Page 2 of 346 Sr NoDescriptionUnitQuantity Unit = cumTaking output = 1 c a) Material

Stone weighing not less than b) Labour Mateday0.04 input#VALUE!L Rate per cum = (a+b+c+d) # say#VALUE!

15.4B Unit = cumTaking output = 1 c cum1.00 #VALUE!#VALUE!# Rate per cum # say#VALUE! # Unit = cumTaking output = 1 c a) Material Graded stone aggregate of r b) Labour Mateday0.05 input#VALUE!L Rate per cum = (a+b+c+d)

# say#VALUE! 15.6Geotextile Filter Unit = sqmTaking output = 10 a) Labour Mateday0.02 input#VALUE!L b) Material sqm11.00 input#VALUE!M-1 Providing and laying Pitching Concrete Grade M15 Rate a Providing and laying Filter ma Includes Mazdoor required fo 700 &2504

Laying of a geotextile filter b c) Overhead charges @ input

Page 3 of 346 Sr NoDescriptionUnitQuantity

#VALUE!Cost for 10 sqm = a Rate per sqm = (a+b+c+d)/10 # say#VALUE! 15.7Toe protection15.82505A Unit = cumTaking output = 1 c cum0.33 #VALUE!#VALUE!c c) Material

Stonecum1.00 input#VALUE d) Labour Mateday0.08 input#VALUE!L Rate per cum = (a+b+c+d+e+ # say#VALUE! * 15.8BCement Concrete block cum1.00 #VALUE!#VALUE!c Rate per cum # say#VALUE!

15.92506Dry Rubble Flooring Unit = cumTaking output = 1 c a) Material Stonecum1.00 input#VALUE b) Labourd) Contractor's profi A toe wall for toe protection c Providing and laying Flooring (Rate as in Item12.6 sub-ana b) Add for cement concrete be Item12.8 (A)Add 1 per cent o e) Overhead charges @ input Includes cement mortar for la

Page 4 of 346 Sr NoDescriptionUnitQuantity

Mateday0.10 input#VALUE!L Rate per cum = (a+b+c+d) # say#VALUE! AStone masonry in cement m cum1.00 #VALUE!#VALUE! Rate per cum say#VALUE! or BCement concrete Grade M1 cum1.00 #VALUE!#VALUE!

Rate per cum say#VALUE! Note Unit = cumTaking Output = 1 a) Material Stonecum1.00 input#VALUE b) Labour Mateday0.05 input#VALUE!L Rate per cum = (a+b+c+d) # say#VALUE! Gabian Structure for Retaining Unit = cum

a) Labour Mateday0.28 input#VALUE!L b) Material Add 1 per cent of (b) for trim c) Overhead charges @ input Item12.7 (A )Rate same as p # Concrete Grade M15 Rate a 15.112507.2Flexible Apron :C Add 1 per cent of cost of (a+ c) Overhead charges @ input Providing and construction o

Taking output = 7 x 3 x 0.6 = 1

Page 5 of 346 Sr NoDescriptionUnitQuantity

sqm61.00 input#VALUE!M-1 Rate per cum (a+b+c+d)/12.6 # say#VALUE! Note Unit = cum a) Labour Mateday0.14 input#VALUE!L b) Material

sqm65.00 input#VALUE!M-1 Rate per cum (a+b+c+d)/6.00 # say#VALUE! Note Galvanised steel wire crates c) Overhead charges @ input Readymade woven wire crat 15.132503.3Gabian Structure Providing and constructing g Taking output = 2 x 1 x 0.3 x 1 Galvanised steel wire crates

c) Overhead charges @ input Readymade woven wire crat


Page 1 of 346

CHAPTER-16REPAIR A

Sr NoDescriptionUnitQuantity Unit = Sq m ( Thickness 75 m a) Labour Mateday0.06 input#VALUE!L b) Machinery hour1.00 input#VALUE! Trac Rate per sqm = (a+b+c+d)/10 #

say#VALUE! # Unit = Sq mTaking output = 1 a) Labour Mateday0.03 input#VALUE!L b) Machinery hour0.75 input#VALUE! Trac Rate per sqm = (a+b+c+d)/10 # say#VALUE! # Unit = Sq mTaking output = 1 Assuming thickness 25 mm

a) Material Cementkg16.00 #VALUE!#V b) Labour Mateday0.01 input#VALUE!L c) Machinery hour0.10 input#VALUE!#VAL Rate per sqm = (a+b+c+d+e) # say#VALUE! Ref.toMoRTHSpec.Remark s/ Air Compressor 250 cfm with c) Overhead charges @ input

