Sei sulla pagina 1di 47

PROFILE

Sun Engineering

An Introduction
Sun Engineering, a proprietary, one of the leading concern, in the field of Engineering, Detail Engineering, Mechanical, Electrical, Civil works and Erection & Commissioning of Power Plant Equipments. Sun Engineering was established in the year 1999 and today, it has grown up to a level of undertaking any challenge in to Engineering. Sun Engineering is a well knit Organization aspiring to do a cost effective, efficient and reliable business.

Time and Quality are the principles and this alone has been the Mantra of our development. Sun Engineering has got its head quarters at Chennai, equipped with latest technological background, infrastructure and a healthy financial resource. A well-trained and experienced team of engineers is the asset of Sun Engineering. Power, Petroleum and Process are the key areas in developing a nation and Rajasurya is marching firmly and successfully towards these major sectors in a remarkable way.

Our strength and facilities:

The core group consists of talented engineers supported by a panel of specialists in various disciplines. Familiarity with ISO 9000 requirements RAJASURYA has link-ups in to manufacturing of components and to design products. Spacious office located in Chennai with all modern office equipment and Machinery.

Advantages working with Sun Engineering :


All our professionals have,

solid work experience with leading MNCs in the areas of boilers and auxiliaries.

Full familiarity with ASME, BS, DIN and other international codes and standards.

Excellent contacts with Indian customers and state / central government agencies.

OUR CAPABILITIES
We offer the following Services

CONSULTANCY IN POWER PLANTS & PROCESS INDUSTRIES


Detail Engineering Piping Layout Drawings Piping Isometric Fabrication drawings Structural Drawings Platforms ,Duct Supports Platforms, Stringer, Gangway, Railings for all platforms Preparation of Schematic Drawings, Instrumentation Drawings, etc.,

IN CONTRACTS:
Annual Maintenance Contracts Heavy Pumps Erection Electrical Works Control Panel Erection Control Boxes Erection, Stand Fabrication Painting Works Oil Guns Servicing Hot Well Erection Condenser Tube Renewal Hydrogen Cooler Cleaning and Erection Baffle Plate Fabrication Piping System Erection Coal and Vapour Piping Erection Dampers Erection Erection of WIND BOX Assembly Erection of Fans Erection Fuel Firing system Erection HFO System Main steam Supports Erection Overhauling of Pumps Erection of Air Pre Heater Tubes Sea Water Pipes Re Routing Erection of Steam Blowing Piping

HP Heater, LP Heater , Ejector, M.O. Cooler Tube Renewal and Erection

MANUFACTURING & SUPPLY


Guillotine Gates Oil Guns for 110 MW Tilting Spares Coupling Bolts Raw Coal Run back System Oil Filters Oil Strainer For Turbine Semi Circular Doors for Ball Mills Universal Coupling for Main Steam Stop valve Actuator Water Box for 110MW Units Water Box doors for 110MW Units Oil Nozzle Tip Supply of HT Studs and Nuts for control vale inter connection Pipes Stringer Steps for Conveyor System SS Mesh Oil Strainer Thrust Block and Cap Nuts for Boiler Drum Man Hole Doors Bearing Cooling Coils for 110MW Units Modified Re Circulation Dampers for Mill Plants

Bearing Cooling Coils for M.C. Pumps Plat form Grills for CWS System

MAJOR RESOURCES AVAILABLE WITH Sun Engineering


Sl.No . 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Project Managers Deputy Project Managers Engineers Supervisors Material Controller Formen Fitters Qualified Welders Grinders & Gas Cutters Riggers Helpers (Semi-skilled) Khalasis Unskilled Labours Category No. of Persons

1 2 2 4 2 2 3 5 5 10 10 15 20

Note: Additional requirement of manpower in any Category shall be arranged as per work content either locally or from other areas.

OUR MACHINERY
QTY. IN Sl.N o 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Center Lathe 8 feet Center Lathe 12 feet Center Lathe 6 feet Radial Drilling Machine Portable Drilling Machine Metal cutting machine Shaping machine Table grinding machine Welding machine Bug Cutting machine Magnetic drilling Machine 01 No. 01 No. 01 No. 01 No. 01 No. 01 No. 01 No. 01 No. 03 Nos 01 No 02 Nos DESCRIPTION Nos.

