Sei sulla pagina 1di 1

BOP

JOB: REMOVAL OF KOOMEY BOTTLES


TOOLS / MATERIALS USED Procedure POTENTIAL HAZARDS Conditions or Actions Which Could Cause an Injury / Affect Health Wrong tools/ Defective tools

BOP-13
RECOMMENDED SAFE PROCEDURES Personal Protective Devices Special Clothing Procedures

KEY JOB PROCESS STEPS

S/P

RISK

1. Hold Pre-job safety meeting Gather up all tools necessary for the job 2. Lockout/Tag out Accumulator Electric pump from SCR Room. Shut off air to Air pumps and tag out. 3. Place all the Accumulator valves in neutral and open Pressure bleed off line 4. Remove the 9/16" plug at bottom of bottle to relieve possible trapped pressure 5. Unscrew and remove bottles in need of repair

Stress on pinch points, overexertion and possible presence of high pressure. Check all tools before use. ELECTRICAL ISOLATION WP Double check both the pumps are shut off.

Isolation permit

System activating accidentally.

3B

Handles

Residual pressure in system

2B

Check all the valves are in neutral and check pressure gauge on accumulator system to ensure system is bled off. Unscrew slowly to let pressure leak out if present. Stay out of the direction of the plug. Plan removal of bottles to eliminate pinch point positions and overstraining. Have one person stand back to spot personnel keeping hands in pinch point positions.

Hand tools

Plug blowing off while unscrewing. Pinch points and strains due to space constraints. 2C M

Hand Tools

123606478.doc

Jan 2003

Page 1 of 1

Potrebbero piacerti anche