Air Compressor 250 cfm with c) Overhead charges @ input M-081/1000Wire mesh 50mm d) Overhead charges @ input

Page 2 of 346 Sr NoDescriptionUnitQuantity Unit = Number Taking output a) Material

Nippleseach1.00 input#VALU b) Labour Mateday0.01 input#VALUE!L Rate per No. = (a+b+c+d)

# say#VALUE! 16.52806ACement Grout Unit = kgTaking output = 1 kg a) Material Cement including 10 per cen b) Labour Mateday0.08 input#VALUE!L c) Machinery hour0.10 input#VALUE!M-11 Rate per kg = (a+b+c+d+e) # say#VALUE!

B Cement Mortar (1:1) Groutin Unit = kgTaking output = 1 kg a) Material Cement including 10 per cen b) Labour Mateday0.08 input#VALUE!L c) Machinery hour0.10 input#VALUE!M-11 Providing and inserting nipple Cement, fixing compound an c) Overhead charges @ input M-081/1000Admixtures (anti d) Overhead charges @ input

M-081/1000M-005/1500Adm d) Overhead charges @ input


Standard Data Book (Roads & Bridges)
Download this Document for FreePrintMobileCollectionsReport Document

Info and Rating


civil construction Follow shariqabideen

Share & Embed Related Documents


PreviousNext 1. 363 p. 344 p. 362 p. 2. 362 p. 361 p. 123 p. 3. 24 p. 47 p. 16 p. 4. 26 p. 26 p. 194 p. 5. 97 p. 28 p. 250 p. 6. 39 p.

More from this user


PreviousNext 1. 313 p. 58 p. 346 p. 2. 8 p. 124 p.

8:00 PM

Recent Readcasters Add a Comment

Upload a Document Search Documents how much 25m Follow Us! scribd.com/scribd twitter.com/scribd facebook.com/scribd About Press Blog Partners Scribd 101 Web Stuff Support FAQ Developers / API Jobs Terms Copyright Privacy Copyright 2012 Scribd Inc. Language: English

UnitQuantityRate RsCost RsRef.toM output = 1 cum

ot less than 40kgcum1.00 input#V

ut#VALUE!L-12Masonday0.35 inp +b+c+d)

output = 1 cum E!#VALUE!#VALUE!

output = 1 cum

gregate of required sizecum1.20 in

ut#VALUE!L-12Mazdoor (Skilled)d +b+c+d)

output = 10 sqm.

ut#VALUE!L-12Mazdoorday0.30 in

VALUE!M-181#VALUE! ng Pitching onslopes laid over prep M15 Rate as per itemNo. 12.8 (A) ng Filter materialunderneath pitchin r required for trimming of slope to

xtile filter betweenpitching and em ges @ input on(a+b)

UnitQuantityRate RsCost RsRef.toM 10 sqm = a+b+c+d#VALUE! +b+c+d)/10

n15.82505A output = 1 cum E!#VALUE!cum0.33 #VALUE!#VA

put#VALUE!M-003Stone Spallscu

ut#VALUE!L-12Masonday0.50 inp +b+c+d+e+f)

ncrete blocks Grade M15 E!#VALUE!cum0.33 #VALUE!#VA

ble Flooring output = 1 cum

put#VALUE!M-003Stone Spallscu actor's profit @ input on(a+b+c)250 protection can either be indry rub ng Flooring completeas per drawing 2.6 sub-analysis) excluding OH & concrete bedding(M15 Nominal mi 1 per cent of cost to account forex ges @ input on(a+c+d)f) Contractor mortar for laying and fillingof joints

UnitQuantityRate RsCost RsRef.toM ut#VALUE!L-12Masonday0.50 inp +b+c+d)

n cement mortar (1:3)Coursed rubb E!#VALUE!

e Grade M15 E!#VALUE!

