Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Backfill over tunnel roof along alignment

Calculation of Backfill Depth along Tunnel Alignment:


Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Ground Level (GL) 215.844 215.762 215.895 215.947 219.163 216.411 216.228 216.388 216.008 215.926 216.019 215.983 215.908 Rail Level (RL) 207.62 207.485 207.285 207.085 206.959 207.052 207.322 207.607 207.893 208.463 208.749 208.034 209.319 Average GL 216.268 216.268 216.268 216.268 216.268 216.268 216.268 216.268 216.268 216.268 216.268 216.268 216.268 = = = = = Avg.GL-RL 8.648 8.783 8.983 9.183 9.309 9.216 8.946 8.661 8.375 7.805 7.519 8.234 6.949 Earth Filling Depth 2.698 2.833 3.033 3.233 3.359 3.266 2.996 2.711 2.425 1.855 1.569 2.284 0.999

Height from the Rail Level to Soffit of Roof Slab Thickness of Roof Slab The chainage of design section Average ground level at design chainage Rail level at design chainage

5.35 m 0.6 m m m m

216.008 207.893

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Support Spring Constants for STAAD Analysis

Calculations for Support Spring Constants at different Nodes


Subgrade modulus of soil below the foundation, k = (from sub-soil investigation data)
3 5100 kN/m

The tunnel structure is modeled in STAAD as 2D frame for per meter length of the tunnel. S.N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Nodes Nos.
55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 57

Dist. B/W Nodes (m) 0 -0.275 0.000 0.275 0.575 1.075 1.575 2.075 2.575 3.175 3.675 4.175 4.675 5.100 5.400 5.550 5.700 6.000 6.500 7.000 7.500 7.925 8.425 8.925 9.425 9.925 10.525 10.825 11.100 11.375 0

Dist. Effective (in m)


0.138 0.275 0.288 0.400 0.500 0.500 0.500 0.550 0.550 0.500 0.500 0.463 0.363 0.225 0.150 0.225 0.400 0.500 0.500 0.463 0.463 0.500 0.500 0.500 0.550 0.450 0.288 0.275 0.138

Spring Constant (k*Dist. Effective)


701 1403 1466 2040 2550 2550 2550 2805 2805 2550 2550 2359 1849 1148 765 1148 2040 2550 2550 2359 2359 2550 2550 2550 2805 2295 1466 1403 701

X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 0 0.275 0.575 1.075 1.575 2.075 2.575 3.175 3.675 4.175 4.675 5.1 5.4 5.55 5.7 6 6.5 7 7.5 7.925 8.425 8.925 9.425 9.925 10.525 10.825 11.1 0 0 0 0 0 5.55 5.55 5.55 5.55 5.55 11.1 11.1 11.1 11.1 11.1 0 0.275 0.775 2.775 4.9 5.4 5.55 5.7 6.2 10.325 10.825

Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4

Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

X 0 0.275 0.575 1.075 1.575 2.075 2.575 3.175 3.675 4.175 4.675 5.1 5.4 5.55 5.7 6 6.5 7 7.5 7.925 8.425 8.925 9.425 9.925 10.525 10.825 11.1 0 0 0 0 0 5.55 5.55 5.55 5.55 5.55 11.1 11.1 11.1 11.1 11.1 0 0.275 0.775 2.775 4.9 5.4 5.55 5.7 6.2 10.325 10.825

diff 0.275 0.3 0.5 0.5 0.5 0.5 0.6 0.5 0.5 0.5 0.425 0.3 0.15 0.15 0.3 0.5 0.5 0.5 0.425 0.5 0.5 0.5 0.5 0.6 0.3 0.275

Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4

d5ff

0.3 0.3 5 0.5 0.3 0.3 0.3 5 0.5 0.3 0.3 0.3 5 0.5 0.3

0 0.275 0.5 2 2.125 0.5 0.15 0.15 0.5 4.125 0.5

54

11.1

6.4

54

11.1

0.275

6.4

Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis

Design Data: Average Ground Level at Design Section, GL Ground Water Table below the ground level Ground Water Table at RL, GWT Total Height of Cut & Cover Tunnel Rail Level at the Design Section, RL Height of Rail above the Base Slab Roof Slab Thickness Base Slab Thickness External Wall Thickness Internal Wall Thickness Clear Height of the tunnel (internal clearance) Founding Level / Bottom of Base Slab Level Top of Roof Slab Level Thickness of Earthfill over Roof Slab Density of Reinforced Concrete Density of Plain Cement Concrete