Sl.No.

Name of Work

Work order / Letter Ref.

Duration

Clients Name

DESIGN ORDERS
1. Rate contract for OFF LOADING of Engineering Drawings Rate contract for OFF LOADING of Engineering Drawings Rate contract for OFF LOADING of Engineering Drawings Preparation of Isometric Drawings with Details Preparation of Isometric Drawings with Details Preparation of Isometric Drawings with Details Preparation of Isometric Drawings with Details As built drawings for Fuel firing system in unit II 60 MW at ETPS As built drawings for HFO Pumping Station system in unit II 60 MW at ETPS BHEL:PC:PUR:RC:001 Dt:16.08.2003 BHEL:PC:PUR:RC:3012 Dt:27.01.2004 PC-450-7100019295 Dt:27.07.2006 CNT 7386/MG-16/2799 Dt:26.06.2006 CNT 7486/MG-16/601A Dt:26.04.2007 CNT 7996/MG-16/1698 Dt:12.06.2007 327/06 Dt:14.10.2006 PO/UTE/234P/UNIT-I Dt:11.11.2006 PO/UTE/248 Dt08.05.2006 1 year BHEL-CHENNAI

2.

1 year

BHEL-CHENNAI

3.

1 year

BHEL-CHENNAI

4.

6 Months

FICHTNER Consulting Engineers ( India ) P LTD. FICHTNER Consulting Engineers ( India ) P LTD. FICHTNER Consulting Engineers ( India ) P LTD. ANDRITZ Separation ( India ) P LTD. SKODA / U-TECH

5.

6 Months

6.

6 Months

7.

6 Months

8.

2 Months SKODA / U-TECH 2 Months

9.

WORK ORDERS
1. 2. 3. Dismantling & erection of HP FLUSH Pumps Dismantling & Erection of control boxes Rectification of Baffle plates R&M K1&K2 Condenser in Unit I 60 MW at ETPS PO/ETPS/S/028 Dt:14.11.2000 PO/ETPS/S/043 Dt:23.04.2001 PO/R&M/EN-1/002 Dt:20.01.2003 1 Month 2 Months 2 Months SKODA EXPORT SKODA EXPORT L&T LTD.

IN YEAR 2004
1. 2. HOT WELL painting work at ETPS Refurbishment of Ennore Thermal Power Station Dismantling, Erection of Condenser K1 & K2 Unit II 60MW at ETPS. PO/ETPS/S/215/VJ/04 Dt:26.07.2004 15 days 2 Months SKODA EXPORT SKODA / U-TECH

PO / ETPS/ 215C/02 Date :15.05.2004

IN YEAR 2005
Sl.No. 1. Name of Work R&M Works in condenser at Unit IV 110MW at ETPS Fabrication & Erection of HFO Pumping station works Air Pre Heater Re Tubing Work at Unit II 60MW at ETPS Dismantling of Old Vapour Piping and Extra work at HFO Pumping station at Unit II 60MW at ETPS Erection of COAL & VAPOUR Pipe Lines of Boiler in Unit II -60 MW at ETPS Extra Rectification works in HFO Pumping station in Unit II 60MW at ETPS Fabrication & erection of Steam Blowing line in Unit II 60MW at ETPS Fabrication Supply of COAL & VAPOUR Pipe line of Boiler at Unit II 60 MW at ETPS Modification of Pipe lines at Unit II 60 MW at ETPS Overhauling of GUILLOTINE GATES in Unit I 60 MW at ETPS Overhauling of HFO PUMPING Station in Unit I 60 MW at ETSP Work order / Letter Ref. PO/UTE/4346/01 Dt:18.01.2005 PO/UTE/220/HFO/UNITII/01 Dt:15.04.2005 PO/UTE/223/01 Dt:14.05.2005 PO/UTE/226/01 Dt:21.10.2005 Duration 3 Months Clients Name TNEB / U-TECH

2.