Output = 1 cum

put#VALUE!M-003Stone Spallscu

ut#VALUE!L-12Masonday0.25 inp +b+c+d)

for Retaining Earth

ut#VALUE!L-12Mazdoorday5.00 in

(b) for trimming andpreparation o ges @ input on(a+b)d) Contractor's e same as per item No. 12.7 (A)inc

M15 Rate as per itemNo. 12.8 (A) ble Apron :Construction of flexibleap cost of (a+b) fortrimming and pre ges @ input on(a+b)d) Contractor's nstruction of a gabianstructure for

x 3 x 0.6 = 12.60cum

UnitQuantityRate RsCost RsRef.toM VALUE!M-102cum12.60 input#VA b+c+d)/12.60

ut#VALUE!L-12Mazdoorday2.50 in

VALUE!M-102cum6.00 input#VAL b+c+d)/6.00

wire crates of meshsize 100 mm x ges @ input on(a+b)d) Contractor's en wire crate rolls havebeen cons an Structure for Erosion Control,Riv nstructing gabianstructures for ero x 1 x 0.3 x 10 Nos. =6.00 cum wire crates of meshsize 100 mm x

ges @ input on(a+b)d) Contractor's en wire crate rolls havebeen cons

REPAIR AND REHABILITATIO

UnitQuantityRate RsCost Rs16.1280 kness 75 mm)Taking output = 10 s

ut#VALUE!L-12Mazdoor day1.00

ALUE! Tractor-trolley.hour0.50 inp +b+c+d)/10

g output = 10 sqm

ut#VALUE!L-12Mazdoor day0.75

ALUE! Tractor-trolley.hour0.40 inp +b+c+d)/10

g output = 1 sqm ess 25 mm

#VALUE!#VALUE!Graded sandcu

ut#VALUE!L-12Masonday0.04 inp

ALUE!#VALUE!#VALUE! +b+c+d+e)

c.Remark s/ Inputref.Removal of ex 250 cfm with pneumaticbreaker/jac ges @ input ond) Contractor's profit

250 cfm with pneumaticP&M-P&M ges @ input ond) Contractor's profit mesh 50mm x 50mm size of 3mm ges @ input one) Contractor's profit

UnitQuantityRate RsCost RsRef.toM king output = 1 No.

input#VALUE!M-129#VALUE!

ut#VALUE!L-12Mazdoor (Skilled) +b+c+d)

nt Grout utput = 1 kg

g 10 per cent wastagekg1.10 #VAL

ut#VALUE!L-12Mazdoor (Skilled)d

ALUE!M-111#VALUE!#VALUE! b+c+d+e)

(1:1) Grouting utput = 1 kg

g 10 per cent wastagekg0.55 #VAL

ut#VALUE!L-12Mazdoor (Skilled)d

ALUE!M-111#VALUE!#VALUE! erting nipples withapproved fixing co ompound andconsumables @ 15 p ges @ input on(a+b)d) Contractor's xtures (anti shrinkage compound) ges @ input on(a+b+c)e) Contracto

5/1500Admixtures (anti shrinkage ges @ input on(a+b+c)e) Contracto

st RsRef.toMoRTHSpec.Remark s/

1.00 input#VALUE!M-003Stone sp

day0.35 input#VALUE!L-11Mazdo

ecum1.20 input#VALUE!M-012

or (Skilled)day0.25 input#VALUE!

orday0.30 input#VALUE!L-13Maz

id over prepared filter mediaincludin No. 12.8 (A)Item12.8 (A)Add 2 per neath pitching in slopescomplete as of slope to proper profile and prep

hing and embankment slopes on w

st RsRef.toMoRTHSpec.Remark s/ ALUE!

VALUE!#VALUE!#VALUE!

ne Spallscum0.20 input#VALUE!M

day0.50 input#VALUE!L-11day1.5

VALUE!#VALUE!#VALUE!

ne Spallscum0.20 input#VALUE!M n(a+b+c)2504.4 be indry rubble masonry in case of per drawing and Technicalspecifica uding OH & CPItem12.6 (A) Nominal mix) vide Item 12.8 (A)exc ccount forexcavation for preparatio ) Contractor's profit @ input on(a+c llingof joints.Concrete Grade M15

st RsRef.toMoRTHSpec.Remark s/ day0.50 input#VALUE!L-11mazdo

oursed rubble masonry (1st sort)

ne Spallscum0.20 input#VALUE!M

day0.25 input#VALUE!L-11Mazdo

orday5.00 input#VALUE!L-13Maz

eparation of base. Contractor's profit @ input on(a+b+c . 12.7 (A)including OH & CP

No. 12.8 (A) including OH & CPItem of flexibleapron 1 m thick comprisin ing and preparation of bed. Contractor's profit @ input on(a+b+c tructure for retaining earth with se

st RsRef.toMoRTHSpec.Remark s/ 60 input#VALUE!M-003Stone spal

orday2.50 input#VALUE!L-13Maz

0 input#VALUE!M-003Stone spalls

e 100 mm x 100 mm woven with4 Contractor's profit @ input on(a+b+c ebeen considered in the rate analy Control,River Training Works and P ures for erosion control, river train 00 cum e 100 mm x 100 mm woven with4

