOR_WINDOW This profile option specifies the number of days over which the planning engine groups activities that are candidates for scheduling. The larger the number, the greater the chance of finding an activity that can be scheduled with another activity of the same setup type. Making this number too large might result in demand priorities not being fully respected while scheduling. Valid values are any number. The profile option is used in Days. Default value: 7 Note Reference(s) 415276.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8538729 -1 -1 No No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Additional Demand Slices for Shared Supply Rescheduling


Profile Code Profile Option Name Description MSO MSO_MAX_NUMBER_OF_RESCHEDULES Controls the maximum number of slices to which supply can be rescheduled. VAlid values are: Between -1 and maximum number of slices.

Controls the maximum number of slices to which supply can be rescheduled. Supply is not rescheduled after this maximum even when demand will be delayed. Possible values include: -1 - Reschedule to last slice 0 - Does not reschedule.

For example, if a supply pegs to demand in slice 2, 3, 4, 5, and 6, and the parameter value is 2, supply will reschedule if needed in slice 3 and 4 (rescheduled 2 times, in slice 3 and 4) and will not reschedule in slice 5 and 6. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - 0 739561.1 952924.1 726610.1 747739.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Allow Partial Demand Completion


Profile Code Profile Option Name Description MSO MSO_PARTIAL_DEMAND_COMPLETION Enables supply orders to individually schedule for partial satisfaction of a demand when demand is split across several supply orders. Valid values include: All End Demands - Enable Partial Demand Satisfaction for all independent demands (forecasts,sales orders, and MDS entries). Sales Orders: Enable Partial Demand Satisfaction for all Sales Order demand only. None: Schedules all supplies to coincide with completion date (latest supply date) to meet demand.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

This functionality can be enabled for all independent demands or only for Sales Orders. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine only uses this profile option if its value is All End Demands. Default Value - None 458693.1

-1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Allow Schedule Gaps for Shared Supplies


Profile Code Profile Option Name Description MSO MSO_ENHANCED_RIGHT_JUSTIFY This profile option controls the scheduling of shared supplies (scheduled receipts, firm planned orders, and planned orders with multiple demands pegged to them). Valid values are: Yes - When scheduling shared supplies, the shared supply is moved to the right (moving the schedule date later) during the final scheduling step (to coincide with the start time of downstream supplies) if it would make one of the pegged demands late or later. The shared supply schedule is always right justified if it does not make any pegged demands late or later. When a lower-level shared supply is scheduled for the highest priority demand pegged to it, there may be a gap between the shared supply end date and the start date of the next downstream supply. By not right justifying it, it is more likely to be on time for the lower priority demands in later demand slices which are also pegged to it. Before selecting Yes, consider the setting for MSO: Additional Demand Slices for Shared Supply Rescheduling. If this profile is not 0, shared supplies may be rescheduled and this profile option does not need to be Yes. For example, Demand A with priority 100 and Demand B with priority 500 are in different slices. If the shared supply is late for Demand B, it may still be rescheduled to be on time depending on available capacity and the number of additional demand slices in which it is scheduled. If MSO: Additional Demand Slices is 0 and this profile option is Yes, the planning engine does not right justify the shared supply due date; the shared supply might still be on time for demand B even though it is not rescheduled in a later slice. No - When scheduling shared supplies and moving them to the right (moving the schedule date later), the planning engine does not consider demands in other slices that are not yet unscheduled but pegged to this supply. This yields a schedule with fewer gaps but at the expense of potentially more late demands.

This is a user level profile option. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No

Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No

MSO: Allow Simultaneous Resource To End At Different Time


Profile Code Profile Option Name Description MSO MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODE

Yes/No - Default = No When scheduling simulateous resources, value of Yes can allow these resources to finish at different times. This can cause different resource consumption. Yes may be required when resources are available with different shift times in order to get reasonable plan results. No documentation on this profile.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

837834.1

-1 No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Allow Simultaneous Resources to End at Different Times


Profile Code Profile Option Name Description MSO MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMES This profile is NOT USED. We have two profiles with same name MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODE - MSO: Allow Simultaneous Resource To End At Different Time MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMES - MSO: Allow Simultaneous Resources to End at Different Times -- this profile has 's' at end of name - Times vs Time -- this is description from application - Relaxes the constraint the the principal and simultaneous resources should start and end at the same time Available in 12.1.1 and upwards Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4566790 -1 No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Alternate Process Penalty


Profile Code Profile Option Name Description MSO MSO_SCO_ALT_PROCESS_PENALTY Specifies weight for alternate process objective in optimization. Valid values are: Integer > 0

This is an internal value. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Alternate Resource Penalty


Profile Code Profile Option Name Description MSO MSO_SCO_ALT_RESOURCE_PENALTY Specifies weight for alternate resource objective in optimization. Valid values are: Integer > 0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Alternate Resource Selection Method


Profile Code Profile Option Name Description MSO MSO_SDS_ALTRES_SELECTION Valid values: (1) Rank of Alternate (2) Setup Type Match If Rank of Alternate, ASCP will prefer to load the primary resource if it is available even if it means incurring a setup that could have been avoided by going to the alternate. If Setup Type Match, ASCP will prefer the alternate that is the best option from a setup minimization perspective. If all alternates are equal from a setup perspective, then ASCP chooses the alternate based on rank.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No No No No No No No No No No No No No

MSO: Alternate Source Penalty


Profile Code Profile Option Name Description MSO MSO_SCO_ALT_SOURCE_PENALTY Specifies weight for alternate source objective in optimization. Valid values are: Integer > 0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Apply Windows for Firm Scheduling


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_APPLY_WINDOW_IN_FORWARD_SCHEDULE Currently not used by HLS

No No No Yes No No No No No No No No No No No No No No No

MSO: Avoid non working days for Buy/Transfer order dates


Profile Code Profile Option Name Description MSO MSO_AVOID_NON_WRKNG_DAY_BUY_AND_TFR This profile option applies only when profile option MSO: Use Shift definitions when scheduling lead-times is No. Valid vales are: Yes - The planning engine avoids placing the ship, dock, due dates of buy and transfer orders on non-workdays according to the appropriate calendar. No: The planning engine does not schedule buy and transfer orders with regard to the appropriate calendar.

This profile option does not govern the placement of order dates. If profile option MSO: Use Shift definitions when scheduling lead-times is Yes, the planning engine assumes accurate shift timing. Note Reference(s) 853822.1 1331154.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Barrier Optimizer Algorithm Choice


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_BARALG This profile indicates which starting point algorithm the planning engine when it uses the barrier algorithm to solve an optimization problem. It applies only when multiple threads are used in optimization. Values: 0, 1, 2, or 3 Default value: Null (interpreted as 0)

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3511063 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Batching Precision


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8899964 -1 Yes No No Yes No No No No No No No No No No No No No No No MSO MSO_BATCHING_TYPE Documentation bug 9669424 has been created to include this profile option in the ASCP User Guide.

MSO: Big M Value for SCO


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_BIG_M No longer used in ASCP

Yes No No Yes No No No No No No No No No No No No No No No

MSO: CPLEX Crash Parameter


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_CRAIND Determines how objective coefficients are used to select basis. Values: -1, 0, and 1 Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: CPLEX Refactor Rate


Profile Code Profile Option Name Description Note Reference(s) MSO MSO_CPX_PARAM_REINV Specifies the value of the parameter to control the refactor rate. Values: Integer > 0.

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

3964120 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: CPLEX Scaling Factor


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_SCAIND Contains the scaling factor in the Planning Engine. Values are -1, 0, 1.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: CPLEX messages to screen indicator


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_SCRIND Used for Debugging issues for Supply Chain Optimized Plans Which means plans that have Decision Rules OR Optimization set. Usually specified by Development when additional information in the log file is required for debugging purposes. Valid values: zero = Off and 1 = On Available in 12.1.1 and upwards

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7424573 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Calculate Constraint Exceptions


Profile Code Profile Option Name Description MSO MSO_CALCULATE_CONSTRAINT_EXCEPTIONS Determines whether constraint exceptions are calculated for plans with Enforce Capacity Constraints selected. The planning engine issues an "Order lead time constraint exception" when the lead-time of an order is the cause for a demand being satisfied late or a "Requirement lead time constraint exception" when the lead time of a resource requirement is the cause for a demand satisfied late or a "Material constraint exception" when a demand due date needs to be pushed out due to either a "Lead time violation" or a "Supplier capacity constraint" and if profile option MSO: Calculate Constraint Exceptions is Yes. Values are Yes or No. 214041.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes No No No Yes No No No No No No No No No No No

MSO: Capacity Units Recalculation Threshold


Profile Code Profile Option Name Description MSO MSO_RESOURCE_CONSUMPTION_PERCENTAGE Valid values are: Any Value between 0 and 1

The planning engine schedules supplies in two phases: Backward schedule - From demand due date to see if demand can be met on time. Forward schedule: If the backward schedule results in a late demand, the forward schedule from the plan start date meet demands with minimum lateness.

At the end of the forward schedule phase, the planning engine adjusts the schedule to remove gaps between supplies (right justification). It may move a supply to occur at a time where there are more resource units available that there were in its previously scheduled time. If this profile option is 1, the planning engine considers assigning more resource units to the supply. For example, this profile option is 0.5. The planning engine considers changing the number of resource units if the current capacity units value is less than 0.5 * Max assigned units on the routing for the item. If this profile option is 0, the planning engine does not consider assigning more resource units. This is a user level profile option. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - 0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8745009 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Check Redundant Constraints


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_DEPIND Specifies location and removal of redundant constraints. Values: 0 and 1 Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Choice of supply for substitution


Profile Code Profile Option Name Description MSO MSO_SUPPLY_FOR_SUBSTITUTE Determines which supplies are considered by the Planning Engine for substitution. Determines which supplies are considered by the Planning Engine for substitution. Valid values are: All Supplies (1) Oracle Advanced Supply Chain Planning takes supplies belonging to substitute items even when there is demand for substitute items. Demand priorities drive the allocation. Excess supplies (2) Oracle Advanced Supply Chain Planning takes supplies belonging to substitute items only if it finds that the supply from the substitute item is in excess. Oracle Advanced Planning performs regular netting logic within the Substitution Window and find that excess can be offered for substitution. The native demand satisfaction has priority only within the Substitution Window. After the Substitution Window demand priorities drive the substitution. Oracle Order Promising does not honor this profile option. Oracle Order Promising always honors native demand satisfaction logic Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

B31553-02 Yes No No No No No No No No No No No No No No

MSO: Component offset logic for optimization


Profile Code Profile Option Name Description MSO MSO_SCO_COMP_OFFSET_LOGIC Introduced in 11.5.10 - ASCP Engine/UI rollup #12 Works in tandem with MSO: Postpone Use of Alternates to Latest Possible Time = Yes 1: Component requirement date is put one day before assembly start date. 2: Component requirement date is put on the same date as assembly start date 3: if assembly lead time =0, same result as 2. if assembly lead time >0, same result as 1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5018283 -1 Yes No No Yes No No Yes Yes No No No Yes Yes No Yes No Yes No No No No No No No

MSO: Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During Component Substitution
Profile Code Profile Option Name Description MSO MSO_SCHEDULE_PO_IN_FIFO

Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During Component Substitution Introduced on top of EBS 12.1.2 in one-off patch 9238752 (included in VCP 12.1.2.1) In base release of EBS 12.1.3 Bug 8238752 notes the following: For enabling the Consume PO supplies in FIFO sequence feature the following profiles needs to be set. 1.MSO: Component offset logic for optimization = 2 2.MSO: Schedule PO in FIFO = Yes 3.MSC: Use Optimization Phase Supply Due Dates for Pegging - Yes 4.MSO: Additional Demand Slices for Shared Supply Rescheduling -1 5.MSO: Net All Firm Supplies Before Creating Planned Order - All Supply Types This enhancement was done for a particular customer. They also used some customization scripts for this solution to work. Default Value=No

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning 9238752 -1 No No No Yes No No Yes Yes No

Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No

MSO: Continuous transfer across organizations


Profile Code Profile Option Name Description MSO MSO_MTQ_ACROSS_ORGS Allows you to model continuous or non-continuous transfers across organizations. Valid values are: Yes - Allows continuous transfers across organizations. No: Allows discrete, incremental or non-continuous transfers across organizations.

