DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Backfill over tunnel roof along alignment
Height from the Rail Level to Soffit of Roof Slab Thickness of Roof Slab The chainage of design section Average ground level at design chainage Rail level at design chainage
5.35 m 0.6 m m m m
216.008 207.893
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Support Spring Constants for STAAD Analysis
The tunnel structure is modeled in STAAD as 2D frame for per meter length of the tunnel. S.N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Nodes Nos.
55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 57
Dist. B/W Nodes (m) 0 -0.275 0.000 0.275 0.575 1.075 1.575 2.075 2.575 3.175 3.675 4.175 4.675 5.100 5.400 5.550 5.700 6.000 6.500 7.000 7.500 7.925 8.425 8.925 9.425 9.925 10.525 10.825 11.100 11.375 0
X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 0 0.275 0.575 1.075 1.575 2.075 2.575 3.175 3.675 4.175 4.675 5.1 5.4 5.55 5.7 6 6.5 7 7.5 7.925 8.425 8.925 9.425 9.925 10.525 10.825 11.1 0 0 0 0 0 5.55 5.55 5.55 5.55 5.55 11.1 11.1 11.1 11.1 11.1 0 0.275 0.775 2.775 4.9 5.4 5.55 5.7 6.2 10.325 10.825
Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4
Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
X 0 0.275 0.575 1.075 1.575 2.075 2.575 3.175 3.675 4.175 4.675 5.1 5.4 5.55 5.7 6 6.5 7 7.5 7.925 8.425 8.925 9.425 9.925 10.525 10.825 11.1 0 0 0 0 0 5.55 5.55 5.55 5.55 5.55 11.1 11.1 11.1 11.1 11.1 0 0.275 0.775 2.775 4.9 5.4 5.55 5.7 6.2 10.325 10.825
diff 0.275 0.3 0.5 0.5 0.5 0.5 0.6 0.5 0.5 0.5 0.425 0.3 0.15 0.15 0.3 0.5 0.5 0.5 0.425 0.5 0.5 0.5 0.5 0.6 0.3 0.275
Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 0.3 0.6 5.6 6.1 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4
d5ff
0.3 0.3 5 0.5 0.3 0.3 0.3 5 0.5 0.3 0.3 0.3 5 0.5 0.3
54
11.1
6.4
54
11.1
0.275
6.4
Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis
Design Data: Average Ground Level at Design Section, GL Ground Water Table below the ground level Ground Water Table at RL, GWT Total Height of Cut & Cover Tunnel Rail Level at the Design Section, RL Height of Rail above the Base Slab Roof Slab Thickness Base Slab Thickness External Wall Thickness Internal Wall Thickness Clear Height of the tunnel (internal clearance) Founding Level / Bottom of Base Slab Level Top of Roof Slab Level Thickness of Earthfill over Roof Slab Density of Reinforced Concrete Density of Plain Cement Concrete
= = = = = = = = = = = = = = = =
216.008 0.000 216.008 7.000 207.893 0.450 0.600 0.600 0.550 0.300 5.800 206.843 213.843 2.165
m m m m m m m m m m m m m m
3 24 kN/m 3 22 kN/m
Dry Density of Soil, gdry Saturated Bulk Density of Soil, gsat Submerged Density of Soil, gsub Unit weight of Water, gwater Angle of internal friction of soil, f Angle of wall friction, d Cohesion, C At rest earth pressure co-efficient, K0 Active earth pressure co-efficient, Ka
= = = = = = = = =
kN/m3 kN/m
3
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis
Self Welght: Density of reinforced concrete is considered as 24 kN/m3 The Self Weight is applied in the STAAD software by the "Self Weight" command.
L/C - 2
Statically Imposed Dead Load (SIDL): Dead load due to rail track on base slab (Second Stage concrete) 450 mm thick second stage concrete is considered for dead load calculation purpose which includes 370 mm thick Secondary stage concrete and equivalent weight of 80mm thick concrete as weight of rail and its fixtures. Load intensity = 0.45 x 22 = 9.9 kN/m
2
L/C - 3
Soil Backfill Load: Thickness of backfill over the roof slab Density of Backfill Considered Backfill load at top of slab = = = 2.165 m 3 20 kN/m 43.3 KN/m
L/C - 4
Live Load on Concourse and Platform: There is no concourse and platform inside the cut & cover tunnel section. The live load is considered as =
2 0 kN/m
L/C - 5
15 kN/m
Lateral Earth Pressure: Lateral earth pressures on structural wall are calculated corresponding to following values of coefficient of lateral earth pressure. i) Coefficient of lateral earth pressure at rest = 0.5 ii) Coefficient of lateral earth pressure during active stage = 0.279 Lateral earth pressures shown below are at top of roof slab and at bottom of base slab. Dry Density of Soil, gdry Saturated Bulk Density of Soil, gsat Submerged Density of Soil, gsub = = = 20 kN/m 3 20 kN/m
3 10.19 kN/m 3
L/C - 6
Lateral Earth Pressure at Submerged Condition (Water Table at GL), K 0 = 0.05 At rest earth pressure condition.