Contractor's profit @ input on(a+b+c ebeen considered in the rate analy

ABILITATION

st Rs16.12809 utput = 10 sqm

or day1.00 input#VALUE!L-13

hour0.50 input#VALUE!#VALUE!#

or day0.75 input#VALUE!L-13

hour0.40 input#VALUE!#VALUE!#

ded sandcum0.04 input#VALUE!M

day0.04 input#VALUE!L-11Mazdo

emoval of existing cement concretew cbreaker/jack hammer along witha actor's profit @ input onRemoval of

cP&M-P&Mactor's profit @ input onGuniting co size of 3mmAccelerator compound actor's profit @ input on

st RsRef.toMoRTHSpec.Remark s/

VALUE!

or (Skilled) labour for drillingday0.

g1.10 #VALUE!#VALUE!#VALUE

or (Skilled)day0.10 input#VALUE!

#VALUE!

g0.55 #VALUE!#VALUE!Sand inc

or (Skilled)day0.10 input#VALUE!

#VALUE! ved fixing compound afterdrilling ho bles @ 15 per cent of cost of nipp Contractor's profit @ input on(a+b+c compound)@ 20 per cent of cost e) Contractor's profit @ input on(a+b

ti shrinkage compound)@ 20 per e) Contractor's profit @ input on(a+b

.Remark s/ Inputref.15.42504ASton

03Stone spalls of minimum 25 mm

!L-11Mazdoorday0.75 input#VALU

E!M-012

ut#VALUE!L-15Mazdoor *day1.00

E!L-13Mazdoor (Skilled)day0.10 i

mediaincluding boulder apron laid dr A)Add 2 per cent of cost to accoun complete as per drawing and Techn file and preparation of bed.

slopes on whichpitching is laid to

.Remark s/ Inputref.

ut#VALUE!M-008

!L-11day1.50 input#VALUE!L-13#

ut#VALUE!M-008

y in case of dry rubblepitching or p nicalspecifications laid over cement 6 (A) 12.8 (A)excluding OH & CP . Quan or preparation of bed.Mazdoor (for nput on(a+c+d+e) Grade M15 block. (Rate as perite

.Remark s/ Inputref. !L-11mazdoorday1.50 input#VALU

(1st sort)

ut#VALUE!M-008

!L-11Mazdoorday1.00 input#VALU

E!L-13Mazdoor (Skilled)day2.00 i

put on(a+b+c)15.102507.2Curtain w & CP

OH & CPItem12.8 (A)Other items l ck comprising of loosestone boulde

put on(a+b+c)15.122503.3 arth with segmentsof wire crates o

.Remark s/ Inputref. 3Stone spalls of minimum size 25

E!L-13Mazdoor (Skilled)day1.00 i

Stone spalls of minimum size 25 m

woven with4mm dia. GI wire in roll put on(a+b+c) e rate analysis. Incase readymade Works and Protectionworks ol, river trainingworks and protectio

woven with4mm dia. GI wire in roll

put on(a+b+c) e rate analysis. Incase readymade

UE!L-13

!#VALUE!#VALUE!Cost for 10 sq

UE!L-13

!#VALUE!#VALUE!Cost for 10 sq

t#VALUE!M-005kg2.00 input#VAL

!L-11Mazdoorday0.14 input#VALU

nt concretewearing coat including i along withaccessories.P&M-001P Removal of existing asphaltic wear

Guniting concrete surface with cem r compound for guniting @ 4per c

.Remark s/ Inputref.16.42800

drillingday0.08 input#VALUE!L-15d

UE!#VALUE!

ut#VALUE!L-15Mazdoor day0.10

UE!Sand including 10 per cent was

ut#VALUE!L-15Mazdoor day0.10

terdrilling holes for grouting as perT cost of nippleMazdoor (Skilled) lab put on(a+b+c)Sealing of cracks/poro ent of cost of cementGrout pump input on(a+b+c+d)

d)@ 20 per cent of cost of cementG input on(a+b+c+d)