This feature can also be set at the item/organization level using the Continuous Inter-Org Transfers item attribute. The value specified for the item attribute overrides the profile option setting. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7436622 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Convergent Supplies Consumption Pattern


Profile Code Profile Option Name Description MSO MSO_DEMAND_SPLIT Allows you to fulfill a demand in series or in parallel from multiple supplies from suppliers and/or other organizations. Valid values are: Series - Demand is satisfied in series from multiple supplies. Parallel - Demand is satisfied in parallel from multiple supplies.

Default Value - Parallel Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders
Profile Code Profile Option Name Description MSO MSO_INTER_ORG_DEMAND_SPLIT Allows you to fulfill a demand in series or in parallel from multiple supplies from suppliers and/or other organizations. Valid Values are: Series - Demand is satisfied in series from multiple supplies. Parallel - This is the default value.Demand is satisfied in parallel from multiple supplies.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value: Parallel For supplier sourced orders, use profile option MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced Orders. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. 726610.1

-1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders


Profile Code Profile Option Name Description MSO MSO_INTRA_ORG_DEMAND_SPLIT Allows you to satisfy a demand in series or in parallel from multiple supplies in the same organization. Values are: Series - Demand is satisfied in series from multiple supplies. Parallel - This is the default value. Demand is satisfied in parallel from multiple supplies.

If a component is fed by orders from multiple organizations, the value of profile option MSO:Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders overrides the value of this profile option. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Defaut value: Parallel
Note Reference(s) 726610.1

Bug Reference(s) Document References(s)

9310030 9147919 -1 -1 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center

Global Order Promising

No

MSO: Cost Roll-up incremental factor


Profile Code Profile Option Name Description MSO MSO_SCO_COST_ROLLUP_INCR_FACTOR ASCP Userguide Profile Name: MSO: Incremental factor of internal cost roll up This profile option controls the cost increments used by the internal cost roll up in Oracle Advanced Supply Chain Planning. The cost calculation is: SUM across all components for the assembly [K * Cost of a component * (Usage of the component for the assembly + 0.01)]. K is the value that you set in this profile option. Oracle recommends a minimum value of 1. Valid values are: Number

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - 1 555016.1

-1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence
Profile Code Profile Option Name Description MSO MSO_AGG_SUP_FOR_DMD_IN_PTF

Introduced in ASCP Engine/UI rollup #33 for 11.5.10 Front ported to R12 in CU5 patch 7270650 Fixed in VCP Cum patch 12.1.3.1 and above The Memory Based Planner (MBP) used to create supplies for unsatisfied demands inside PTF on respective dates after considering the FDS. Later on those supplies were moved to PTF date, resulting in more than one supply on PTF date. This would be wrong for some set up. So, we made the code changes to create single supply for unsatisfied demands in PTF. This is now controlled by this profile.
Yes, then one supply is created for unsatisfied demands on the PTF date if all of the following conditions are satisfied: Plan is not constrained with Decision Rules Plan is not optimized.

No, more than one supply may be created for unsatisfied demands on the PTF date.

Available in 12.1.1 and upwards


Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning 7294117 -1 Yes No No Yes No Yes No No No No No No

Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No

MSO: DS Scheduling Window


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_DETAILED_SCHEDULING_WINDOW This was introduced in R12 for DS. It is not being used.

No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Default Forecast Priority


Profile Code Profile Option Name Description MSO MSO_DEFAULT_FORECAST_PRIORITY Contains default priority value for forecasts and is used by the Scheduling Engine to determine when to schedule the forecast. Can be defined at the site level. Valid values are: Integer > 0.

Note Reference(s)

Default Value - 100000. 147220.1 296941.1

Bug Reference(s) Document References(s)

-1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Default Idle Time Tolerance (Hours)


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_IDLE_TIME_TOLERANCE No Documentation on this profile.

No No No Yes No No No No No No No No No No No No No No No

MSO: Default Resource Sequencing Window (in Days)


Profile Code Profile Option Name Description MSO MSO_SETUP_CYCLE_FOR_HLS_SDS After the planning engine select an unscheduled activity from the activity selection window specified by MSO: Activity Selection Window (Days), this profile option specifies the number of days from the pegged demand date over which the planning engine can look for another activity of the same setup type to schedule the activity with and achieve a good sequence on the resource. This profile option number can be overridden by resource level settings made in the Departments: Resources screen in the source system. The large this number, the longer the time spent by the resource on a setup type before changing over to the next setup type. Valid values: any number Default value: 7 (days) 415276.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 No No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Default Sales Order Priority


Profile Code Profile Option Name Description MSO MSO_DEFAULT_SO_PRIORITY Contains default priority value for sales orders. Used by the Scheduling Engine to determine when to schedule a sales order. Can be defined at the site level. Valid values are: Integer > 0.

Default Value - 10000. Note Reference(s) 296941.1 147220.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Default Timestamp Safety Stocks


Profile Code Profile Option Name Description MSO MSO_DEFAULT_TIMESTAMP_SFTSTCK The planning engine uses this profile option value to determine when safety stock supplies are due. The timestamp value applies to the safety stock requirements from Oracle Inventory, Oracle Inventory Optimization, Oracle Material Requirements Planning, and Oracle Advanced Supply Chain Planning. Valid values are: Beginning of Day - Supplies must be available at 00:00.Set this option if you want to use timestamps that match safety stock requirements from Oracle Inventory Optimization. End of Day: Supplies must be available at 23:59.Set this option if you want to use timestamps that match safety stock requirements from Oracle Inventory or Oracle Material Requirements Planning.

Default Value - Beginning of Day Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No

MSO: Default Timestamp for Forecasts


Profile Code Profile Option Name Description MSO MSO_DEF_TIME_FCST Determines the forecast timestamps that ASCP uses to plan. The timestamp denotes the time by which supplies to meet the demand must be available to be considered on time E - End of Day (23:59) B - Beginning of Day (00:00) R - Retain Timestamp of Salesorders Note Reference(s)

1331154.1 Bug Reference(s) 6273866 3198606 7460229 3573179 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 -1 Yes No No Yes Yes No No No No No No No No Yes No No No No No

Document References(s)

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Default Timestamp for Sales Orders


Profile Code Profile Option Name Description MSO MSO_DEF_TIME_SO This profile option determines the sales order line timestamps that Oracle Advanced Supply Chain Planning uses to plan. The timestamp denotes the time by which supplies to meet the demand must be available to be considered on time: Values are: B - Beginning of Day: Supplies must be available at 00:00. E - End of Day: Supplies must be available at 23:59. R - Retain Sales Order Timestamps: Supplies must be available at the timestamp on the sales order line.

The sales order demand due timestamp does not affect forecast consumption because forecast consumption is done in daily buckets. This profile option does not apply to forecasts. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4120214 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Default Value for Maximum Acceptable Days Early


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_DEFAULT_MAX_EARLY_DAYS No information on this profile

No No No Yes No No No No No No No No No No No No No No No

MSO: Delay Fulfillment of Small Demands


Profile Code Profile Option Name Description MSO MSO_RESPECT_SUPPLY_TOLERANCES Use this profile option to enable the planning engine to delay fulfilling a small demand until it has a later larger demand. Valid values are: Yes - set the item attribute Unsatified Demand Factor on each item whose small demands you want delayed. No

Note Reference(s)

Default Value - No 1068297.1 749448.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Demand Size Tolerance Before Splitting Planned Orders


Profile Code Profile Option Name Description MSO MSO_SPLIT_PO_THRESHOLD Creates a threshold percentage that causes Planned Orders to split prior to scheduling (if the remaining unallocated quantity of a planned order is greater than the remaining unallocated quantity of the pegged demand). Not used if order modifiers exist for an item and not used in a project planning environment. Valid values are: Positive decimal quantities (.5 is interpreted as 50%).

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - NULL 739561.1 1068297.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Demand Type Priority


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4573393 -1 No No No Yes No No No No No No No No No No No No No No No MSO MSO_DEMAND_TYPE_PRIORITY Appears to be unused according to the Oracle Advanced Supply Chain Planning Implementation and Users Guide

MSO: Demand Window Size


Profile Code Profile Option Name Description MSO MSO_DEMAND_WIN During priority pegging, demands are sorted based on the demand priority within the demand window. After these demands are fully pegged, Oracle Advanced Supply Chain Planning sorts all demands in the next window by priority. This is stated as the number of calendar days including nonworkdays. With a value of 10, the first demand window is between the start date of the plan or the first demand date +10 days. Valid values are: Integer >= 0

Default Value - NULL (1) Note Reference(s)

Bug Reference(s)

Document References(s)

8264328 2764894 8264323 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Disable Inference of Item Substitution Relationship


Profile Code Profile Option Name Description MSO MSO_NO_INFER_IN_ITEMSUBST Use this profile option to instruct the planning engine whether to infer end item substitution relationships. Valid values are: Yes - Do not infer item substitution relationships No/Null - Do infer item substitution relationships

Note Reference(s)

Default Value - Null 1068297.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6901454 -1 -1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Divergent Supply Feeding Pattern


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SUPPLY_SPLIT Not used.

4573393 -1 Yes No No No No No No No No No No No No No No

MSO: Divergent Supply Feeding Pattern for InterOrg and Supplier Sourced orders
Profile Code Profile Option Name Description MSO MSO_INTER_ORG_SUPPLY_SPLIT Allows you to fulfill multiple downstream demands in parallel or in series by a supply from another internal organization. Values are: Series With MTQ Only - This is the default value. A supply always feeds multiple demands in series when a corresponding MTQ has been specified. Series - Supply feeds multiple demands in series.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value: Series With MTQ Only
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Divergent Supply Feeding Pattern for IntraOrg Sourced orders


Profile Code Profile Option Name Description MSO MSO_INTRA_ORG_SUPPLY_SPLIT Allows you to fulfill multiple downstream demands in parallel or in series by a supply in the same organization. Values are: Series With MTQ Only - This is the default value. A supply always feeds Multiple demands in series when a corresponding MTQ has been specified. Series - Supply feeds multiple demands in series.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

8675345 9147919 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Dual Simplex Parameter


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_DPRIIND Gradient parameter for dual simplex. Values: 0, 1, 2, 3, and 4 Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: EDD Demand Cutoff Priority


Profile Code Profile Option Name Description MSO MSO_EDD_DEMAND_CUTOFF_PRIORITY For an (ECC) plan, we can Enforce Due Dates (EDD) for some sales order demand based on priority So if you have sales order priorities, and want all priority 1 and 2 to be planned as EDD, then set the profile value = 3 This will override constraints, and plan these orders as EDD. This can cause overloads in resources and also for supplier capacity. This is a hidden profile in 11.5.10, but can be defined manually in Application Developer In R12, this is seeded profile. This is available in 12.1.1 and upwards as well.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4572101 -1 Yes No No Yes No No No Yes No No No No No No No No No No No

MSO: EDD Scheduling Window Control


Profile Code Profile Option Name Description MSO MSO_EDD_SCHEDULING_WINDOW_CONTROL This profile option is applicable to constrained plans with enforce demand due dates. The planning engine calculates an actual scheduling window for each resource activity and supply. Valid values are: Number between 0 and 1

The actual window is defined by the dates: Latest Possible completion time (LPCT) - Determined by the start time of downstream activities that have already been scheduled. Earliest Allowable Completion Time (EACT) - Calculated by the planning engine which accounts for the unscheduled upstream activities and how much time those activities need.