= = = = = = = = = = = = = = = =

216.008 0.000 216.008 7.000 207.893 0.450 0.600 0.600 0.550 0.300 5.800 206.843 213.843 2.165

m m m m m m m m m m m m m m

3 24 kN/m 3 22 kN/m

Dry Density of Soil, gdry Saturated Bulk Density of Soil, gsat Submerged Density of Soil, gsub Unit weight of Water, gwater Angle of internal friction of soil, f Angle of wall friction, d Cohesion, C At rest earth pressure co-efficient, K0 Active earth pressure co-efficient, Ka

= = = = = = = = =

20.000 20.000 10.190 9.810 30.000 20.000 0.500 0.279

kN/m3 kN/m
3

kN/m3 kN/m3 0 kN/m2

Project: Part: Subject: L/C - 1

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis

Self Welght: Density of reinforced concrete is considered as 24 kN/m3 The Self Weight is applied in the STAAD software by the "Self Weight" command.

L/C - 2

Statically Imposed Dead Load (SIDL): Dead load due to rail track on base slab (Second Stage concrete) 450 mm thick second stage concrete is considered for dead load calculation purpose which includes 370 mm thick Secondary stage concrete and equivalent weight of 80mm thick concrete as weight of rail and its fixtures. Load intensity = 0.45 x 22 = 9.9 kN/m
2

L/C - 3

Soil Backfill Load: Thickness of backfill over the roof slab Density of Backfill Considered Backfill load at top of slab = = = 2.165 m 3 20 kN/m 43.3 KN/m

L/C - 4

Live Load on Concourse and Platform: There is no concourse and platform inside the cut & cover tunnel section. The live load is considered as =

2 0 kN/m

L/C - 5

Train Live Load on Base Slab:


2 The live load due to train is considered as 15 kN/m over top of base slab. As the tunnel section is modeled for 1m width only, the UDL on base slab =

15 kN/m

Lateral Earth Pressure: Lateral earth pressures on structural wall are calculated corresponding to following values of coefficient of lateral earth pressure. i) Coefficient of lateral earth pressure at rest = 0.5 ii) Coefficient of lateral earth pressure during active stage = 0.279 Lateral earth pressures shown below are at top of roof slab and at bottom of base slab. Dry Density of Soil, gdry Saturated Bulk Density of Soil, gsat Submerged Density of Soil, gsub = = = 20 kN/m 3 20 kN/m
3 10.19 kN/m 3

L/C - 6

Lateral Earth Pressure at Submerged Condition (Water Table at GL), K 0 = 0.05 At rest earth pressure condition.

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis

Earth Pressure at top of tunnel roof = K0 x gsub x (GL - Top of Roof level) = 0.5 x 10.19 x (216.008 - 213.843)

11.031 kN/m

Earth Pressure at bottom of tunnel base slab = K0 x gsub x (GL - Bottom of Base Slab) = 0.5 x 10.19 x (216.008 - 206.843) =

46.696 kN/m

L/C - 7

Lateral Earth Pressure at Submerged Condition (Water Table at GL), K a = 0.279 Active earth pressure condition. Earth Pressure at top of tunnel roof = Ka x gsub x (GL - Top of Roof level) = 0.279 x 10.19 x (216.008 - 213.843)

6.155 kN/m

Earth Pressure at bottom of tunnel base slab = Ka x gsub x (GL - Bottom of Base Slab) = 0.279 x 10.19 x (216.008 - 206.843) =

26.056 kN/m

L/C - 8

Lateral Earth Pressure at Saturated Condition, K0 = 0.05 At rest earth pressure condition. Earth Pressure at top of tunnel roof = K0 x gsat x (GL - Top of Roof level) = 0.5 x 20 x (216.008 - 213.843)

21.650 kN/m

Earth Pressure at bottom of tunnel base slab = K0 x gsat x (GL - Bottom of Base Slab) = 0.5 x 20 x (216.008 - 206.843) =