42504AStone/Boulder

mum 25 mm sizecum0.20 input#V

input#VALUE!L-13#VALUE!#VAL

or *day1.00 input#VALUE!L-13#V

d)day0.10 input#VALUE!L-15

apron laid dry infront of toe of emban t to account fornominal surface re g and Technicalspecificationc) Over

ng is laid to prevent escape of thee

ALUE!L-13#VALUE!#VALUE!

pitching or pitching with stones in ver cement concertbedding.Rubble

& CP . Quantity shall beadopted as azdoor (for laying stones, filling of

te as peritem No. 12.8 (A) includin

input#VALUE!L-13#VALUE!#VAL

input#VALUE!L-13#VALUE!#VAL

d)day2.00 input#VALUE!L-15

7.2Curtain wall complete as per dra

ther items like excavation for foun tone boulders weighing not less tha

wire crates of size 7 m x 3 m x 0.6

um size 25 mm cum2.52 input#VA

d)day1.00 input#VALUE!L-15

m size 25 mm cum1.20 input#VAL

I wire in rolls of requiredsize.Stone

readymade rolls are not available

nd protection works with wire crat

I wire in rolls of requiredsize to cov

readymade rolls are not available

st for 10 sqm = (a+d+c+d)#VALUE

st for 10 sqm = (a+d+c+d)#VALUE

0 input#VALUE!M-192Epoxykg0.6

input#VALUE!L-13

t including its disposalcomplete as .P&M-001P&Mphaltic wearingcoat comprising of 5

ce with cementmortar applied with ng @ 4per cent of weight of cemen

42800

ALUE!L-15day0.08 input#VALUE!

or day0.10 input#VALUE!L-13

er cent wastagekg0.55 #VALUE!#

or day0.10 input#VALUE!L-13

ting as perTechnical Specifications (Skilled) labour for fixing nipplean cracks/porous concrete byinjection Grout pump with agitator andacces

of cementGrout pump with agitat

.20 input#VALUE!M-008

ALUE!#VALUE!

LUE!L-13#VALUE!#VALUE!

UE!L-15

oe of embankment completeas per l surface reinforcement andfilling ationc) Overhead charges @ input

cape of theembankment material t

ALUE!

h stones in wirecrates or it can be ding.Rubble stone laid in cement m

eadopted as per design ( AssumeRu es, filling of quarry spalls)

(A) including OH & CP.Item12.8 (

ALUE!#VALUE!#VALUE!

ALUE!#VALUE!#VALUE!

UE!L-15

e as per drawingand Technical spec

ion for foundation,filling behind wa not less than40 kg beyond curtain

x 3 m x 0.6 meach divided into 1.5

52 input#VALUE!M-008#VALUE!#

UE!L-15

0 input#VALUE!M-008#VALUE!#V

dsize.Stone boulders with least di

ot available, GIwire 4mm dia. @ 3

th wire cratesof size 2 m x 1 m x 0

dsize to cover 6.00 cum.Stone bo

ot available, GIwire 4mm dia. @ 3

c+d)#VALUE!

c+d)#VALUE!

Epoxykg0.67 input#VALUE!M-095

omplete as per TechnicalSpecificat

mprising of 50 mm thick asphaltic co

applied with compressor aftercleanin ht of cementAdd 2 per cent of cos

ut#VALUE!L-15day0.04 input#VA

UE!L-13

5 #VALUE!#VALUE!#VALUE!

UE!L-13

pecifications includingsubsequent cu ng nippleand sealing inletsMazdoo e byinjection process throughnipple or andaccessories

p with agitator andaccessories

LUE!

mpleteas per drawing and Technical t andfilling of granular material in es @ input on(a+b)d) Contractor's p

nt material through the voids of the

or it can be in PCC M15 nominal m n cement mortar1:3a) Cement mort

( AssumeRubble stone Flooring thic

P.Item12.8 (A)Add for cement conc

chnical specification

g behind wall, filter media, weep h ond curtain wall.

ded into 1.5 m compartments byc

8#VALUE!#VALUE!Cost for 12.60

#VALUE!#VALUE!Cost for 6.00 cu

with least dimension of 200 mm

mm dia. @ 32 kg per 10 sqm may

m x 1 m x 0.3 m each divided into

m.Stone boulders with least dimen

mm dia. @ 32 kg per 10 sqm may

ALUE!M-095kg0.64 input#VALUE!

alSpecification without causing any

asphaltic concert laid over 12 mm th

aftercleaning surface and spraying cent of cost of material formiscell

4 input#VALUE!L-13#VALUE!#VA

VALUE!