If this profile option is the default value, the planning engine uses the calculated EACT. If this profile option is lower than the default value, the planning engine uses an earlier EACT than the calculated EACT which gives the activity a larger scheduling window. If this profile option is higher than the default value, the planning engine uses a later EACT than the calculated EACT which gives the activity a smaller scheduling window. This is a user level profile option. Default Value - 0.5 Note Reference(s) 259322.1

Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Enable Advanced Sequencing


Profile Code Profile Option Name Description MSO MSO_GLOBAL_SDS_FLAG

Valid values: Yes/No Default value: No The planning modes Constrained (Without Detailed Scheduling) and Constrained (With Detailed Scheduling) are available when the value of this profile option is set to Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5233140 -1 No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Enable Cost Rollup for Optimization


Profile Code Profile Option Name Description MSO MSO_SCO_COST_ROLLUP This profile specifies where the optimization engine looks for costs during cost-based optimization. Valid values are: No: Use user-provided costs from the source system Yes: Use costs from the internal cost rollup

Default value = NULL (No) Will be used if the Optimization Flag is checked in Plan Options. When Yes, it is possible that internal cost rollup may take some time and impact performance.
Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No

MSO: Enable Decision Rules


Profile Code Profile Option Name Description MSO MSO_ENABLE_DECISION_RULES The profile option enables User Defined Decision Rules. Valid values are: Yes - Use the user-defined decision rules. No - User defined decision rules are not allowed.

The Plan Options tab, Decision Rules, is disabled. If you select No, you can duplicate the functionality of the decision rule Use Alternate Sources parameter for buy items but not for transfers from other organizations; set profile option MSC: Enable Enhanced Sourcing to Yes. Default Value - No Note Reference(s)

214041.1 225876.1

267399.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Enable Hard Links Globally


Profile Code Profile Option Name Description MSO MSO_GLOBAL_HARD_LINK_FLAG Valid values are: Yes - hard links in the code are not disabled No - disable the hard links in the code.

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5067925

No No No No No No No No No No No No No No No

MSO: Enable Rounding of Fractional Supplies For Service Planning


Profile Code Profile Option Name Description MSO MSO_ENABLE_ROUNDING_OF_FRACTIONAL_SUPPLIES_FOR_SRP

Enables rounding of fractional supplies and demands and allocated qty after 1-to-1 splitting based on pegging for SPP Valid values are: Y - By rounding the orders we are going to update the data from the pegging, supplies and demands table. Rounding is process that round up to the nearest integer the fractional order quantities. N - If the profile is not specified the order quantities are NOT rounded up (default behavior)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6834025 -1 No No No No No No No Yes No No No No No No No No No No No No

MSO: Enable sourcing split for end item substitution


Profile Code Profile Option Name Description MSO MSO_SRC_SPLIT_FOR_SUBS

When using End Item Substitution, for Rank 1 sourcing rules with split sourcing %, this profile must be set to enforce the sourcing split. Valid values: Yes/No Default value: No Not supported on Rank 2 of the sourcing rule.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6430766 9486069 -1 -1 Yes No No Yes No No Yes Yes No No No Yes Yes Yes Yes No Yes No No No No No No No

MSO: Enforce Minimum Transfer Quantities


Profile Code Profile Option Name Description MSO MSO_GLOBAL_MTQ_FLAG

Valid values : Yes/No Default value = Yes If set to Yes : The downstream process starts after a minimum quantity from the upstream process has been completed. The material transfer is continuous after the Minimum Transfer Quantity is completed. No documentation on this profile. However, you can find information about "Minimum Transfer Quantity" (MTQ) in ASCP guide (Page 6-79) This is linked to MTQ setups for resources and routings. This should be No, unless you have specific MTQ setups that must be enforced.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6650688 9409110 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Enforce Resource Sequence Contiguity


Profile Code Profile Option Name Description MSO MSO_ENFORCE_RESOURCE_SEQUENCE_CONTIGUITY Controls contiguity constraints between resource activities within an operation. Valid values are: Yes - Resource activities within the same operation are scheduled contiguously in time. The end of the preceding activity exactly lines up with the start of the current activity and the end of the current activity exactly lines up with the start of the next (if there is MTQ specified, the activities may also overlap). No: The contiguity constraint is relaxed and in certain cases, the chances of obtaining feasible schedules improved.

Default Value - No Note Reference(s) 562872.1 259322.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Firm Purchase Orders Within Time Fence


Profile Code Profile Option Name Description MSO MSO_FIRM_PURCHASE_ORDER_WITHIN_PTF Indicates whether or not the planning engine should firm those purchase orders that are within the time fence. Valid values are: Yes - Firms purchase orders that are within the time fence. No - The planning engine does not reschedule the non-firm purchase orders that have dock dates within the Planning Time Fence. The planning engine does not reschedule or cancel recommendations even if there are conditions for reschedules and cancellations.

Note Reference(s)

370386.1 365112.1

Bug Reference(s) Document References(s)

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Firm Requisitions Within Time Fence


Profile Code Profile Option Name Description MSO MSO_FIRM_REQ_WITHIN_PTF Indicates whether or not the planning engine should firm those requisitions that are within the time fence. The valid values are: Yes: Firms requisitions that are within the time fence. No: The planning engine does not reschedule the non-firm purchase requisitions that have dock dates within the Planning Time Fence.

Note Reference(s)

The planning engine does not reschedule or cancel recommendations even if there are conditions for reschedules and cancellations. The planning engine uses the start date of the receiving organization as the reference for internal requisitions. Default : No 555016.1 1079681.1 1068297.1 365112.1

Bug Reference(s) Document References(s)

8709703 -1 -1 -1 -1 -1 Yes No No Yes Yes No No No No No No Yes No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Firm Supply Allocation Window (Backward days)


Profile Code Profile Option Name Description MSO MSO_FIRM_SUPPLY_ALLOC_WIN The allocation of firm supplies to demands is based on demand priorities within the Firm Supply Allocation window. Set this window using system level profile options. This window is derived dynamically for each demand; it starts with the demand due date and goes backwards to the window size. This is stated as the number of calendar days including non-workdays. Valid values are: Integer > 0

Default Value - 1 Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4688250 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Firm Supply Allocation Window (Forward days)


Profile Code Profile Option Name Description MSO MSC_FIRM_SUPPLY_FWD_FENCE The allocation of firm supplies to demands is based on demand priorities within the Firm Supply Allocation window. Set this window using system level profile options. This window is derived dynamically for each demand; it starts with the demand due date and moves forwards to the window size. This pegs demands to firm supplies that are scheduled after the demand date. After searching backward, it searches forward by the number of days set by this profile option, pegging the supply with the nearest (earliest) schedule to the unallocated demand quantity. This can cause supplies to be late for the demand due date. This is stated as the number of calendar days including non-workdays. To use this feature, set profile option MSO: Net All Firm Supplies Before Creating Planned Orders to Yes. Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Firm Work Orders/Operations Within Time Fence


Profile Code Profile Option Name Description MSO MSO_SCHEDULE_FIRMED_BEFORE_PTF Used for both constrained and unconstrained plans. Valid values are Yes - all operations of an order with start dates in the Planning Time Fence are treated as firm. Any operation with a start date outside of the Planning Time Fence is not considered firm and can be moved. No - operations with start dates in the Planning Time Fence can be rescheduled out.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Floating Point Precision


Profile Code Profile Option Name Description MSO MSO_FLOATING_POINT_PRECISION

There is a documentation bug : The documentation says that this profile is replaced by profile MSO: Floating Point Precision for Order Quantities - but this does not exist. This (Floating Point Precision) is the correct profile name - Refer to the documentation for MSO: Floating Point Precision for Order Quantities and use this profile instead. Number > 0 Default = 100 Internal multiplier for order quantities. Can change the value depending on precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled by the machine.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Floating Point Precision for Increments of Shift Start/End Times Within a Planning Bucket
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_HLS_SHIFT_INC_PRECISION Could not find in the User guide.

Yes No No No No No No No No No No No No No No

MSO: Floating Point Precision for Order Q


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_HLS_ORDER_QUANTITY_PRECISION Not used. Replaced by profile option MSO: Floating Point Precision for Order Quantities

Yes No No No No No No No No No No No No No No

MSO: Floating Point Precision for Planning Bucket Efficiency


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_HLS_GRANULAR_PRECISION This has been changed to MSO:HLS Granularity Precision.

Yes No No No No No No No No No No No No No No

MSO: Floating Point Precision for Transportation Capacities (Volume)


Profile Code Profile Option Name Description MSO MSO_HLS_TRANS_VOLUME_PRECISION Internal multiplier for transportation lane capacities by volume, by day. Can change the value depending on precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled by the machine. See 'Floating Point Precision, page A-2 of ASCP User guide for more information. Valid Values: Number>0 Default Value: 100 If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Floating Point Precision for Transportation Capacities (Weight)


Profile Code Profile Option Name Description MSO MSO_HLS_TRANS_WEIGHT_PRECISION Internal multiplier for transportation lane capacities by weight, by day. Can change the value depending on precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled by the machine. See 'Floating Point Precision, page A-2 of ASCP User guide for more information. Valid Values: Number>0 Default Value: 100 If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5173359 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Floating Point Precision for Usage in Routings


Profile Code Profile Option Name Description MSO MSO_HLS_USAGE_PRECISION Internal multiplier for order quantities. Can change the value depending on precision desired. Verify that the product of the floating point precision and the number does not exceed the maximum integer size handled by the machine. See 'Floating Point Precision, page A-2 of ASCP User guide for more information. Valid Values: Number>0 Default Value: 100 If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. 560505.1 579204.1 224112.1

Note Reference(s)

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Generate Compression Days Exception


Profile Code Profile Option Name Description MSO MSO_GENERATE_COMPRESSION_EXCEPTION Use this profile option to control issuance of exception message Orders with compression days. Valid values are: Yes - Issue the exception message No - Do not issue the exception message

The planning engine issues exception message Orders with insufficient leadtime when it schedules orders for less time than their assembly's lead-time. If the reason for that scheduling is that the planning engine would schedule the order in the past, it also issues exception message Orders with compression days. To avoid seeing both these exceptions for the same order, select No for this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Generate Compression/Firming Exceptions for Orders in Progress


Profile Code Profile Option Name Description MSO MSO_GENERATE_COMPRESSION_FIRMING_EXCEPTIONS When set to No, the planning engine does not issue the following exception messages for firm orders whose start date is in the past (after applying the lead time offset to the due date). Valid values are: Order with Insufficient Lead Time Order is Firmed Early

The planning engine assumes that these orders are in progress and on time: Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes No No No No No No No No No No No No No No No

MSO: Generate Reduced Model


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_ENABLE_REDUCED_MODEL Generate Reduced Model in Optimization

No No No No No No No No No No No No No No No

MSO: Generate Shared Supply Exceptions


Profile Code Profile Option Name Description MSO MSO_GENERATE_SHARED_SUPPLY_EXCEPTIONS MSO: Generate Shared Supply Exceptions Values: Yes/No No: The planning engine schedules demands in slices; each slice contains a set of demands in a time period. Sometimes, a supply is pegged to two demands (shared supply) that are each in different slices. If these two slices are separated by more slices than the value of profile option MSO: Additional Demand Slices for Shared Supply Rescheduling, the planning engine does not reschedule the shared supply in the earlier slice when it schedules the demand in the later slice. It is possible that the demand in the later slice is satisfied late because the planning engine did not reschedule in (earlier date) the supply in the earlier slice. Yes: The planning engine issues a Shared Supply Scheduled Late exception message when this occurs. If this profile option is No, the planning engine does not generate the exception message. This is a user level profile option.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Global Batchable Flag


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_BATCHABLE_FLAG Enables resource batching functionality for order scheduling.

B31553-02 Yes No No No No No No No No No No No No No No

MSO: Global Chargeable Flag


Profile Code Profile Option Name Description MSO MSO_CHARGEABLE_FLAG This profile option controls whether Oracle Advanced Supply Chain Planning schedules resource charges. Yes: the planning engine schedules charges for chargeable resources. No, chargeable resources are considered as item basis an no individual charges are scheduled.

