Sei sulla pagina 1di 4

Dear Experts I have scenario where i give a batch number for the input material and the same

batch number should be captured for output material . Regards Surender Tao Zhang
Posts: 779 Registered: 5/27/08 Forum Points: 1,844

Re: Batch number


Posted: Dec 7, 2008 5:34 AM in response to: Puranam Surende...

Reply

Hi Firstly you use make the indicator "Batch Management" active in material master data. Then. If you activate the module of batch determination, the batch number can be assigned by SAP system automatically! Otherwise, when you do GR with MIGO, in item detial you have to input the batch number manually. After that you can use the batch number to trace your stock. Good day Tao

R Brahmankar
Posts: 6,052 Registered: 4/6/08 Forum Points: 16,484

Re: Batch number


Posted: Dec 8, 2008 6:05 AM in response to: Puranam Surende...

Reply

Dear, With internal Batch Number assignment, it is possible to have the Production Order No. as your BAtch No. You can have the detailed information regarding the same in the below path. SPRO --> Logistics - General --> Batch Management --> Batch Number Assignment --> when ever you release order you need to check in component view , for all batch reqd entry is batch is assigned to that component.For all component you have assigned batch management need to batch assigned in CO02 while release of the order in componenet view next to storage location. first of all you have to maintain your material master by setting the batch management option for the material codes where you want to give the batch number. MRP3 view batch entry or in OPKP there is option batch entry while releasing, creating or confirmation. then assign this scheduling profile to work scheduling view. Please try and come back. Regards, R.Brahmankar

anil Satya
Posts: 1,723 Registered: 6/20/07 Forum Points: 1,642

Re: Batch number Hi,

Reply

Posted: Dec 8, 2008 6:54 AM in response to: Puranam Surende...

This can be done by MM consultant. pls put this in mm forums. Anil

Puranam Surende...
Posts: 24 Registered: 12/20/07 Forum Points: 0

Re: Batch number Dear Brahma

Posted: Dec 8, 2008 7:07 AM Surende...

in response to: Puranam

My requirement is when i create a process order i give a batch number to input i.e to the key and the batch number which was assigned to key component should be carried forward to m material by the system itself. Regards Surender

Ashok Keerthipati
Posts: 1,246 Registered: 9/19/05 Forum Points: 2,218

Re: Batch number


Posted: Dec 8, 2008 7:38 AM Surende... in response to: Puranam

hi This can be achieved by Use of Batch Derivation Functionality. Go to t.code DVSP and activate Batch Derivation.

Now ,First Create Sander Condition by usng T.code DVS1, Assign Material type (Halb) and assign required characteristic for which you want to transfer to Fert Code. Then create recipient condition by T.code DVR1. Assign material Type Fert to it and Characteristic which you have assign in T.code DVS1. This will work during Production Order or Process Order release. And for this you have do Batch Determination for Halb in Order itself check this help link

http://help.sap.com/saphelp_47x200/helpdata/en/35/7b723c4356d068e10000000a114084/fr -ashok Edited by: Ashok Keerthipati on Dec 8, 2008 12:11 PM Dhaval
Posts: 2,190 Registered: 2/9/08 Forum Points: 4,878

Re: Batch number


Posted: Dec 9, 2008 12:34 PM in response to: Puranam Surende...

Reply

Hi,

This can be done by using User Exit. Available User exit for the same is, Enhancement is SAPLV01Z - CFCs for internal batch number assignment Function Module is EXIT_SAPLV01Z_002 and Include is zxvbzu02. Below is the detail of this User Exit :In the field of internal batch number assignment, you can now use the following components of the SAP enhancement SAPLV01Z:

o EXIT_SAPLV01Z_001. Using this CFC, you replace the number range object and/or internal interval proposed by the system with your own number range object and/or internal interval. In addition, you can block the system from assigning an internal number depending on material or plant, for example.

o EXIT_SAPLV01Z_002. Using this CFC, you change the number assigned by the system.

Interfaces are documented in the respective components.

In all exits you can use communication structure X_BNCOM with application data for the respective business transaction (plant or material type, for example). You must

obtain further information about the time, user name, or date, for example, in one of the exits yourself.

SAP provides six examples of internal batch number assignment in the includes LXVBZF01 and LXVBZF02. You can copy or adjust these example codes:

1.

Copying the production order number

2.

Copying the sales order number

3. Material-type-dependent batch number assignment

4. Material-number-dependent batch number assignment

5.

Including the date in the batch number

6. Including the plant in the batch number

In this include you have to write your logic for generation of B.No of Header Material by taking reference of Input Material. Regards, Dhaval

Potrebbero piacerti anche