91.650 kN/m

L/C - 9

Lateral Earth Pressure at Saturated Condition , Ka = 0.279 Active earth pressure condition. Earth Pressure at top of tunnel roof = Ka x gsat x (GL - Top of Roof level) = 0.279 x 20 x (216.008 - 213.843)

12.081 kN/m

Earth Pressure at bottom of tunnel base slab = Ka x gsat x (GL - Bottom of Base Slab) = 0.279 x 20 x (216.008 - 206.843) =

51.141 kN/m

L/C - 10

Vertical Surcharge Load (on Roof Slab) Vertical Surcharge load of 20 kN/m2 on normal ground level (vertical only) for roof slab only.

L/C - 11

Lateral Surcharge Load on Wall (Towards Right), K 0 = 0.5 Vertical Surcharge Load at Ground Level is considered as= Earth pressure co-efficient =
2 24 kN/m 0.5

(infinite extent considered)

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis = 0.5 x 24 =
2 12 kN/m

Lateral earth pressure on Wall

L/C - 12

Lateral Surcharge Load on Wall (Towards Left), K 0 = 0.5 Vertical Surcharge Load at Ground Level is considered as= Earth pressure co-efficient = Lateral earth pressure on Wall = 24 kN/m 0.5 0.5 x 24 =
2

(infinite extent considered)

12 kN/m

L/C - 13

Lateral Surcharge Load on Wall (Both Sides), K 0 = 0.5 Vertical Surcharge Load at Ground Level is considered as= Earth pressure co-efficient = Lateral earth pressure on Wall =
2 24 kN/m 0.5

(infinite extent considered)

0.5 x 24

2 12 kN/m

L/C - 14

Water Pressure on Walls (Hydrostatic Pressure) Water Table at Level, GWT Top of Roof Slab Bottom of Base Slab Unit weight of Water, gwater = = = = 216.008 213.843 206.843 9.81 m m m kN/m3

Water Pressure at top of tunnel roof = gwater x (GWT - Top of Roof level) = 9.81 x (216.008 - 213.843) =
2 21.239 kN/m

Water Pressure at bottom of base slab = gwater x (GWT - Bottom of Base slab) = 9.81 x (216.008 - 206.843) = 89.909 kN/m
2

L/C - 15

Uplift Water Pressure on the Base Slab Uplift Pressure = 9.81 x (216.008 - 206.843) =
2 89.909 kN/m

L/C - 16

Racking Force (Towards Right) The racking force is applied on the structure by applying a racking displacement calculated by Free Field Deformation of the soil. The detail calculation for the racking displacement is attached. The racking displacement is calculated as = 3.6624 mm (towards right)

L/C - 17

Racking Force (Towards Left)

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis

The racking force is applied on the structure by applying a racking displacement calculated by Free Field Deformation of the soil. The detail calculation for the racking displacement is attached. The racking displacement is calculated as = 3.6624 mm (towards left)

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement

Introduction: Evaluation of Free Field Raking effect on under ground structures due to earth quake. For Raking only the free field deformation is considered ignoring the soil structure interaction. This assumption is on conservative side. The effect of soil structure interaction is to decrease the raking effect but even for very soft soil, this reduction is of the order of 15% only.

Main References: 1. Hashash, Y.M.A., Hook, J.A., Schmidt, B., Yao, J., "Seismic Design and analysis of Underground Structures". 2. Wang, J., "Seismic Design of Tunnels". 3. Kuesel, R.K., "Earthquake design criteria for subways". 4. Macormick. Data: Overall height of tunnel, H = Height of earth fill over roof = Gravitational Acceleration, g =

7 m= 2.165 m 2 9.807 m/sec =

7000 mm 980.7 m/sec


2

2.0 SEISMIC PARAMETRS 2.1 Peak Ground Acceleration (amax): MDE (Max Design Earthquake) or MCE (Max Considered Earthquake) = 0.24 x g = = Z 0.24 =

980.7 2 235.368 cm/sec

From IS:1893-2002:
Zone

II III IV V

Z 0.1 0.16 0.24 0.36

(From DMRC) Intensity MSK64 VI or less low moderate VII VIII severe IX or more very severe