Material flows and resource loads are not influenced by charge quantities. Valid values: yes/no Default value: no Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide No No No Yes Yes No No No No No No No No No No No No No No

MSO: Global Time Limit


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_TILIM Parameter used to set global time limit for halting optimization. Values: Number > 0.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: HLS flat files path


Profile Code Profile Option Name Description MSO MSO_HLS_FLAT_FILES_PATH Specifies the directory to store the Planning Engine debugging data files. Valid Values: Text Default Value: Null

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Hard link scheduling window


Profile Code Profile Option Name Description MSO MSO_HARD_LINK_SCHEDULING_WINDOW

This profile option specifies the time window within which ASCP tries to schedule a set of operations linked together through hard links.If scheduling is unsuccessful,overloads are created. This is a hidden profile option used by development. This defines the scheduling window within which the system schedules the hard-linked operation set. Increasing the window gives room to schedule operations with hard links without overloading. Based on the number of operations per hard linked operation set,increasing this value can have a performance impact. Valid Values : Integer Default value 30

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No No No No No No No No No No

MSO: Hard link scheduling window expansion factor


Profile Code Profile Option Name Description MSO MSO_HARD_LINK_SCHEDULE_WINDOW_FACTOR This hidden profile option used by development is used to limit the propagation for the hard linked operation set. Normally, we limit the propagation by a factor of (This profile option value * Minimum duration of hard linked operation set). Valid Values: Integer Default Value: 10

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No No No No No No No No No No

MSO: Heuristic type


Profile Code Profile Option Name Description MSO MSO_HEURISTIC_TYPE Determines which heuristic to use. The look-ahead heuristic reserves time for lower priorities so the schedule begins with the tasks of higher priorities. This is a site level profile option. Valid Value: Look Ahead Default Value Look Ahead

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Incremental Planned Orders


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SUPPLIER_DEMAND_SPLIT No documentation found.

Yes No No No No No No No No No No No No No No

MSO: Internal Demand Aggregation Within Optimization


Profile Code Profile Option Name Description MSO MSO_SCO_INT_DMD_AGGR This profile specifies how the optimization engine should prioritize independent demands. Valid values are: Yes: Prioritize by date. This value improves optimization engine performance. No: Prioritize by demand priority

Bug 9587814 shows that cusotmer had plan using 12gb of memory and by setting this profile = Yes, the plan only used 5gb of memory
Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

9587814 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No Yes Yes Yes No No No No No No No No No No

MSO: Inventory Carrying Costs Percentage


Profile Code Profile Option Name Description MSO MSO_CARRYING_COST_PCT Specifies inventory carrying costs percentage for all items in the plan. Can be defined at the site level. You can update this value. The inventory carrying cost is a percent (if the user enters 10, the value is 10%). A percentage between 0 and 100.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

6863019 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes Yes No No No No No No No No No No No No No No

MSO: JIT Selector Window Size


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SELECTOR_JIT_WINDOW_SIZE No information on this profile

No No No Yes No No No No No No No No No No No No No No No

MSO: LP Constraint Batch Size


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CONSTRAINT_BATCH_SIZE Not used.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No No No No No No No No No No No No No

MSO: LP Markowitz Coefficient


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_EPMRK Sets the Markowitz Coefficient. Values: Number between 0.0001 and 0.99999 Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: LP Optimization Algorithm


Profile Code Profile Option Name Description MSO MSO_LP_ALGORITHM Determines which optimization algorithm is used. Can be defined at the site level. This is Automatic Calculations. When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. Valid Values: 0: Primal simplex 1:Dual simplex 2: Hybrid barrier primal 3: Hybrid barrier dual

Default Value:0 If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No Yes Yes No No Yes Yes No No No No No No No No No No No No

MSO: Late Demands Exceptions Tolerance Minutes


Profile Code Profile Option Name Description MSO MSO_LATE_DMD_EXC_TOL_MIN This profile option is used by constrained plans. Sets the value in minutes for a window during which the planning engine does not issue exception messages for late demands. Use it particularly in cases where demands are only a few minutes or a few hours late. The value that you enter is used based on a 24 hour, 7 day per week calendar. For example, enter 1440 minutes (24 hours) for this profile option. A demand due at 15:00 on Tuesday does not cause late demand exception or diagnosis information as long as the supplies are complete by l5:00 on Wednesday.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No Yes No No No No No No No No No No No

MSO: Lead Time Control


Profile Code Profile Option Name Description MSO MSO_LEAD_TIME_CONTROL

Violate Minimum Processing Times to Meet Demand Due Date: The planning engine meets the demand due date even if it compresses operations and supplies beyond their minimum durations (from item lead-times and routing usages). -- This setting can violate the Planning Time Fence settings for an item. -- It can also violate a Natural Time Fence created by using profile MR: Create Time Fence = Yes Do Not Violate Minimum Processing Times: The planning engine respects the minimum durations of operations and supplies (from item lead-times and routing usages) even if it satisfies demands late. Default Value: Violate minimum Processing Times to Meet Demand Due Date This, sometimes, used with plan option - Enforce Purchasing Lead-times Constraint and can change planning engine behaviour. In 11.5.10, this profile is only for EDD - Enforce Demand Due Dates plan In 12.0.4 and above, this profile works for BOTH EDD and ECC - Enforce Capacity Constraints plans.

Note Reference(s)

399888.1 850591.1 443357.1

Bug Reference(s) Document References(s)

-1 -1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning

All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No Yes Yes No No No Yes No Yes Yes No Yes No No No No No No No

MSO: List Size for Pricing Candidates


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_PRICELIM Parameter to set the list size for pricing candidates. Values: Integer > 0.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Lookahead days to net co-product/by-product supplies before creating planned orders
Profile Code Profile Option Name Description MSO MSO_CO_LOOKAHEAD_WINDOW Profile no longer used in the application. Will be removed from UI in a future release. Was originally available in 11.5.8 and removed in 11.5.10. accidentally included in R12 Note Reference(s) 111.1

Bug Reference(s) Document References(s)

5462273 3631110 -1 -1 -1 No No No Yes No No Yes Yes No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Max Gap Tolerence on SDS


Profile Code Profile Option Name Description MSO MSO_MAX_GAP_TOLERANCE_ON_SDS Per bug 8538729 this profile is not currently used.

**Begin PM Update This profile was introduced in R1 for DS. Not used anymore **End PM Update Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No No No No No No No No No No

MSO: Maximium Number of Prepones


Profile Code Profile Option Name Description MSO MSO_MAXIMUM_PREPONES Scalability factor for the Scheduling Engine. The Scheduling Engine attempts to schedule the operations in different orders to find a solution. Limits the number of times the Scheduling Engine attempts to schedule an operation.If there are many components for some items or many small supplies answering a demand, the number of orders is larger; reduce this parameter. Valid values are: Integer > 0

Can be defined at the site level. This profile is automatically calculated,this means that the Planning Engine determines the default value of this profile option. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Default Value - 10 If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximize Search of Availability Intervals


Profile Code Profile Option Name Description MSO MSO_MAXIMIZE_SEARCH_OF_AVAILABILITY_INTERVALS Enhances the capability of the scheduling engine to accurately identify pockets of available time where resource activities can be feasibly scheduled. Valid values are: Yes - Maintains a detailed picture of the Resource Profile while scheduling. Resource Profile refers to the time varying picture of requirements and availability. The maintenance of this detailed picture causes the planning engine to miss fewer valid slots for scheduling activities than otherwise. No - Detailed Resource Profile is not maintained.

Default Value: Yes

If you need to change the default value of this profile in your installation, it is recommended that you consult with Oracle Development before doing so. You can set this option if you receive the Requirement causes resource overload exceptions in the Planner Workbench in Enforce Capacity Constraints Plans. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. 841308.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in Optimization


Profile Code Profile Option Name Description MSO MSO_SCO_MAXIMIZE_POWO Optimization phase of the engine has the capability to evaluate the use of new planned orders versus using partial supplies from scheduled receipts. If you set it to 0 (Zero) engine may create new planned orders while scheduled receipts exist. Ex: you have demand of 10 units and you have a W/O or PO of 100 units, engine will create new supply for 10 units versus using 10 units ut of 100 units of scheduled receipts and carrying the 90 units. This decision might be taken as it is cheaper to produce than to carry extra inventory. If you set it to 1, the engine will use existing supplies and decide to carry the un used portion of the supplies from W/O or a PO. Continuing the example, Engine will use 10 units of supply out of 100 and decide to carry the rest of the 90 units instead of creating new supplies. This might not be cost effective.

Note Reference(s) 567317.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 4006732 -1 -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No

MSO: Maximum Activity Duration


Profile Code Profile Option Name Description MSO MSO_HLS_ACTIVITY_DURATION_MAX Defines the Planning Engine maximum activity duration in days.All requirements should be less in duration than this. If null, the planning horizon duration is used. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Valid Values: Number>0 Default Value: by Automatic Calculations 179406.1 1327805.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximum Allowable Days Late


Profile Code Profile Option Name Description MSO MSO_MAX_DAYS_LATE Limits the number of days by which a demand or unfirmed scheduled receipt can be moved out when optimization is turned on. This value is used only to improve performance and reduce the size of the plan for the optimization component of the Planning Engine. Scheduling moves demands and unfirmed scheduled receipts out as long as necessary. Valid values are: Integer > 0

Can be defined at the site level. Note: Set this to a number as large as the typical planning horizon to avoid unusual results. Default Value - 300 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Maximum Allowable Days Late before Forecast Expiration


Profile Code Profile Option Name Description MSO MSO_MAX_FCST_LATE_DAYS Oracle Advanced Supply Chain Planning uses this profile option when planning supplies for forecast scenarios from Oracle Demand Planning, master demand schedule forecasts, and manual master demand schedule entries. When a forecast or master demand schedule entry cannot be completely satisfied within the allowable days late, the planning engine does not plan supplies for the quantity that is late by this many days. The profile option does not apply to sales orders. Valid values are: Interger > 0

Default Value - Null Note Reference(s) 859179.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8801111 -1 -1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Maximum Alternate Combinations


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_ALT_COMBINATIONS Does not appear in any manual,

No No No No No No No No No No No No No No No

MSO: Maximum Demands Per Group for Advanced Sequencing


Profile Code Profile Option Name Description MSO MSO_NUMBER_OF_DEMAND_PER_GROUP_FOR_SDS The profile option specifies the number of demands that are grouped together for scheduling. The larger this number, the greater the chances of obtaining good sequences on the resources. Making this number too large might result in demand priorities not being fully respected while scheduling. Valid values are: Any number

Default Value - 1 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No No No No No No No No No No

MSO: Maximum Demands per Group


Profile Code Profile Option Name Description MSO MSO_DEMANDS_PER_GROUP Determines the maximum number of demands that can be grouped together for scheduling. Within a group, the default heuristic can try different orders among the demands. Valid values are: Integer > 0, smaller than the size of a slice

Default Value - 5 Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2829066 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximum Demands per Slice


Profile Code Profile Option Name Description MSO MSO_DEMANDS_PER_SLICE Determines the number of demands in a slice. Enables the Scheduling Engine to resolve interactions of demands within a slice. Supplies shared between demands are scheduled better when the demands are in the same slice. However, slices that are too large slow down the Scheduling Engine use more memory. Valid values are: Integer >= 0

Default Value - 100 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximum Inventory Level % of Safety Stock


Profile Code Profile Option Name Description MSO MSO_MAX_INV_LEVEL Use this option to specify maximum inventory levels. If no other method of calculation is defined for an item-organization maximum inventory level, the levels are based on the specified percentage of the safety stock level. Valid values are: Note Reference(s) Percentage between 0 and 100

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 MSO: Target Inventory Level % of Safety Stock Yes No No Yes No No No No Yes No No No No No No No No No No

MSO: Maximum Lead Time Factor


Profile Code Profile Option Name Description MSO MSO_MAX_LEAD_TIME_FACTOR As per Bug#2953151 not used any more. This is used by the scheduling engine. This is the fraction of the overall horizon length, within which the backward pass restricts looking for resources to fit the schedule. If this cannot be scheduled within this fraction of the overall horizon length, it is forward scheduled. The value is specified as a number between 0 to 1. This profile option can be defined at the site level. You can update this value. The default value is 1 167239.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No No No No No No No No No No No No No

MSO: Maximum Number of Demands in a Hard Linked Demand Set


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6818322 -1 No No No Yes No No No No No No No No No No No No No No No MSO MSO_MAX_DEMANDS_PER_HLK_DEMAND_SET Value specified in number of demands. Default value is 1, indicating no upper limit. This is a hidden profile option.