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis
Earth Pressure at top of tunnel roof = K0 x gsub x (GL - Top of Roof level) = 0.5 x 10.19 x (216.008 - 213.843)
11.031 kN/m
Earth Pressure at bottom of tunnel base slab = K0 x gsub x (GL - Bottom of Base Slab) = 0.5 x 10.19 x (216.008 - 206.843) =
46.696 kN/m
L/C - 7
Lateral Earth Pressure at Submerged Condition (Water Table at GL), K a = 0.279 Active earth pressure condition. Earth Pressure at top of tunnel roof = Ka x gsub x (GL - Top of Roof level) = 0.279 x 10.19 x (216.008 - 213.843)
6.155 kN/m
Earth Pressure at bottom of tunnel base slab = Ka x gsub x (GL - Bottom of Base Slab) = 0.279 x 10.19 x (216.008 - 206.843) =
26.056 kN/m
L/C - 8
Lateral Earth Pressure at Saturated Condition, K0 = 0.05 At rest earth pressure condition. Earth Pressure at top of tunnel roof = K0 x gsat x (GL - Top of Roof level) = 0.5 x 20 x (216.008 - 213.843)
21.650 kN/m
Earth Pressure at bottom of tunnel base slab = K0 x gsat x (GL - Bottom of Base Slab) = 0.5 x 20 x (216.008 - 206.843) =
91.650 kN/m
L/C - 9
Lateral Earth Pressure at Saturated Condition , Ka = 0.279 Active earth pressure condition. Earth Pressure at top of tunnel roof = Ka x gsat x (GL - Top of Roof level) = 0.279 x 20 x (216.008 - 213.843)
12.081 kN/m
Earth Pressure at bottom of tunnel base slab = Ka x gsat x (GL - Bottom of Base Slab) = 0.279 x 20 x (216.008 - 206.843) =
51.141 kN/m
L/C - 10
Vertical Surcharge Load (on Roof Slab) Vertical Surcharge load of 20 kN/m2 on normal ground level (vertical only) for roof slab only.
L/C - 11
Lateral Surcharge Load on Wall (Towards Right), K 0 = 0.5 Vertical Surcharge Load at Ground Level is considered as= Earth pressure co-efficient =
2 24 kN/m 0.5
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis = 0.5 x 24 =
2 12 kN/m
L/C - 12
Lateral Surcharge Load on Wall (Towards Left), K 0 = 0.5 Vertical Surcharge Load at Ground Level is considered as= Earth pressure co-efficient = Lateral earth pressure on Wall = 24 kN/m 0.5 0.5 x 24 =
2
12 kN/m
L/C - 13
Lateral Surcharge Load on Wall (Both Sides), K 0 = 0.5 Vertical Surcharge Load at Ground Level is considered as= Earth pressure co-efficient = Lateral earth pressure on Wall =
2 24 kN/m 0.5
0.5 x 24
2 12 kN/m
L/C - 14
Water Pressure on Walls (Hydrostatic Pressure) Water Table at Level, GWT Top of Roof Slab Bottom of Base Slab Unit weight of Water, gwater = = = = 216.008 213.843 206.843 9.81 m m m kN/m3
Water Pressure at top of tunnel roof = gwater x (GWT - Top of Roof level) = 9.81 x (216.008 - 213.843) =
2 21.239 kN/m
Water Pressure at bottom of base slab = gwater x (GWT - Bottom of Base slab) = 9.81 x (216.008 - 206.843) = 89.909 kN/m
2
L/C - 15
Uplift Water Pressure on the Base Slab Uplift Pressure = 9.81 x (216.008 - 206.843) =
2 89.909 kN/m
L/C - 16
Racking Force (Towards Right) The racking force is applied on the structure by applying a racking displacement calculated by Free Field Deformation of the soil. The detail calculation for the racking displacement is attached. The racking displacement is calculated as = 3.6624 mm (towards right)
L/C - 17
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Load Calculation for STAAD Analysis
The racking force is applied on the structure by applying a racking displacement calculated by Free Field Deformation of the soil. The detail calculation for the racking displacement is attached. The racking displacement is calculated as = 3.6624 mm (towards left)
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement
Introduction: Evaluation of Free Field Raking effect on under ground structures due to earth quake. For Raking only the free field deformation is considered ignoring the soil structure interaction. This assumption is on conservative side. The effect of soil structure interaction is to decrease the raking effect but even for very soft soil, this reduction is of the order of 15% only.