1 Month

SKODA / U-TECH

3.

2 Months

SKODA / U-TECH

4.

1 Month

SKODA / U-TECH

5.

PO/UTE/226/ERE/01 Dt:07.10.2005

1 Month

SKODA / U-TECH

6.

PO/UTE/220/HFO/REC/ UNIT-II/01 Dt:29.11.2005 PO/UTE/220/SB/UNITII/01 Dt:25.11.2005 PO/UTE/226CA/01 Dt:02.12.2005

1 Month

SKODA / U-TECH

7.

1 Month

SKODA / U-TECH

8.

1 Month

SKODA / U-TECH

9. 10.

PO/UTE/226CB/01 Dt:02.12.2005 PO/UTE/220/GU/UNITI/01 Dt:24.12.2005 PO/UTE/220/HFO/OH/U NIT-I/01 Dt:24.12.2005

1 Month 1 Month

SKODA / U-TECH SKODA / U-TECH

11.

1 Month

SKODA / U-TECH

IN YEAR 2006
Sl.No. 1. Name of Work Fabrication & Erection of HFO PUMPING station Skid in Unit I 60 MW at ETPS Fabrication of MS VAPOUR Pipes, MS VAPOUR Bends, & Reducers in Unit II 60 MW at ETPS Dismantling work in COAL & VAPOUR Pipe lines in Unit I 60 MW at ETPS Fabrication & Erection of MAIN OIL COOLER Pipes, Flushing line Pipes and bend in Unit II 60 MW at ETPS Dismantling and devolution of STEAM BLOWING line in Unit II 60 MW at ETPS Rectification of HFO Heating Station platform & fabrication & Erection of HFO Pumping station, Return / Suction / Steam lines Fabrication of ATYP Flange for GUILLOTINE GATES of Unit I 60 MW at ETPS Air Pre Heater Re Tubing Work at Unit I 60 MW at ETPS Renewal of CONDENSER TUBES, Partition plates, condenser tubes at ETPS Erection of WIND BOX BURNER and Fabrication and erection of Coal and Oil Pipes of BURNER,LDO PIPES, HFO Heating station Piping Work order / Letter Ref. PO/UTE/220/HFO/UNIT1/01 Dt:02.01.2006 PO/UTE/4445-52/01 Dt:02.02.2006 Duration 1 Month Clients Name SKODA / U-TECH

2.

1 Month

SKODA / U-TECH

3.

PO/UTE/233/P/01 Dt:11.02.2006 PO/UTE/236/01 Dt:08.03.2006

1 Month

SKODA / U-TECH

4.

1 Month

SKODA / U-TECH

5.

PO/UTE/235SB/01 Dt:18.03.2006 PO/UTE/226/02 Dt:19.05.2006

1 Month

SKODA / U-TECH

6.

1 Month

SKODA / U-TECH

7.

PO/UTE/240/01 Dt:20.05.2006 PO/UTE/223/02 Dt:31.05.2006 PO/UTE/241 Dt:06.06.2006 PO/UTE/245 Dt :16.06.2006

1 Month

SKODA / U-TECH

8.

2 Months

SKODA / U-TECH

9.

1 Month

SKODA / U-TECH

10.

1 Month

SKODA / U-TECH

11.

Fabrication and erection of MS VAPOUR pipes in Unit I 60 MW at ETPS Fabrication of wind box BURNER Frame at Unit I 60 MW at ETPS Fabrication and erection of COAL & VAPOUR pipes in Unit I 60 MW at ETPS Fabrication & erection of Steam Blowing line in Unit I 60MW at ETPS Dismantling and devolution of Steam Blowing line in Unit I 60MW at ETPS Fabrication & Erection of MAIN OIL COOLER pipe flushing line pipe and bend including dismantling and normalizing Design, Fabrication & supply of Vapour pipe lines in Unit I 60 MW at ETPS Maching of PLATE HEAT EXCHANGERS Stay bolts

PO/UTE/247 Dt:20.07.2006 PO/UTE/252 Dt:25.08.2006 PO/UTE/226/ERE/UNIT I Dt:11.11.2006 PO/UTE/220/SB/UNIT-I Dt:11.11.2006 PO/UTE/235 SB/UNIT-I Dt:11.11.2006

1 Month

SKODA / U-TECH

12

1 Month

SKODA / U-TECH

13.