MSO: Maximum Number of Pull for Operation


Profile Code Profile Option Name Description MSO MSO_MAX_PULL_OPERATION When an operation cannot be scheduled on a certain day, the scheduling engine attempts to schedule it on an earlier date (for backward scheduling). This profile option controls how many days are tried in this manner. Many days result in lower performance. Valid values are: Integer > 0

Can be defined at the site level. This profile is automatically calculated, this means that the Planning Engine determines the default value of this profile option. Default Value - 8 If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support.
Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Maximum Number of Pushes for Operation


Profile Code Profile Option Name Description MSO MSO_MAX_PUSH_OPERATION When you are running constrained plans with the Enforce Capacity Constraints plan option checked,this profile option controls the number of attempts made to schedule a resource activity feasibly. Valid values are: -1 - Continues the search for available capacity till the end of the planning horizon. Integer > 0 - The number that you specify here determines the number of attempts that the planning engine makes to schedule the activity. For example, if you set the profile option to 5, the planning engine makes 5 attempts to schedule the activity feasibly, and after that schedules the activity with an overload. The spot chosen to schedule the activity with overload is the initial spot that was tried.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Maximum Operations Per Slice


Profile Code Profile Option Name Description MSO MSO_HLS_MAX_OPERATIONS_PER_SLICE Determines the number of operations which can be scheduled in a slice. Limits the problem size in a slice and can be a limiting factor in determining the number of demands that can be scheduled in a slice. Oracle recommends that you use a large value such as the default value. If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. Valid Values: Integer>0 Default Value: 3000 operations 747739.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximum Resource Over-capacity


Profile Code Profile Option Name Description MSO MSO_MAX_EXCESS_RESOURCE_UNITS Assigns resource slacks when it does not find the resource available and it is forced to use slacks. The Scheduling Engine initiate the resource slack from 0 to maximum assigned units and will jump to this number if no solution is possible. This limits the number of tries to assign the resource slack. Valid values are: Number > 0

Can be defined at the site level. This is automatic Calculated profile. When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. Default Value - 5 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximum Simplex Iterations


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_ITLIM Parameter to set the maximum number of simplex iterations. Values: Integer > 0

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Maximum number of pulls/push for hard linked operations


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_MAX_PUSH_PULL_FOR_HARD_LINKS This hidden profile option is not used.

No No No No No No No No No No No No No No No

MSO: Minimize Supply Duration


Profile Code Profile Option Name Description MSO MSO_MIN_SUPPLY_LEAD_TIME_BY_LEFT_JUSTIFY Valid Values: 1. Yes 2. No This is a profile to compress supply durations. It was introduced in R12. Default value: Yes

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Minimum Processing Lead Time Adjustment Factor


Profile Code Profile Option Name Description Note Reference(s) MSO MSO_MIN_PROC_LEAD_TIME_ADJ_FACTOR Not available in user guide. 564241.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Multiplier To Derive Supply Allocation Window


Profile Code Profile Option Name Description MSO MSO_FIRM_SUPPLY_MULTIPLIER You can set the Firm Supply Allocation window using the profile option MSC: Firm Supply Allocation Window or you can use the manufacturing lead-time and the profile option MSC: Multiplier to Derive Firm Supply Allocation Window. If you specify any value for the latter profile option, the information you enter for MSC: Firm Supply Allocation Window is ignored. If the product of this multiplier and cumulative manufacturing lead-time is a fractional quantity, the number is rounded up to the next integer. Formulas for the item-specific firm supply allocation window: Make item: Cumulative manufacturing lead-time * MSO: Multiplier to derive supply allocation window. Buy item: Processing lead-time * MSO: Multiplier to derive supply allocation window.

Valid Value: Number >= 0. Default Value: Null. Note Reference(s) 1068297.1 Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Net All Firm Supplies Before Creating Planned Order


Profile Code Profile Option Name Description MSO MSO_FIRM_B4_PO Nets all firmed supply available in any future period before creating new planned orders. The profile option treats firmed planned orders the same as real supplies. The values are: 0 - No: Does not net firm supplies before creating planned orders. 1 - All Supply Types: Net all firm supplies before creating planned orders. This includes work orders, purchase orders, transfer supplies and firm planned orders for these supplies. 2 - Only for Work Orders: Net only firm discrete jobs before creating planned orders.

3 - Only for Purchase and Transfer Supplies: Net all firm purchased and transfer supplies before creating planned orders. 4 - All Supply Types Including by-product/co-product supplies: Nets all firm supplies (including by-product and coproduct supplies) before creating planned orders. The planning engine does not reschedule by-product and coproduct supplies, they follow the scheduling of the supply that generates them. This choice allows these supplies to be netted for earlier demands. This may cause late demands, but may reduce overall inventory.

Note Reference(s)

Default: No 370386.1

749448.1

Bug Reference(s) Document References(s)

-1 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes Yes Yes Yes Yes No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning

Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No No No No No No No No

MSO: Network routing cycle time coefficient


Profile Code Profile Option Name Description MSO MSO_NFL_CYCLE_TIME_COEFFICIENT Used by the Scheduling Engine to calculate the window of time allocated to schedule a network flow. This is used in conjunction with NFL Fixed Time Window. The window of time is (Coefficient *Cycle time) + Fixed time window. Valid values are: Number > 0

Defined at the site level. Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Default Value:0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Network routing fixed time window


Profile Code Profile Option Name Description MSO MSO_NFL_FIXED_TIME_WINDOW Used by the Scheduling Engine to calculate the window of time allocated to schedule a network flow. This is used in conjunction with NFL Fixed Time Window. The window of time is (Coefficient *Cycle time) + Fixed time window. Valid values are: Number > 0

Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Defined at the site level. Default Value - 0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Nfl Backward Compression Pct


Profile Code Profile Option Name Description MSO MSO_NFL_BACKWARD_COMPRESSION_PCT Defines the percentage of the actual resources capacity that the network flow takes into account. A value under 100 percent tends to offload more activities to alternate resources. Can be defined at the site level. Valid values are: Between 10 and 100%

Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Default Value - 100% Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Nfl Forward Compression Pct


Profile Code Profile Option Name Description MSO MSO_NFL_FORWARD_COMPRESSION_PCT Defines the percentage of the actual resources capacity that the network flow takes into account. Use in forward phase to force the system to use alternates and limit the tardiness of activities. Valid values are: Between 10 and 100%

Can be defined at the site level. Profile is applicable when OSFM Network Scheduling Method is set to Optimized. Default Value - 100% Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Number of Backtracks Allowed


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_MAX_BACKTRACKS As per Bug 2953151, this is not used

No No No No No No No No No No No No No No No

MSO: Number of Decomposition Groups Per Process


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_DECOMP_GROUPS Set to the number of decomposition groups in each process in multi-process solve mode

No No No No No No No No No No No No No No No

MSO: Number of Demand Groups for Optimization


Profile Code Profile Option Name Description MSO MSO_SCO_MAX_DEMAND_GROUPS You can use this profile option only for constrained plans that have decision rules enabled. In the case of cost-based optimization, the planning engine considers the demand lateness penalty cost instead of demand priorities. Use this profile option to instruct the planning engine how to group demand into demand groups by priority ranges. For example, the demand priority values are from 1 to 100 and you set this profile option to 5. The planning engine assigns demands to five demand groups. Each group includes a range of 20 priorities - 1 to 20, 21 to 40, 41 to 60, 61 to 80, 81 to 100. The planning engine searches for supplies that satisfy all demands having priorities in the same range. It satisfies demands in the higher priority range first. For multiple demands in the same priority range, the planning engine satisfies demands based on individual demand priorities. Valid values: Integer > 0 Default value = 50 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No

MSO: Number of Iterations for Local Search


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_NUMBER_OF_LOCAL_SEARCH_ITERATIONS Introduced for Detailed scheduling in R12. Not used

No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Number of LP Phases for Safety Stock Calculation


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_MRP_SS_LOGIC Set only with guidance from Oracle Development

Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Number of Processes to use in Decomposition


Profile Code Profile Option Name Description MSO MSO_DECOMPOSITION_TOTAL_PROCESSES Number of Processes to use in Decomposition. This is applicable for Service Parts Planning and Distribution Planning Used to help in performance of a specific stage of the planning engine. Default is 2 This should be changed only with Support or DEV recommendation.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 12409853 -1 No No No No Yes No No Yes No No No No No No No No No No No No

MSO: Number of Threads for Optimization


Profile Code Profile Option Name Description MSO MSO_SCO_NUM_THREADS This profile option applies to 64-bit platforms only. Values greater than 1 invoke running optimized plans in a multi-threaded mode. This enables various optimization problems to be solved in parallel so that run time may be reduced.

However, multi-threading increases the CPU usage and memory consumption. You can control the load on CPU by specifying the number of threads that you want to run in parallel. Valid value: Integer >0 Default value: null Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No

MSO: Number of processes for Inline Forecast


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8687334 -1 No No No No No No No Yes Yes No No No No No No No No No No No MSO MSO_NUM_OF_PROCS Number of processes for Inline Forecast. For Multiprocess run for inline forecast the user need to supply number of processes

MSO: Optimization Advanced Start


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_ADVIND This profile option controls whether the planning engine should be set to use advanced start (profile option value 1). This means that the optimization engine uses certain values from a previous run of the plan; it sees improved performance by reusing certain computations. This is an optimization engine profile option and should not be changed under ordinary circumstances. Values: 0 and 1 Default value is: Null (internally defaulted as a value of 1)

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Optimization Daily Aggregation Buckets


Profile Code Profile Option Name Description MSO MSO_SCO_AGGREG_DAY_BUCKETS Specifies the Daily Aggregation Time Bucket to be used by the Planning Engine if the profile option MSO: Use Optimization Internal Time Aggregation is set to True.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Optimization Weekly Aggregation Buckets


Profile Code Profile Option Name Description MSO MSO_SCO_AGGREG_WEEK_BUCKETS Specifies the Weekly Aggregation Time Bucket to be used by the Planning Engine if the profile option MSO: Use Optimization Internal Time Aggregation is set to True.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Optimization debug level


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_DEBUG_LEVEL Optimization debug level

No No No No No No No No No No No No No No No

MSO: Order Modifier Max Searching Depth


Profile Code Profile Option Name Description MSO MSO_OM_CTP_MAX_DEPTH Use this profile option to specify the maximum number of lower levels in the supply chain that the planning engine searches for alternate sources, bills of material, components, and resources to resolve a shortage. The shortages often occur when the planning engine rounds down planed orders with respect to capacity constraints and order modifiers. The planning engine searches this many levels down both in: The organization with the shortage Organizations that supply the short organization with the short item

Oracle suggests that: The solution quality improves with higher numbers while the processing time worsens with higher numbers. For each integer increase in the profile option, processing time worsens at a much higher rate than solution quality improves. You consider the tradeoffs and tend towards lower rather than higher numbers. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 6890145 -1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Overlap Activities by MTQ


Profile Code Profile Option Name Description MSO MSO_OVERLAP_ACTIVITIES_BY_MTQ Use this profile option to control overlapping activities inside one operation. Valid values are: Yes - Allow overlapping activities inside one operation. No - Prevent overlapping activities inside one operation.

Default Value - No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes No No No No No No No No No No No No No No No

MSO: Peg By-product Supplies


Profile Code Profile Option Name Description MSO MSO_PEG_BYPROD_SUPP Yes: Pegging is considered when scheduling operations with by-product supply. Scheduling of these operations respects demand for the by-product and demand for the main product. After scheduling these operations, the by-product supply date is updated to reflect the operation scheduled date. No: By-Product Supplies are not pegged to demands For constraint-based plans. Set this profile option to No with items that are components on the supply chain bill of materials and that are by-product on a different level of the same supply chain bill of materials. Selecting No prevents the planning engine from continuous looping between the component demand and the by-product supply.