Main References: 1. Hashash, Y.M.A., Hook, J.A., Schmidt, B., Yao, J., "Seismic Design and analysis of Underground Structures". 2. Wang, J., "Seismic Design of Tunnels". 3. Kuesel, R.K., "Earthquake design criteria for subways". 4. Macormick. Data: Overall height of tunnel, H = Height of earth fill over roof = Gravitational Acceleration, g =
2.0 SEISMIC PARAMETRS 2.1 Peak Ground Acceleration (amax): MDE (Max Design Earthquake) or MCE (Max Considered Earthquake) = 0.24 x g = = Z 0.24 =
From IS:1893-2002:
Zone
II III IV V
(From DMRC) Intensity MSK64 VI or less low moderate VII VIII severe IX or more very severe
Seismic Zone =
IV
= Z/2 0.12 =
2.2 Peak Ground Acceleration at Depth (as): Overall height of tunnel, H = 7 Height of earth fill over roof = 2.165 Therefore, Depth of Tunnel (C.G. from the GL) = Depth factor considered as 1 from the table below as = 1 x amax = 1.0 m m 2.165 + 7 / 2 =
5.665 m
0.24 =
0.24
Table 4 of Ref 1 Tunnel Depth(m) Ratio of ground motion at tunnel depth to motion at IS :1893-1984 for info only
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement ground surface 1 0.9 0.8 0.7 depth 0 ratio 1
30
0.5
2.3 Peak Ground Velocity(Vs): Table 2 of Ref 1 Moment Magnitude Mw (Ref 4) Rock 6.5 7.5 8.5 Stiff Soil 6.5 7.5 8.5 Soft Soil 6.5 7.5 8.5 Ratio Vs (cm/sec) / amax (g) = Ratio Vs(cm/sec)/amax(g) Source - to - Site Distance (Km) 0-20 20-50 2 3 66 97 127 76 109 140 109 Derived from Vs
94 140 180
Source to Site distance considered = SPT of sub soil, N = Soil Type of the Site Data from column of table Moment Magnitude, Mw = Ratio Vs(cm/sec)/amax (g) from the table Vs = Ratio * amax (g) =
26.16 cm/sec =
3.0 ESTIMATION OF FREE - FIELD DEFORMATION 3.1 Max free-field shear of sub-strata (Ymax): Ymax = Vs/Cm
Where Cm = Effective Shear Wave propagation velocity (refer eq 4-2 of ref 2) =(Gm/r)^0.5 Where Gm = Effective shear modulus of strata r = mass density of ground or use Table 1 Ref 3 given below
3.2 Corresponding free-field deflection (dmax) for MCE/MDE (2*DBE) without applying importence factor dmax = Ymax * H
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement 1.5 0.18 g
4.0 STAAD Modelling for estimation of Raking Force Next step of Seismic Design of Underground Structure is the establishment of raking forces. Raking force is the load required to generate the deflection estimated above. Table 1 of Ref 3 Shear Velocity feet/sec m/sec
Soil Classification
Compact granular Soil Silty Sand medium Clay Soft Clay Vs = Ratio * amax (g) = Assume Cm = Hence Ymax (Strain per m Height) Vs/Cm = Therefore, raking to be applied in STAAD, dmax = Ymax * H =
3.6624 mm
DMRC CC30: Design and construction of underground metro corridor between ch. 3440.493m to 5641.450m Cut & Cover Tunnel Section between chainage ______m to _______m Calculation of Free Field Raking Displacement
Pa=active pressure in kg/m of length of wall w=unit weight of soil in kg/m^3 h=height of wall in m
20 7
Ca=(
)x (
1
0.42768 0.36774 0.075 0.15 30 7.95 0 0 20 0.296893 g g
[1+ {sin(+)sin(-i-)/cos(-i)cos(++
v= h= = = = i= =
vertical seismic co-efficient =.5xh horizontal seismic co-efficient= angle of internal friction of soil h 1+v tan^-1 angle of earth face of the wall makes with thw vertical slope of earthfill angle of friction between the wall and earthfill 0.7981 0.372 ZISa/(2*R*g)