1 Month

SKODA / U-TECH

1 Month

SKODA / U-TECH

14. 15.

1 Month

SKODA / U-TECH

16.

PO/UTE/236/UNIT-I Dt:11.11.2006

1 Month

SKODA / U-TECH

17.

PO/UTE/215 Dt:22.11.2006 PO/UTE/250 Dt:10.10.2006

1 Month

SKODA / U-TECH

18.

1 Month

SKODA / U-TECH

IN THE YEAR 2007


1. Fabrication and erection of Coal and PO/UTE/256 Vapour Piping in Unit III 110 MW Dt:24.01.2007 at ETPS Maching of PLATE HEAT EXCHANGERS Stay bolts Erection of Economiser Beam cooling liles Drum interval Exhaust piping Feed manifold at 8.0 M Elevation Furnace Bottom sealing Piping Erection of HDPE Piping Cyclone separator Ash drain lines Membrane water wall drain and vent 4. ETPS MM II Circle conveyor division Attending modification works in heavy oil pipe lines of the OIL HANDLING plant ETPS-MMI Circle Mill plant division Unit II Modification of vapour line fabrication of new vapour bend removal of insulation WCT.605/D.286 Dt:21.05.2007 1 Month TNEB PO/UTE/256A Dt:02.02.2007 1 Month TNEB/UTECH TNEB/UTECH SKODA / UTECH

2. 3.

1 Month 1 Month

5.

CE/MM-I / LT-697 Dt:14.04.2007

1 Month

TNEB

IN THE YEAR 2008


1. ETPS MM II Circle Conveyor Dn. OHP Attending breakdown works in heavy oil & light oil systems of oil handling plant ETPS Mechanical maintenance I Circle turbine Maintenance division 110 MW Unit V Cleaning of PLATE HEAT EXCHANGER plates with soap and acid solution re fixing the gasket with special adhesive & assembling the plates. ETPS Mechanical Maintenance I Circle Turbine Maintenance division Fabrication of Man hole doors for Debris filters with SS Plates for unit I to V ETPS Mechanical Maintenance - I Circle Turbine Maintenance division fabrication and supply of Main steam stop valve actuator connecting link mechanism with universal coupling and erection in Unit III ETPS Mechanical Maintenance - I Circle Turbine Maintenance division Dewatering pump house 30HP Diesel engine pump dismantling, Inspection, Reconditioning of worn out parts testing and commissioning of the 30 HP Diesel engine ETPS Mechanical Maintenance - I Circle Turbine Maintenance division 110 MW Unit IV Machining of gland box oil guard bolts and Nuts, MP Inner casing studs and nuts and LP HEATER studs and OIL SERVO lock nuts WCT-753/D1828 Dt:01.03.2008 1 Month TNEB

2.

WCT No.1904/D.251/0 8 Dt:27.02.2008

1 Month

TNEB

3.

WCT No.1896/d.225/08 Dt:15.02.2008

1 Month

TNEB

4.

WCT No.1847/D.126/0 8 Dt:22.01.2008

1 Month

TNEB

5.

WCT No.1843/D.122/0 8 Dt:22.01.2008

20 days

TNEB

6.

WCT No.1829/D.82/08 Dt:14.01.2008

20 days

TNEB

7.

ETPS Mechanical Maintenance - I Circle Turbine Maintenance division 110 MW Unit IV - TG Set machining of 60 nos seal oil pump coupling bolt 2 nos, Flanges with adapter, 5 nos, Casting studs, dummy flanges pins inner thread pins 35 nos Bolt machining etc. ETPS Mechanical Maintenance - I Circle Turbine Maintenance division 110 MW Unit IV Reconditioning of lub oil filters machining of iylam sheet, bolt machining and coupling bolt machining. ETPS Mechanical Maintenance - I Circle Mill Plant division 110 MW Unit IV - Renewal/ Recondiioning of coal and vapour lines and bends providing additional strenthening plates in coal and vapour line and bends renewal of insulation work during shut down period ETPS - CWS Division - Removing, Reconditioning and Refixing of Pinion gear Shaft and assembling of gear box of cws pump No 6

WCT NO. 1828/ D. 86, Dt 14.01.08

20 days

TNEB

8.