Note Reference(s)

Default Value: Yes 566497.1 984372.1 957490.1

Bug Reference(s) Document References(s)

-1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Penalty Basis for Changeovers


Profile Code Profile Option Name Description MSO MSO_PENALTY_BASIS_FOR_CHANGEOVERS Indicates whether the changeover time of the changeover penalty is to be used as the criterion for calculation the ideal sequence. Valid Values are: Changeover time :If Changeover Time, ASCP uses the relative changeover times between setup types as the criteria for deciding on the ideal sequence of setup types. Changeover Penalty: If Changeover Penalty, ASCP uses the relative changeover penalties between setup types as the criteria for deciding on the ideal sequence of setup types.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value: Changeover time 415276.1

-1 No No No Yes No No No Yes No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ITEM_CAP_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 of ASCP user guide for more information. Valid Values: Interger>=0 Default Value: Null 763878.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Material Capacity


Profile Code Profile Option Name Description MSO MSO_GLOBAL_ITEM_PENALTY Defines a penalty cost factor for exceeding material capacity. Valid Values: Number>=0 Default Value: Null

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_SUP_CAP_PENALTY Attribute Number Automatically generated to denote flexfield segment holding the penalty factor. This profile option stores the item flexfield segment that holds the penalty cost factor for exceeding material capacity. The collections process Generate Planning Flexfield concurrent program captures the segment when it first runs during installation. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_ITEM_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are: Interger >= 0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - Null 1069694.1

-1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_RES_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are: Interger >= 0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - Null 1069694.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_TRSP_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes,page A-1 for more information. Valid values are: Interger >= 0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - Null 1069694.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Resource Capacity


Profile Code Profile Option Name Description MSO MSO_GLOBAL_RES_PENALTY Denotes a factor for plan profit computations that is invoked only when the plan profit parameter for optimization has a value greater than 0. The penalty cost factor is multiplied by the resource cost to give the cost of overloading a particular resource. Valid Values: 0 and 1 Default Value: Null (internally defaulted as a value of 1) 562872.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_RES_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. Valid values are: Interger >=0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - NULL 147242.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute
Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_TRSP_PENALTY Penalty Cost for Exceeding Transportation Capacity (Optimized Plan)

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No Yes No No No No No No No No No No

MSO: Penalty Cost Factor for Late Demands


Profile Code Profile Option Name Description MSO MSO_GLOBAL_DMD_PENALTY MSO: Penalty Cost Factor for Late Demands Defines a penalty cost factor common to all demands. The demands include sales orders, forecasts and safety stock. Can be defined at the site level. Values Integer > 0 No default value

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

4139766 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute


Profile Code Profile Option Name Description MSO MSO_FCST_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. Valid values are Integer >= 0

Default Value - NULL Note Reference(s) 176030.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ITEM_DMD_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. Valid Values: Integer>=0 Default Value: Null

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_ORG_DMD_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 for more information. Valid values are: Interger >= 0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - Null 1069694.1

-1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute
Profile Code Profile Option Name Description MSO MSO_SO_PENALTY Stores the flexfield column name that contains the value in the corresponding table. Setup performed only during application install. See 'Flexfield Attributes, page A-1 in the ASCP User Guide for more information. Valid values: integer >= 0 Default value: 0 153919.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Penalty Increase Tolerance Percentage in Local Search


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_TOLERANCE_PERCENT_FOR_LOCAL_SEARCH No information on this profile.

No No No Yes No No No No No No No No No No No No No No No

MSO: Penalty multiplier outside unconstrained


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_LATE_PENALTY_MULTIPLIER This profile option specifies an extra lateness penalty when scheduling later than the unconstrained latest possible completion time for a given activity.

No No No Yes No No No No No No No No No No No No No No No

MSO: Percent Complete Before Resequencing


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_PERCENTAGE_OF_OPS_SCHED_BEFORE_RESEQUENCE No information on this profile

No No No Yes No No No No No No No No No No No No No No No

MSO: Postpone Use of Alternates to Latest Possible Time


Profile Code Profile Option Name Description MSO MSO_USE_ALT_ALAP This will cause the planning engine to postpone the use of Alternate Rank sourcing until latest possible time in the plan. Used with sourcing rules where multiple ranks are used and trying to force use of Alternates. Best to set to Yes when using Multi-Rank sourcing rules. 872452.1 363069.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No Yes Yes No No No Yes No Yes Yes No Yes No No No No No No No

MSO: Preemption Slack Ratio


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_PREEMPT_SLACK_RATIO This was introduced in R12 for DS. It is not being used

No No No Yes No No No No No No No No No No No No No No No

MSO: Preprocessing Aggregator Fill


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_AGGFILL Preprocessor aggregator fill Valid values: Integer >= 0 Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Preprocessing Aggregator Limit


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_AGGIND Parameter to control preprocessing aggregator limit. Values: Integer > 0 Default value: See 'Automatic Calculations, page A-1 of the R12.1 User Guide.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Preprocessing Flag for LP Matrix


Profile Code Profile Option Name Description Note Reference(s) MSO MSO_CPX_PARAM_PREIND Contains the presolve indicator. Values are 0 and 1.

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2149275 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Preprocessor LP Compression


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_PREPROCESS_COMPRESS Not Used by ASCP

No No No Yes No No No No No No No No No No No No No No No

MSO: Primal Simplex Parameter


Profile Code Profile Option Name Description MSO MSO_PARAM_PPRIIND Gradient parameter for primal simplex algorithm. Valid values are: -1 0 1 2 3 4

Default Value - Automatic Calulations When the Default Value of a profile option states that it is automatically calculated, this means that the Planning Engine determines the default value of that particular profile option. These profile options are included in this appendix for information purposes only. If you must change these profile option values, do so only after consulting Oracle Development and Oracle Support. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No Yes No No Yes No No No No No No No No No

MSO: Primal/Dual Preprocessing Reduction


Profile Code Profile Option Name Description MSO MSO_SCO_PREPROC_REDUCTION Values 0, 1, 2, and 3 See 'Automatic Calculations,in ASCP User Guide page A-1. Used by optimization

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Pull push base


Profile Code Profile Option Name Description MSO MSO_PULL_PUSH_BASE Each time the planning engine needs to search for a new spot to schedule it looks ahead by a certain time period that is dictated by the settings of the profile options MSO: Push Pull Base and MSO: Push Pull Offset. Valid values are: Positive Interger

Default Value - 1 Used in the HLS code


Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2953151 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Pull push offset


Profile Code Profile Option Name Description MSO MSO_PULL_PUSH_OFFSET Each time the planning engine needs to search for a new spot to schedule it looks ahead by a certain time period that is dictated by the settings of the profile options MSO: Push Pull Base and MSO: Push Pull Offset. Valid values are: Positive Interger

Default Value - 1440 This is used in HLS code


Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2953151 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Queue Time Factor


Profile Code Profile Option Name Description MSO MSO_SCO_LEAD_TIME_FACTOR Increases item lead-time in optimization, so that lead-time values are close to those used in the Scheduling Engine. Optimization lead-time is padded to include queue time. Valid values: Number >=0

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Re-computation percentage for sequence generation


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_RECOMPUTATION_PERCENTAGE_FOR_SDS No information on this profile

No No No Yes No No No No No No No No No No No No No No No

MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs


Profile Code Profile Option Name Description MSO MSO_RESCHEDULE_JOBS_OUT This profile option involves right justifying standard and lot-based discrete jobs when rescheduling them out to line up with other supplies for the job. When there is a constraint, the planning engine always moves the jobs based on the constraint. When there are no constraints, you have the option to instruct the planning engine to right justify the jobs. Valid values are: Yes - The planning engine attempts to schedule the job as late as possible for one or more demands. No - The planning engine does not reschedule or right justify the job beyond its old due date. If there is existing capacity earlier than the old due date of the job, the planning engine may recommend a reschedule in.

This profile option does not apply to other order types, for example, purchase orders and purchase requisitions. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7280156 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Reschedule Shared Supply to Influence Batching


Profile Code Profile Option Name Description MSO MSO_BATCHING_BEST_EFFORT Determines whether the Planning Engine schedules shared supplies early to avoid item-based resource constraints prior to batch resources. Valid values are: Yes - considers whether scheduling shared supplies early will allow subsequent resource batching; this value improves the scheduled utilization of batch resources by considering earlier constraints No - schedules resource batching when supplies are available

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Resource Adjustment Factor For Improved Offloading to Alternates


Profile Code Profile Option Name Description MSO MSO_SCO_RES_ADJ_FACTOR

The factor that the planning engine uses to reduce the resource availability when making the sourcing decision. For example, if the factor is set to 0.8, the resource availability is reduced by 20% and the planning engine uses more of the alternate processes. Then, at the time of scheduling, planning has more flexibility. Valid values: A number between and including 0 and 1 Default value: Null (internally defaulted as a value of 1)

Note Reference(s)

562872.1 374093.1 317501.1 787458.1

Bug Reference(s) Document References(s)

-1 -1 -1 -1 Yes No No Yes No No No Yes No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Resource Batching Strategy


Profile Code Profile Option Name Description MSO MSO_BATCHING_STRATEGY Selects order scheduling strategy used in resource batching. Valid values are: Nearest Date - schedules orders to load resources nearest the due date of the order) Level Utilization schedules orders to level utilization of the resource

Note Reference(s) 244748.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes Yes No No No No No No No No No No No No No No

MSO: Resource Group for the Line Flexfield Attribute


Profile Code Profile Option Name Description MSO MSO_LINE_RESOURCE_GROUP Stores the name of the flexfield column that contains the value in the corresponding table. This setup is only performed during application install. Valid Values: Integer>=0 Default Value: Null

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Respect Activity Contiguity Flag for Process Supplies


Profile Code Profile Option Name Description MSO MSO_MAKE_ACTIVITY_NON_BREAKABLE_AS_PER_FLAG When the profile is set to "respect" OPM activity flag (profile set to yes), this is then used in conjunction of profile "MSO: Schedule Across Breaks" . 1. With the profile "MSO: Schedule Across Breaks" to allow breaks set to 'Yes', this will override OPM's activity break indicator (even if flag is not checked) : APS can schedule across Calendar breaks. 2. With the profile to allow breaks set to 'No', and the OPM activity break indicator set to 'N', APS does not schedule across breaks. Given these settings APS does not schedule resources outside of working shifts for an ECC plan. Note Reference(s) 1106718.1 1112749.1 Bug Reference(s) Document References(s) 4517139 -1 -1 -1 No No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Respect EDD Scheduling windows for Lead Times


Profile Code Profile Option Name Description MSO MSO_PRESERVE_OPERATION_LEADTIMES Do not compress post processing lead time for buy orders if enforce purchasing lead time option is unchecked. Yes - The scheduling windows used in enforce demand due dates scheduling will be respected when scheduling lead time activities such as pre-processing, processing, postprocessing and fixed+variable lead times. No - In Enforce demand due dates scheduling, these lead times will be scheduled backwards from due date and need not respect the scheduling windows assigned to the supply.

Valid values: Yes/No Default value: Yes Available in 12.1.1 and upwards as well Note Reference(s) 365112.1 Bug Reference(s) Document References(s) 4413913 4432428 -1 -1 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: SCO Dual Variables Tolerance


Profile Code Profile Option Name Description MSO MSO_SCO_DUALVAR_TOL Parameter used internally for optimization. Consult Oracle Development and Oracle Support before modifying this profile option. Valid values: Numeric Default value: 0.000000001 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No

MSO: SCO Reduced Cost Tolerance


Profile Code Profile Option Name Description MSO MSO_SCO_REDCOST_TOL Parameter used internally for optimization. Consult Oracle Development and Oracle Support before modifying this profile option. Default value: 0.000000001 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: SCO TRIANGULATION


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SCO_TRIANGULATION Internal (hidden profile)

Yes No No No No No No No No No No No No No No

MSO: STL Buffer Size


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_STL_BUFFER_SIZE Not used.