Seismic Zone =

IV

ODE (Operating Design Earthqake) or DBE (Design Basis Earthquke) = 0.12 x g =

= Z/2 0.12 =

980.7 117.684 cm/sec2

2.2 Peak Ground Acceleration at Depth (as): Overall height of tunnel, H = 7 Height of earth fill over roof = 2.165 Therefore, Depth of Tunnel (C.G. from the GL) = Depth factor considered as 1 from the table below as = 1 x amax = 1.0 m m 2.165 + 7 / 2 =

5.665 m

0.24 =

0.24

Table 4 of Ref 1 Tunnel Depth(m) Ratio of ground motion at tunnel depth to motion at IS :1893-1984 for info only

Project: Part: Subject: Depth, d = <or =6 6 t0 15 15 to 30 >30 5.665 m

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement ground surface 1 0.9 0.8 0.7 depth 0 ratio 1

30

0.5

2.3 Peak Ground Velocity(Vs): Table 2 of Ref 1 Moment Magnitude Mw (Ref 4) Rock 6.5 7.5 8.5 Stiff Soil 6.5 7.5 8.5 Soft Soil 6.5 7.5 8.5 Ratio Vs (cm/sec) / amax (g) = Ratio Vs(cm/sec)/amax(g) Source - to - Site Distance (Km) 0-20 20-50 2 3 66 97 127 76 109 140 109 Derived from Vs

Range of Share Velocity (m/sec) 50-100 4 >750 86 97 152 200-750

94 140 180

102 127 188

109 155 193 <200

140 208 269

132 165 244 100 km 30 nos. STIFF SOIL 4 6.5 =

142 201 251

Source to Site distance considered = SPT of sub soil, N = Soil Type of the Site Data from column of table Moment Magnitude, Mw = Ratio Vs(cm/sec)/amax (g) from the table Vs = Ratio * amax (g) =

109 0.2616 m/sec

26.16 cm/sec =

3.0 ESTIMATION OF FREE - FIELD DEFORMATION 3.1 Max free-field shear of sub-strata (Ymax): Ymax = Vs/Cm

Where Cm = Effective Shear Wave propagation velocity (refer eq 4-2 of ref 2) =(Gm/r)^0.5 Where Gm = Effective shear modulus of strata r = mass density of ground or use Table 1 Ref 3 given below

3.2 Corresponding free-field deflection (dmax) for MCE/MDE (2*DBE) without applying importence factor dmax = Ymax * H

3.3 Earthquake effects for DBE/ODE as per IS:1893-2002 Z/2 = 0.12g

Project: Part: Subject: Importence factor (IF) = Hence A = Z/2 * IF =

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement 1.5 0.18 g

4.0 STAAD Modelling for estimation of Raking Force Next step of Seismic Design of Underground Structure is the establishment of raking forces. Raking force is the load required to generate the deflection estimated above. Table 1 of Ref 3 Shear Velocity feet/sec m/sec

Soil Classification

Soil Type Shear Velocity=

SILTY SAND 500

Compact granular Soil Silty Sand medium Clay Soft Clay Vs = Ratio * amax (g) = Assume Cm = Hence Ymax (Strain per m Height) Vs/Cm = Therefore, raking to be applied in STAAD, dmax = Ymax * H =

1000 500 200 100 0.2616 m/sec 500 m/sec 0.00052

304.8 152.4 60.96 30.48

3.6624 mm

Project: Part: Subject:

DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement

Active Pressure Due to Earthfill


Pa=.5*w*h^2*Ca 209.5632 180.1926

Pa=active pressure in kg/m of length of wall w=unit weight of soil in kg/m^3 h=height of wall in m

20 7

Ca=(

(1v) cos^2(--) coscos^2cos(++)


1.056 0.908 0.405

)x (

1
0.42768 0.36774 0.075 0.15 30 7.95 0 0 20 0.296893 g g

[1+ {sin(+)sin(-i-)/cos(-i)cos(++

v= h= = = = i= =

vertical seismic co-efficient =.5xh horizontal seismic co-efficient= angle of internal friction of soil h 1+v tan^-1 angle of earth face of the wall makes with thw vertical slope of earthfill angle of friction between the wall and earthfill 0.7981 0.372 ZISa/(2*R*g)