WCT NO. 1827/ D. 85, Dt. 14.01.08

20 days

TNEB

WCT NO 1961/ D. 435 Dt 18.04.08

20 days

TNEB

9.

10.

WCT No-2024/D 586/08/Dt 24.06.08

20 days

TNEB

11.

ETPS Mechanical maintenance I Circle turbine Maintenance division 110 MW Unit V Cleaning of PLATE HEAT EXCHANGER plates with soap and acid solution re fixing the gasket with special adhesive & assembling the plates.

WCT No.4930/D.943/0 8 Dt.06.11.2008

30 days

TNEB

IN THE YEAR 2007


12. ETPS Mechanical maintenance I Circle turbine Maintenance division 110 MW Unit IV Positioning of Debris filter flab at a time intervals and online removal of debris chocked in the debris filters in 110 MW Unit IV WCT No.2223/D.55/09 Dt:28.01.2009 20 days TNEB

SUPPLY ORDERS
1. Supply of coupling bolt and nuts for cooling water main pumps. LP & HP Flush water pumps Supply of HT studs and nuts for control valves inter connection pipes Supply of stringer steps of JT 5 PO NO. 07 S.178 D.1596/ Dt 01.12.07 PO NO. 07 S.134 D.1576/ Dt 05.09.07 PO NO.2007 S. 161 D. 1463/ Dt 12.11.07 PO NO.2007 S. 182 D. 1632/ Dt 13.12.07 2 Months TNEB

2.

2 Months

TNEB

3.

2 Months

TNEB

4.

Supply of SS Mesh oil Strainer

2 Months

TNEB

IN THE YEAR 2007


1. Supply of semi circular door PO NO. 2008 S. 71 D. 175/ Dt 05.02.08 PO NO. 2008 S. 06 D. 38 Dt 14.01.08 2 Months TNEB

2.

Supply of Capnut and Thrust block for drum manhole doors in unit iii and iv (110MW) Supply of Bearing and cooling coil for110 mW unit for soft water pump

2 Months

TNEB

3.

PO NO. 2008 S. 94 D. 241 Dt 08.02.08 PO NO. 2008 S. 44 D. 257 Dt 17.03.08 PO NO. 2008 212 D. 367 Dt 23.04.08 P.O NO. 2008 - S - 90 D - 803/08. Dt 13.05.08 P.O.No.2008 275 D - 452/08.Dt 23.05.08 ETPS - CWS Specn No 2238/ PO No 2008 423/D 556/08 /DT 03.07.08

2 Months

TNEB

4.

Supply of main steam stop valve actuator connector with universal coupling for 110MW Fabrication and supply of modified recirculation flap valve for vapour fans 60 MW with self lubricating Supply of MC Pump bearing and cooling coil Supply of M.S Fabricated platform grills SS guide Roller with Bracket Pin and bush for travelling water

2 Months

TNEB

5.

2 Months

TNEB

6.

2 Months

TNEB

7.

3 Months

TNEB

8.

3 Months

TNEB

9.

Design fabrication supply and erection of WATER CHAMBER for K1 & K2 Condenser Unit V 110 MW

6 Months

IN THE YEAR 2008


1. Fabrication, Supply errection with supporting and commissioning of silenser for CBD with vent and drain arrangement for unit iv ( 110 MW ) Boiler Supply of Ignitor guide tube assembly for Unit V 110 MW - boiler filter for unit V 110 MW Boiler P.O.No.2009- 06 D050/09 Dt.17.01.09 2 Months TNEB

2.