2953151 -1 No No No No No No No No No No No No No No No

MSO: Schedule Across Breaks


Profile Code Profile Option Name Description MSO MSO_SCHEDULE_ACROSS_BREAKS Determines whether the scheduling engine starts an activity before a break and ends it after the break. Valid values are: Yes No - verify that every activity has enough resource in one shift (otherwise the activities are moved to the end of the horizon). Can be defined at the site level.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Schedule All Firm Planned Orders First


Profile Code Profile Option Name Description MSO MSO_SCHEDULE_FIRM_PLANNED_ORDERS_FIRST No documentation on this profile option. It appears that this can work to make sure Firm Planned Orders are scheduled first before any new planned orders are created. This should work in tandem with other Firm profiles and could create a Natural Time fence. Valid values: Yes/No Default value: No Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes Yes Yes Yes Yes No No No No No No No No No No No

MSO: Schedule Simultaneous Resources Across Breaks


Profile Code Profile Option Name Description MSO MSO_SCHEDULE_ACROSS_BREAKS_FOR_SIM_RES

Details added to recent ASCP Guide - E13358-08 (page A-125) Valid Values: Yes/No Default Value: Yes (can schedule across break) Specifies whether the simultaneous resource activity is allowed to go across calendar breaks or not. This profile option behaves the same as profile option MSO: Schedule Across Breaks. However, it only applies to simultaneous resources. MSO: Schedule Across Breaks: Determines whether the scheduling engine starts an activity before a break and ends it after the break. If set to No, verify that every activity has enough resource in one shift (otherwise the activities are moved to the end of the horizon). The setting would depend on whether or not the requirements on the simultaneous resource(s) are "breakable". It would be best for this to be in sync with the principal, but there may be cases where we really can't allow a simultaneous requirement to span a break even though the principal may be able to. Generally, we expect the principal resource to be the one dictating the behavior, but this allows for the simultaneous resource to actually be somewhat more restrictive. If we set "MSO: Schedule Simultaneous Resources Across Breaks" to "No", but "MSO: Schedule Across Breaks" to "Yes", then the user should be prepared to see requirements being pushed out by the simultaneous if necessary. When your requirement for the simultaneous is non-breakable and too long to fit in shift time. 1. MSO: Schedule across break is set to No/

should be Yes 2. MSO: Schedule Simultaneous Resources Across Breaks should also be yes. We have this profile precisely to avoid that the simultaneous would be longer because of breaks. i.e. the labor finishing his job after the machine has finished during the night.
Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5028133 -1 -1 No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Schedule window width


Profile Code Profile Option Name Description MSO MSO_SCHEDULE_WINDOW_WIDTH Defines time window (days) that the scheduling engine looks for its primary resource. If the primary resource is not in this window, the scheduling engine moves to an alternate resource. Can be defined at the site level. Valid values are: Integer >=0

Default Value - 8 days Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Scheduler Time Step


Profile Code Profile Option Name Description MSO MSO_SCHEDULER_TIME_STEP According to bug 2920076 this profile should have been removed from the application and the user guide in 2003. ** However, the User Guide states that this is reserved for future use ** Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Scheduling Activity Selection Window


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SELECTOR_FORWARD_WINDOW_SIZE no documentation on this bug

No No No Yes No No No No No No No No No No No No No No No

MSO: Scheduling Window UOM


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_DETAILED_SCHEDULING_WINDOW_UOM Not currently used in ASCP per Bug 4007906

4007906 -1 No No No Yes No No No No No No No No No No No No No No No

MSO: Setup Pattern Calculation Window


Profile Code Profile Option Name Description MSO MSO_SUB_HORIZON_CYCLE_FOR_HLS_SDS A window is calculated by multiplying the Resource's Sequencing window value by the value in this profile. Valid values are: Integer

The relative mix of various setup types that fall into this window is calculated and then applied to each resource sequencing window. When MSO: Use Sequencing Template is set to Yes, ASCP uses this calculated mix of setup types to determine the desired spots. Default Value - 1 Note Reference(s)

Bug Reference(s) Document References(s)

4113649 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 No No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Simplex Feasibility Tolerance


Profile Code Profile Option Name Description Note Reference(s) MSO MSO_CPX_PARAM_EPRHS Parameter to set the simplex feasibility tolerance. Values: Number between e-9 and e-4

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

5090041 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Simplex Optimality Tolerance


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_EPOPT Parameter to set the optimality tolerance for the simplex algorithm. Values: Number between e-9 and e-4 Default: e-6

Note Reference(s)

Bug Reference(s)

Document References(s)

4164443 4416504 5090041 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Simplex Perturbation Constant


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_EPPER This profile option is a parameter to set the simplex perturbation constant. Provides a perturbation constant for the Planning Engine. Sets the amount by which the Planning Engine perturbs the upper and lower bounds on the variables when a problem is perturbed. The value is specified as any number greater than e-8. This value is defaulted by CPLEX. Use for SCO. This profile should not be changed unless directed by Oracle Development Available in 12.1.1 and upwards 147222.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Simplex Perturbation Limit


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_PERLIM Parameter for the simplex perturbation limit. Values: Integer > 0

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Simplex Perturbation Parameter


Profile Code Profile Option Name Description MSO MSO_CPX_PARAM_PERIND Provides a perturbation constant for the Planning Engine. Sets the amount by which the Planning Engine perturbs the upper and lower bounds on the variables when a problem is perturbed. Values are 0 and 1.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Simplex Presolve Limit


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_PREPASS Parameter to set the limit on the number of pre-solves. Values are -1, 0, and integer > 0

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Simplex Singularity Repair Limit


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_CPX_PARAM_SINGLIM Parameter to set the simplex singularity repair limit. Values: Integer > 0.

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Skip Firm SDS Activities During Justify


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SKIP_FIRM_IN_SEQUENCE_FOR_JUSTIFY This profile was introduced in R12 for DS. Not used anymore

8538729 -1 No No No Yes No No No No No No No No No No No No No No No

MSO: Slack Hours For Batch Resource


Profile Code Profile Option Name Description MSO MSO_SLACK_HOURS_FOR_BATCH_RESOURCE This profile value is used by Oracle Advanced Supply Chain Planning to right justify the maximum end date for a scheduled batch resource. The value specified is the amount of slack time (in hours) to delay scheduling the resource so that other supplies can be included in the same batch even though they cannot be scheduled as early as the original supply. This means that the batch must wait for the constrained supply. Valid values: integer Default value: null Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Solve Dual Problem


Profile Code Profile Option Name Description MSO MSO_CPX_DUAL Controls whether the Planning Engine solves the dual problem or the primal problem. Valid values: 0 and 1 Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP User Guide. 147222.1

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Sourcing Allocation Window


Profile Code Profile Option Name Description MSO MSO_SCO_ALLOCATION_WINDOW Specifies the Allocation Percentages Satisfaction Period. The constraints are enforced in a rolling horizon manner. Used with Enforce Sourcing Constraints enabled in specific plan options.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Split Planned Orders for Assigned Units


Profile Code Profile Option Name Description MSO MSO_SCO_ASSIGNED_UNITS This profile option is used by Oracle Advanced Supply Chain Planning optimized plans only. It specifies if the planning engine should attempt to split planned orders such that they can be scheduled within a specific day. Valid values are: Yes: Create more planned orders with quantities that can be scheduled by the resource units available within a given day. No: The planning engine generates larger planned orders that may require a resource duration spanning several days.

Note that the maximum number of resource units at the routing level will always be respected. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No

MSO: Split Supplies for SPP Release


Profile Code Profile Option Name Description MSO MSO_SPLIT_SUPPLIES_FOR_RELEASE Split Supplies to Ensure 1-1 Pegging in Service Parts Planning During Release Set on APS Destination in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 11882204 -1 No No No No No No No Yes Yes No No No No No No No No No No No

MSO: Spread Resource Consumption Within Optimization


Profile Code Profile Option Name Description MSO MSO_SCO_SPREAD_RESOURCE This profile specifies how the optimization engine should model resource consumption is modeled in optimization. Valid values are: Yes: Consume resources at the first operation. This value provides improved optimization engine performance. No: Consume resources at the operation to which they belong. This value provides improved optimization engine accuracy.

Default value: Null (interpreted as No) Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9020829 -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Substitute Item Penalty


Profile Code Profile Option Name Description MSO MSO_SCO_SUB_ITEM_PENALTY Defines an internal penalty weight for substitute item objective in supply chain optimization. Valid values: number > 0 Default: none 228459.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Supplies used for satisfying transient safety stock


Profile Code Profile Option Name Description MSO MSO_TRANS_SS_SUPPLY_CHOICE Values Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising Supplies pegging to lower priority demands (Default) Closest pegged supplies

Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Supply Reschedule Window Size for Safety Stock Pegging


Profile Code Profile Option Name Description MSO MSO_SS_WINDOW_SIZE This profile options provides an estimate of the number of days by which the supply and its associated demand (dependent demand) moves due to constraints. Valid values are: Integer > 0

You can use this profile option to specify the number of days a specific supply can satisfy safety stock demand. Default Value - Null Note Reference(s)

Bug Reference(s) Document References(s)

3500953 -1 Oracle Advanced Supply Chain Planning Implementation and User's Guide Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Supply Window Size


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SUPPLY_WIN Used with priority pegging.

B31553-02 MSC: Use FIFO Pegging Yes No No No No No No No No No No No No No No

MSO: Synchronize Chargeable Resources to Respect Hard Links


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_SYNCHRONIZE_CHARGES Not enough information in bugs to define this profile

No No No Yes No No No No No No No No No No No No No No No

MSO: Target Inventory Level % of Safety Stock


Profile Code Profile Option Name Description MSO MSO_TGT_INV_LEVEL Use this option to specify target inventory levels. If no other method of calculation is defined for an item-organization target inventory level, the levels are based on the specified percentage of the safety stock level.

Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 MSO: Maximum Inventory Level % of Safety Stock Yes No No Yes No No No No Yes No No No No No No No No No No

MSO: Transfer Quantity Threshold for Enforceing Hard Links


Profile Code Profile Option Name Description MSO MSO_HARD_LINK_TRANSFER_QUANTITY_THRESHOLD Use this profile option to instruct the planning engine to ignore the hard link constraints if a transfer quantity is less than or equal to this percent threshold of the corresponding order quantity. Valid values are Number between 0 and 1: Ignores hard link constraints for transfer quantities less than or equal to this percent threshold Null: Respects all hard link constraints regardless of the size of the transfer quantities

Default Value: 0 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 8730427 -1 No No No Yes No No No No No No No No No No No No No No No

MSO: UOM for converting Changeover Time to Penalty


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_UOM_TO_CONVERT_CHANGEOVER_TIME_TO_PENALTY no documentation for this profile

No No No Yes No No No No No No No No No No No No No No No

MSO: Upper Limit for Maximum Time Offset for Hard Links
Profile Code Profile Option Name Description MSO MSO_HARD_LINK_MAX_OFFSET_UPPERBOUND

Use this profile option to set an upper limit for the maximum time offset. If a maximum time offset is higher than this number, the planning engine uses this number instead of what you set. Valid values are: Valid Values: Integer (including 0),null: Use 10,000,000 Default value: Null

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

760046.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows


Profile Code Profile Option Name Description MSO MSO_USE_BREAKS_IN_UNCONSTRAINED The planning engine calculates an unconstrained scheduling window for each resource activity and supply in a plan. The scheduling window is defined by the dates: Unconstrained Earliest Possible Start Time (UEPST) Unconstrained Earliest Possible Completion Time (UEPCT) Unconstrained Latest Possible Start Time (ULPST) Unconstrained Latest Possible Completion Time (ULPCT).

Valid values are: Yes - the planning engine does not set any of these dates during a break even if the calculation places it there. No - the planning engine does set any of these dates during a break if the calculation places it there.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - Yes 1080929.1

-1 Yes No No Yes No Yes No No No No No No No No No No No No No

MSO: Use Collections Start Time


Profile Code Profile Option Name Description MSO MSO_USE_COLLECTIONS_START_TIME Use this profile option to coordinate plan start date and collections start time. This affects how the plan calculates resource availability. Valid values are: No - Always use plan start time. Yes - Use collections start time. Use Input Demand Plan Start Time or Collections Start Time - If there is an input demand plan, the planning engine uses the Input Demand Plan Start Time. Otherwise, it uses the Collections Start Time. Use Input Demand Plan Start Time or Plan Start Time - The planning engine uses the Input Demand Plan Start Time. Otherwise, it uses the Plan Start Time.