ubsequent cutting/removal andsealin letsMazdoor for cutting and remov roughnipples/Grouting complete as

ssories

d Technicalc) Overhead charges @ material in recessesbetween bloc Contractor's profit @ input on(a+b+c

voids of the stone pitching/cemen

5 nominal mixif cement concert bl Cement mortor 1:3

Flooring thickness300mm and cem

cement concrete bedding (M15Nom

dia, weep holesetc. shall be adde

tments bycross netting, made from

st for 12.60 cum (a+b+c+d)#VALU

t for 6.00 cum (a+b+c+d)#VALUE

200 mm

0 sqm may beprovided. In that cas

divided into1m compartments by least dimension of 200 mm

0 sqm may beprovided. In that cas

ut#VALUE!M-180#VALUE!

causing anydetrimental effect to an

ver 12 mm thick mastic asphalt inclu

and spraying withepoxy complete as al formiscellaneous consumables l

VALUE!#VALUE!#VALUE!

val andsealing of the hole as necess g and removing of nipplesAdd 10 p complete as perTechnical Specifica

d charges @ input ond) Contractor's etween blocks. ut on(a+b+c)

hing/cement concrete blocksas w

nt concert block have been used fo

mm and cement concrete bedding

ng (M15Nominal mix) vide Item 12

all be added separately as perapp

g, made from 4 mm galvanisedstee

+c+d)#VALUE!

+d)#VALUE!

. In that case 2 per cent of thecos

rtments by cross netting, madefro

0 mm

. In that case 2 per cent of thecos

effect to any part of thebridge struc

asphalt including disposal withall lift

complete as per TechnicalSpecifica nsumables likenozzles, wire brush

le as necessary of nipples after com lesAdd 10 per cent of labour cost al Specification.

Contractor's profit @ input onCeme

blocksas well as Permeable synth to allow free mov

een used forpitching . Rates for to

e bedding

vide Item 12.8 (A)including OH & C

y as perapproved design.

vanisedsteel wire @ 32 kg per 10

nt of thecost of GI wire may be ad

g, madefrom 4 mm galvanised ste

nt of thecost of GI wire may be ad

bridge structure and removal of dis

sal withall lift and lead upto 1000 m.

calSpecification wire brush, cotton waste etc.Com P&M

es after completion of grouting labour cost fordrilling holes etc

put onCement Concrete Blocks of s

ow free movement of waterwithout eable synthetic geotextileincluding

Rates for toe wall can be adopted

ding OH & CP. Quantity shall bead

2 kg per 10 sqm havingminimum t

may be added for weaving

lvanised steel wire @ 32 kgper 10

may be added for weaving

moval of dismantled material with a

pto 1000 m.

ste etc.Compressor with guniting e P&M-076

grouting oles etc

e Blocks of size0.3x0.3 x0.3 m cast

waterwithout creating any uplift hea tileincluding 5 per cent for overlap

be adoptedfrom respective clause

y shall beadopted as per design (

gminimum tensile strength of 300

32 kgper 10 sqm having minimum

terial with all lifts and

th guniting equipmentalong with a

x0.3 m cast in cement concreteof G

ny uplift head on the for overlap andwastage

ctive clauses depending uponapp

per design ( AssumeCement Conc

ngth of 300 Mpaconforming to IS:2

ng minimum tensilestrength of 300

along with accessories

oncreteof Grade M15

ge

ng uponapproved design. The rate

ement Concrete blocks thickness3

ming to IS:280 and galvanizingcoa

ngth of 300 Mpa conforming to IS

gn. The rate for excavationfor foun

thickness300mm and cement con

vanizingcoating conforming to IS:

rming to IS:280and galvanizing co

tionfor foundation, dry rubble mas

cement concrete bedding Item12.8

rming to IS:4826, woven intomesh

lvanizing coating conforming toIS:

rubble masonry and PCCM15 hav

ding Item12.8 (A)Add 1 per cent of c

en intomesh with double twist, mes

orming toIS:4826, woven into mes

CCM15 have been analysed and

per cent of cost to account forexca

e twist, mesh size notexceeding 1

en into mesh with double twist,me

alysed and given in

ount forexcavation for preparation

exceeding 100 x 100 mm, filled wit

ble twist,mesh size not exceeding

preparation of bed.Construction of

m, filled with

exceeding 100 mm x 100mm, fille

struction of dry rubble flooring at c

100mm, filled with boulders with le

flooring at crossdrainage works fo

ders with least

ge works for relatively less importa

less importantworks.