P.O.No.2009- 40 D126/09 Dt.05.01.09

2 Months

TNEB

OUR VALUED CUSTOMERS : 1. 2. 3. BHEL CHENNAI TAMILNADU ELECTRICITY BOARD M/s. SKODA EXPORT CHENNAI-600 057 4. M/s ALSTOM POWER INDIA LTD CHENNAI-600 018 5. M/s. LARSON TOUBRO LIMITED CHENNAI- 600 057 6. U-TECH CONSULTANTS & ENGINEERS P LTD CHENNAI-06 FICHTNER Consulting Engineers ( India ) P LTD. ANDRITZ Separation ( India ) P LTD. M/s. RADHA ENGINEERING P LTD CHENNAI-600 057 10. M/s.KUMARAN ENGINEERING WORKS CHENNAI-600 057

7.

8. 9.

PHATO GALLERY
RE TUBING OF PLATE HEAT EXCHANGERS FOR UNIT IV 110 MW ETPS

BURNER ASSEMBLY ERECTION UNIT I - 60 MW ETPS

BURNER ASSEMBLY ERECTION UNIT I - 60 MW ETPS

TUBE CLEANING FOR AIR PRE HEATER UNIT -60 MW ETPS

RE TUBING OF PLATE HEAT EXCHANGERS UNIT IV 110 MW ETPS

TUBLAR AIR PRE HEATER POOJA WITH SKODA EXPORT OFFICALS

MODIFIED RE CIRCULATION DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

COLD AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

HOT AIR CONTROL DAMPER ASSY. FOR UNIT III&IV 110MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

DURING LOYDS INSPECTION GROUP INSPECTING WATER CHAMBER UNTI V 110 MW ETPS

WATER CHAMBER

MACHINING OF STAY BOLT FOR CONENSER ETPS

OIL GUN SPARES FOR UNIT V 110 MW ETPS

FRONT WATER CHAMBER FOR 110 MW

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

ARM FOR WATER CHAMBER

REAR WATER CHAMBER

BRACKET ASSEMBLY

DURING POOJA FOR COMPLETION OF WATER CHAMBER

OUR WORK SHOP

WATER CHAMBER DOOR FOR UNIT V 110 MW

FABRICATION OF SHED TRESS WORK IN OUR FACTORY

DURING TNEB OFFICAL INSPECTION

DURING HYDRO TEST TNEB OFFICAL INSPECTION

OUR MACHINIRIES

RAW COAL RUN BACK SYATEM FOR CONVEYOR 29

DURING DNV INSPECTION LOW PRESSURE HEAT EXCHANGERS

WATER CHAMBER FOR UNIT V 110 MW

GUILLOTINE GATE SPARES

DURING THE ERECTION OF COAL AND VAPOUR PIPES AND BENDS

MITRE BENDS FOR COAL AND VAPOUR PIPING

MITRE BEND PREPARATION

BEARING COOLING COIL FOR BOILER FEED PUMPS

MANUFACTURING GRILLS FOR ENNORE THERMAL POWER STATION

DURING THE PLATE CUTTING

P.A.FAN LAYOUT MARKING AND INSPECTION WITH TNEB OFFICALS

P.A.FAN LAYOUT CUTTING

P.A.FAN PRE ASSEMBLY INSPECTION WITH TNEB OFFICALS

P.A.FAN CASING

P.A.FAN CASING

P.A.FAN CASING

DURING ASSEMBLY OF DIFFUSER MOUTH PIECE FOR P.A.FAN

DURING ASSEMBLY OF DIFFUSER MOUTH PIECE FOR P.A.FAN

AFTER WELDING DIFFUSER MOUTH PIECE FOR P.A.FAN

AFTER WELDING SUCTION BRANCH FOR P.A.FAN

DURING FULL ASSEMBLY OF P.A.FAN

DURING FULL ASSEMBLY OF P.A.FAN AND LOYDS INSPECTION GROUP INSPECTING THE ASSEMBLY

AFTER WELDING DIFFUSER MOUTH PIECE FOR P.A.FA

DURING FULL ASSEMBLY OF P.A.FAN

DURING FULL ASSEMBLY OF P.A.FAN

Potrebbero piacerti anche