Default Value - Yes Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Use Customer Site in End Item Substitution Rule


Profile Code Profile Option Name Description MSO MSO_USE_CUSTSITE_IN_ITEMSUBST Could not find information about this profile in user guides. For GOP, this profile is NOT in R12.0 or 12.1.x For SCO Planning, the profile is included in 11.5.10, R12.0 and above Introduced by SCO and we should be using that to set the partial fulfilment flag (all_or_nothing) flag appropirately based on that. This profile indicates if set to No, that rules are defined only at the customer level and not at the site level. Used in GOP as well, per bug 5048642 When profile option MSO_USE_CUSTSITE_IN_ITEMSUBST is set to N,we use specific customer id and customer site id is null to select the specific rule. If there is more than one records, we will randomly select one. GOP like SCO assumes that the user has run the script to set the customer site id to NULL in the ODS prior to running the plan.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 5048642 -1 Yes No No Yes No No Yes Yes No No No No No No No No No No Yes

MSO: Use Decomposition in Optimization


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_USE_DECOMPOSITION MSO: Use Decomposition in Optimization. This is applicable for Service Parts Planning and Distribution Planning

No No No No Yes No No Yes No No No No No No No No No No No No

MSO: Use Discrete Job Resource Usage to Consume Resource Capacity


Profile Code Profile Option Name Description MSO MSO_USE_RESOURCE_HOURS_PRECONSUME Use this profile to instruct the planning engine what data to use for resource load when it determines resource availability. Valid values are: Yes: The planning engine uses resource hours to determine the resource load. Use this value if you do not attend to work in process timestamps, your work in process times are not adjusted for efficiency, and you specify resource hours. No: The planning engine uses timestamps to determine the resource load. Use this value if your work in process times are adjusted for efficiency. If work in process is scheduled by the planning engine scheduling process, choose this value.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - No 745977.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Use Effectivity Date to Infer End Item Substitution Priority


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_USE_EFCDATE_FOR_PRIO_IN_ITEMSUBST Could not find information about this profile in user guides. 564241.1

-1 Yes No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Use Existing Supplies in Alternate BOM/Subs. Comp


Profile Code Profile Option Name Description MSO MSO_SCO_EXIST_SUPP_ABR_SUBSCOMP This profile will enable the user to adjust the objective sequence so that optimization will always go to primary BOM before going to alternate BOM. Controls how SCO will use the existing supply in alternate BOM or substitute component paths. NULL or 0 (zero) is the default and indicates all the existing supply will be used before creating new planned orders in primary path. 1 means SCO will consume supplies in subs comp path but will not consume supplies in alternate BOM path. 2 means SCO will consume supplies in alt bom path but will not consume supplies in substitute component path.

Note Reference(s)

NOTE: This profile, when used with the profile "MSO: Postpone Use of Alternates to Latest Possible Time" may give you different results. From Note 365112.1 - also see Note 567667.1 for clarification on the use of this profile in an Enforce Due Date (EDD) plan. 365112.1

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 -1 Yes No No Yes No No Yes Yes No No No Yes No No Yes No Yes No No No No No No No

MSO: Use Item Shelf Life Days in Scheduling Buy/Transfer Orders


Profile Code Profile Option Name Description MSO MSO_USE_SHELF_LIFE This profile option specifies whether to use item shelf life days as a maximum time offset between operations that produce and consume the item. Valid values are: Yes - the planning engine uses item shelf life days as a maximum time offset if a maximum time offset value is not specified on the routing step that produces the item. No - the planning engine does not use item shelf life days as a maximum time offset between operations.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - No 415101.1

-1 No No No Yes No No No No No No No No No No No No No No No

MSO: Use JIT dates from high level scheduling results


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSO MSO_USE_JIT_DATES_FROM_HLS Not currently used in ASCP per Internal Bug 4007906

No No No Yes No No No No No No No No No No No No No No No

MSO: Use Of Assigned Units In Scheduling


Profile Code Profile Option Name Description MSO MSO_USE_OF_ASSIGNED_UNITS_IN_SCHEDULING Controls the number of resource units to be used when scheduling a resource activity. Valid values are: Variable - Permits a choice ranging between a minimum of one unit and a maximum value equivalent to the assigned units specified on the routing for the item. Fixed at Routing Value - Forces the scheduling engine to always choose the number of assigned units specified in the routing when scheduling a resource activity. It is recommended that you choose this option when you do not need to use the flexibility of the Variable option.

Note: The assumption that the activity duration is less when more units are chosen is only valid for the basis type of Item specified in the Operation > Resources form. Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSO: Use Optimization and Decision Rules for Simulation


Profile Code Profile Option Name Description MSO MSO_ONLINE_SCO For online planner sessions against constrained plans with decision rules or optimized plans. Valid values are: Yes: To rerun the optimization and decision rules-based decisions during the online planner session No: To retain the optimization and decision rules-based decisions from the initial planning run for the online planner session Valid Values: Yes/No

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Default Value - No (Do not run Optimization / Decision Rules during Online Planning) 365112.1

-1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Use SCO Time Aggregation


Profile Code Profile Option Name Description MSO MSO_USE_SCO_INT_TIMEAGGREG Determines whether the Planning Engine should use different aggregate time buckets than specified in the aggregation settings of the plan options. You can specify large values for daily and weekly buckets for Planning Engine output, but this increases Planning Engine calculation time. Valid values are: True - The Planning Engine uses aggregate time buckets specified in MSO: Optimization Daily Aggregation Buckets and MSO: Optimization Weekly Aggregation Buckets. The period time bucket is derived. False - The Planning Engine uses the same aggregate time buckets as specified in the Aggregation tab of the Plan Options window.

Default Value - False Note Reference(s)

Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Use Safety Lead Time


Profile Code Profile Option Name Description MSO MSO_USE_SAFETY_LEAD_TIME Use this profile option to instruct the planning engine how to plan material to be completed early as a safety buffer. Valid values are: Yes - Use safety lead-time planning. The value in item attribute Safety Stock Percent is the safety lead-time in days; for example, if safety lead-time is two days, enter 200. No - Use non-transient / transient safety stock planning. The value in item attribute Safety Stock Percent is a percent of demand.

Default Value - No Note Reference(s) 872475.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

MSO: Use Sequencing Template


Profile Code Profile Option Name Description MSO MSO_NEED_USE_SOFT_PATTERN This profile option specifies whether Oracle Advances Supply Chain Planning tries to schedule activities in accordance with a determined preferred sequence of activities. Valid values are: Yes - the planning engine determines a preferred sequence of activities on resources and tries to schedule activities in accordancewith the sequence. This setting is recommended if the sequence dependent setup resource is the primary bottleneck. No - the sequence of activities is determined more dynamically when scheduling other activities.This setting is recommended if there are multiple bottleneck resources.

Default value: No Note Reference(s) 415276.1 Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 9500377 -1 -1 No No No Yes No No Yes Yes No No No No No No No No No No No

MSO: Use Shift Definitions When Scheduling Lead Times


Profile Code Profile Option Name Description MSO MSO_USE_SHIFT_TIMES_IN_LEAD_TIME_SCHEDULING Determines whether the planning engine needs to take into account shift times for calculating lead-times on shipping, receiving, and carrier calendars. Valid values are: Yes - Considers shift definitions for calculating lead-times on calendars in case of constrained plans. No - Shift definitions are not considered when offsetting leadtimes on calendars.

If the plan planning mode is Constrained (Without Detailed Scheduling), the planning engine does not use this profile option. (Default) Note Reference(s) 950994.1 978623.1 1301132.1 Bug Reference(s) Document References(s)

Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 -1 -1 -1 Yes No No Yes No No No No No No No No No No No No No No No

Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

MSO: Use Up Existing Supply of Primary Components Before Substitute


Profile Code Profile Option Name Description MSO MSO_SCO_SUBSCOMP_SEQ Use this profile option to specify whether to use the supply of substitute components or the primary component first. Valid values are: Yes: Use the supply of the primary component before using the supply of the substitute components No: Use the supply of the substitute components before using the supply of the primary component 834624.1

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

-1 Yes No No Yes No No No No No No No Yes No No No No No No No No No No No No

MSO: Write Inline forecasting flat files


Profile Code Profile Option Name Description MSO MSO_FORECASTER_WRITE_FLATFILE

If this profile is set to "Yes" then Inline forecasting calculation details are written in the flat files. This should only be set if you would like to debug the inline forecasting results.

Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning All Plan Types Enforce Constraints Not Optimized Enforce Constraints Optimized Disable Constraints Not Optimized Disable Constraints Optimized Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising 7621495 -1 No No No No No No No Yes No No No No No No No No No No No No

MSR: Budget Category Set


Profile Code Profile Option Name Description MSR MSR_BUDGET_CATEGORY_SET Use this profile option to specify the categories that you can use when defining budgets in Oracle Inventory. Valid values are: NULL - Define budgets with any category. Any category set: Define budgets only with categories that are in the category set.

Default Value - NULL Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No

MSR: Budget Enditem Favor Factor


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSR MSR_BUDGET_ENDITEM_FAVOR_FACTOR Could not find details of this profile in user guides.

5182644 -1 No No No No No No Yes No No No No No No No No

MSR: Budget Heuristic


Profile Code Profile Option Name Description Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising MSR MSR_BUDGET_HEURISTIC Profile to enable use of budget heuristic for single level supply chain instead of use of budget LP 1081430.1

-1 Yes No No No No No Yes No No No No No No No No

MSR: Postponement Factor


Profile Code Profile Option Name Description MSR MSR_POSTPONEMENT_FACTOR Specifies maximum depth in the bill of materials and sourcing tree to which uncertainty must be postponed. Valid values are: Integers >= 0

Default Value - 10 Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No No No No No No No No No No

MSR: Probability Distribution Type


Profile Code Profile Option Name Description MSR MSR_PROB_DISTR_TYPE Determines probability distribution type associated with forecast sets as input to Oracle Inventory Optimization. Valid values are: Probabilities - Demand uncertainty is stated in terms of a (non-cumulative) probability distribution. Cumulative Probabilities - Demand uncertainty is stated in terms of a cumulative probability distribution.

Default Value - Probabilities Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Oracle Advanced Supply Chain Planning Implementation and User's Guide Yes No No Yes No No No No No No Yes No No No No No No No No

MSR: Safety Stock Holding Strategy


Profile Code Profile Option Name Description MSR MSR_SS_HOLDING_STRATEGY Specifies where safety stock should be held when the carrying cost is the same for an item in the destination organization and a source organization. Valid values are: 0 - causes the safety stock to be held at the destination organization. 1 - causes the safety stock to be held at the source organization.

Default Value - Source Organization Note Reference(s)

Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

2260006 Oracle Advanced Supply Chain Planning Implementation and User's Guide -1 Yes No No Yes No No No No No No No No No No No No No No No

POR: Sync up Need by date on IR with OM


Profile Code Profile Option Name Description POR POR_SYNC_NEEDBYDATE_OM Required to be Yes for the rescheduling or Internal Reqs (IR) and Internal Sales Orders (ISO) to be called to synchronize the IR/ISO when rescheduled. Only available when EBS source is on 12.1 Set on EBS Source in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

No No No Yes Yes No No No Yes No No No No No No No No No No

WIP:Discrete Job Prefix


Profile Code Profile Option Name Description WIP WIP_JOB_PREFIX Set on EBS Source in a distributed environment Default prefix for discrete job name Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes Yes No No No Yes No No No No No No No No No No

WSM: Create Job Level BOM and Routing Copies


Profile Code Profile Option Name Description WSM WSM_CREATE_LBJ_COPY_ROUTING Create Job Level BOM and Routing Copies for OSFM jobs Set on EBS Source in a distributed environment Note Reference(s) Bug Reference(s) Document References(s) Dependent Profiles 11.5.10 Profile 12.1.1 Profile Data Collections Item Mass Maintenance Advanced Supply Chain Planning All Plan Types Unconstrained Plan Constrained EDD Constrained ECC Distribution Planning Collaborative Planning Inventory Optimization Service Parts Planning Rapid Planning Demand Planning Demantra Strategic Network Optimization Advanced Planning Command Center Manufacturing Operations Center Global Order Promising

Yes No No Yes No No No No No No No No No No No No No No No